| docket = 05000333
| docket = 05000333
| license number = DPR-059
| license number = DPR-059
| contact person = Boska J P,  NRR, 301-415-2901
| contact person = Boska J,  NRR, 301-415-2901
| case reference number = EA-02-026, EA-06-137, TAC MD4533
| case reference number = EA-02-026, EA-06-137, TAC MD4533
| package number = ML072340002
| package number = ML072340002
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:ENCLOSURE 1REVISED PAGES OF FACILITY OPERATING LICENSE NO. DPR-59DOCKET NO. 50-333JAMES A. FITZPATRICK NUCLEAR POWER PLANTReplace the following page of the Facility Operating License. The revised pages are identifiedby the date of the letter issuing the page and contain marginal lines indicating the areas of change.REMOVEINSERTLicense DPR-59License DPR-59Page 7 Page 7--------Page 8 Q.ENF shall take all necessary steps to ensure that the decommissioning trust ismaintained in accordance with the application for the transfer of this license to ENF and ENO and the requirements of the order approving the transfer, and consistent with the safety evaluation supporting such order.R.Mitigation Strategy License ConditionDevelop and maintain strategies for addressing large fires and explosions andthat include the following key areas:(a) Fire fighting response strategy with the following elements:1. Pre-defined coordinated fire response strategy and guidance
{{#Wiki_filter:ENCLOSURE 1 REVISED PAGES OF FACILITY OPERATING LICENSE NO. DPR-59 DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT Replace the following page of the Facility Operating License. The revised pages are identified by the date of the letter issuing the page and contain marginal lines indicating the areas of change.
REMOVE                              INSERT License DPR-59                      License DPR-59 Page 7                             Page 7
                        --------                           Page 8
 
Q. ENF shall take all necessary steps to ensure that the decommissioning trust is maintained in accordance with the application for the transfer of this license to ENF and ENO and the requirements of the order approving the transfer, and consistent with the safety evaluation supporting such order.
R. Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a)     Fire fighting response strategy with the following elements:
: 1. Pre-defined coordinated fire response strategy and guidance
: 2. Assessment of mutual aid fire fighting assets
: 2. Assessment of mutual aid fire fighting assets
: 3. Designated staging areas for equipment and materials
: 3. Designated staging areas for equipment and materials
: 4. Command and control
: 4. Command and control
: 5. Training of response personnel(b) Operations to mitigate fuel damage considering the following:1. Protection and use of personnel assets
: 5. Training of response personnel (b)     Operations to mitigate fuel damage considering the following:
: 1. Protection and use of personnel assets
: 2. Communications
: 2. Communications
: 3. Minimizing fire spread
: 3. Minimizing fire spread
Line 29: Line 37:
: 5. Identification of readily-available pre-staged equipment
: 5. Identification of readily-available pre-staged equipment
: 6. Training on integrated fire response strategy
: 6. Training on integrated fire response strategy
: 7. Spent fuel pool mitigation measures(c) Actions to minimize release to include consideration of:1. Water spray scrubbing
: 7. Spent fuel pool mitigation measures (c)     Actions to minimize release to include consideration of:
: 2. Dose to onsite respondersS.The licensee shall implement and maintain all Actions required by Attachment 2to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.Revised by letter dated August 23, 2007 3.This license is effective as of the date of issuance and shall expire at midnight onOctober 17, 2014.FOR THE NUCLEAR REGULATORY COMMISSION (ORIGINAL SIGNED BY: ROBERT W. REID)
: 1. Water spray scrubbing
Robert W. Reid, ChiefOperating Reactors Branch #4 Division of Operating ReactorsAttachments/Appendices:1. Appendix A - Technical Specifications
: 2. Dose to onsite responders S. The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.
: 2. Appendix B - Deleted  
Revised by letter dated August 23, 2007
: 3. Appendix C - Additional ConditionsDate of Issuance: June 3, 1977Revised by letter dated August 23, 2007}}
: 3. This license is effective as of the date of issuance and shall expire at midnight on October 17, 2014.
FOR THE NUCLEAR REGULATORY COMMISSION (ORIGINAL SIGNED BY: ROBERT W. REID)
Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors Attachments/Appendices:
: 1. Appendix A - Technical Specifications
: 2. Appendix B - Deleted
: 3. Appendix C - Additional Conditions Date of Issuance: June 3, 1977 Revised by letter dated August 23, 2007}}

Latest revision as of 04:21, 23 November 2019

Revised Pages of Facility Operating License DPR-59 B.5.b
ML072340004
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/23/2007
From:
NRC/NRR/ADRO/DORL/LPLI-1
To:
Boska J, NRR, 301-415-2901
Shared Package
ML072340002 List:
References
EA-02-026, EA-06-137, TAC MD4533
Download: ML072340004 (4)


Text

ENCLOSURE 1 REVISED PAGES OF FACILITY OPERATING LICENSE NO. DPR-59 DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT Replace the following page of the Facility Operating License. The revised pages are identified by the date of the letter issuing the page and contain marginal lines indicating the areas of change.

REMOVE INSERT License DPR-59 License DPR-59 Page 7 Page 7


Page 8

Q. ENF shall take all necessary steps to ensure that the decommissioning trust is maintained in accordance with the application for the transfer of this license to ENF and ENO and the requirements of the order approving the transfer, and consistent with the safety evaluation supporting such order.

R. Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders S. The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.

Revised by letter dated August 23, 2007

3. This license is effective as of the date of issuance and shall expire at midnight on October 17, 2014.

FOR THE NUCLEAR REGULATORY COMMISSION (ORIGINAL SIGNED BY: ROBERT W. REID)

Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors Attachments/Appendices:

1. Appendix A - Technical Specifications
2. Appendix B - Deleted
3. Appendix C - Additional Conditions Date of Issuance: June 3, 1977 Revised by letter dated August 23, 2007