{{#Wiki_filter:ATTACHMENT 3 DOSE ESTIMATES  
{{#Wiki_filter:ATTACHMENT 3 DOSE ESTIMATES


Pen Ind Character/Loc. Repair steps Time Dose mRem Repair Comments 64 1 Mark indication 6 420   Light Grinding 20 1400   Welding Supv Perform Visual 2 140   Remark Penetration and Clean 3 210   Enter/Exit All Jumps 94 6819     12:00 J-Weld 3/32" x 1/4" Linear Rejectable QC inspection @ 5X PT of area 20 1400 Light Grind to reduce to acceptable Weld over if depth required 64 2 Mark indication 0 0    Light Grinding 0 0   Welding Supv Perform Visual 2 140    Remark Penetration and Clean  3 210    12:00 J-Weld 1/16" x 1/16" Rounded Acceptable QC inspection @ 5X PT of area 1 70 Repaired incidently with #1 64 3 Mark indication 0 0   Light Grinding 15 1050    Welding Supv Perform Visual 2 140   Remark Penetration and Clean 3 210     11:00 1/16" x 1/2" Linear Rejectable QC inspection @ 5X PT of area 1 70 Light Grind to reduce to acceptable Weld over if depth required 64 4 Mark indication 0 0    Light Grinding 22 1540   Welding Supv Perform Visual 2 140   Remark Penetration and Clean 3 210     3:00 1/4" x 1/4" Rounded Rejectable QC inspection @ 5X PT of area 1 70 Light Grind to reduce to acceptable Weld over if depth required 64 5 Mark indication 0 0   Light Grinding 0 0   Welding Supv Perform Visual 0 0   Remark Penetration and Clean 3 210     3:00 1/8" x 1/8" Rounded Acceptable QC inspection @ 5X PT of area 1 70 Possibly will be Repaired incidently with #1 64 6 Mark indication 10 700   Light Grinding 15 1050    Welding Supv Perform Visual 2 140   Remark Penetration and Clean 3 210     2:00 1/8" x 1/2" Linear Rejectable QC inspection @ 5X PT of area 1 70 Light Grind to reduce to acceptable Weld over if depth required
Dose Pen Ind Character/Loc.           Repair steps       Time         Repair Comments mRem 64 1                 Mark indication                 6   420 12:00 J-Weld Light Grinding                 20 1400 Light Grind to reduce to 3/32" x 1/4" Welding Supv Perform Visual     2   140       acceptable Linear Weld over if depth required Rejectable  Remark Penetration and Clean   3   210 Enter/Exit All Jumps           94 6819 QC inspection @ 5X PT of area 20 1400 64 2                 Mark indication                 0    0 12:00 J-Weld 1/16" x 1/16" Light Grinding                  0    0  Repaired incidently with #1 Rounded     Welding Supv Perform Visual    2  140 Acceptable Remark Penetration and Clean    3  210 QC inspection @ 5X PT of area   1   70 64 3                 Mark indication                 0   0 11:00                                              Light Grind to reduce to 1/16" x 1/2" Light Grinding                 15 1050       acceptable Linear   Welding Supv Perform Visual     2   140 Weld over if depth required Rejectable Remark Penetration and Clean   3   210 QC inspection @ 5X PT of area   1   70 64  4                Mark indication                0    0 3:00                                              Light Grind to reduce to 1/4" x 1/4Light Grinding                 22 1540       acceptable Rounded    Welding Supv Perform Visual     2   140 Weld over if depth required Rejectable Remark Penetration and Clean   3   210 QC inspection @ 5X PT of area   1   70 64 5                 Mark indication                 0   0 3:00 Light Grinding                 0   0       Possibly will be 1/8" x 1/8" Repaired incidently with #1 Rounded    Welding Supv Perform Visual     0   0 Acceptable Remark Penetration and Clean   3   210 QC inspection @ 5X PT of area   1   70 64 6                 Mark indication               10   700 2:00                                              Light Grind to reduce to 1/8" x 1/2"  Light Grinding                 15 1050       acceptable Linear   Welding Supv Perform Visual     2   140 Weld over if depth required Rejectable Remark Penetration and Clean   3   210 QC inspection @ 5X PT of area   1   70


Pen Ind Character/Loc. Repair steps Time Dose mRem Repair Comments 64 7 Mark indication 0 0   Light Grinding 15 1050   Welding Supv Perform Visual 2 140   Remark Penetration and Clean 3 210     2:00 0 Rounded Rejectable QC inspection @ 5X PT of area 1 70 Light Grind to reduce to acceptable Weld over if depth required 64 8 Mark indication 0 0   Light Grinding 15 1050    Welding Supv Perform Visual 2 140   Remark Penetration and Clean 3 210     5:00 1/16" x 3/16" Linear Rejectable QC inspection @ 5X PT of area 1 70 Light Grind to reduce to acceptable Weld over if depth required 64 9 Mark indication 0 0   Light Grinding 10 700    Welding Supv Perform Visual 2 140   Remark Penetration and Clean 3 210     6:00 1/16" x 3/16" Linear Rejectable QC inspection @ 5X PT of area 1 70 Light Grind to reduce to acceptable Weld over if depth required 31 1 Mark indication 6 420   Light Grinding 15 1050    Welding Supv Perform Visual 2 140   Remark Penetration and Clean 3 210     11:00 1/8" x 3/8" Linear Rejectable QC inspection @ 5X PT of area 15.5 1085 Light Grind to reduce to acceptable Weld over if depth required 31 2 Mark indication 0 0   Light Grinding 15 1050    Welding Supv Perform Visual 2 140   Remark Penetration and Clean 3 210     1:00 1/16" x 1" Linear Rejectable QC inspection @ 5X PT of area 1 70 Light Grind to reduce to acceptable Weld over if depth required 31 3 Mark indication 0 0   Light Grinding 15 1050   Welding Supv Perform Visual 2 140   Remark Penetration and Clean 3 210     1:00 1/4" x 1/4" Rounded Rejectable QC inspection @ 5X PT of area 1 70 Light Grind to reduce to acceptable Weld over if depth required
Dose Pen Ind Character/Loc.           Repair steps       Time         Repair Comments mRem 64 7                 Mark indication                 0     0 2:00 Light Grinding                 15 1050 Light Grind to reduce to 0
acceptable Rounded    Welding Supv Perform Visual     2   140 Weld over if depth required Rejectable Remark Penetration and Clean   3   210 QC inspection @ 5X PT of area   1   70 64 8                 Mark indication                 0     0 5:00 Light Grinding                 15 1050 Light Grind to reduce to 1/16" x 3/16" acceptable Linear   Welding Supv Perform Visual     2   140 Weld over if depth required Rejectable Remark Penetration and Clean   3   210 QC inspection @ 5X PT of area   1   70 64 9                 Mark indication                 0     0 6:00 Light Grinding                 10   700 Light Grind to reduce to 1/16" x 3/16" acceptable Linear   Welding Supv Perform Visual     2   140 Weld over if depth required Rejectable Remark Penetration and Clean   3   210 QC inspection @ 5X PT of area   1   70 31 1                 Mark indication                 6   420 11:00 Light Grinding                 15 1050 Light Grind to reduce to 1/8" x 3/8" acceptable Linear   Welding Supv Perform Visual     2   140 Weld over if depth required Rejectable Remark Penetration and Clean   3   210 QC inspection @ 5X PT of area 15.5 1085 31 2                 Mark indication                 0     0 1:00 Light Grinding                 15 1050 Light Grind to reduce to 1/16" x 1" acceptable Linear   Welding Supv Perform Visual     2   140 Weld over if depth required Rejectable Remark Penetration and Clean   3   210 QC inspection @ 5X PT of area   1   70 31 3                 Mark indication                 0     0 1:00 Light Grinding                 15 1050 Light Grind to reduce to 1/4" x 1/4" acceptable Rounded    Welding Supv Perform Visual     2   140 Weld over if depth required Rejectable Remark Penetration and Clean   3   210 QC inspection @ 5X PT of area   1   70


Pen Ind Character/Loc. Repair steps Time Dose mRem Repair Comments 31 4 Mark indication 0 0   Light Grinding 22 1540   Welding Supv Perform Visual 2 140   Remark Penetration and Clean 3 210     8:00 1/2" x 5/8" Rounded Rejectable QC inspection @ 5X PT of area 1 70 Local Excavate to reduce to acceptable Weld over if depth required Total REM 28..554 Assumptions:  
Dose Pen   Ind   Character/Loc.               Repair steps         Time               Repair Comments mRem 31     4                       Mark indication                   0       0 8:00 Light Grinding                   22     1540   Local Excavate to reduce to 1/2" x 5/8" acceptable Rounded        Welding Supv Perform Visual       2       140   Weld over if depth required Rejectable Remark Penetration and Clean       3       210 QC inspection @ 5X PT of area     1       70 Total                         REM       28..554 Assumptions:
 
Only covers penetration 64 and 31 Both options include grinding on 64-4 and 31-4 (pen-Indication)
Only covers penetration 64 and 31 Both options include grinding on 64-4 and 31-4   (pen-Indication)
Both options include weld repair (overlay) on all indications in 64 and 31 No extra time for chasing indications after grinding Actuals for dose used:
Both options include weld repair (overlay) on all indications in 64 and 31 No extra time for chasing indications after grinding  
Dose at head 70 mrem/min Dose in and out 36 mrem/min Dose on turnovers .1 mrem/min
 
Actuals for dose used: Dose at head 70 mrem/min Dose in and out 36 mrem/min Dose on turnovers .1 mrem/min  


==
==
Conclusions:==
Conclusions:==


Relief request will yield a 7 REM savings for pen 64 and 31 MINIMUM  
Relief request will yield a 7 REM savings for pen 64 and 31 MINIMUM Additional saving should be less for the remaining penetrations since we expect less indication repair.
 
Additional saving should be less for the remaining penetrations since we expect less indication repair.  
 
Overall savings of approx 35% in dose.}}
Overall savings of approx 35% in dose.}}

Latest revision as of 01:00, 13 November 2019

Enclosure 3 - Dose Estimates
ML111030188
Person / Time
Site: Byron Constellation icon.png
Issue date: 04/08/2011
From:
Exelon Generation Co, Exelon Nuclear
To:
Office of Nuclear Reactor Regulation
Shared Package
ML111010578 List:
References
RS-11-062
Download: ML111030188 (4)


Text

ATTACHMENT 3 DOSE ESTIMATES

Dose Pen Ind Character/Loc. Repair steps Time Repair Comments mRem 64 1 Mark indication 6 420 12:00 J-Weld Light Grinding 20 1400 Light Grind to reduce to 3/32" x 1/4" Welding Supv Perform Visual 2 140 acceptable Linear Weld over if depth required Rejectable Remark Penetration and Clean 3 210 Enter/Exit All Jumps 94 6819 QC inspection @ 5X PT of area 20 1400 64 2 Mark indication 0 0 12:00 J-Weld 1/16" x 1/16" Light Grinding 0 0 Repaired incidently with #1 Rounded Welding Supv Perform Visual 2 140 Acceptable Remark Penetration and Clean 3 210 QC inspection @ 5X PT of area 1 70 64 3 Mark indication 0 0 11:00 Light Grind to reduce to 1/16" x 1/2" Light Grinding 15 1050 acceptable Linear Welding Supv Perform Visual 2 140 Weld over if depth required Rejectable Remark Penetration and Clean 3 210 QC inspection @ 5X PT of area 1 70 64 4 Mark indication 0 0 3:00 Light Grind to reduce to 1/4" x 1/4" Light Grinding 22 1540 acceptable Rounded Welding Supv Perform Visual 2 140 Weld over if depth required Rejectable Remark Penetration and Clean 3 210 QC inspection @ 5X PT of area 1 70 64 5 Mark indication 0 0 3:00 Light Grinding 0 0 Possibly will be 1/8" x 1/8" Repaired incidently with #1 Rounded Welding Supv Perform Visual 0 0 Acceptable Remark Penetration and Clean 3 210 QC inspection @ 5X PT of area 1 70 64 6 Mark indication 10 700 2:00 Light Grind to reduce to 1/8" x 1/2" Light Grinding 15 1050 acceptable Linear Welding Supv Perform Visual 2 140 Weld over if depth required Rejectable Remark Penetration and Clean 3 210 QC inspection @ 5X PT of area 1 70

Dose Pen Ind Character/Loc. Repair steps Time Repair Comments mRem 64 7 Mark indication 0 0 2:00 Light Grinding 15 1050 Light Grind to reduce to 0

acceptable Rounded Welding Supv Perform Visual 2 140 Weld over if depth required Rejectable Remark Penetration and Clean 3 210 QC inspection @ 5X PT of area 1 70 64 8 Mark indication 0 0 5:00 Light Grinding 15 1050 Light Grind to reduce to 1/16" x 3/16" acceptable Linear Welding Supv Perform Visual 2 140 Weld over if depth required Rejectable Remark Penetration and Clean 3 210 QC inspection @ 5X PT of area 1 70 64 9 Mark indication 0 0 6:00 Light Grinding 10 700 Light Grind to reduce to 1/16" x 3/16" acceptable Linear Welding Supv Perform Visual 2 140 Weld over if depth required Rejectable Remark Penetration and Clean 3 210 QC inspection @ 5X PT of area 1 70 31 1 Mark indication 6 420 11:00 Light Grinding 15 1050 Light Grind to reduce to 1/8" x 3/8" acceptable Linear Welding Supv Perform Visual 2 140 Weld over if depth required Rejectable Remark Penetration and Clean 3 210 QC inspection @ 5X PT of area 15.5 1085 31 2 Mark indication 0 0 1:00 Light Grinding 15 1050 Light Grind to reduce to 1/16" x 1" acceptable Linear Welding Supv Perform Visual 2 140 Weld over if depth required Rejectable Remark Penetration and Clean 3 210 QC inspection @ 5X PT of area 1 70 31 3 Mark indication 0 0 1:00 Light Grinding 15 1050 Light Grind to reduce to 1/4" x 1/4" acceptable Rounded Welding Supv Perform Visual 2 140 Weld over if depth required Rejectable Remark Penetration and Clean 3 210 QC inspection @ 5X PT of area 1 70

Dose Pen Ind Character/Loc. Repair steps Time Repair Comments mRem 31 4 Mark indication 0 0 8:00 Light Grinding 22 1540 Local Excavate to reduce to 1/2" x 5/8" acceptable Rounded Welding Supv Perform Visual 2 140 Weld over if depth required Rejectable Remark Penetration and Clean 3 210 QC inspection @ 5X PT of area 1 70 Total REM 28..554 Assumptions:

Only covers penetration 64 and 31 Both options include grinding on 64-4 and 31-4 (pen-Indication)

Both options include weld repair (overlay) on all indications in 64 and 31 No extra time for chasing indications after grinding Actuals for dose used:

Dose at head 70 mrem/min Dose in and out 36 mrem/min Dose on turnovers .1 mrem/min

==

Conclusions:==

Relief request will yield a 7 REM savings for pen 64 and 31 MINIMUM Additional saving should be less for the remaining penetrations since we expect less indication repair.

Overall savings of approx 35% in dose.