ML18355A637: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/21/2018
| issue date = 12/21/2018
| title = Notification of Licensed Operator Initial Exam Report 05000250/2019302 and 05000251/2019302
| title = Notification of Licensed Operator Initial Exam Report 05000250/2019302 and 05000251/2019302
| author name = McCoy G J
| author name = Mccoy G
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Nazar M
| addressee name = Nazar M
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000250/2019302]]
See also: [[see also::IR 05000250/2019302]]


=Text=
=Text=
{{#Wiki_filter:i.e.,
{{#Wiki_filter:UNITED STATES
                                  NUCLEAR REGULATORY COMMISSION
                                                REGION II
                              245 PEACHTREE CENTER AVENUE NE, SUITE 1200
                                      ATLANTA, GEORGIA 30303-1257
                                        December 21, 2018
Mano Nazar
Florida Power & Light Company
Mail Stop EX/JB
700 Universe Blvd.
Juno Beach, FL 33408
SUBJECT:        TURKEY POINT 3 & 4 - NOTIFICATION OF LICENSED OPERATOR INITIAL
                EXAMINATION 05000250/2019302 AND 05000251/2019302
Dear Mr. Nazar:
During a telephone conversation on December 7, 2018, between Mr. Val Miklausich, Exam
Project Manager, and Mr. Gary Callaway, Senior Reactor Technology Instructor, arrangements
were made for the administration of licensing examinations at Turkey Point. The on-site
preparatory week is scheduled for the week of June 17, 2019. The operating test is scheduled
to be administered during the weeks of July 22 and 29, 2019. The written examination is
scheduled to be administered the week of Aug 5, 2019.
As agreed during the telephone conversation, the U.S. Nuclear Regulatory Commission (NRC)
will prepare both the operating test outline and written examination based on the guidelines in
Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."
Your staff has already furnished the supporting reference materials identified in Attachment 3 to
ES-201. Your staff will be given the opportunity to review the complete examination in June
2019.
To meet the above schedule, the NRC will provide the operating test outlines by January 31,
2019.
The draft operating test examination materials will be due by May 8, 2019. Pursuant to Title 10,
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the examinations and tests before they are
submitted to the Commission for review and approval. All materials shall be complete and
ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information
provided to the NRC be contained in a separate enclosure and appropriately marked. Any
delay in receiving the required examination and reference materials, or the submittal of
inadequate or incomplete materials, may cause the examinations to be rescheduled.


M. Nazar                                      2
Your staff will be given the opportunity to review the written examination during preparation, and
will also be given the opportunity to discuss any changes that might be necessary to the
operating test during the preparatory week. Your staff has also agreed to make copies of all
examination materials that are necessary for administering the examination.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the NRC takes
licensing action on all the applications and any adjudicatory actions on any hearing demands
are complete.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator waiver and/or excusal requests (Office of Management and
Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if
possible). Contact Mr. Callaway to determine the method for submission of the waiver or
excusal requests. Preliminary reactor operator and senior reactor operator license applications
(OMB approval number 3150-0090) and medical certifications (OMB approval number 3150-
0024) should be submitted at least 30 days before the first examination date (that is, by June 22
2019). If the applications are not received at least 30 days before the examination date, a
postponement may be necessary. Final signed applications certifying that all training has been
completed and requesting any waivers or excusals, as applicable, should be submitted at least
14 days (by July 8, 2019) before the first examination date.
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before
the first examination date (preliminary) and 14 days before the first examination date (final), the
requests should be submitted as early as possible in the process (see the 60-day guideline
above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form
398, Personal Qualifications StatementLicensee, or as directed by Mr. Callaway when
contacting him to determine the method for submission). The NRC will document its final
decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398
submitted for the applicant. The NRC will not provide its decision until the final application is
submitted to the agency.
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average
2,250 hours per examination, including the time for reviewing instructions, searching existing
data sources, gathering and maintaining the data needed, and completing and reviewing the
information collections. You may submit comments on any aspect of the information collections,
including suggestions for reducing the burden, to FOIA, Privacy and Information Collections
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by


  /RA/
M. Nazar                                      3
electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information, unless the document requesting or requiring the collection displays a currently
valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the agencys Rules of Practice, a copy of this letter and its enclosures will be available
electronically for public inspection through the Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the NRC Website at
http://www.nrc.gov/reading-rm.adams.html.
Thank you for your cooperation in this matter. Mr. Miklausich has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Callaway at (423) 855-6502,
(Internet E-mail: Gary.Callaway@nrc.gov), or me at (404) 997-4551, (Internet E-mail:
Gerald.McCoy@nrc.gov ).
                                                Sincerely,
                                                /RA/
                                                Gerald J. McCoy, Chief
                                                Operations Branch 1
                                                Division of Reactor Safety
Docket Nos.: 50-250, 50-251
License Nos.: DPR-31, DPR-41
cc: Distribution via Listserv
 
 
__ML      18355A637_ SUNSI REVIEW COMPLETE  FORM 665 ATTACHED
  OFFICE              RII:DRS        RII:DRS
  SIGNATURE            JDB10          GJM1
  NAME              GCALLAWAY        GMCCOY
  DATE              12/ 14 / 2018  12/ 21 / 2018
  E-MAIL COPY?      YES      NO    YES      NO    YES NO    YES    NO    YES  NO      YES    NO
}}
}}

Latest revision as of 08:45, 20 October 2019

Notification of Licensed Operator Initial Exam Report 05000250/2019302 and 05000251/2019302
ML18355A637
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/21/2018
From: Gerald Mccoy
Division of Reactor Safety II
To: Nazar M
Florida Power & Light Co
References
50-250/19-301, 50-251/19-302
Download: ML18355A637 (4)


See also: IR 05000250/2019302

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

December 21, 2018

Mano Nazar

Florida Power & Light Company

Mail Stop EX/JB

700 Universe Blvd.

Juno Beach, FL 33408

SUBJECT: TURKEY POINT 3 & 4 - NOTIFICATION OF LICENSED OPERATOR INITIAL

EXAMINATION 05000250/2019302 AND 05000251/2019302

Dear Mr. Nazar:

During a telephone conversation on December 7, 2018, between Mr. Val Miklausich, Exam

Project Manager, and Mr. Gary Callaway, Senior Reactor Technology Instructor, arrangements

were made for the administration of licensing examinations at Turkey Point. The on-site

preparatory week is scheduled for the week of June 17, 2019. The operating test is scheduled

to be administered during the weeks of July 22 and 29, 2019. The written examination is

scheduled to be administered the week of Aug 5, 2019.

As agreed during the telephone conversation, the U.S. Nuclear Regulatory Commission (NRC)

will prepare both the operating test outline and written examination based on the guidelines in

Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."

Your staff has already furnished the supporting reference materials identified in Attachment 3 to

ES-201. Your staff will be given the opportunity to review the complete examination in June

2019.

To meet the above schedule, the NRC will provide the operating test outlines by January 31,

2019.

The draft operating test examination materials will be due by May 8, 2019. Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the examinations and tests before they are

submitted to the Commission for review and approval. All materials shall be complete and

ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information

provided to the NRC be contained in a separate enclosure and appropriately marked. Any

delay in receiving the required examination and reference materials, or the submittal of

inadequate or incomplete materials, may cause the examinations to be rescheduled.

M. Nazar 2

Your staff will be given the opportunity to review the written examination during preparation, and

will also be given the opportunity to discuss any changes that might be necessary to the

operating test during the preparatory week. Your staff has also agreed to make copies of all

examination materials that are necessary for administering the examination.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the NRC takes

licensing action on all the applications and any adjudicatory actions on any hearing demands

are complete.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator waiver and/or excusal requests (Office of Management and

Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if

possible). Contact Mr. Callaway to determine the method for submission of the waiver or

excusal requests. Preliminary reactor operator and senior reactor operator license applications

(OMB approval number 3150-0090) and medical certifications (OMB approval number 3150-

0024) should be submitted at least 30 days before the first examination date (that is, by June 22

2019). If the applications are not received at least 30 days before the examination date, a

postponement may be necessary. Final signed applications certifying that all training has been

completed and requesting any waivers or excusals, as applicable, should be submitted at least

14 days (by July 8, 2019) before the first examination date.

Although the guidelines for receiving waiver or excusal requests call for at least 30 days before

the first examination date (preliminary) and 14 days before the first examination date (final), the

requests should be submitted as early as possible in the process (see the 60-day guideline

above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.

Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form

398, Personal Qualifications StatementLicensee, or as directed by Mr. Callaway when

contacting him to determine the method for submission). The NRC will document its final

decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398

submitted for the applicant. The NRC will not provide its decision until the final application is

submitted to the agency.

Paperwork Reduction Act Statement

This letter contains information collection requirements that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved

by the Office of Management and Budget, approval number 3150-0018.

The burden to the public for these mandatory information collections is estimated to average

2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination, including the time for reviewing instructions, searching existing

data sources, gathering and maintaining the data needed, and completing and reviewing the

information collections. You may submit comments on any aspect of the information collections,

including suggestions for reducing the burden, to FOIA, Privacy and Information Collections

Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by

M. Nazar 3

electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

Public Protection Notification

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information, unless the document requesting or requiring the collection displays a currently

valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the agencys Rules of Practice, a copy of this letter and its enclosures will be available

electronically for public inspection through the Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Website at

http://www.nrc.gov/reading-rm.adams.html.

Thank you for your cooperation in this matter. Mr. Miklausich has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Callaway at (423) 855-6502,

(Internet E-mail: Gary.Callaway@nrc.gov), or me at (404) 997-4551, (Internet E-mail:

Gerald.McCoy@nrc.gov ).

Sincerely,

/RA/

Gerald J. McCoy, Chief

Operations Branch 1

Division of Reactor Safety

Docket Nos.: 50-250, 50-251

License Nos.: DPR-31, DPR-41

cc: Distribution via Listserv

__ML 18355A637_ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE JDB10 GJM1

NAME GCALLAWAY GMCCOY

DATE 12/ 14 / 2018 12/ 21 / 2018

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO