ML16343A194: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16343A194
| number = ML16343A194
| issue date = 10/24/2016
| issue date = 10/24/2016
| title = Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 14, Table 14.1-5 - SGTP Program Input Assumptions for RCS Volumes
| title = Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 14, Table 14.1-5 - Sgtp Program Input Assumptions for RCS Volumes
| author name =  
| author name =  
| author affiliation = Indiana Michigan Power Co
| author affiliation = Indiana Michigan Power Co
Line 15: Line 15:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:I I N N D D I I A A N N A A  A A N N D D  M M I I C C H H I I G G A A N N  P P O O W W E E R R D D.. C C.. C C O O O O K K  N N U U C C L L E E A A R R  P P L L A A N N T T U U P P D D A A T T E E D D  F F I I N N A A L L  S S A A F F E E T T Y Y  A A N N A A L L Y Y S S I I S S R R E E P P O O R R T TRevision:16.6Table:14.1-5 Page:1 of 1UNIT 1DONALD C. COOK NUCLEAR PLANT UNIT 1 SGTP PROGRAM INPUTASSUMPTIONS FOR RCS VOLUMES 1 INITIAL CONDITIONSINPUT ASSUMPTIONS0% SGTP30% SGTPReactor Vessel (ft 3)4643 4643Steam Generators (ft 3 - Total)4357 2 3442 (2)Reactor Coolant Pumps (ft 3 - Total)324 324Loop Piping (ft 3 - Total)1185 1185Surge Line Piping (ft 3)43 43Pressurizer (ft 3)1834 1834Total RCS Volume (ft
: 3) (Ambient Conditions) 12,386 11,471Total RCS Volume (ft 3)(Hot Conditions includes 3% for thermal expansion) 12,758 11,815 1 The volumes presented in this table represent the reactor coolant system volumes from theWestinghouse IMP database SEC-LIS-4428-C3. Note that the volumes documented in thistable are slightly different than those used in the Westinghouse analysis of record, but havebeen evaluated for acceptability as documented in letter AEP-99-485.
2 The SG tube volume is assumed to be 762 ft 3/SG (3048 ft 3 total). The increase in SG tubeplugging from 0% to 30% results in a total reduction in SG tube volume of approximately 915
ft 3. The reduction between the SG tube volume and SG tube plugging is assumed to be a linearrelationship;  e.g. at 15% SGTP, total volume reduction is 0.15*(3048 ft
: 3) = 457.2 ft 3.}}

Latest revision as of 02:45, 8 July 2018

Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 14, Table 14.1-5 - Sgtp Program Input Assumptions for RCS Volumes
ML16343A194
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16343A194 (1)


Text

I I N N D D I I A A N N A A A A N N D D M M I I C C H H I I G G A A N N P P O O W W E E R R D D.. C C.. C C O O O O K K N N U U C C L L E E A A R R P P L L A A N N T T U U P P D D A A T T E E D D F F I I N N A A L L S S A A F F E E T T Y Y A A N N A A L L Y Y S S I I S S R R E E P P O O R R T TRevision:16.6Table:14.1-5 Page:1 of 1UNIT 1DONALD C. COOK NUCLEAR PLANT UNIT 1 SGTP PROGRAM INPUTASSUMPTIONS FOR RCS VOLUMES 1 INITIAL CONDITIONSINPUT ASSUMPTIONS0% SGTP30% SGTPReactor Vessel (ft 3)4643 4643Steam Generators (ft 3 - Total)4357 2 3442 (2)Reactor Coolant Pumps (ft 3 - Total)324 324Loop Piping (ft 3 - Total)1185 1185Surge Line Piping (ft 3)43 43Pressurizer (ft 3)1834 1834Total RCS Volume (ft

3) (Ambient Conditions) 12,386 11,471Total RCS Volume (ft 3)(Hot Conditions includes 3% for thermal expansion) 12,758 11,815 1 The volumes presented in this table represent the reactor coolant system volumes from theWestinghouse IMP database SEC-LIS-4428-C3. Note that the volumes documented in thistable are slightly different than those used in the Westinghouse analysis of record, but havebeen evaluated for acceptability as documented in letter AEP-99-485.

2 The SG tube volume is assumed to be 762 ft 3/SG (3048 ft 3 total). The increase in SG tubeplugging from 0% to 30% results in a total reduction in SG tube volume of approximately 915

ft 3. The reduction between the SG tube volume and SG tube plugging is assumed to be a linearrelationship; e.g. at 15% SGTP, total volume reduction is 0.15*(3048 ft

3) = 457.2 ft 3.