05000293/FIN-2011003-04: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 15: Line 15:
| CCA = H.5
| CCA = H.5
| INPO aspect = WP.1
| INPO aspect = WP.1
| description = The inspectors  identified  a Green NCV of Technical Specification  (TS) 3'7.8.2'f   
| description = The inspectors  identified  a Green NCV of Technical Specification  (TS) 3\'7.8.2\'f   
StanOOV  Gas Treatment System  and Control  Room High Efficiency Air Filtration Syste
StanOOV  Gas Treatment System  and Control  Room High Efficiency Air Filtration Syste
(CRHEAFS),"  for Entergy's  failure to enter and perform  the actions prescribed  in TS afte
(CRHEAFS),\"  for Entergy\'s  failure to enter and perform  the actions prescribed  in TS afte
the Control Room Envelope  (CRE) was breached  during work on a vital area door into th
the Control Room Envelope  (CRE) was breached  during work on a vital area door into th
CRE. Entergy  has since repaired  the vital area door and restored the CRE. This finding was more than minor because  it was associated  with the Human Performanc
CRE. Entergy  has since repaired  the vital area door and restored the CRE. This finding was more than minor because  it was associated  with the Human Performanc
Line 23: Line 23:
control  room) and adversely  affected  the cornerstone  objective  to provide reasonabl
control  room) and adversely  affected  the cornerstone  objective  to provide reasonabl
assurance  that physical  design barriers  protect the public from radionuclide  release
assurance  that physical  design barriers  protect the public from radionuclide  release
caused by accidents or events. Specifically,  the inoperable CRE could affect the operator'
caused by accidents or events. Specifically,  the inoperable CRE could affect the operator\'
ability to occupy  the control room under adverse radiological, chemical,  or smoke  condition
ability to occupy  the control room under adverse radiological, chemical,  or smoke  condition
while responding  to an event. IMC 0609, "Significance  Determination Process," Attachmen
while responding  to an event. IMC 0609, \"Significance  Determination Process,\" Attachmen
0609.04,  "Phase 1- Initial Screening and Characterization  of Findings," was used t
0609.04,  \"Phase 1- Initial Screening and Characterization  of Findings,\" was used t
evaluate  the impact of the finding on loss of operability or functionality of the CRE an
evaluate  the impact of the finding on loss of operability or functionality of the CRE an
CHREAFS,  and it was determined that further evaluation  was required  since the finding ha
CHREAFS,  and it was determined that further evaluation  was required  since the finding ha

Latest revision as of 20:42, 20 February 2018

04
Site: Pilgrim
Report IR 05000293/2011003 Section 1R15
Date counted Sep 30, 2011 (2011Q3)
Type: NCV: Green
cornerstone Barrier Integrity
Identified by: NRC identified
Inspection Procedure: IP 71111.15
Inspectors (proximate) T Burns
R Rolph
B Smith
M Schneider
K Dunham
CCA H.5, Work Management
INPO aspect WP.1
'