{{#Wiki_filter:May 1, 2015
{{#Wiki_filter:UNITED STATES May 1, 2015


==SUBJECT:==
==SUBJECT:==
Line 24: Line 24:


==Dear Mr. Browning:==
==Dear Mr. Browning:==
On March 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at Arkansas Nuclear One, Unit s 1 and 2, and the NRC inspector discussed the results of this inspection with Mr. D. James, Director, Regulatory Recovery, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.
On March 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at Arkansas Nuclear One, Units 1 and 2, and the NRC inspector discussed the results of this inspection with Mr. D. James, Director, Regulatory Recovery, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.


No NRC-identified or self-revealing findings were identified during this inspection. However, the inspector documented a licensee-identified violati on which was determined to be of very low security significance in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
No NRC-identified or self-revealing findings were identified during this inspection. However, the inspector documented a licensee-identified violation which was determined to be of very low security significance in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.


If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; and the NRC resident inspector at Arkansas Nuclear One, Units 1 and 2.
If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; and the NRC resident inspector at Arkansas Nuclear One, Units 1 and 2.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).


UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for  
 
your response.


Sincerely,
Sincerely,
/RA/
/RA/
Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety  
Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-313; 50-368 License Nos. DPR-51; NPF-6 Nonpublic Enclosure:
 
NRC Inspection Report 05000313/2015403; 05000368/2015403 w/Attachment: Supplemental Information cc w/encl:
Docket Nos. 50-313; 50-368  
Mr. Jonathan Laplante Senior Manager, Security Operations Entergy Operations, Inc.
 
License Nos. DPR-51; NPF-6  
 
Nonpublic Enclosure:
NRC Inspection Report 05000313/2015403; 05000368/2015403 w/Attachment: Supplemental Information  
 
cc w/encl: Mr. Jonathan Laplante Senior Manager, Security Operations Entergy Operations, Inc.


1340 Echelon Parkway Jackson, MS 39286-1995 cc w/o encl:
1340 Echelon Parkway Jackson, MS 39286-1995 cc w/o encl:
Electronic Distribution  
Electronic Distribution ML15121A899 Entire Report: Non-Sensitive Publicly Available Keyword:
 
SUNSI Review Complete Sensitive Non-Publicly Available MD 3.4 Non-Public A.3 By: J. Buchanan    NRC-002 Cover Letter Only: Non-Sensitive Publicly Available Keyword:
ML15121A899 Entire Report: SUNSI Review Complete By: J. Buchanan Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: MD 3.4 Non-Public A.3 NRC-002 Cover Letter Only:
SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete By: J. Buchanan    NRC-002 OFFICE PSI:PSB1 C:PSB1 C:DRP/E C:PSB1 NAME JBuchanan MHaire NO'Keefe MHaire SIGNATURE /RA/ /RA/ /RA/ /RA/
SUNSI Review Complete By: J. Buchanan Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: SUNSI Review Complete NRC-002 OFFICE PSI:PSB1 C:PSB1 C:DRP/E C:PSB1 NAME JBuchanan MHaire NO'Keefe MHaire SIGNATURE /RA/ /RA/ /RA/ /RA/ DATE 4/29/15 4/29/15 4/30/15 5/1/15 Letter to Jeremy Browning from Mark S. Haire, dated May 1, 2015 SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000313/2015403 AND 05000368/2015403 Distribution w/enclosure
DATE 4/29/15 4/29/15 4/30/15 5/1/15 Letter to Jeremy Browning from Mark S. Haire, dated May 1, 2015 SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000313/2015403 AND 05000368/2015403 Distribution w/enclosure:
: Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov) Senior Resident Inspector (Brian.Tindell@nrc.gov) ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Distribution w/o enclosure
Senior Resident Inspector (Brian.Tindell@nrc.gov)
: Regional Administrator (Marc.Dapas@nrc.gov)
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
Distribution w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)  
Senior Resident Inspector (Brian.Tindell@nrc.gov)
 
Resident Inspector (Matt.Young@nrc.gov)
Resident Inspector (Matt.Young@nrc.gov) Resident Inspector (Abin.Fairbanks@nrc.gov)
Resident Inspector (Abin.Fairbanks@nrc.gov)
Branch Chief, DRP/E (Neil.OKeefe@nrc.gov)
Branch Chief, DRP/E (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/E (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/E (Nick.Taylor@nrc.gov)
Project Engineer, DRP/E (Thomas.Farina@nrc.gov)
Project Engineer, DRP/E (Thomas.Farina@nrc.gov)
Project Engineer, DRP/E (Brian.Correll@nrc.gov) Project Engineer, DRP/E (Jackson.Choate@nrc.gov) ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)
Project Engineer, DRP/E (Brian.Correll@nrc.gov)
Project Engineer, DRP/E (Jackson.Choate@nrc.gov)
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)
 
Project Manager (Andrea.George@nrc.gov)
Project Manager (Andrea.George@nrc.gov)  
 
Team Leader, DRS/TSB (Don.Allen@nrc.gov)
Team Leader, DRS/TSB (Don.Allen@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Michael.Waters@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
}}
}}

Latest revision as of 13:05, 31 October 2019

NRC Security Inspection Report 05000313/2015403 and 05000368/2015403
ML15121A899
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/01/2015
From: Mark Haire
Plant Support Branch-1
To: Jeremy G. Browning
Entergy Operations
References
IR 2015403
Download: ML15121A899 (4)


Text

UNITED STATES May 1, 2015

SUBJECT:

ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000313/2015403 AND 05000368/2015403

Dear Mr. Browning:

On March 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at Arkansas Nuclear One, Units 1 and 2, and the NRC inspector discussed the results of this inspection with Mr. D. James, Director, Regulatory Recovery, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.

No NRC-identified or self-revealing findings were identified during this inspection. However, the inspector documented a licensee-identified violation which was determined to be of very low security significance in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; and the NRC resident inspector at Arkansas Nuclear One, Units 1 and 2.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-313; 50-368 License Nos. DPR-51; NPF-6 Nonpublic Enclosure:

NRC Inspection Report 05000313/2015403; 05000368/2015403 w/Attachment: Supplemental Information cc w/encl:

Mr. Jonathan Laplante Senior Manager, Security Operations Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39286-1995 cc w/o encl:

Electronic Distribution ML15121A899 Entire Report: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available MD 3.4 Non-Public A.3 By: J. Buchanan NRC-002 Cover Letter Only: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete By: J. Buchanan NRC-002 OFFICE PSI:PSB1 C:PSB1 C:DRP/E C:PSB1 NAME JBuchanan MHaire NO'Keefe MHaire SIGNATURE /RA/ /RA/ /RA/ /RA/

DATE 4/29/15 4/29/15 4/30/15 5/1/15 Letter to Jeremy Browning from Mark S. Haire, dated May 1, 2015 SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000313/2015403 AND 05000368/2015403 Distribution w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Senior Resident Inspector (Brian.Tindell@nrc.gov)

ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)

Distribution w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

Senior Resident Inspector (Brian.Tindell@nrc.gov)

Resident Inspector (Matt.Young@nrc.gov)

Resident Inspector (Abin.Fairbanks@nrc.gov)

Branch Chief, DRP/E (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP/E (Nick.Taylor@nrc.gov)

Project Engineer, DRP/E (Thomas.Farina@nrc.gov)

Project Engineer, DRP/E (Brian.Correll@nrc.gov)

Project Engineer, DRP/E (Jackson.Choate@nrc.gov)

ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Andrea.George@nrc.gov)

Team Leader, DRS/TSB (Don.Allen@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)