| {{#Wiki_filter:Sharon W. Peavyhouse H. B. Robinson Steam~DUKE Electric Plant Unit 2 ENERGY, Director -Nuclear Organization Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsville, SC 29550 0:843 857 1584 F: 843 857 1319 Sharon.Peavyhouse@duke-energy.comn Serial: RNP-RA/15-0018 10 CFR 50.36 FEB 2 6 2015 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 TECHNICAL SPECIFICATIONS (TS) SECTION 5.6.6, POST ACCIDENT MONITORING (PAM) INSTRUMENTATION REPORT, 14-DAY REPORT FOR THE INOPERABILITY OF THE POWER RANGE NEUTRON FLUX CHANNEL Ladies and Gentlemen: | | {{#Wiki_filter:Sharon W. Peavyhouse H. B.Robinson Steam |
| Duke Energy Progress, Inc. hereby submits a report in accordance with H. B. Robinson Steam Electric Plant, Unit No. 2, Technical Specifications (TS) Section 3.3.3, Post Accident Monitoring Instrumentation, and TS 5.6.6, Post Accident Monitoring Instrumentation Report.The report, which is provided as an attachment to this letter, is based on the inoperability of the Power Range Neutron Flux Channel.The Power Range Neutron Flux Channel (N-51 B) will be post maintenance tested and returned to OPERABLE status prior to restart from the next refueling outage, which is currently scheduled to begin on May, 9, 2015, or duringthe first outage of sufficient duration.If you should have any questions concerning this matter, please contact Richard Hightower, Manager -Nuclear Regulatory Affairs at (843) 857-1329.Sincerely, Sharon W. Peavyhouse Director -Nuclear Organization Effectiveness Attachment SWP/cc cc: Mr. V. M. McCree, NRC, Region 1i Ms. Martha Barillas, NRC, NRC Project Manager, NRR.NRC Resident Inspector. | | ~DUKE ENERGY, Electric Plant Unit 2 Director - Nuclear OrganizationEffectiveness Duke EnergyProgress 3581 West Entrance Road Hartsville, SC 29550 0:843 857 1584 F: 843 857 1319 Sharon.Peavyhouse@duke-energy.comn Serial: RNP-RA/15-0018 10 CFR 50.36 FEB 2 6 2015 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 TECHNICAL SPECIFICATIONS (TS) SECTION 5.6.6, POST ACCIDENT MONITORING (PAM) INSTRUMENTATION REPORT, 14-DAY REPORT FOR THE INOPERABILITY OF THE POWER RANGE NEUTRON FLUX CHANNEL Ladies and Gentlemen: |
| ....... .0 DI United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/15-0018 Page 1 of 2 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 TECHNICAL SPECIFICATIONS SECTION 5.6.6 POST ACCIDENT MONITORING INSTRUMENTATION 14-DAY REPORT FOR THE POWER RANGE NEUTRON FLUX CHANNEL Event Description On January 19, 2015, Power Range Neutron Flux Channel (N-51 B) was noted to have decreased to 53% Power indication. | | Duke Energy Progress, Inc. hereby submits a report in accordance with H. B. Robinson Steam Electric Plant, Unit No. 2, Technical Specifications (TS) Section 3.3.3, Post Accident Monitoring Instrumentation, and TS 5.6.6, Post Accident Monitoring Instrumentation Report. |
| During maintenance activities the decrease in power indication was initially attributed to a degraded pre-amplifier. | | The report, which is provided as an attachment to this letter, is based on the inoperability of the Power Range Neutron Flux Channel. |
| Multiple pre-amplifier replacements were performed with a subsequent signal decrease following maintenance. | | The Power Range Neutron Flux Channel (N-51 B) will be post maintenance tested and returned to OPERABLE status prior to restart from the next refueling outage, which is currently scheduled to begin on May, 9, 2015, or duringthe first outage of sufficient duration. |
| It is believed that the pre-amplifier degradations are being caused by an intermittent connection issue in the field cables; however, a degradation of the detector has not been completely ruled out. Because the field connections are at the containment electrical penetrations in close proximity with other cables, it is preferred that the intermittent connection repair be scheduled to be completed during the Refueling Outage currently scheduled to start on May 09, 2015. If a detector replacement is required then it can only be performed during an outage since the detector is in the vicinity of the reactor vessel.The actions for Technical Specifications (TS) Section 3.3.3, Post Accident Monitoring (PAM)Instrumentation, Table 3.3.3-1, Function 1, requires an inoperable Power Range Neutron Flux channel to be restored to OPERABLE status within 30 days. If this indication is not restored within 30 days, a report in accordance with TS 5.6.6 is required within the following 14 days.TS 5.6.6 states that the report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the channel to operable status.Preplanned Alternate Method of Monitoring Standing Instruction 15-001, effective 02/19/2015 for N-51 B, Power Range Neutron Flux Channel, outlines the alternate method of monitoring excore neutron flux level until N-51 B is returned to service: Continuous monitoring capability: | | If you should have any questions concerning this matter, please contact Richard Hightower, Manager - Nuclear Regulatory Affairs at (843) 857-1329. |
| * Excore Instrumentation power range channels N-41, N-42, N-43, N-44 are available on the Reactor Turbine Gauge Board (RTGB) as well as the Emergency Response Facility Information System (ERFIS)Event Based Monitoring Capability (Post Accident Monitoring): " Power Range Neutron Flux N-52B" Source Range Neutron Flux N-51A, and N-52A United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/15-0018 Page 2 of 2 These indications are trended on the RTGB, and as triggered by an event by the control room operators. | | Sincerely, Sharon W. Peavyhouse Director - Nuclear Organization Effectiveness Attachment SWP/cc cc: Mr. V. M. McCree, NRC, Region 1i Ms. Martha Barillas, NRC, NRC Project Manager, NRR. |
| Annunciators are also available to alert the Control Room to adverse-reactor power or source range conditions. | | NRC Resident Inspector. |
| Should any of these indications fail, a work order will be initiated and worked on an emergent basis to ensure that the back-up methods for monitoring remain in place.The TS Bases for TS 3.3.3, as it pertains to the power range and source range neutron flux channels, states: "Power Range and Source Range Neutron Flux indication is provided to verify reactor shutdown. | | ....... . 0 DI |
| The two ranges are necessary to cover the full range of flux that may occur post-accident. | | |
| Neutron flux is used for accident diagnosis, verification of subcriticality, and diagnosis of positive reactivity insertion." As stated in the TS Bases for TS 3.3.3, the Power Range Neutron Flux channels provide a verification indication. | | United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/15-0018 Page 1 of 2 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 TECHNICAL SPECIFICATIONS SECTION 5.6.6 POST ACCIDENT MONITORING INSTRUMENTATION 14-DAY REPORT FOR THE POWER RANGE NEUTRON FLUX CHANNEL Event Description On January 19, 2015, Power Range Neutron Flux Channel (N-51 B) was noted to have decreased to 53% Power indication. During maintenance activities the decrease in power indication was initially attributed to a degraded pre-amplifier. Multiple pre-amplifier replacements were performed with a subsequent signal decrease following maintenance. |
| This monitoring capability does not directly impact safety systems or the ability to mitigate the consequences of an accident.Cause of the Inoperability This event has been entered into the H. B. Robinson Steam Electric Plant, Unit No. 2, Corrective Action Program. The cause of the N-51 B inoperability was attributed to pre-amplifier degradation, which is believed to be caused by an intermittent field cable connection or detector degradation. | | It is believed that the pre-amplifier degradations are being caused by an intermittent connection issue in the field cables; however, a degradation of the detector has not been completely ruled out. Because the field connections are at the containment electrical penetrations in close proximity with other cables, it is preferred that the intermittent connection repair be scheduled to be completed during the Refueling Outage currently scheduled to start on May 09, 2015. Ifa detector replacement is required then it can only be performed during an outage since the detector is in the vicinity of the reactor vessel. |
| Troubleshooting is ongoing in an effort to better determine the cause of the inoperability as well as alternate actions to restore the operability of the Power Range Neutron Flux indication. | | The actions for Technical Specifications (TS) Section 3.3.3, Post Accident Monitoring (PAM) |
| Plans and Schedule for Restoring the Channel The N-51 B channel intermittent connection may require repairs in close proximity to the electrical penetrations or a detector replacement, hence, it is preferable that this deficiency is resolved while the unit is offline for refueling. | | Instrumentation, Table 3.3.3-1, Function 1, requires an inoperable Power Range Neutron Flux channel to be restored to OPERABLE status within 30 days. Ifthis indication is not restored within 30 days, a report in accordance with TS 5.6.6 is required within the following 14 days. |
| Therefore, N-51 B will be repaired and tested prior to restart from the next refueling outage, which is currently scheduled to begin on May 09, 2015, or during the first outage of sufficient duration.}} | | TS 5.6.6 states that the report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the channel to operable status. |
| | Preplanned Alternate Method of Monitoring Standing Instruction 15-001, effective 02/19/2015 for N-51 B, Power Range Neutron Flux Channel, outlines the alternate method of monitoring excore neutron flux level until N-51 B is returned to service: |
| | Continuous monitoring capability: |
| | * Excore Instrumentation power range channels N-41, N-42, N-43, N-44 are available on the Reactor Turbine Gauge Board (RTGB) as well as the Emergency Response Facility Information System (ERFIS) |
| | Event Based Monitoring Capability (Post Accident Monitoring): |
| | " Power Range Neutron Flux N-52B |
| | " Source Range Neutron Flux N-51A, and N-52A |
| | |
| | United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/15-0018 Page 2 of 2 These indications are trended on the RTGB, and as triggered by an event by the control room operators. Annunciators are also available to alert the Control Room to adverse-reactor power or source range conditions. Should any of these indications fail, a work order will be initiated and worked on an emergent basis to ensure that the back-up methods for monitoring remain in place. |
| | The TS Bases for TS 3.3.3, as it pertains to the power range and source range neutron flux channels, states: |
| | "Power Range and Source Range Neutron Flux indication is provided to verify reactor shutdown. The two ranges are necessary to cover the full range of flux that may occur post-accident. |
| | Neutron flux is used for accident diagnosis, verification of subcriticality, and diagnosis of positive reactivity insertion." |
| | As stated in the TS Bases for TS 3.3.3, the Power Range Neutron Flux channels provide a verification indication. This monitoring capability does not directly impact safety systems or the ability to mitigate the consequences of an accident. |
| | Cause of the Inoperability This event has been entered into the H. B. Robinson Steam Electric Plant, Unit No. 2, Corrective Action Program. The cause of the N-51 B inoperability was attributed to pre-amplifier degradation, which is believed to be caused by an intermittent field cable connection or detector degradation. Troubleshooting is ongoing in an effort to better determine the cause of the inoperability as well as alternate actions to restore the operability of the Power Range Neutron Flux indication. |
| | Plans and Schedule for Restoring the Channel The N-51 B channel intermittent connection may require repairs in close proximity to the electrical penetrations or a detector replacement, hence, it is preferable that this deficiency is resolved while the unit is offline for refueling. Therefore, N-51 B will be repaired and tested prior to restart from the next refueling outage, which is currently scheduled to begin on May 09, 2015, or during the first outage of sufficient duration.}} |
|
---|
Category:Letter type:RNP
MONTHYEARRNP-RA/21-0035, Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-18018 February 2021 Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/20-0234, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2020-07-23023 July 2020 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RNP-RA/20-0199, Registration of Use of Spent Fuel Casks2020-06-25025 June 2020 Registration of Use of Spent Fuel Casks RNP-RA/18-0063, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal2018-11-29029 November 2018 Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal RNP-RA/18-0060, Transmittal of Core Operating Limits Report2018-10-17017 October 2018 Transmittal of Core Operating Limits Report RNP-RA/18-0050, Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change2018-08-0101 August 2018 Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/18-0039, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis2018-06-27027 June 2018 Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis RNP-RA/18-0041, Independent Spent Fuel Storage Installation - Register as User for Cask2018-06-13013 June 2018 Independent Spent Fuel Storage Installation - Register as User for Cask RNP-RA/18-0036, Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ...2018-05-16016 May 2018 Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ... RNP-RA/18-0029, Submittal of 2017 Annual Radiological Environmental Operating Report2018-05-0808 May 2018 Submittal of 2017 Annual Radiological Environmental Operating Report RNP-RA/18-0031, (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 352018-04-23023 April 2018 (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 35 RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) RNP-RA/18-0020, Notification of Change in Licensed Operator Status2018-02-20020 February 2018 Notification of Change in Licensed Operator Status RNP-RA/18-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-01-23023 January 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/17-0085, Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2018-01-0808 January 2018 Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0086, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses2017-12-14014 December 2017 Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses RNP-RA/17-0081, Submittal of Change in Licensed Operators Medical Status2017-12-11011 December 2017 Submittal of Change in Licensed Operators Medical Status RNP-RA/17-0079, Operator License Renewal Application2017-12-0707 December 2017 Operator License Renewal Application RNP-RA/17-0071, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks2017-10-19019 October 2017 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks RNP-RA/17-0068, Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-09-28028 September 2017 Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/17-0043, Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-42017-09-22022 September 2017 Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report2017-09-18018 September 2017 Refueling Outage 30 Steam Generator Tube Inspection Report RNP-RA/17-0060, Notification of Change in Licensed Operator Status2017-08-10010 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0058, Notification of Change in Licensed Operator Status2017-08-0303 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0055, Transmittal of Core Operating Limits Report for Cycle 312017-07-26026 July 2017 Transmittal of Core Operating Limits Report for Cycle 31 RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals2017-06-29029 June 2017 Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report2017-06-29029 June 2017 Submittal of Nine Day Inservice Inspection Summary Report RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0038, (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report2017-05-0909 May 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RNP-RA/17-0036, (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 342017-04-25025 April 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 34 RNP-RA/17-0031, Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 02017-04-20020 April 2017 Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 0 RNP-RA/17-0033, Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal2017-04-12012 April 2017 Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0028, Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0021, Transmittal of Core Operating Limits Report2017-03-13013 March 2017 Transmittal of Core Operating Limits Report RNP-RA/17-0019, Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 22017-03-0808 March 2017 Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RNP-RA/17-0015, Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/17-0016, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RNP-RA/17-0015, H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/16-0100, Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-2272017-01-24024 January 2017 Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-227 RNP-RA/16-0097, Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/20154052016-12-15015 December 2016 Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/2015405 RNP-RA/16-0089, Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-11-10010 November 2016 Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0090, Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise2016-11-10010 November 2016 Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0079, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants.2016-10-0505 October 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. 2021-02-18
[Table view] Category:Report
MONTHYEARRA-24-0173, Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld2024-06-28028 June 2024 Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0080, Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube2023-04-0505 April 2023 Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube RA-22-0302, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2022-11-0101 November 2022 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) RA-22-0239, Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary)2022-08-0909 August 2022 Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary) RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0312, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2021-11-22022 November 2021 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.462019-05-30030 May 2019 Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) RA-17-0040, Providing Methodology Reports DPC-NE-1008-P, Revision 0, DPC-NF-2010, Revision 3, and DPC-NE-2011-P, Revision 2. (Non-Proprietary Versions)2017-08-15015 August 2017 Providing Methodology Reports DPC-NE-1008-P, Revision 0, DPC-NF-2010, Revision 3, and DPC-NE-2011-P, Revision 2. (Non-Proprietary Versions) ML16281A5102016-12-15015 December 2016 Staff Assessment of the Reactor Vessel Internals Aging Management Program Plans RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors ML16280A2002016-10-0505 October 2016 Response to Request for Additional Information Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RA-16-0024, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P2016-10-0303 October 2016 Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P RNP-RA/16-0073, Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits2016-09-14014 September 2016 Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-1742016-05-25025 May 2016 Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 RA-16-0023, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-1008-P2016-05-0404 May 2016 Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-1008-P ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report RA-15-0042, Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis.2015-11-19019 November 2015 Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis. RA-15-0047, Annual Report of Changes Pursuant to 10 CFR 50.462015-11-17017 November 2015 Annual Report of Changes Pursuant to 10 CFR 50.46 ML15280A1992015-10-19019 October 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)2015-08-19019 August 2015 Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. RNP-RA/15-0018, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel2015-02-26026 February 2015 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel RNP-RA/14-0037, Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System2014-04-0808 April 2014 Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System RNP-RA/14-0012, Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3....2014-03-12012 March 2014 Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3.... RNP-RA/14-0011, Revision to Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident2014-02-27027 February 2014 Revision to Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident ML13365A2912014-02-19019 February 2014 Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14027A0632014-01-24024 January 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for H. B. Robinson Steam Electric Plant, Unit 2, TAC No.: MF0720 ML13267A2122013-09-30030 September 2013 Enclosure 1, Transition Report - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition ML13270A1762013-09-24024 September 2013 Redacted - Office of Nuclear Reactor Regulation (NRR) Reactor Systems Branch (Srxb) Support of Region II Inspection of H. B. Robinson Treatment of Voids in Systems That Are Important to Safety RNP-RA/13-0079, Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter2013-08-21021 August 2013 Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter RNP-RA/13-0066, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication2013-06-24024 June 2013 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication RNP-RA/13-0037, Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 20122013-04-25025 April 2013 Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 2012 ML12331A1752012-11-26026 November 2012 Draft Bypass Fiber Quantity Test Plan ML12278A3992012-08-31031 August 2012 WCAP-17077-NP, Rev 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant ML1210707162012-05-17017 May 2012 Letter Report on the Evaluation of Cables from the HEAF Fire Event at the H.B. Robinson Steam Electric Plant ML12068A1332012-02-23023 February 2012 Calculation RNP-M/MECH-1815, Revision 1, Evaluation of Emergency Diesel Generator Starting Capability at 150 PSIG RNP-RA/11-0100, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System2011-11-23023 November 2011 Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System ML1124113592011-09-23023 September 2011 Final Precursor Analysis: Electrical Fault Causes Fire and Subsequent Reactor Trip with a Loss of Reactor Coolant Pump Seal Injection and Cooling ML1124113582011-09-23023 September 2011 Final Precursor Analysis: Concurrent Unavailabilities - EDG B Inoperable Due to Failed Output Breaker and EDG a Unavailable Due to Testing and Maintenance ML1128005282010-12-29029 December 2010 NRC 2011 Hb Robinson ML1019304172010-05-0606 May 2010 Tritium Database Report RNP-RA/09-0081, WCAP-17077-NP, Revision 0, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant.2009-07-31031 July 2009 WCAP-17077-NP, Revision 0, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant. RNP-RA/09-0054, Attachments VI & VII to Serial: RNP-RA/09-0054 - Request for Technical Specifications Change to Section 3.3.1 Reactor Protection System Instrumentation2009-06-19019 June 2009 Attachments VI & VII to Serial: RNP-RA/09-0054 - Request for Technical Specifications Change to Section 3.3.1 Reactor Protection System Instrumentation ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 2024-06-28
[Table view] Category:Miscellaneous
MONTHYEARRA-21-0312, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2021-11-22022 November 2021 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.462019-05-30030 May 2019 Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) ML16281A5102016-12-15015 December 2016 Staff Assessment of the Reactor Vessel Internals Aging Management Program Plans RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RA-16-0024, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P2016-10-0303 October 2016 Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-1742016-05-25025 May 2016 Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report RA-15-0047, Annual Report of Changes Pursuant to 10 CFR 50.462015-11-17017 November 2015 Annual Report of Changes Pursuant to 10 CFR 50.46 ML15280A1992015-10-19019 October 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)2015-08-19019 August 2015 Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) RNP-RA/15-0018, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel2015-02-26026 February 2015 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel RNP-RA/14-0037, Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System2014-04-0808 April 2014 Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System RNP-RA/14-0012, Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3....2014-03-12012 March 2014 Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3.... RNP-RA/13-0079, Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter2013-08-21021 August 2013 Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter RNP-RA/13-0066, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication2013-06-24024 June 2013 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication RNP-RA/13-0037, Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 20122013-04-25025 April 2013 Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 2012 RNP-RA/11-0100, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System2011-11-23023 November 2011 Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System ML1124113582011-09-23023 September 2011 Final Precursor Analysis: Concurrent Unavailabilities - EDG B Inoperable Due to Failed Output Breaker and EDG a Unavailable Due to Testing and Maintenance ML1124113592011-09-23023 September 2011 Final Precursor Analysis: Electrical Fault Causes Fire and Subsequent Reactor Trip with a Loss of Reactor Coolant Pump Seal Injection and Cooling ML1128005282010-12-29029 December 2010 NRC 2011 Hb Robinson ML1019304172010-05-0606 May 2010 Tritium Database Report RNP-RA/08-0026, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-03-0707 March 2008 Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors RNP-RA/06-0062, Groundwater Protection - Data Collection Questionnaire2006-07-24024 July 2006 Groundwater Protection - Data Collection Questionnaire RNP-RA/06-0048, Request for Technical Specifications, Change Related to Containment Peak Pressure2006-07-17017 July 2006 Request for Technical Specifications, Change Related to Containment Peak Pressure RA-05-0104, Transmittal of Core Operating Limits Report2005-10-10010 October 2005 Transmittal of Core Operating Limits Report ML0414602462004-05-19019 May 2004 Q Report for Period Ending 03/31/2004 ML0324716322003-08-22022 August 2003 Submittal of 10-Q Report ML0318909362003-07-10010 July 2003 Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Brunswick, Crys ML0317000272003-06-0606 June 2003 Submittal of 10-O Report RNP-RA/02-0028, Request for Technical Specifications Change Re One-Time Extension of Containment Type a Test Interval2002-03-26026 March 2002 Request for Technical Specifications Change Re One-Time Extension of Containment Type a Test Interval 2021-08-25
[Table view] |
Text
Sharon W. Peavyhouse H. B.Robinson Steam
~DUKE ENERGY, Electric Plant Unit 2 Director - Nuclear OrganizationEffectiveness Duke EnergyProgress 3581 West Entrance Road Hartsville, SC 29550 0:843 857 1584 F: 843 857 1319 Sharon.Peavyhouse@duke-energy.comn Serial: RNP-RA/15-0018 10 CFR 50.36 FEB 2 6 2015 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 TECHNICAL SPECIFICATIONS (TS) SECTION 5.6.6, POST ACCIDENT MONITORING (PAM) INSTRUMENTATION REPORT, 14-DAY REPORT FOR THE INOPERABILITY OF THE POWER RANGE NEUTRON FLUX CHANNEL Ladies and Gentlemen:
Duke Energy Progress, Inc. hereby submits a report in accordance with H. B. Robinson Steam Electric Plant, Unit No. 2, Technical Specifications (TS) Section 3.3.3, Post Accident Monitoring Instrumentation, and TS 5.6.6, Post Accident Monitoring Instrumentation Report.
The report, which is provided as an attachment to this letter, is based on the inoperability of the Power Range Neutron Flux Channel.
The Power Range Neutron Flux Channel (N-51 B) will be post maintenance tested and returned to OPERABLE status prior to restart from the next refueling outage, which is currently scheduled to begin on May, 9, 2015, or duringthe first outage of sufficient duration.
If you should have any questions concerning this matter, please contact Richard Hightower, Manager - Nuclear Regulatory Affairs at (843) 857-1329.
Sincerely, Sharon W. Peavyhouse Director - Nuclear Organization Effectiveness Attachment SWP/cc cc: Mr. V. M. McCree, NRC, Region 1i Ms. Martha Barillas, NRC, NRC Project Manager, NRR.
NRC Resident Inspector.
....... . 0 DI
United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/15-0018 Page 1 of 2 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 TECHNICAL SPECIFICATIONS SECTION 5.6.6 POST ACCIDENT MONITORING INSTRUMENTATION 14-DAY REPORT FOR THE POWER RANGE NEUTRON FLUX CHANNEL Event Description On January 19, 2015, Power Range Neutron Flux Channel (N-51 B) was noted to have decreased to 53% Power indication. During maintenance activities the decrease in power indication was initially attributed to a degraded pre-amplifier. Multiple pre-amplifier replacements were performed with a subsequent signal decrease following maintenance.
It is believed that the pre-amplifier degradations are being caused by an intermittent connection issue in the field cables; however, a degradation of the detector has not been completely ruled out. Because the field connections are at the containment electrical penetrations in close proximity with other cables, it is preferred that the intermittent connection repair be scheduled to be completed during the Refueling Outage currently scheduled to start on May 09, 2015. Ifa detector replacement is required then it can only be performed during an outage since the detector is in the vicinity of the reactor vessel.
The actions for Technical Specifications (TS) Section 3.3.3, Post Accident Monitoring (PAM)
Instrumentation, Table 3.3.3-1, Function 1, requires an inoperable Power Range Neutron Flux channel to be restored to OPERABLE status within 30 days. Ifthis indication is not restored within 30 days, a report in accordance with TS 5.6.6 is required within the following 14 days.
TS 5.6.6 states that the report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the channel to operable status.
Preplanned Alternate Method of Monitoring Standing Instruction 15-001, effective 02/19/2015 for N-51 B, Power Range Neutron Flux Channel, outlines the alternate method of monitoring excore neutron flux level until N-51 B is returned to service:
Continuous monitoring capability:
- Excore Instrumentation power range channels N-41, N-42, N-43, N-44 are available on the Reactor Turbine Gauge Board (RTGB) as well as the Emergency Response Facility Information System (ERFIS)
Event Based Monitoring Capability (Post Accident Monitoring):
" Power Range Neutron Flux N-52B
" Source Range Neutron Flux N-51A, and N-52A
United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/15-0018 Page 2 of 2 These indications are trended on the RTGB, and as triggered by an event by the control room operators. Annunciators are also available to alert the Control Room to adverse-reactor power or source range conditions. Should any of these indications fail, a work order will be initiated and worked on an emergent basis to ensure that the back-up methods for monitoring remain in place.
The TS Bases for TS 3.3.3, as it pertains to the power range and source range neutron flux channels, states:
"Power Range and Source Range Neutron Flux indication is provided to verify reactor shutdown. The two ranges are necessary to cover the full range of flux that may occur post-accident.
Neutron flux is used for accident diagnosis, verification of subcriticality, and diagnosis of positive reactivity insertion."
As stated in the TS Bases for TS 3.3.3, the Power Range Neutron Flux channels provide a verification indication. This monitoring capability does not directly impact safety systems or the ability to mitigate the consequences of an accident.
Cause of the Inoperability This event has been entered into the H. B. Robinson Steam Electric Plant, Unit No. 2, Corrective Action Program. The cause of the N-51 B inoperability was attributed to pre-amplifier degradation, which is believed to be caused by an intermittent field cable connection or detector degradation. Troubleshooting is ongoing in an effort to better determine the cause of the inoperability as well as alternate actions to restore the operability of the Power Range Neutron Flux indication.
Plans and Schedule for Restoring the Channel The N-51 B channel intermittent connection may require repairs in close proximity to the electrical penetrations or a detector replacement, hence, it is preferable that this deficiency is resolved while the unit is offline for refueling. Therefore, N-51 B will be repaired and tested prior to restart from the next refueling outage, which is currently scheduled to begin on May 09, 2015, or during the first outage of sufficient duration.