{{#Wiki_filter:REPLY TO ATIENTIONOF Operations Division Operations Manager, Completed Works DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P. 0. BOX 60267 NEW ORLEANS, LOUISIANA 70160-0267 September 19, 2013 Mr. Joseph Dantin -President Board of Commissioners Lafourche Basin Levee District Post Office Box 670 Vacherie, Louisiana 70090  
{{#Wiki_filter:DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P. 0. BOX 60267 NEW ORLEANS, LOUISIANA 70160-0267 September 19, 2013 REPLY TO ATIENTIONOF Operations Division Operations Manager, Completed Works Mr. Joseph Dantin - President Board of Commissioners Lafourche Basin Levee District Post Office Box 670 Vacherie, Louisiana 70090


==Dear Mr. Dantin:==
==Dear Mr. Dantin:==
We have received an application for a Department of the Army permit dated July 15, 2013, from Entergy-Waterford 3, concerning permission to replace four dolphins on the right descending Mississippi River bank, vicinity of second order levee station 443+00, in St. Bernard Parish, Louisiana.
 
We have received an application for a Department of the Army permit dated July 15, 2013, from Entergy- Waterford 3, concerning permission to replace four dolphins on the right descending Mississippi River bank, vicinity of second order levee station 443+00, in St. Bernard Parish, Louisiana.
We have no objection to your Board's issuance of a permit for that portion of the work which is under your jurisdiction provided:
We have no objection to your Board's issuance of a permit for that portion of the work which is under your jurisdiction provided:
: a. The work is accomplished in accordance with the above referenced application, vicinity map and accompanying drawings, copy enclosed.
: a. The work is accomplished in accordance with the above referenced application, vicinity map and accompanying drawings, copy enclosed.
: b. All pile driving work is performed and completed while the stage of the Mississippi River is below elevation  
: b. All pile driving work is performed and completed while the stage of the Mississippi River is below elevation +15.0 feet on the Carrollton gage, at New Orleans, Louisiana. Information concerning current river stages may be obtained on our website at www.mvn.usace.army.mil.
+15.0 feet on the Carrollton gage, at New Orleans, Louisiana.
Information concerning current river stages may be obtained on our website at www.mvn.usace.army.mil.
: c. Riprap is placed around all piles that penetrate through the revetment in accordance with the Corps of Engineers standard drawing, "Repair Procedures Required When Penetrating Revetments With Piles, Caissons and/or Pile Clusters," file No. H-18-45204, copy enclosed.
: c. Riprap is placed around all piles that penetrate through the revetment in accordance with the Corps of Engineers standard drawing, "Repair Procedures Required When Penetrating Revetments With Piles, Caissons and/or Pile Clusters," file No. H-18-45204, copy enclosed.
: d. Any damage to the bank resulting from the applicant's activities is repaired at the applicant's expense. e. That should changes in the location or section of the existing levee and/or river, or in the generally prevailing conditions in the vicinity, be required in the future in the public interest, the applicant shall make changes in the project concerned, or in the arrangement thereof, as may be necessary to satisfactorily meet the situation and shall bear the cost thereof. This letter of no objection is based upon engineering criteria, and no interpretation or comments regarding local laws, zoning, or ordinances concerning property rights, etc., have been made. Additionally, this letter of no objection does not obviate the applicant's requirement to obtain federal, state, or local permits required by law. If we can be of any further assistance, please feel free to call Mr. Albert Terry of my office, at (504) 862-2311.
: d. Any damage to the bank resulting from the applicant's activities is repaired at the applicant's expense.
Additionally, future correspondence concerning this project should reference our permit number 13-592. This will allow us to more easily locate records of previous correspondence, and thus provide a quicker response.
: e. That should changes in the location or section of the existing levee and/or river, or in the generally prevailing conditions in the vicinity, be required in the future in the public interest, the applicant shall make changes in the project concerned, or in the arrangement thereof, as may be necessary to satisfactorily meet the situation and shall bear the cost thereof.
Please furnish this office a copy of your permit if the applicant's proposal is approved by your Board. Sincerely, Operations Manager, Completed Works Enclosures Copies Furnished:
This letter of no objection is based upon engineering criteria, and no interpretation or comments regarding local laws, zoning, or ordinances concerning property rights, etc., have been made. Additionally, this letter of no objection does not obviate the applicant's requirement to obtain federal, state, or local permits required by law.
CPRA, Baton Rouge, Attn: Rhonda Braud CPRA, Baton Rouge, Attn: Antonio German Entergy -Waterford 3 Attn: Mr. Gerald Davey STONE RIPRAP PILE RIVER BANK DEPTH OF WATER IN FEET AT POINT OF PENETRATION AT TIME OF STONE PLACEMENT I' -10' 11' -40' 41' -60' CAISSON SPUD PILE PILE CLUSTER (BUOY AND ANCHOR CHA I Nl STONE PILE x y 3 1.5 5 2 8 3 ASPHALT WILLOW OR A.C. MA TT RESS RIVER BANK DIMENSIONS IN FEET FOR PROTECTION AREA REQUIRED SPUD PILE CAISSON <BUOY AND ANCHOR CHAIN) x y x y 5 2 8 3 7 3 12 4 12 4 STONE PILE CLUSTER x y 3 I 6 2 10 3 ASPHALT WILLOW OR A.C. MATTRESS RIVER BANK STONE RJPRAP ASPHALT WILLOW OR A.C. MATTRESS RIVER BANK STONE COVERAGE REQUIRED OVER TOT AL AREA NOTES: I. SIZE OF RIPRAP TO VARY BETWEEN 6 POUNDS AND 125 POUNDS WITH 40 PERCENT TO 60 PERCENT OF THE STONE WITHIN THE RANGE OF 25 POUNDS TO 75 POUNDS. << w "' << >-0 >-"' w > 0 0 w "' " w " << "' w > 0 u z 0 2. WHEN PENETRATING THE UPPER BANK PAVING IN A REVETMENT AREA WITH PILES, CAISSONS AND/OR PILE CLUSTERS, A 10 INCH THICK RIPRAP STONE LAYER SHALL BE PLACED OVER ALL AREAS WHERE THE BANK PAVING IS DISTURBED BY DRIVING OPERATIONS.
If we can be of any further assistance, please feel free to call Mr. Albert Terry of my office, at (504) 862-2311. Additionally, future correspondence concerning this project should reference our permit number 13-592. This will allow us to more easily locate records of previous correspondence, and thus provide a quicker response.
: 3. WHEN USING AN ANCHOR CHAIN AND BUOY SYSTEM, THE ANCHOR CHAIN MUST BE ATTACHED AT THE TOP OF THE PILE TO MINIMIZE REVETMENT DAMAGE. " . ' z G';
Please furnish this office a copy of your permit if the applicant's proposal is approved by your Board.
B ! ! " "' ,,; j mi "':0;:.
Sincerely, A~1.~~
Ai}}
Operations Manager, Completed Works Enclosures Copies Furnished:
CPRA, Baton Rouge, Attn: Rhonda Braud CPRA, Baton Rouge, Attn: Antonio German Entergy - Waterford 3 Attn: Mr. Gerald Davey
 
                                                                                                                                                                                ~      ."
PILE                             CAISSON                               SPUD PILE                               PILE CLUSTER (BUOY AND ANCHOR CHA I Nl STONE RJPRAP STONE                              STONE                                        STONE        ASPHALT RIPRAP                                                      ASPHALT                           WILLOW WILLOW                          OR A.C.
OR A.C.                                                                                                 ASPHALT MATTRESS                                                                 WILLOW MA TT RESS OR A.C.
MATTRESS RIVER BANK                                                             RIVER BANK RIVER BANK RIVER BANK w
                                                                                                                                                                  ~
0 w
      ~
0 0
w
      ~                                                                                                                                                          "~
w
                                                                                                                                                                  "'w>
0 u
z 0            ~
                                                                                                                                                                  >-            z
                                                                                                                                                                  ~
                                                                                                                                                                                ~
G';
                                                                                                                                                                                ~~~~;
STONE COVERAGE REQUIRED OVER TOT AL AREA B )~ ffi~ ~
                                                                                                                                                                                ~~~ !
                                                                                                                                                                                ~ ~~ ~~ !
NOTES:                                                                                 ~ 8~ ~~ ~
                                                                                                                                                                                ~
I. SIZE OF RIPRAP TO VARY BETWEEN 6 POUNDS AND 125 POUNDS                           "
WITH 40 PERCENT TO 60 PERCENT OF THE STONE WITHIN THE                         "',,; mi"':0;:.
DIMENSIONS IN FEET FOR                                                                                                        j Hi~
RANGE OF 25 POUNDS TO 75 POUNDS.
PROTECTION AREA REQUIRED DEPTH OF WATER IN FEET                                  SPUD PILE              2. WHEN PENETRATING THE UPPER BANK PAVING IN A REVETMENT AREA PILE          WITH PILES, CAISSONS AND/OR PILE CLUSTERS, A 10 INCH THICK AT POINT OF PENETRATION      PILE      CAISSON        <BUOY AND CLUSTER          RIPRAP STONE LAYER SHALL BE PLACED OVER ALL AREAS WHERE
                                                                                                                                                                                    ~&sect;~
AT TIME OF STONE PLACEMENT                              ANCHOR CHAIN)                                                                                                      8~~
                                                                                                                                                                                    ~;~~
THE BANK PAVING IS DISTURBED BY DRIVING OPERATIONS.
x        y  x      y        x      y  x      y I' - 10'          3      1.5  5      2                    3      I                                                                                      Ai &sect;~~d
: 3. WHEN USING AN ANCHOR CHAIN AND BUOY SYSTEM, THE ANCHOR 11' - 40' 41' - 60' 5
8 2
3 8
12 3
4 7
12 3
4 6
10 2
3 CHAIN MUST BE ATTACHED AT THE TOP OF THE PILE TO MINIMIZE REVETMENT DAMAGE.
                                                                                                                                                                                    ;u~}}

Latest revision as of 20:50, 4 February 2020

Surface Water Resources (SW) RAI SW-11 Department of Army Letter of No Objection
ML17038A273
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/07/2017
From:
Entergy Operations
To: Keegan E
Division of License Renewal
ELAINE KEEGAN, NRR/DLR, 415-8517
Shared Package
ML17018A143 List:
References
Download: ML17038A273 (3)


Text

DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P. 0. BOX 60267 NEW ORLEANS, LOUISIANA 70160-0267 September 19, 2013 REPLY TO ATIENTIONOF Operations Division Operations Manager, Completed Works Mr. Joseph Dantin - President Board of Commissioners Lafourche Basin Levee District Post Office Box 670 Vacherie, Louisiana 70090

Dear Mr. Dantin:

We have received an application for a Department of the Army permit dated July 15, 2013, from Entergy- Waterford 3, concerning permission to replace four dolphins on the right descending Mississippi River bank, vicinity of second order levee station 443+00, in St. Bernard Parish, Louisiana.

We have no objection to your Board's issuance of a permit for that portion of the work which is under your jurisdiction provided:

a. The work is accomplished in accordance with the above referenced application, vicinity map and accompanying drawings, copy enclosed.
b. All pile driving work is performed and completed while the stage of the Mississippi River is below elevation +15.0 feet on the Carrollton gage, at New Orleans, Louisiana. Information concerning current river stages may be obtained on our website at www.mvn.usace.army.mil.
c. Riprap is placed around all piles that penetrate through the revetment in accordance with the Corps of Engineers standard drawing, "Repair Procedures Required When Penetrating Revetments With Piles, Caissons and/or Pile Clusters," file No. H-18-45204, copy enclosed.
d. Any damage to the bank resulting from the applicant's activities is repaired at the applicant's expense.
e. That should changes in the location or section of the existing levee and/or river, or in the generally prevailing conditions in the vicinity, be required in the future in the public interest, the applicant shall make changes in the project concerned, or in the arrangement thereof, as may be necessary to satisfactorily meet the situation and shall bear the cost thereof.

This letter of no objection is based upon engineering criteria, and no interpretation or comments regarding local laws, zoning, or ordinances concerning property rights, etc., have been made. Additionally, this letter of no objection does not obviate the applicant's requirement to obtain federal, state, or local permits required by law.

If we can be of any further assistance, please feel free to call Mr. Albert Terry of my office, at (504) 862-2311. Additionally, future correspondence concerning this project should reference our permit number 13-592. This will allow us to more easily locate records of previous correspondence, and thus provide a quicker response.

Please furnish this office a copy of your permit if the applicant's proposal is approved by your Board.

Sincerely, A~1.~~

Operations Manager, Completed Works Enclosures Copies Furnished:

CPRA, Baton Rouge, Attn: Rhonda Braud CPRA, Baton Rouge, Attn: Antonio German Entergy - Waterford 3 Attn: Mr. Gerald Davey

~ ."

PILE CAISSON SPUD PILE PILE CLUSTER (BUOY AND ANCHOR CHA I Nl STONE RJPRAP STONE STONE STONE ASPHALT RIPRAP ASPHALT WILLOW WILLOW OR A.C.

OR A.C. ASPHALT MATTRESS WILLOW MA TT RESS OR A.C.

MATTRESS RIVER BANK RIVER BANK RIVER BANK RIVER BANK w

~

0 w

~

0 0

w

~ "~

w

"'w>

0 u

z 0 ~

>- z

~

~

G';

~~~~;

STONE COVERAGE REQUIRED OVER TOT AL AREA B )~ ffi~ ~

~~~ !

~ ~~ ~~ !

NOTES: ~ 8~ ~~ ~

~

I. SIZE OF RIPRAP TO VARY BETWEEN 6 POUNDS AND 125 POUNDS "

WITH 40 PERCENT TO 60 PERCENT OF THE STONE WITHIN THE "',,; mi"':0;:.

DIMENSIONS IN FEET FOR j Hi~

RANGE OF 25 POUNDS TO 75 POUNDS.

PROTECTION AREA REQUIRED DEPTH OF WATER IN FEET SPUD PILE 2. WHEN PENETRATING THE UPPER BANK PAVING IN A REVETMENT AREA PILE WITH PILES, CAISSONS AND/OR PILE CLUSTERS, A 10 INCH THICK AT POINT OF PENETRATION PILE CAISSON <BUOY AND CLUSTER RIPRAP STONE LAYER SHALL BE PLACED OVER ALL AREAS WHERE

~§~

AT TIME OF STONE PLACEMENT ANCHOR CHAIN) 8~~

~;~~

THE BANK PAVING IS DISTURBED BY DRIVING OPERATIONS.

x y x y x y x y I' - 10' 3 1.5 5 2 3 I Ai §~~d

3. WHEN USING AN ANCHOR CHAIN AND BUOY SYSTEM, THE ANCHOR 11' - 40' 41' - 60' 5

8 2

3 8

12 3

4 7

12 3

4 6

10 2

3 CHAIN MUST BE ATTACHED AT THE TOP OF THE PILE TO MINIMIZE REVETMENT DAMAGE.

u~