ML19079A257: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:MARK A. RICHTER, PH.D.
{{#Wiki_filter:MARK A. RICHTER, PH.D.
Senior Project Manager, Fuel and Decommissioning Programs 1201 F Street, NW, Suite 1100 Washington, DC 20004 P: 202.739.8106 mar@nei.org nei.org   March 13, 2017 Mr. John Lubinski Director Division of Engineering Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Senior Project Manager, Fuel and Decommissioning Programs 1201 F Street, NW, Suite 1100 Washington, DC 20004 P: 202.739.8106 mar@nei.org nei.org March 13, 2017 Mr. John Lubinski Director Division of Engineering Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
-0001


==Subject:==
==Subject:==
Transmittal of NEI 03
Transmittal of NEI 03-08 rev. 03, Guideline for the Management of Materials Issues Project Number: 689
-08 rev. 03 , "Guideline for the Management of Materials Issues"


Project Number: 689 Dear Mr. Lubinski
==Dear Mr. Lubinski:==
: The Nuclear Energy Institute (NEI) in partnership with the Electric Power Research Institute (EPRI) Materials Degradation and Aging APC (MAPC) has completed Revision 3 to the NEI "Guideline for the Management of Materials Issues NEI 03
 
-08." The controlled copy of NEI 03
The Nuclear Energy Institute (NEI) in partnership with the Electric Power Research Institute (EPRI) Materials Degradation and Aging APC (MAPC) has completed Revision 3 to the NEI Guideline for the Management of Materials Issues NEI 03-08. The controlled copy of NEI 03-08 revision 3 is attached for your reference and is effective immediately. Notable changes include: inclusion of Appendix C Screening Process, explicit identification of NEI roles and expectations (pg. 13), and an explicit description of the NEI role in managing the regulatory interface (pg. 9).
-08 revision 3 is attached for your reference and is effective immediately. Notable changes include: inclusion of Appendix C Screening Process, explicit identification of NEI roles and expectations (pg. 13), and an explicit description of the NEI role in managing the regulatory interface (pg.
We appreciate your ongoing engagement with industry on materials issues. If you have any questions, please contact me at 202.739.8106; mar@nei.org.
9). We appreciate your ongoing engagement with industry on materials issues. If you have any questions, please contact me at 202.739.8106; mar@nei.org
Sincerely, Mark A. Richter Attachment}}
. Sincerely,   Mark A. Richter Attachment}}

Latest revision as of 23:43, 19 October 2019

Transmittal of NEI 03-08 Rev. 3, Guideline for the Management of Materials Issues
ML19079A257
Person / Time
Site: Nuclear Energy Institute
Issue date: 03/13/2017
From: Richter M
Nuclear Energy Institute
To: John Lubinski
Division of Engineering
Poehler J, NRR-DMLR 415-8353
Shared Package
ML19079A253 List:
References
NEI 03-08, Rev 3
Download: ML19079A257 (1)


Text

MARK A. RICHTER, PH.D.

Senior Project Manager, Fuel and Decommissioning Programs 1201 F Street, NW, Suite 1100 Washington, DC 20004 P: 202.739.8106 mar@nei.org nei.org March 13, 2017 Mr. John Lubinski Director Division of Engineering Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Transmittal of NEI 03-08 rev. 03, Guideline for the Management of Materials Issues Project Number: 689

Dear Mr. Lubinski:

The Nuclear Energy Institute (NEI) in partnership with the Electric Power Research Institute (EPRI) Materials Degradation and Aging APC (MAPC) has completed Revision 3 to the NEI Guideline for the Management of Materials Issues NEI 03-08. The controlled copy of NEI 03-08 revision 3 is attached for your reference and is effective immediately. Notable changes include: inclusion of Appendix C Screening Process, explicit identification of NEI roles and expectations (pg. 13), and an explicit description of the NEI role in managing the regulatory interface (pg. 9).

We appreciate your ongoing engagement with industry on materials issues. If you have any questions, please contact me at 202.739.8106; mar@nei.org.

Sincerely, Mark A. Richter Attachment