{{#Wiki_filter:Boration Systems Flow Paths, Shutdown TR 3.1.1 Watts Bar - Unit 2 3.1-1 Technical Requirements  (developmental) A TR 3.1 REACTIVITY CONTROL SYSTEMS  
{{#Wiki_filter:Boration Systems Flow Paths, Shutdown TR 3.1.1 TR 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.1 Boration Systems Flow Paths, Shutdown TR 3.1.1                     One of the following boron injection flow paths shall be OPERABLE and capable of being powered from an OPERABLE emergency power source:
 
: a. A flow path from an OPERABLE boric acid storage system, through the boric acid transfer pump, through a charging pump to the Reactor Coolant System (RCS), or
TR 3.1.1 Boration Systems Flow Paths, Shutdown  
: b. A flow path from an OPERABLE RWST through a charging pump to the RCS.
 
APPLICABILITY:               MODES 4, 5, and 6.
TR 3.1.1 One of the following boron injection flow paths shall be OPERABLE and capable of being powered from an OPERABLE emergency power source:
--------------------------------------------------------NOTE-------------------------------------------------------------
: a. A flow path from an OPERABLE boric acid storage system, through the boric acid transfer pump, through a charging pump to the Reactor  
For MODE 4, Technical Specification LCO 3.0.4.b is not applicable to ECCS high head (centrifugal charging) subsystem.
 
ACTIONS CONDITION                                   REQUIRED ACTION                           COMPLETION TIME A. Boration Systems flow path                 A.1          Suspend CORE                          Immediately OPERABILITY                                           ALTERATIONS.
Coolant System (RCS), or
: b. A flow path from an OPERABLE RWST through a charging pump to the RCS.  
 
APPLICABILITY: MODES 4, 5, and 6.  
 
--------------------------------------------------------NOTE-------------------------------------------------------------  
 
For MODE 4, Technical Specification LCO 3.0.4.b is not applicable to ECCS high head (centrifugal charging) subsystem.  
 
-----------------------------------------------------------------------------------------------------------------------------
 
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Boration Systems flow path OPERABILITY  
 
requirements not met.
requirements not met.
OR Boration Systems flow path not capable of being  
AND OR A.2          Suspend positive                      Immediately Boration Systems flow path                             reactivity additions.
not capable of being powered by an OPERABLE emergency power source.
Watts Bar - Unit 2                                          3.1-1 Technical Requirements (developmental)                                                                                        A


powered by an OPERABLE  
Boration Systems Flow Paths, Shutdown TR 3.1.1 TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                FREQUENCY TSR 3.1.1.1        -------------------------------NOTE------------------------------
Only required if the flow path from the boric acid storage tanks is required OPERABLE.
Verify temperature of the areas containing flow path                  12 hours components from the boric acid tanks is > 63°F.
TSR 3.1.1.2        Verify, for the required OPERABLE flow path, that                    31 days each manual, power operated, or automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.
Watts Bar - Unit 2                                    3.1-2 Technical Requirements (developmental)                                                                  A


emergency power source. A.1 Suspend CORE ALTERATIONS.
Boration Systems Flow Paths, Operating TR 3.1.2 TR 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.2 Boration Systems Flow Paths, Operating TR 3.1.2             Two of the following three boron injection flow paths shall be OPERABLE:
Immediately AND  A.2 Suspend positive reactivity additions.
Immediately
 
Boration Systems Flow Paths, Shutdown TR 3.1.1  Watts Bar - Unit 2 3.1-2 Technical Requirements  (developmental) A TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR  3.1.1.1 -------------------------------NOTE------------------------------
Only required if the flow path from the boric acid
 
storage tanks is required OPERABLE.
 
---------------------------------------------------------------------
Verify temperature of the areas containing flow path components from the boric acid tanks is >
63 F. 12 hours TSR  3.1.1.2 Verify, for the required OPERABLE flow path, that each manual, power operated, or automatic valve in
 
the flow path that is not locked, sealed, or otherwise
 
secured in position is in the correct position.
31 days Boration Systems Flow Paths, Operating TR 3.1.2 Watts Bar - Unit 2 3.1-3 Technical Requirements  (developmental) A TR 3.1 REACTIVITY CONTROL SYSTEMS  
 
TR 3.1.2 Boration Systems Flow Paths, Operating  
 
TR 3.1.2 Two of the following three boron injection flow paths shall be OPERABLE:
: a. One flow path from the boric acid tanks, through a boric acid transfer pump, through a charging pump to the Reactor Coolant System (RCS).
: a. One flow path from the boric acid tanks, through a boric acid transfer pump, through a charging pump to the Reactor Coolant System (RCS).
: b. Two flow paths from the Refueling Water Storage Tank (RWST), through charging pumps to the RCS.  
: b. Two flow paths from the Refueling Water Storage Tank (RWST),
 
through charging pumps to the RCS.
APPLICABILITY: MODES 1, 2, and 3.  
APPLICABILITY:       MODES 1, 2, and 3.
 
ACTIONS CONDITION                         REQUIRED ACTION                   COMPLETION TIME A. One required flow path         A.1       Restore required flow path   72 hours inoperable.                                to OPERABLE status.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required flow path inoperable. A.1 Restore required flow path to OPERABLE status.
OR A.2.1     Be in MODE 3.                 78 hours AND A.2.2     Borate to a SDM               78 hours equivalent to > 1% k/k at 200°F.
72 hours OR   A.2.1 Be in MODE 3. 78 hours AND A.2.2 Borate to a SDM equivalent to >
AND A.2.3     Restore required path to     246 hours OPERABLE status.
1% k/k at 200 F. 78 hours AND A.2.3 Restore required path to OPERABLE status.
B. Required Action and             B.1        Be in MODE 4.                6 hours associated Completion Time of Condition A not met.
246 hours B. Required Action and associated Completion Time  
Watts Bar - Unit 2                            3.1-3 Technical Requirements (developmental)                                                          A


of Condition A not met. B.1 Be in MODE 4. 6 hours
Boration Systems Flow Paths, Operating TR 3.1.2 TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                FREQUENCY TSR 3.1.2.1        -------------------------------NOTE------------------------------
Only required if the flow path from the boric acid tanks is required OPERABLE.
Verify temperature of the areas containing portions of               12 hours the required flow path from the boric acid tanks is
                  > 63°F.
TSR 3.1.2.2        Verify, for the required OPERABLE flow paths, each                    31 days manual, power operated or automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.
TSR 3.1.2.3        Demonstrate that each automatic valve in the flow                    18 months path actuates to its correct position on an actual or simulated actuation signal.
TSR 3.1.2.4       Verify that the flow path from the boric acid tanks                  18 months delivers > 35 gpm to the RCS.
Watts Bar - Unit 2                                    3.1-4 Technical Requirements (developmental)                                                                  A


Boration Systems Flow Paths, Operating TR 3.1.2  Watts Bar - Unit 2 3.1-4 Technical Requirements  (developmental) A TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR  3.1.2.1 -------------------------------NOTE------------------------------
Charging Pump, Shutdown TR 3.1.3 TR 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.3 Charging Pump, Shutdown TR 3.1.3                    One charging pump in the boron injection flow path required by TR 3.1.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency power source.
Only required if the flow path from the boric acid
APPLICABILITY:              MODES 4, 5, and 6.
--------------------------------------------------------NOTE-------------------------------------------------------------
For MODE 4, Technical Specification LCO 3.0.4.b is not applicable to ECCS high head (centrifugal charging) subsystem.
ACTIONS CONDITION                                  REQUIRED ACTION                          COMPLETION TIME A. Required charging pump                    A.1          Suspend CORE                          Immediately inoperable.                                            ALTERATIONS.
OR                                      AND Required charging pump                  A.2          Suspend positive                      Immediately not capable of being                                  reactivity additions.
powered by an OPERABLE emergency power source.
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                      FREQUENCY TSR 3.1.3.1              Verify required charging pump's developed head at                        In accordance with the test flow point is > the required developed head.                    Inservice Testing Program Watts Bar - Unit 2                                          3.1-5 Technical Requirements (developmental)                                                                                        A


tanks is required OPERABLE.  
Charging Pumps, Operating TR 3.1.4 TR 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.4 Charging Pumps, Operating TR 3.1.4            Two charging pumps shall be OPERABLE.
APPLICABILITY:      MODES 1, 2, and 3.
ACTIONS CONDITION                    REQUIRED ACTION              COMPLETION TIME A. One required charging        A.1      Restore required          72 hours pump inoperable.                      charging pump to OPERABLE status.
OR A.2.1    Be in MODE 3.              78 hours AND A.2.2    Borate to a SDM            78 hours equivalent to > 1% k/k at 200°F.
AND A.2.3    Restore required           246 hours charging pump to OPERABLE status.
B. Required Action and          B.1      Be in MODE 4.              6 hours associated Completion Time of Condition A not met.
Watts Bar - Unit 2                      3.1-6 Technical Requirements (developmental)                                                A


---------------------------------------------------------------------
Charging Pumps, Operating TR 3.1.4 TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY TSR 3.1.4.1        Verify required charging pump's developed head at        In accordance with the test flow point is > the required developed head. Inservice Testing Program Watts Bar - Unit 2                              3.1-7 Technical Requirements (developmental)                                                        A
Verify temperature of the areas containing portions of the required flow path from the boric acid tanks is
> 63 F. 12 hours TSR 3.1.2.2 Verify, for the required OPERABLE flow paths, each manual, power operated or automatic valve in the flow


path that is not locked, sealed, or otherwise secured in
Borated Water Sources, Shutdown TR 3.1.5 TR 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.5 Borated Water Sources, Shutdown TR 3.1.5           One of the following borated water sources shall be OPERABLE as required by TR 3.1.1:
 
position is in the correct position.
31 days TSR  3.1.2.3 Demonstrate that each automatic valve in the flow path actuates to its correct position on an actual or
 
simulated actuation signal.
18 months TSR  3.1.2.4 Verify that the flow path from the boric acid tanks delivers >
35 gpm to the RCS.
18 months
 
Charging Pump, Shutdown TR 3.1.3  Watts Bar - Unit 2 3.1-5 Technical Requirements  (developmental) A TR 3.1  REACTIVITY CONTROL SYSTEMS
 
TR 3.1.3  Charging Pump, Shutdown
 
TR  3.1.3 One charging pump in the boron injection flow path required by TR 3.1.1 shall be OPERABLE and capable of being powered from an OPERABLE
 
emergency power source.
 
APPLICABILITY: MODES 4, 5, and 6.
 
--------------------------------------------------------NOTE-------------------------------------------------------------
 
For MODE 4, Technical Specification LCO 3.0.4.b is not applicable to ECCS high head (centrifugal charging) subsystem.
 
-----------------------------------------------------------------------------------------------------------------------------
 
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required charging pump inoperable.
OR Required charging pump not capable of being
 
powered by an OPERABLE
 
emergency power source. A.1 Suspend CORE ALTERATIONS.
Immediately AND  A.2 Suspend positive reactivity additions.
Immediately
 
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR  3.1.3.1 Verify required charging pump's developed head at the test flow point is >
the required developed head.
In accordance with Inservice Testing
 
Program Charging Pumps, Operating TR 3.1.4  Watts Bar - Unit 2 3.1-6 Technical Requirements  (developmental) A TR 3.1  REACTIVITY CONTROL SYSTEMS
 
TR 3.1.4  Charging Pumps, Operating
 
TR  3.1.4 Two charging pumps shall be OPERABLE.
 
APPLICABILITY: MODES 1, 2, and 3.
 
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required charging pump inoperable. A.1 Restore required charging pump to
 
OPERABLE status.
72 hours OR  A.2.1 Be in MODE 3. 78 hours AND  A.2.2 Borate to a SDM equivalent to  >
1% k/k at 200 F. 78 hours AND  A.2.3 Restore required charging pump to
 
OPERABLE status.
246 hours B. Required Action and associated Completion
 
Time of Condition A
 
not met. B.1 Be in MODE 4. 6 hours
 
Charging Pumps, Operating TR 3.1.4  Watts Bar - Unit 2 3.1-7 Technical Requirements  (developmental) A TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR  3.1.4.1 Verify required charging pump's developed head at the test flow point is >
the required developed head.
In accordance with Inservice Testing
 
Program Borated Water Sources, Shutdown TR 3.1.5 Watts Bar - Unit 2 3.1-8 Technical Requirements  (developmental) A TR 3.1 REACTIVITY CONTROL SYSTEMS  
 
TR 3.1.5 Borated Water Sources, Shutdown  
 
TR 3.1.5 One of the following borated water sources shall be OPERABLE as required by TR 3.1.1:
: a. A Boric Acid Storage System, or
: a. A Boric Acid Storage System, or
: b. The Refueling Water Storage Tank (RWST).  
: b. The Refueling Water Storage Tank (RWST).
 
APPLICABILITY:     MODES 4, 5, and 6.
APPLICABILITY: MODES 4, 5, and 6.  
ACTIONS CONDITION                       REQUIRED ACTION                 COMPLETION TIME A. Required borated water       A.1       Suspend CORE                 Immediately source inoperable.                      ALTERATIONS.
 
AND A.2       Suspend positive             Immediately reactivity additions.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required borated water source inoperable. A.1 Suspend CORE ALTERATIONS.
Watts Bar - Unit 2                          3.1-8 Technical Requirements (developmental)                                                      A
Immediately AND   A.2 Suspend positive reactivity additions.
Immediately


Borated Water Sources, Shutdown TR 3.1.5 Watts Bar - Unit 2 3.1-9 Technical Requirements  (developmental) A TECHNICAL SURVEILLANCE REQUIREMENTS  
Borated Water Sources, Shutdown TR 3.1.5 TECHNICAL SURVEILLANCE REQUIREMENTS
--------------------------------------------------------NOTES-----------------------------------------------------------
--------------------------------------------------------NOTES-----------------------------------------------------------
: 1. TSR 3.1.5.1, TSR 3.1.5.2 and TSR 3.1.5.3 are only required to be performed if the RWST is the required borated water source.
: 1. TSR 3.1.5.1, TSR 3.1.5.2 and TSR 3.1.5.3 are only required to be performed if the RWST is the required borated water source.
: 2. TSR 3.1.5.4, TSR 3.1.5.5 and TSR 3.1.5.6 are only required to be performed if the Boric Acid Storage System is the required borated water source.
: 2. TSR 3.1.5.4, TSR 3.1.5.5 and TSR 3.1.5.6 are only required to be performed if the Boric Acid Storage System is the required borated water source.
-----------------------------------------------------------------------------------------------------------------------------
SURVEILLANCE                                                       FREQUENCY TSR 3.1.5.1             -------------------------------NOTE------------------------------
SURVEILLANCE FREQUENCY TSR 3.1.5.1 -------------------------------NOTE------------------------------
Only required when ambient air temperature is
Only required when ambient air temperature is  
                        < 60&deg;F.
Verify RWST solution temperature is > 60&deg;F.                              24 hours TSR 3.1.5.2              Verify RWST boron concentration is > 3,100 ppm.                          7 days TSR 3.1.5.3              Verify RWST borated water volume is                                      7 days
                        > 62,900 gallons.
TSR 3.1.5.4              Verify Boric Acid Tank (BAT) solution temperature is                      24 hours
                        > 63&deg;F.
TSR 3.1.5.5              Verify BAT boron concentration is > 6,120 ppm and                        7 days 6,990 ppm.
TSR 3.1.5.6              Verify BAT borated water volume is > 5,300 gallons.                      7 days Watts Bar - Unit 2                                          3.1-9 Technical Requirements (developmental)                                                                                      A


< 60&deg;F.
Borated Water Sources, Operating TR 3.1.6 TR 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.6 Borated Water Sources, Operating TR 3.1.6           The following borated water sources shall be OPERABLE as required by TR 3.1.2:
---------------------------------------------------------------------
Verify RWST solution temperature is >
60 F. 24 hours TSR  3.1.5.2 Verify RWST boron concentration is > 3,100 ppm. 7 days TSR  3.1.5.3 Verify RWST borated water volume is
> 62,900 gallons.
7 days TSR  3.1.5.4 Verify Boric Acid Tank (BAT) solution temperature is
> 63&deg;F. 24 hours TSR  3.1.5.5 Verify BAT boron concentration is >
6,120 ppm and  6,990 ppm.
7 days TSR  3.1.5.6 Verify BAT borated water volume is > 5,300 gallons. 7 days
 
Borated Water Sources, Operating TR 3.1.6 Watts Bar - Unit 2 3.1-10 Technical Requirements  (developmental) A TR 3.1 REACTIVITY CONTROL SYSTEMS  
 
TR 3.1.6 Borated Water Sources, Operating  
 
TR 3.1.6 The following borated water sources shall be OPERABLE as required by TR 3.1.2:
: a. A Boric Acid Storage System, and
: a. A Boric Acid Storage System, and
: b. The Refueling Water Storage Tank (RWST).  
: b. The Refueling Water Storage Tank (RWST).
 
APPLICABILITY:     MODES 1, 2, and 3.
APPLICABILITY: MODES 1, 2, and 3.  
ACTIONS CONDITION                       REQUIRED ACTION               COMPLETION TIME A. Required Boric Acid           A.1       Restore Boric Acid         72 hours Storage System inoperable.              Storage System, to OPERABLE status.
 
OR A.2.1     Be in MODE 3.               78 hours AND A.2.2     Borate to a SDM             78 hours equivalent to  1% k/k at 200&deg;F.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required Boric Acid Storage System inoperable. A.1 Restore Boric Acid Storage System, to  
AND A.2.3     Restore Boric Acid         246 hours Storage System to OPERABLE status.
 
B. Required Action and           B.1       Be in MODE 4.               6 hours associated Completion Time of Condition A not met.
OPERABLE status.
(continued)
72 hours OR   A.2.1 Be in MODE 3. 78 hours AND A.2.2 Borate to a SDM equivalent to  1% k/k at 200&deg;F. 78 hours AND A.2.3 Restore Boric Acid Storage System to  
Watts Bar - Unit 2                         3.1-10 Technical Requirements (developmental)                                                     A
 
OPERABLE status.
246 hours B. Required Action and associated Completion
 
Time of Condition A
 
not met. B.1 Be in MODE 4. 6 hours (continued)
Borated Water Sources, Operating TR 3.1.6  Watts Bar - Unit 2 3.1-11 Technical Requirements  (developmental) A ACTIONS  (continued) CONDITION REQUIRED ACTION COMPLETION TIME C. RWST boron concentration not within limits.
OR RWST borated water temperature not within
 
limits. C.1 Restore RWST to OPERABLE status.
8 hours D. RWST inoperable for reasons other than
 
Condition C. D.1 Restore RWST to OPERABLE status.
1 hour E. Required Action and associated Completion  
 
Time of Condition C or D
 
not met. E.1 Be in MODE 3 6 hours AND  E.2 Be in MODE 4 with one or more RCS cold leg
 
temperatures <
310&deg;F. 12 hours 
 
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR  3.1.6.1 -------------------------------NOTE------------------------------
Only required when outside air temperature is
 
< 60&deg;F or >105&deg;F.
 
---------------------------------------------------------------------
Verify RWST solution temperature is  60 F and  105&deg;F. 24 hours TSR  3.1.6.2 Verify RWST boron concentration is  3,100 ppm and  3,300 ppm.
7 days (continued)
Borated Water Sources, Operating TR 3.1.6  Watts Bar - Unit 2 3.1-12 Technical Requirements (developmental) B TECHNICAL SURVEILLANCE REQUIREMENTS  (continued) SURVEILLANCE FREQUENCY TSR  3.1.6.3 Verifiy RWST borated water volume is  370,000 gallons.
7 days TSR  3.1.6.4 -------------------------------NOTE------------------------------
Only required if the BAT is required OPERABLE.
 
---------------------------------------------------------------------
Verify Boric Acid Tank (BAT) solution temperature is  63&deg;F. 24 hours TSR  3.1.6.5 -------------------------------NOTE------------------------------
Only required if the BAT is required OPERABLE.
 
---------------------------------------------------------------------
Verify BAT boron concentration is in accordance with Figures 3.1.6A, 3.1.6B, and 3.1.6C.
7 days TSR  3.1.6.6 -------------------------------NOTE------------------------------
Only required if the BAT is required OPERABLE.
 
---------------------------------------------------------------------
Verify BAT borated water volume is in accordance with Figures 3.1.6A, 3.1.6B, and 3.1.6C.
7 days Borated Water Sources, Operating TR 3.1.6 TECHNICAL REQUIREMENTS FIGURE 3.1.6A BORIC ACID TANK LIMITS BASED ON RWST BORON CONCENTRATION Level 1 RWST ConcentrationIIIIIIII I REGION OF ACCEPTABLE OPERATION 1...,/ RWST=2700[IDm B I I*I>,....."-r'4;l RWST=.2800 oom B I"-"!/I RWST>2900o[m B'-.I"'-"-r'-......,11"-...........J ,".......'"'-r-'"""'"...............'".,.......REGION OF UNACCEPTABLE OPERATION J, I......H 6120 ppm MINIMUM I I 6990 ppm MAXIMUM I I II I I I I I I-Indicated values include additional 1 ,91 0 gal compensation for liliiii unusablevol, instrument error, and conservatism.
11500 CI)z o...J C)I l-e:(0)0500 z w:E:J
>c w U1 c W I-is z:IE i 8500 Z i 8000 6000 610062006300640065006600 670068006900 7000 7100 CONCENTRATION IN BAT-PPM BORON RWST Concentration
-+-2700 ppm B-2800 ppm B B I Watts Bar-Unit 2 Technical Requirements 3.1-13 B Borated Water Sources, Operating TR3.1.6 TECHNICAL REQUIREMENTS FIGURE 3.1.68 BORIC ACI D TAN K LIMIT S BASED ON RWST BORON CONCENTRATION Level 2 RWST Concentration 11500 (J)z o j1000<<C)I.....
z w:E:J
>Q W r.t:
tJ)c w.....
is:z:i i S500:EIIIIII I REGION OF ACCEPTABLE OPERATION I.....,,/''(RWST=3100OCIl1B 1..,.........."-,[RWST=320000m B J.."-J",,-I RWST3300 JPm B]),'""-.L ,..,.......'" , ,'-.....1,.....'....."-...............,'...i'-REGION OF UNACCEPTABLE OPERATION I/"..........
H 6120ppm MINIMUM I[6990oom MAXIMUM)III II III**III*I Indicated values include additional 1,910 gal compensation for unusablevot instrument error, and conservatism.
8000 6000 61006200630064006500 6600 6700 6800 6900 7000 7100 CONCENTRATION IN BAT*PPM BORON R.WST Concentration
-+-3100 ppm B_3200 ppm B.....-3300 ppm B I Watts Bar-Unit 2 Technical Requirements 3.1-14 Borated Water Sources, Operating TR 3.1.6 TECHNICAL REQUIREMENTS FIGURE 3 1.6C BORIC ACI D TAN K LIMIT S BASED ON RWST BORON CONCENTRA rlON Level 3 RWST Concentration I I I I I I I II[REGION OF ACCEPTABLE OPERATION]I I I I I...VRWST=3600 ppm B IK...J V[RWST=3700 ppn B]-..."'"','-/'-"'"[RWST=3800 porn B'""-........*'"l'...i"""-
I''-"-...'....."-,.............,-..II REGION OF UNACCEPTABLE OPERATION If....r--..H 6120pptll MINIMUM I[6990 ppm MAXIMUM]...II I I I I Indicated values include additional 1 ,91 0 gal compensation for unusablevol, instrument error, and conservatism.
I--p.-I 800060006100 6200 630064006500 6600 6700 6800 690070007100 CONCENTRATION IN BAT-PPM BORON U)z o...I...I<<C).<<co z w:E=>>...I o>Q W 0:: o.....(J)C W I-<<U C 9000 z:E:;::):I z 8500 i RWST Concentration
--.-3600 ppm B_3700 ppm B........3800 ppm B I Watts Bar-Unit 2 Technical Requirements 3.1-15 B Position Indication System, Shutdown TR 3.1.7  Watts Bar - Unit 2 3.1-16 Technical Requirements  (developmental) A TR 3.1  REACTIVITY CONTROL SYSTEMS
 
TR 3.1.7  Position Indication System, Shutdown
 
TR  3.1.7 The group demand position indicators shall be OPERABLE and capable of determining within +/- 2 steps the demand position for each shutdown or
 
control rod that is not fully inserted.
 
APPLICABILITY: MODES 3, 4, and 5, when the reactor trip breakers are closed.
 
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more group demand position indicators
 
inoperable. A.1 Open reactor trip breakers.
Immediately


TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR  3.1.7.1 Determine that each group demand position indicator is OPERABLE by movement of the associated
Borated Water Sources, Operating TR 3.1.6 ACTIONS (continued)
CONDITION                                REQUIRED ACTION                      COMPLETION TIME C. RWST boron concentration              C.1          Restore RWST to                    8 hours not within limits.                                  OPERABLE status.
OR RWST borated water temperature not within limits.
D. RWST inoperable for                    D.1          Restore RWST to                    1 hour reasons other than                                  OPERABLE status.
Condition C.
E. Required Action and                    E.1          Be in MODE 3                      6 hours associated Completion Time of Condition C or D              AND not met.
E.2          Be in MODE 4 with one              12 hours or more RCS cold leg temperatures < 310&deg;F.
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                 FREQUENCY TSR 3.1.6.1        -------------------------------NOTE------------------------------
Only required when outside air temperature is
                    < 60&deg;F or >105&deg;F.
Verify RWST solution temperature is 60&deg;F and                        24 hours 105&deg;F.
TSR 3.1.6.2        Verify RWST boron concentration is  3,100 ppm                        7 days and  3,300 ppm.
(continued)
Watts Bar - Unit 2                                    3.1-11 Technical Requirements (developmental)                                                                        A


shutdown or control rod 10 steps in any one
Borated Water Sources, Operating TR 3.1.6 TECHNICAL SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                FREQUENCY TSR 3.1.6.3        Verifiy RWST borated water volume is                                  7 days 370,000 gallons.
TSR 3.1.6.4        -------------------------------NOTE------------------------------
Only required if the BAT is required OPERABLE.
Verify Boric Acid Tank (BAT) solution temperature is                  24 hours 63&deg;F.
TSR 3.1.6.5        -------------------------------NOTE------------------------------
Only required if the BAT is required OPERABLE.
Verify BAT boron concentration is in accordance with                  7 days Figures 3.1.6A, 3.1.6B, and 3.1.6C.
TSR 3.1.6.6        -------------------------------NOTE------------------------------
Only required if the BAT is required OPERABLE.
Verify BAT borated water volume is in accordance                      7 days with Figures 3.1.6A, 3.1.6B, and 3.1.6C.
Watts Bar - Unit 2                                    3.1-12 Technical Requirements (developmental)                                                                    B


direction.
Borated Water Sources, Operating TR 3.1.6 TECHNICAL REQUIREMENTS FIGURE 3.1.6A BORIC ACID TANK LIMITS BASED ON RWST BORON CONCENTRATION Level 1 RWST Concentration 11500                            I            I      I          I      I      I              I            I
Within 4 hours after closing the reactor
                                    ,I      REGION OF ACCEPTABLE OPERATION                                          1 CI) z o
    ...J
    ~1000
                              ... I>      , / ~I RWST            =2700 [IDm B I I
* C)
                              ~            .....
r'4 ~ ;l I
l-                            ~                                    RWST =.2800 oom B                  I e:(
0)0500                    ~
z w
:E
                                  "- ~
                                          ""-'-        ~
                                                        .I
                                                            !/ ~ "'-
                                                            ~                ~
I RWST>2900o[m B r
                                                                              ~ .....
:J
    ~OOOO
                                                    -~
                                                                ~
c w
                                                            ~ -...
                                                                  ... ~
                                                                            ~
11 , "      ~ .....
                                                                                                          ....... ,~
    ~
    ~9500
                                                                            ~  J r- "
                                                                                          ~
U1 c                                                                              '" ,,~
                                                                                                    ""'" ....... ,,~    .,
W I-
    ~9000
                                                                                                          ....... ~ ~
REGION OF UNACCEPTABLE OPERATION                                      J is                                                                  I                                    ~iJI z
                        ......H  6120 ppm MINIMUM                I I 6990 ppm MAXIMUM
:IE                                                                  I      I    I I        I    I i 8500 -
I            I      II Indicated values include additional 1,91 0 gal compensation for Z                          unusablevol, instrument error, and conservatism.
i          liliiii 8000 6000 6100 6200 6300 6400 6500 6600 6700 6800 6900 7000 7100 CONCENTRATION IN BAT - PPM BORON RWST Concentration
                            -+-2700 ppm B -2800 ppm B                          ~2900ppm B I Watts Bar - Unit 2                                                    3.1-13 Technical Requirements              (ae~VeIOClmE~ntcal                                                                            B


trip breakers if not
Borated Water Sources, Operating TR3.1.6 TECHNICAL REQUIREMENTS FIGURE 3.1.68 BORIC ACI D TAN K LIMITS BASED ON RWST BORON CONCENTRATION Level 2 RWST Concentration 11500                              I            I        I      I      I      I (J)                              I  REGION OF ACCEPTABLE OPERATION                                              I z
o j1000
                              ...  ~
                                        ..,,/ ''( RWST=3100OCIl1B 1    . .
C)
I
                                    ~
                                        ~
    .....                                                        ,[ RWST = 320000m B
    ~0500                    ~
                                                          "-  ~
J                .        .
z w
:E
:J
    ~OOOO
                                    ~
                                        ~ "- J
                                            ~~
                                                      )    ~
                                                                  ~
                                                                          ~
I RWST ~ 3300 JPm B
                                                                            ~~      ,..,
                                                                                                                          ]
Q
                                                      -~
                                                              ,~
                                                                    ~,
                                                                      '" "- .L
                                                                          ~[      '",
                                                                                          ~ .......
W r.t:
                                                                                          ~                        ~ '-.....
    ~9500                                                                  1  ~,                      ~
tJ) c w                                                                                '    ...........
    ~900o is
:z
                ~
REGION OF UNACCEPTABLE OPERATION I
                                                                                                                ' ... i'-
                                                                                                                  /"
                    ..........H6120ppm MINIMUM                    I [6990oom MAXIMUM                              )
:i                          III      II          III
                                                                *
* III
* I i S500        Indicated values include additional 1,910 gal compensation for
      ~                        unusablevot instrument error, and conservatism.
:E 8000 6000 6100 6200 6300 6400 6500 6600 6700 6800 6900 7000 7100 CONCENTRATION IN BAT
* PPM BORON R.WST Concentration
                      -+-3100 ppm B _3200 ppm B .....-3300 ppm B                                                I Watts Bar - Unit 2                                                    3.1-14 Technical Requirements                {aE~veIOrJ~mE~nt;tU


completed within
Borated Water Sources, Operating TR 3.1.6 TECHNICAL REQUIREMENTS FIGURE 3 1.6C BORIC ACI D TAN K LIMIT S BASED ON RWST BORON CONCENTRA rlON Level 3 RWST Concentration I      I        I        I  I  I        I                  II
[  REGION OF ACCEPTABLE OPERATION                                        ]
I        I      I        I z
U)
I. . .        ~
V  ~'[
RWST      =3600 ppm B I o
                                ... K
      ...I                          ~
      ...I
      <<                                      ~
C)
I-
        .                            ~
                                          ~
                                                ~
                                                    ~          J V[ RWST =3700 ppn B
                                                                                                              ]
                                              "''-      /"'
co z                              ~~
w                                            ~
                                                        ~
                                              "'"                        ~ ....... [ RWST =3800 porn B
:E
      =>>
      ...I                                                  "-
o                                          -~
Q
                                                        ~ ...
                                                              ,...~
                                                                      ~
                                                                        ~        l' i"            ""-
I'
                                                                                  ~ ~ '-"-
W 0::
o                                                              ~~
                                                                                                                  ~
      .....                                                              ~N
                                                                                                      .~                ...
(J)
C U
C W
I-9000 II    REGION OF UNACCEPTABLE OPERATION
                                                                                                    ~    ,-..
I ~
z
:E
:;::)
r--.. H6120pptll MINIMUM I [ 6990 f
:I z      8500                  . . .                II      I ppm MAXIMUM I        I                  I
                                                                                                                ]
i                    Indicated values include additional 1,91 0 gal compensation for unusablevol, instrument error, and conservatism.
I--                                                                                                    ~ p.-
8000      I 6000 6100 6200 6300 6400 6500 6600 6700 6800 6900 7000 7100 CONCENTRATION IN BAT - PPM BORON RWST Concentration
                                  --.-3600 ppm B _3700 ppm B ........ 3800 ppm B                                I Watts Bar - Unit 2                                      3.1-15 Technical Requirements    (aE~Ve~IOI)men'[all                                                                                          B


previous 31 days.
Position Indication System, Shutdown TR 3.1.7 TR 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.7 Position Indication System, Shutdown TR 3.1.7              The group demand position indicators shall be OPERABLE and capable of determining within +/- 2 steps the demand position for each shutdown or control rod that is not fully inserted.
AND 31 days thereafter}}
APPLICABILITY:        MODES 3, 4, and 5, when the reactor trip breakers are closed.
ACTIONS CONDITION                          REQUIRED ACTION                    COMPLETION TIME A. One or more group demand        A.1        Open reactor trip              Immediately position indicators                          breakers.
inoperable.
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE                                            FREQUENCY TSR 3.1.7.1        Determine that each group demand position indicator          Within 4 hours after is OPERABLE by movement of the associated                    closing the reactor shutdown or control rod 10 steps in any one                  trip breakers if not direction.                                                  completed within previous 31 days.
AND 31 days thereafter Watts Bar - Unit 2                              3.1-16 Technical Requirements (developmental)                                                              A}}

Latest revision as of 03:11, 12 March 2020

Developmental Revision B - Technical Requirements Manual TR 3.1 - Reactivity Control Systems
ML100550620
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/02/2010
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML100550620 (16)


Text

Boration Systems Flow Paths, Shutdown TR 3.1.1 TR 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.1 Boration Systems Flow Paths, Shutdown TR 3.1.1 One of the following boron injection flow paths shall be OPERABLE and capable of being powered from an OPERABLE emergency power source:

a. A flow path from an OPERABLE boric acid storage system, through the boric acid transfer pump, through a charging pump to the Reactor Coolant System (RCS), or
b. A flow path from an OPERABLE RWST through a charging pump to the RCS.

APPLICABILITY: MODES 4, 5, and 6.


NOTE-------------------------------------------------------------

For MODE 4, Technical Specification LCO 3.0.4.b is not applicable to ECCS high head (centrifugal charging) subsystem.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Boration Systems flow path A.1 Suspend CORE Immediately OPERABILITY ALTERATIONS.

requirements not met.

AND OR A.2 Suspend positive Immediately Boration Systems flow path reactivity additions.

not capable of being powered by an OPERABLE emergency power source.

Watts Bar - Unit 2 3.1-1 Technical Requirements (developmental) A

Boration Systems Flow Paths, Shutdown TR 3.1.1 TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.1.1.1 -------------------------------NOTE------------------------------

Only required if the flow path from the boric acid storage tanks is required OPERABLE.

Verify temperature of the areas containing flow path 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> components from the boric acid tanks is > 63°F.

TSR 3.1.1.2 Verify, for the required OPERABLE flow path, that 31 days each manual, power operated, or automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.

Watts Bar - Unit 2 3.1-2 Technical Requirements (developmental) A

Boration Systems Flow Paths, Operating TR 3.1.2 TR 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.2 Boration Systems Flow Paths, Operating TR 3.1.2 Two of the following three boron injection flow paths shall be OPERABLE:

a. One flow path from the boric acid tanks, through a boric acid transfer pump, through a charging pump to the Reactor Coolant System (RCS).
b. Two flow paths from the Refueling Water Storage Tank (RWST),

through charging pumps to the RCS.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required flow path A.1 Restore required flow path 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. to OPERABLE status.

OR A.2.1 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> AND A.2.2 Borate to a SDM 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> equivalent to > 1% k/k at 200°F.

AND A.2.3 Restore required path to 246 hours0.00285 days <br />0.0683 hours <br />4.06746e-4 weeks <br />9.3603e-5 months <br /> OPERABLE status.

B. Required Action and B.1 Be in MODE 4. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not met.

Watts Bar - Unit 2 3.1-3 Technical Requirements (developmental) A

Boration Systems Flow Paths, Operating TR 3.1.2 TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.1.2.1 -------------------------------NOTE------------------------------

Only required if the flow path from the boric acid tanks is required OPERABLE.

Verify temperature of the areas containing portions of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> the required flow path from the boric acid tanks is

> 63°F.

TSR 3.1.2.2 Verify, for the required OPERABLE flow paths, each 31 days manual, power operated or automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.

TSR 3.1.2.3 Demonstrate that each automatic valve in the flow 18 months path actuates to its correct position on an actual or simulated actuation signal.

TSR 3.1.2.4 Verify that the flow path from the boric acid tanks 18 months delivers > 35 gpm to the RCS.

Watts Bar - Unit 2 3.1-4 Technical Requirements (developmental) A

Charging Pump, Shutdown TR 3.1.3 TR 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.3 Charging Pump, Shutdown TR 3.1.3 One charging pump in the boron injection flow path required by TR 3.1.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency power source.

APPLICABILITY: MODES 4, 5, and 6.


NOTE-------------------------------------------------------------

For MODE 4, Technical Specification LCO 3.0.4.b is not applicable to ECCS high head (centrifugal charging) subsystem.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required charging pump A.1 Suspend CORE Immediately inoperable. ALTERATIONS.

OR AND Required charging pump A.2 Suspend positive Immediately not capable of being reactivity additions.

powered by an OPERABLE emergency power source.

TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.1.3.1 Verify required charging pump's developed head at In accordance with the test flow point is > the required developed head. Inservice Testing Program Watts Bar - Unit 2 3.1-5 Technical Requirements (developmental) A

Charging Pumps, Operating TR 3.1.4 TR 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.4 Charging Pumps, Operating TR 3.1.4 Two charging pumps shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required charging A.1 Restore required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> pump inoperable. charging pump to OPERABLE status.

OR A.2.1 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> AND A.2.2 Borate to a SDM 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> equivalent to > 1% k/k at 200°F.

AND A.2.3 Restore required 246 hours0.00285 days <br />0.0683 hours <br />4.06746e-4 weeks <br />9.3603e-5 months <br /> charging pump to OPERABLE status.

B. Required Action and B.1 Be in MODE 4. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not met.

Watts Bar - Unit 2 3.1-6 Technical Requirements (developmental) A

Charging Pumps, Operating TR 3.1.4 TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.1.4.1 Verify required charging pump's developed head at In accordance with the test flow point is > the required developed head. Inservice Testing Program Watts Bar - Unit 2 3.1-7 Technical Requirements (developmental) A

Borated Water Sources, Shutdown TR 3.1.5 TR 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.5 Borated Water Sources, Shutdown TR 3.1.5 One of the following borated water sources shall be OPERABLE as required by TR 3.1.1:

a. A Boric Acid Storage System, or
b. The Refueling Water Storage Tank (RWST).

APPLICABILITY: MODES 4, 5, and 6.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required borated water A.1 Suspend CORE Immediately source inoperable. ALTERATIONS.

AND A.2 Suspend positive Immediately reactivity additions.

Watts Bar - Unit 2 3.1-8 Technical Requirements (developmental) A

Borated Water Sources, Shutdown TR 3.1.5 TECHNICAL SURVEILLANCE REQUIREMENTS


NOTES-----------------------------------------------------------

1. TSR 3.1.5.1, TSR 3.1.5.2 and TSR 3.1.5.3 are only required to be performed if the RWST is the required borated water source.
2. TSR 3.1.5.4, TSR 3.1.5.5 and TSR 3.1.5.6 are only required to be performed if the Boric Acid Storage System is the required borated water source.

SURVEILLANCE FREQUENCY TSR 3.1.5.1 -------------------------------NOTE------------------------------

Only required when ambient air temperature is

< 60°F.

Verify RWST solution temperature is > 60°F. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TSR 3.1.5.2 Verify RWST boron concentration is > 3,100 ppm. 7 days TSR 3.1.5.3 Verify RWST borated water volume is 7 days

> 62,900 gallons.

TSR 3.1.5.4 Verify Boric Acid Tank (BAT) solution temperature is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

> 63°F.

TSR 3.1.5.5 Verify BAT boron concentration is > 6,120 ppm and 7 days 6,990 ppm.

TSR 3.1.5.6 Verify BAT borated water volume is > 5,300 gallons. 7 days Watts Bar - Unit 2 3.1-9 Technical Requirements (developmental) A

Borated Water Sources, Operating TR 3.1.6 TR 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.6 Borated Water Sources, Operating TR 3.1.6 The following borated water sources shall be OPERABLE as required by TR 3.1.2:

a. A Boric Acid Storage System, and
b. The Refueling Water Storage Tank (RWST).

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required Boric Acid A.1 Restore Boric Acid 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Storage System inoperable. Storage System, to OPERABLE status.

OR A.2.1 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> AND A.2.2 Borate to a SDM 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> equivalent to 1% k/k at 200°F.

AND A.2.3 Restore Boric Acid 246 hours0.00285 days <br />0.0683 hours <br />4.06746e-4 weeks <br />9.3603e-5 months <br /> Storage System to OPERABLE status.

B. Required Action and B.1 Be in MODE 4. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not met.

(continued)

Watts Bar - Unit 2 3.1-10 Technical Requirements (developmental) A

Borated Water Sources, Operating TR 3.1.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. RWST boron concentration C.1 Restore RWST to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> not within limits. OPERABLE status.

OR RWST borated water temperature not within limits.

D. RWST inoperable for D.1 Restore RWST to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> reasons other than OPERABLE status.

Condition C.

E. Required Action and E.1 Be in MODE 3 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition C or D AND not met.

E.2 Be in MODE 4 with one 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or more RCS cold leg temperatures < 310°F.

TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.1.6.1 -------------------------------NOTE------------------------------

Only required when outside air temperature is

< 60°F or >105°F.

Verify RWST solution temperature is 60°F and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 105°F.

TSR 3.1.6.2 Verify RWST boron concentration is 3,100 ppm 7 days and 3,300 ppm.

(continued)

Watts Bar - Unit 2 3.1-11 Technical Requirements (developmental) A

Borated Water Sources, Operating TR 3.1.6 TECHNICAL SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY TSR 3.1.6.3 Verifiy RWST borated water volume is 7 days 370,000 gallons.

TSR 3.1.6.4 -------------------------------NOTE------------------------------

Only required if the BAT is required OPERABLE.

Verify Boric Acid Tank (BAT) solution temperature is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 63°F.

TSR 3.1.6.5 -------------------------------NOTE------------------------------

Only required if the BAT is required OPERABLE.

Verify BAT boron concentration is in accordance with 7 days Figures 3.1.6A, 3.1.6B, and 3.1.6C.

TSR 3.1.6.6 -------------------------------NOTE------------------------------

Only required if the BAT is required OPERABLE.

Verify BAT borated water volume is in accordance 7 days with Figures 3.1.6A, 3.1.6B, and 3.1.6C.

Watts Bar - Unit 2 3.1-12 Technical Requirements (developmental) B

Borated Water Sources, Operating TR 3.1.6 TECHNICAL REQUIREMENTS FIGURE 3.1.6A BORIC ACID TANK LIMITS BASED ON RWST BORON CONCENTRATION Level 1 RWST Concentration 11500 I I I I I I I I

,I REGION OF ACCEPTABLE OPERATION 1 CI) z o

...J

~1000

... I> , / ~I RWST =2700 [IDm B I I

  • C)

~ .....

r'4 ~ ;l I

l- ~ RWST =.2800 oom B I e:(

0)0500 ~

z w

E

"- ~

""-'- ~

.I

!/ ~ "'-

~ ~

I RWST>2900o[m B r

~ .....

J

~OOOO

-~

~

c w

~ -...

... ~

~

11 , " ~ .....

....... ,~

~

~9500

~ J r- "

~

U1 c '" ,,~

""'" ....... ,,~ .,

W I-

~9000

....... ~ ~

REGION OF UNACCEPTABLE OPERATION J is I ~iJI z

......H 6120 ppm MINIMUM I I 6990 ppm MAXIMUM

IE I I I I I I i 8500 -

I I II Indicated values include additional 1,91 0 gal compensation for Z unusablevol, instrument error, and conservatism.

i liliiii 8000 6000 6100 6200 6300 6400 6500 6600 6700 6800 6900 7000 7100 CONCENTRATION IN BAT - PPM BORON RWST Concentration

-+-2700 ppm B -2800 ppm B ~2900ppm B I Watts Bar - Unit 2 3.1-13 Technical Requirements (ae~VeIOClmE~ntcal B

Borated Water Sources, Operating TR3.1.6 TECHNICAL REQUIREMENTS FIGURE 3.1.68 BORIC ACI D TAN K LIMITS BASED ON RWST BORON CONCENTRATION Level 2 RWST Concentration 11500 I I I I I I (J) I REGION OF ACCEPTABLE OPERATION I z

o j1000

... ~

..,,/ ( RWST=3100OCIl1B 1 . .

C)

I

~

~

..... ,[ RWST = 320000m B

~0500 ~

"- ~

J . .

z w

E
J

~OOOO

~

~ "- J

~~

) ~

~

~

I RWST ~ 3300 JPm B

~~ ,..,

]

Q

-~

,~

~,

'" "- .L

~[ '",

~ .......

W r.t:

~ ~ '-.....

~9500 1 ~, ~

tJ) c w ' ...........

~900o is

z

~

REGION OF UNACCEPTABLE OPERATION I

' ... i'-

/"

..........H6120ppm MINIMUM I [6990oom MAXIMUM )

i III II III
  • III
  • I i S500 Indicated values include additional 1,910 gal compensation for

~ unusablevot instrument error, and conservatism.

E 8000 6000 6100 6200 6300 6400 6500 6600 6700 6800 6900 7000 7100 CONCENTRATION IN BAT

-+-3100 ppm B _3200 ppm B .....-3300 ppm B I Watts Bar - Unit 2 3.1-14 Technical Requirements {aE~veIOrJ~mE~nt;tU

Borated Water Sources, Operating TR 3.1.6 TECHNICAL REQUIREMENTS FIGURE 3 1.6C BORIC ACI D TAN K LIMIT S BASED ON RWST BORON CONCENTRA rlON Level 3 RWST Concentration I I I I I I I II

[ REGION OF ACCEPTABLE OPERATION ]

I I I I z

U)

I. . . ~

V ~'[

RWST =3600 ppm B I o

... K

...I ~

...I

<< ~

C)

I-

. ~

~

~

~ J V[ RWST =3700 ppn B

]

"- /"'

co z ~~

w ~

~

"'" ~ ....... [ RWST =3800 porn B

E

=>>

...I "-

o -~

Q

~ ...

,...~

~

~ l' i" ""-

I'

~ ~ '-"-

W 0::

o ~~

~

..... ~N

.~ ...

(J)

C U

C W

I-9000 II REGION OF UNACCEPTABLE OPERATION

~ ,-..

I ~

z

E
)

r--.. H6120pptll MINIMUM I [ 6990 f

I z 8500 . . . II I ppm MAXIMUM I I I

]

i Indicated values include additional 1,91 0 gal compensation for unusablevol, instrument error, and conservatism.

I-- ~ p.-

8000 I 6000 6100 6200 6300 6400 6500 6600 6700 6800 6900 7000 7100 CONCENTRATION IN BAT - PPM BORON RWST Concentration

--.-3600 ppm B _3700 ppm B ........ 3800 ppm B I Watts Bar - Unit 2 3.1-15 Technical Requirements (aE~Ve~IOI)men'[all B

Position Indication System, Shutdown TR 3.1.7 TR 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.7 Position Indication System, Shutdown TR 3.1.7 The group demand position indicators shall be OPERABLE and capable of determining within +/- 2 steps the demand position for each shutdown or control rod that is not fully inserted.

APPLICABILITY: MODES 3, 4, and 5, when the reactor trip breakers are closed.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more group demand A.1 Open reactor trip Immediately position indicators breakers.

inoperable.

TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.1.7.1 Determine that each group demand position indicator Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after is OPERABLE by movement of the associated closing the reactor shutdown or control rod 10 steps in any one trip breakers if not direction. completed within previous 31 days.

AND 31 days thereafter Watts Bar - Unit 2 3.1-16 Technical Requirements (developmental) A