| title = E-mail from L. Trocine of Usnrc to D. Lew of Usnrc Regarding Update on the TMI Event
| title = E-mail from L. Trocine of USNRC to D. Lew of USNRC Regarding Update on the TMI Event
| author name = Trocine L
| author name = Trocine L
| author affiliation = NRC/EDO/AO
| author affiliation = NRC/EDO/AO
| addressee name = Lew D C
| addressee name = Lew D
| addressee affiliation = NRC/RGN-I/DRP
| addressee affiliation = NRC/RGN-I/DRP
| docket = 05000289, 05000320
| docket = 05000289, 05000320
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Lew, David From: Trocine, Leigh Sent: Monday, November 23, 2009 9:20 AM To: Lew, David  
{{#Wiki_filter:Lew, David From:                       Trocine, Leigh Sent:                       Monday, November 23, 2009 9:20 AM To:                         Lew, David


==Subject:==
==Subject:==
RE: Update on the TMI event Thanks a million for keeping me in the loop! You did a great job on the 11/22 TA Briefing!
RE: Update on the TMI event Thanks a million for keeping me in the loop! You did a great job on the 11/22 TA Briefing! :-)
:-)Cheers, Leigh-- --- Original Message -----From: Lew, David Sent: Sunday, November 22, 2009 10:00 AM To: Lew, David; Collins, Sam; Spindler, David; Hayden, Elizabeth; Powell, Amy; Grobe, Jack; Johnson, Michael; Roberts, Darrell; Mallett, Bruce; Leeds, Eric; Trocine, Leigh Cc: Screnci, Diane; McNamara, Nancy; McKinley, Raymond; McDermott, Brian; White, John; Newport, Christopher; Bamford, Peter; Barber, Scott; HOO Hoc; Kern, David; Brand, Javier; Bellamy, Ronald  
: Cheers, Leigh
-- Original
    ---     Message -----
From: Lew, David Sent: Sunday, November 22, 2009 10:00 AM To: Lew, David; Collins, Sam; Spindler, David; Hayden, Elizabeth; Powell, Amy; Grobe, Jack; Johnson, Michael; Roberts, Darrell; Mallett, Bruce; Leeds, Eric; Trocine, Leigh Cc: Screnci, Diane; McNamara, Nancy; McKinley, Raymond; McDermott, Brian; White, John; Newport, Christopher; Bamford, Peter; Barber, Scott; HOO Hoc; Kern, David; Brand, Javier; Bellamy, Ronald


==Subject:==
==Subject:==
RE: Update on the TMI event We are revising the time for an internal briefing.
RE: Update on the TMI event We are revising the time for an internal briefing. Region I will provide an update brief via the HOO at 4:30 pm, after PAO and staff have met with the media. Anyone interested can particpate by calling the HOO.
Region I will provide an update brief via the HOO at 4:30 pm, after PAO and staff have met with the media. Anyone interested can particpate by calling the HOO.Separately, one of our SPEs (Scott Barber) will being working on talking points to support the media outreach at 2 pm. Nancy McNamara with also be coming into the office to support communication needs for OCA.-- --- Original Message -----From: Lew, David Sent: Sunday, November 22, 2009 9:47 AM To: Collins, Sam; Spindler, David; Hayden, Elizabeth; Powell, Amy; Grobe, Jack; Johnson, Michael; Roberts, Darrell Cc: Screnci, Diane; McNamara, Nancy; McKinley, Raymond; McDermott, Brian; White, John; Newport, Christopher; Bamford, Peter; Barber, Scott; HOO Hoc; Kern, David; Brand, Javier; Bellamy, Ronald  
Separately, one of our SPEs (Scott Barber) will being working on talking points to support the media outreach at 2 pm. Nancy McNamara with also be coming into the office to support communication needs for OCA.
-- Original
    ---     Message -----
From: Lew, David Sent: Sunday, November 22, 2009 9:47 AM To: Collins, Sam; Spindler, David; Hayden, Elizabeth; Powell, Amy; Grobe, Jack; Johnson, Michael; Roberts, Darrell Cc: Screnci, Diane; McNamara, Nancy; McKinley, Raymond; McDermott, Brian; White, John; Newport, Christopher; Bamford, Peter; Barber, Scott; HOO Hoc; Kern, David; Brand, Javier; Bellamy, Ronald


==Subject:==
==Subject:==
Update on the TMI event The HOO has established a bridge for Region I to facilitate internal communications and coordination in response to the anticipated media issues. The staff should provide information via this bridge by calling the HOO and asking to be put on the TMI bridge. We will be lookingto set up a general briefing for internal stakeholders later this morning (expected around 11 am).Update on media interest: 1. Numerous calls last night from external stakeholders were address but the HOO and Region I PAO;however, few calls were received after 2 am this morning.2. The Region I PAO (Diane Screnci), a DRS Branch Chief (John White) and a senior Health Physicists (Ron Nimitz) will be on site today. Tentatively, they will meet with the media at 2 pm at the training center to answer questions.
Update on the TMI event The HOO has established a bridge for Region I to facilitate internal communications and coordination in response to the anticipated media issues. The staff should provide information via this bridge by calling the HOO and asking to be put on the TMI bridge. We will be lookingto set up a general briefing for internal stakeholders later this morning (expected around 11 am).
: 3. The staff continues to monitor media interest on the web.4. Exelon public affairs will been meeting with the media this morning.Update on the plant 1. The licensee has completed the whole body count of about 150 workers in containment.
Update on media interest:
20 of these workers had estimated between 10 mrem and 36 mrem. 5 of these workers initially show higher doses, but the 1 11 results are suspect and are being evaluated.
: 1. Numerous calls last night from external stakeholders were address but the HOO and Region I PAO; however, few calls were received after 2 am this morning.
: 2. The Region I PAO (Diane Screnci), a DRS Branch Chief (John White) and a senior Health Physicists (Ron Nimitz) will be on site today. Tentatively, they will meet with the media at 2 pm at the training center to answer questions.
: 3. The staff continues to monitor media interest on the web.
: 4. Exelon public affairs will been meeting with the media this morning.
Update on the plant
: 1. The licensee has completed the whole body count of about 150 workers in containment. 20 of these workers had estimated between 10 mrem and 36 mrem. 5 of these workers initially show higher doses, but the 1
 
11 results are suspect and are being evaluated.
: 2. The licensee continues to maintain a tarp on the containment hole for the SG replacement.
: 2. The licensee continues to maintain a tarp on the containment hole for the SG replacement.
: 3. Two potential causes of the airborne contamination event are being reviewed.
: 3. Two potential causes of the airborne contamination event are being reviewed. The first is associated with welding activities on a small plug inside the skirt on the bottom of the B SG, during which the associated HEPA filter which is powered via an extension cord was found tripped. The other is pipe decontamination and preparation activities associated with the A cold leg, which they identified high contamination on the outside of a wet vac located near the work.
The first is associated with welding activities on a small plug inside the skirt on the bottom of the B SG, during which the associated HEPA filter which is powered via an extension cord was found tripped. The other is pipe decontamination and preparation activities associated with the A cold leg, which they identified high contamination on the outside of a wet vac located near the work.4. Both these two actiities are located in the D ring. The license has maintained a hold on work in these areas, as they continue to assess the cause and clean up areas of high containment.
: 4. Both these two actiities are located in the D ring. The license has maintained a hold on work in these areas, as they continue to assess the cause and clean up areas of high containment.
2}}
2}}

Latest revision as of 20:01, 13 November 2019

E-mail from L. Trocine of USNRC to D. Lew of USNRC Regarding Update on the TMI Event
ML101230126
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 11/23/2009
From: Trocine L
NRC/EDO/AO
To: David Lew
Division Reactor Projects I
References
FOIA/PA-2010-0118
Download: ML101230126 (2)


Text

Lew, David From: Trocine, Leigh Sent: Monday, November 23, 2009 9:20 AM To: Lew, David

Subject:

RE: Update on the TMI event Thanks a million for keeping me in the loop! You did a great job on the 11/22 TA Briefing! :-)

Cheers, Leigh

-- Original

--- Message -----

From: Lew, David Sent: Sunday, November 22, 2009 10:00 AM To: Lew, David; Collins, Sam; Spindler, David; Hayden, Elizabeth; Powell, Amy; Grobe, Jack; Johnson, Michael; Roberts, Darrell; Mallett, Bruce; Leeds, Eric; Trocine, Leigh Cc: Screnci, Diane; McNamara, Nancy; McKinley, Raymond; McDermott, Brian; White, John; Newport, Christopher; Bamford, Peter; Barber, Scott; HOO Hoc; Kern, David; Brand, Javier; Bellamy, Ronald

Subject:

RE: Update on the TMI event We are revising the time for an internal briefing. Region I will provide an update brief via the HOO at 4:30 pm, after PAO and staff have met with the media. Anyone interested can particpate by calling the HOO.

Separately, one of our SPEs (Scott Barber) will being working on talking points to support the media outreach at 2 pm. Nancy McNamara with also be coming into the office to support communication needs for OCA.

-- Original

--- Message -----

From: Lew, David Sent: Sunday, November 22, 2009 9:47 AM To: Collins, Sam; Spindler, David; Hayden, Elizabeth; Powell, Amy; Grobe, Jack; Johnson, Michael; Roberts, Darrell Cc: Screnci, Diane; McNamara, Nancy; McKinley, Raymond; McDermott, Brian; White, John; Newport, Christopher; Bamford, Peter; Barber, Scott; HOO Hoc; Kern, David; Brand, Javier; Bellamy, Ronald

Subject:

Update on the TMI event The HOO has established a bridge for Region I to facilitate internal communications and coordination in response to the anticipated media issues. The staff should provide information via this bridge by calling the HOO and asking to be put on the TMI bridge. We will be lookingto set up a general briefing for internal stakeholders later this morning (expected around 11 am).

Update on media interest:

1. Numerous calls last night from external stakeholders were address but the HOO and Region I PAO; however, few calls were received after 2 am this morning.
2. The Region I PAO (Diane Screnci), a DRS Branch Chief (John White) and a senior Health Physicists (Ron Nimitz) will be on site today. Tentatively, they will meet with the media at 2 pm at the training center to answer questions.
3. The staff continues to monitor media interest on the web.
4. Exelon public affairs will been meeting with the media this morning.

Update on the plant

1. The licensee has completed the whole body count of about 150 workers in containment. 20 of these workers had estimated between 10 mrem and 36 mrem. 5 of these workers initially show higher doses, but the 1

11 results are suspect and are being evaluated.

2. The licensee continues to maintain a tarp on the containment hole for the SG replacement.
3. Two potential causes of the airborne contamination event are being reviewed. The first is associated with welding activities on a small plug inside the skirt on the bottom of the B SG, during which the associated HEPA filter which is powered via an extension cord was found tripped. The other is pipe decontamination and preparation activities associated with the A cold leg, which they identified high contamination on the outside of a wet vac located near the work.
4. Both these two actiities are located in the D ring. The license has maintained a hold on work in these areas, as they continue to assess the cause and clean up areas of high containment.