Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:ADAMS Accession Number ML17363A442 December 21, 2017 NRC Supplement to NRC Letter - IN FORMATION REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 BASELINE INSPECTION DATED November 17, 2017 (Hereafter Items ref erred to are from this NRC Letter). | | {{#Wiki_filter:December 21, 2017 NRC Supplement to NRC Letter - INFORMATION REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 BASELINE INSPECTION DATED November 17, 2017 (Hereafter Items referred to are from this NRC Letter). |
| NRC Supplemental Information Requests for - Dresden Station | | NRC Supplemental Information Requests for - Dresden Station The following Evaluations, Screenings, and Applicability Determinations are requested: |
| | Evaluations: |
| | ESSENTIAL SERVICES BUS UFSAR AND TECHNICAL SPECIFICATION BASES 2016-04-001 EC 405313 UPDATE UTILIZE MSIV 2A SWITCH AS THE RPS 2016-03-002 TCCP 405013 SIGNAL FOR FAILED 1B CONTACT EC 380008, 383022, UFSAR On-Line Noble Metals Chemical (OLNC) 2016-03-001 Change 16-002 Injection for Unit 2 and Unit 3 2016-10-001 EC 391644 Reactor and Diesel Building Flood Barriers UFSAR tracking Revise references within UFSAR Section 2016-05-001 number 15-019 9.6.4.1.5 2016-03-002 TCCP 405013 Reactor and Diesel Building Flood Barriers Screenings: |
| | 2017- FAILURE OF UNIT 2 125 VDC POWER 13085 212 DOA 6900-02 Procedure SUPPLY 2017- Facility Basis for Declassification of Power Supplies for 13058 187 EC 402740 Change RWCU Leak Detection Panels to Non-EQ INSTALL TEMPORARY 120V FEED FROM 2016- Facility UNIT 2 SBO UPS TO UNIT 3 SBO ENGINE 12751 228 EC 406198 Change CONTROL CIRCUIT 405048,405049, 405050,405051, 2016- 405052,405053, Facility UTILIZE 2A SWITCH AS THE RPS SIGNAL 12566 059 405054 Change FOR THE FAILED 1A and 1B CONTACT ADAMS Accession Number ML17363A442 |
|
| |
|
| The following Evaluations, Screenings, and Applicability Determinations are requested:
| | 2015- TRM Change 12475 356 15-014 Revise TRM Sections 3.3.e, and Section 3.7.k 2015- Facility Temporary Installation of Emergency Lighting 12242 144 EC 402314 Change Units (ELU) for the 903-39 Panels MR90 CONNECT BATTERY CHARGER 3-2017- Facility 8350-3B DIRECTLY TO CHARGE NEW U3 12993 123 MR90 618106 Change BOP 250VDC BATTERY 2017- DOS 6620-08 SBO 2(3) DIESEL GENERATOR 12970 101 Rev 03 Procedure OVERSPEED TRIP TEST 2017- DOP 6900-06 12908 041 Rev 39 Procedure 125 VDC GROUND DETECTION UNIT 2 Jumper Cell 3 and Cell 110 on 250 VDC 12836 2016-51 EC 407161 Facility Station Battery 2017- Facility 13061 190 EC 618606 Change Unit 1 Fuel Oil Transfer System Replacement 2017- DOP 3200-09, 13031 160 rev 27 Procedure ZINC INJECTION SYSTEM OPERATION 2017-13018 147 DGA-12 rev76 Procedure LOSS OF OFFSITE POWER 2017- DSSP 0200-S 12995 125 rev 17 Procedure SDC COLD SHUTDOWN METHOD 2017- Facility Largest Single Load For Emergency Diesel 12890 023 17-002 Change Generators Facility NUCLEAR FUEL TRANSITION TO AREVA 12789 2016-46 EC 393280 Change ATRIUM 10XM 2015- DGP 04-01 Rev 12269 169 32 Procedure FUEL MOVES AND REFUELING 2015- DOP 5750-02 12193 093 Rev 44 Procedure REACTOR BUILDING VENTILATION 2015- DOP 0220-01 12233 135 Rev 12 Procedure RPV HEAD COOLING 2015- Facility RWCU HELB CALC IN EQ ZONE 28/ |
| | 12491 372 EC 402480 Change REVISION 1 OF CALC.DR-067-M-001 ADAMS Accession Number ML17363A442 |
|
| |
|
| Evaluations: 2016-04-001 EC 405313 ESSENTIAL SERVICES BUS UFSAR AND TECHNICAL SPECIFICATION BASES UPDATE 2016-03-002 TCCP 405013 UTILIZE MSIV 2A SWITCH AS THE RPS SIGNAL FOR FAILED 1B CONTACT 2016-03-001 EC 380008, 383022, UFSAR Change 16-002 On-Line Noble Metals Chemical (OLNC) Injection for Unit 2 and Unit 3 2016-10-001 EC 391644 Reactor and Diesel Building Flood Barriers 2016-05-001 UFSAR tracking number 15-019 Revise references within UFSAR Section 9.6.4.1.5 2016-03-002 TCCP 405013 Reactor and Diesel Building Flood Barriers Screenings:
| | 2015- Facility 12214 116 EC 399633 Change FW Check Valve Test Taps "A" Line - U2 2015- Facility Installation of New 2-1201-1 Valve During 12283 182 WO 1312947-01 Change D2R24 2016- Facility 12587 080 UFSAR 5.4.6.3 Change Revision to UFSAR section 5.4.6.3 2015- DAN 902(3)-3 D-12261 161 4 Rev13 Procedure ISOL CONDR LVL HI/LO 2015- DOP 1300-02 Procedur AUTOMATIC OPERATION OF ISOLATION 12262 162 Rev 27 e CONDENSER 2015- DOP 1300-03 MANUAL OPERATION OF THE ISOLATION 12263 163 Rev 36 Procedure CONDENSER 2015- Facility Hardened Containment Vent System - |
| 13085 2017-212 DOA 6900-02 Procedure FAILURE OF UNIT 2 125 VDC POWER SUPPLY 13058 2017-187 EC 402740 Facility Change Basis for Declassification of Power Supplies for RWCU Leak Detection Panels to Non-EQ 12751 2016-228 EC 406198 Facility Change INSTALL TEMPORARY 120V FEED FROM UNIT 2 SBO UPS TO UNIT 3 SBO ENGINE CONTROL CIRCUIT 12566 2016-059 405048,405049, 405050,405051, 405052,405053, 405054 Facility Change UTILIZE 2A SWITCH AS THE RPS SIGNAL FOR THE FAILED 1A and 1B CONTACT ADAMS Accession Number ML17363A442 12475 2015-356 TRM Change 15-014 Revise TRM Sections 3.3.e, and Section 3.7.k 12242 2015-144 EC 402314 Facility Change Temporary Installation of Emergency Lighting Units (ELU) for the 903-39 Panels 12993 2017-123 MR90 618106 Facility Change MR90 CONNECT BATTERY CHARGER 3-8350-3B DIRECTLY TO CHARGE NEW U3
| | 12404 289 EC 400578 Change Modification - U3 Online 2016- DOP 6620-21 12510 005 Rev 08 Procedure UNIT 2(3) SBO VENTILATION 2016- DOP 0010-13 12539 033 Rev 07 Procedure SEISMIC EVENT RETRIEVAL/EVALUATION 2016- Facility MOV 2-3906 TO BE CHANGED TO 12593 083 EC 404969 Change MANUALLY OPERATED VALVE 2016- TORUS WATER COOLING MODE OF LOW 12570 167 DOP 1500-02 Procedure PRESSURE COOLANT INJECTION SYSTEM 2016- UFSAR Change Appendix R Elevated Temperature and HPCI 12723 205 No. 16-012 Procedure Operation DISPOSITION OF 175 FT-LBF FOR THE 2017- Facility MOUNTING BOLTS ON U3 MSIVS LIMIT 12912 045 EC 618693 Change SWITCH MOUNTING PLATES Applicability Determinations: |
| | | 0000388891 20171130 2013: UNIT 2 SR 480V MCC BUCKET REPLACEMENT PROJECT BREAKER TRIP SETTING CHANGE AT MCC 2-7826-1F3 FOR MOTOR FOR 2A REACTOR FEED PUMP DISCHARGE VALVE 0000622072 20171115 MOV 2-3201-A 0000388891 20171130 2013: UNIT 2 SR 480V MCC BUCKET REPLACEMENT PROJECT ADAMS Accession Number ML17363A442 |
| BOP 250VDC BATTERY 12970 2017-101 DOS 6620-08 Rev 03 Procedure SBO 2(3) DIESEL GENERATOR OVERSPEED TRIP TEST 12908 2017-041 DOP 6900-06 Rev 39 Procedure 125 VDC GROUND DETECTION UNIT 2 12836 2016-51 EC 407161 Facility Jumper Cell 3 and Cell 110 on 250 VDC Station Battery 13061 2017-190 EC 618606 Facility Change Unit 1 Fuel Oil Transfer System Replacement 13031 2017-160 DOP 3200-09, rev 27 ProcedureZINC INJECTION SYSTEM OPERATION 13018 2017-147 DGA-12 rev76 ProcedureLOSS OF OFFSITE POWER 12995 2017-125 DSSP 0200-S rev 17 ProcedureSDC COLD SHUTDOWN METHOD 12890 2017-023 17-002 Facility Change Largest Single Load For Emergency Diesel Generators 12789 2016-46 EC 393280 Facility Change NUCLEAR FUEL TRANSITION TO AREVA ATRIUM 10XM 12269 2015-169 DGP 04-01 Rev 32 ProcedureFUEL MOVES AND REFUELING 12193 2015-093 DOP 5750-02 Rev 44 ProcedureREACTOR BUILDING VENTILATION 12233 2015-135 DOP 0220-01 Rev 12 ProcedureRPV HEAD COOLING 12491 2015-372 EC 402480 Facility Change RWCU HELB CALC IN EQ ZONE 28/ REVISION 1 OF CALC.DR-067-M-001 ADAMS Accession Number ML17363A442 12214 2015-116 EC 399633 Facility Change FW Check Valve Test Taps "A" Line - U2 12283 2015-182 WO 1312947-01 Facility Change Installation of New 2-1201-1 Valve During D2R24 12587 2016-080 UFSAR 5.4.6.3 Facility Change Revision to UFSAR section 5.4.6.3 12261 2015-161 DAN 902(3)-3 D-4 Rev13 ProcedureISOL CONDR LVL HI/LO 12262 2015-162 DOP 1300-02 Rev 27 Procedur e AUTOMATIC OPERATION OF ISOLATION CONDENSER 12263 2015-163 DOP 1300-03 Rev 36 ProcedureMANUAL OPERATION OF THE ISOLATION CONDENSER 12404 2015-289 EC 400578 Facility Change Hardened Containment Vent System -Modification - U3 Online 12510 2016-005 DOP 6620-21 Rev 08 ProcedureUNIT 2(3) SBO VENTILATION 12539 2016-033 DOP 0010-13 Rev 07 ProcedureSEISMIC EVENT RETRIEVAL/EVALUATION 12593 2016-083 EC 404969 Facility Change MOV 2-3906 TO BE CHANGED TO MANUALLY OPERATED VALVE 12570 2016-167 DOP 1500-02 ProcedureTORUS WATER COOLING MODE OF LOW PRESSURE COOLANT INJECTION SYSTEM 12723 2016-205 UFSAR Change No. 16-012 ProcedureAppendix R Elevated Temperature and HPCI Operation 12912 2017-045 EC 618693 Facility Change DISPOSITION OF 175 FT-LBF FOR THE MOUNTING BOLTS ON U3 MSIVS LIMIT SWITCH MOUNTING PLATES Applicability Determinations: 0000388891 20171130 2013: UNIT 2 SR 480V MCC BUCKET REPLACEMENT PROJECT 0000622072 20171115 BREAKER TRIP SETTING CHANGE AT MCC 2-7826-1F3 FOR MOTOR FOR 2A REACTOR FEED PUMP DISCHARGE VALVE
| |
| | |
| MOV 2-3201-A 0000388891 20171130 2013: UNIT 2 SR 480V MCC BUCKET REPLACEMENT PROJECT | |
|
| |
|
| ADAMS Accession Number ML17363A442}} | | ADAMS Accession Number ML17363A442}} |
Latest revision as of 06:37, 22 October 2019
Supplemental Request for Information for 50.59 Inspection (DRS-A.Shaikh)ML17363A442 |
Person / Time |
---|
Site: |
Dresden |
---|
Issue date: |
12/21/2017 |
---|
From: |
NRC/RGN-III |
---|
To: |
|
---|
References |
---|
Download: ML17363A442 (4) |
|
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24066A0872024-03-0404 March 2024 NRR E-mail Capture - Dresden 2 and 3 - Request for Additional Information for Alternative Request I5R-22 ML24067A1242024-03-0101 March 2024 Email to Christian Williams: Request for Additional Information Regarding Dresden Relief Request Dated February 23, 2024 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23187A0462023-07-0606 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2023004 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23052A0652023-02-21021 February 2023 NRR E-mail Capture - Dresden Units 2 and 3 - Request for Additional Information for Alternative Request RV-23H ML23037A9192023-02-0707 February 2023 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000237/2023011 and 05000249/2023011 ML23019A0132023-01-12012 January 2023 NRR E-mail Capture - Final RAI Dresden 2 and 3 - License Amendment Pertaining to GNF3 Fuel Transition ML22290A0842022-10-13013 October 2022 NRR E-mail Capture - Dresden 2 and 3 - RAI License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies ML22270A1032022-09-27027 September 2022 Notification of NRC Baseline Inspection and Request for Information (05000249/2022004) ML22203A0442022-07-21021 July 2022 Request for Additional Information (RAI) ML22199A2422022-07-13013 July 2022 NRR E-mail Capture - Draft RAI Dresden 2 and 3 Proposed Alternative Related to Sblc Nozzle Inspection for the Sixth Inservice Inspection Interval ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21244A4012021-08-10010 August 2021 (Final) Request for Information (RAI) Dresden, Units 1, 2, 3, and ISFSI Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50 Appendix E ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21097A2602021-04-0808 April 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21096A1752021-04-0606 April 2021 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000237/2021011; 05000249/2021011 ML21063A3202021-03-0202 March 2021 RAIs for Dresden, Units 2 and 3, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (EPID L-2020-LLA-0239) (E-mail) ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML20337A4242020-12-0202 December 2020 Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perform Inspection 05000237/2021401 and 05000249/2021401 ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20231A7432020-08-18018 August 2020 Request for Additional Information (IOLB/HFT-RAI-1) Dresden MSIV LAR ML20224A3532020-08-11011 August 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000249/2020004 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20094H0292020-03-27027 March 2020 Final: Dresden, Units 2 & 3 LAR Request for Additional Information to Modify Technical Specifications to Main Steam Isolation Valve Leakage Requirements ML20071G2242020-03-11011 March 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML19330E1772019-11-25025 November 2019 RAI Dresden/Clinton Request for LAR to Modify TSs Following Adoption of TSTF-542 ML19226A3712019-08-14014 August 2019 Ltr. 08/14/19 Dresden Nuclear Power Station, Unit 2 - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2019004 (DRS-M.Domke) ML18330A2382018-11-21021 November 2018 Initial Information Request (Part 1) for the Upcoming Phase IV License Renewal Inspection; Inspection Report 05000237(249)/2019010; E-Mailed 11/21/18 (DRS-J.Corujo-Sandin) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17353A9492018-01-0909 January 2018 Supplemental Information Needed for Acceptance of License Amendment Request to Revise Technical Specification Requirements for Secondary Containment ML18002A4572017-12-22022 December 2017 NRR E-mail Capture - (External_Sender) (External) Dresden Nuclear Power Station, Units 2 and 3 - RAIs to Support Request to Revise TS 5.5.12 Primary Containment Leakage Rate Testing Program ML17360A0082017-12-22022 December 2017 NRR E-mail Capture - Dresden Nuclear Power Station, Units 2 and 3 - RAIs to Support Request to Revise TS 5.5.12 Primary Containment Leakage Rate Testing Program ML17363A4422017-12-21021 December 2017 Supplemental Request for Information for 50.59 Inspection (DRS-A.Shaikh) ML17342A7372017-12-0808 December 2017 NRR E-mail Capture - Dresden Nuclear Power Station, Units 2 and 3 - Draft RAIs to Support Request to Revise TS 5.5.12 Primary Containment Leakage Rate Testing Program ML17191A2582017-07-11011 July 2017 RAI Related to License Amendment Request to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler-542, Revision 2 (CAC NOS.MF9295 and MF9296) ML17159A6292017-06-0707 June 2017 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML16308A1002016-11-10010 November 2016 Request for Additional Information Regarding License Amendment Request to Revise Secondary Containment Access Opening Requirements (Cac. No. MF7325-MF7330) ML16208A0282016-07-25025 July 2016 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000249/2016004 (LAS) ML16172A1112016-06-29029 June 2016 Request for Additional Information Regarding License Amendment Request to Revise Secondary Containment Access Opening Requirements(Cac Nos.MF7325-MF7330) ML16153A2812016-06-0808 June 2016 Request for Additional Information Related to the License Amendment Request to Increase the Minimum Required Fuel Oil in Each Standby Diesel Generator Fuel Oil Day Tank (CAC Nos. MF7158 and MF7159) ML16071A2062016-03-15015 March 2016 RAI Regarding License Amendment Request to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core Sls(Cac Nos. MF6640 & MF6644) ML15329A2462016-01-19019 January 2016 Request for Additional Information Related to the License Amendment Request to Transition to Areva Fuel ML15232A6702015-09-29029 September 2015 Request for Additional Information Related to Dresden Units 2 and 3 License Amendment Request for Spent Fuel Storage Criticality Methodology 2024-05-21
[Table view] |
Text
December 21, 2017 NRC Supplement to NRC Letter - INFORMATION REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 BASELINE INSPECTION DATED November 17, 2017 (Hereafter Items referred to are from this NRC Letter).
NRC Supplemental Information Requests for - Dresden Station The following Evaluations, Screenings, and Applicability Determinations are requested:
Evaluations:
ESSENTIAL SERVICES BUS UFSAR AND TECHNICAL SPECIFICATION BASES 2016-04-001 EC 405313 UPDATE UTILIZE MSIV 2A SWITCH AS THE RPS 2016-03-002 TCCP 405013 SIGNAL FOR FAILED 1B CONTACT EC 380008, 383022, UFSAR On-Line Noble Metals Chemical (OLNC) 2016-03-001 Change 16-002 Injection for Unit 2 and Unit 3 2016-10-001 EC 391644 Reactor and Diesel Building Flood Barriers UFSAR tracking Revise references within UFSAR Section 2016-05-001 number 15-019 9.6.4.1.5 2016-03-002 TCCP 405013 Reactor and Diesel Building Flood Barriers Screenings:
2017- FAILURE OF UNIT 2 125 VDC POWER 13085 212 DOA 6900-02 Procedure SUPPLY 2017- Facility Basis for Declassification of Power Supplies for 13058 187 EC 402740 Change RWCU Leak Detection Panels to Non-EQ INSTALL TEMPORARY 120V FEED FROM 2016- Facility UNIT 2 SBO UPS TO UNIT 3 SBO ENGINE 12751 228 EC 406198 Change CONTROL CIRCUIT 405048,405049, 405050,405051, 2016- 405052,405053, Facility UTILIZE 2A SWITCH AS THE RPS SIGNAL 12566 059 405054 Change FOR THE FAILED 1A and 1B CONTACT ADAMS Accession Number ML17363A442
2015- TRM Change 12475 356 15-014 Revise TRM Sections 3.3.e, and Section 3.7.k 2015- Facility Temporary Installation of Emergency Lighting 12242 144 EC 402314 Change Units (ELU) for the 903-39 Panels MR90 CONNECT BATTERY CHARGER 3-2017- Facility 8350-3B DIRECTLY TO CHARGE NEW U3 12993 123 MR90 618106 Change BOP 250VDC BATTERY 2017- DOS 6620-08 SBO 2(3) DIESEL GENERATOR 12970 101 Rev 03 Procedure OVERSPEED TRIP TEST 2017- DOP 6900-06 12908 041 Rev 39 Procedure 125 VDC GROUND DETECTION UNIT 2 Jumper Cell 3 and Cell 110 on 250 VDC 12836 2016-51 EC 407161 Facility Station Battery 2017- Facility 13061 190 EC 618606 Change Unit 1 Fuel Oil Transfer System Replacement 2017- DOP 3200-09, 13031 160 rev 27 Procedure ZINC INJECTION SYSTEM OPERATION 2017-13018 147 DGA-12 rev76 Procedure LOSS OF OFFSITE POWER 2017- DSSP 0200-S 12995 125 rev 17 Procedure SDC COLD SHUTDOWN METHOD 2017- Facility Largest Single Load For Emergency Diesel 12890 023 17-002 Change Generators Facility NUCLEAR FUEL TRANSITION TO AREVA 12789 2016-46 EC 393280 Change ATRIUM 10XM 2015- DGP 04-01 Rev 12269 169 32 Procedure FUEL MOVES AND REFUELING 2015- DOP 5750-02 12193 093 Rev 44 Procedure REACTOR BUILDING VENTILATION 2015- DOP 0220-01 12233 135 Rev 12 Procedure RPV HEAD COOLING 2015- Facility RWCU HELB CALC IN EQ ZONE 28/
12491 372 EC 402480 Change REVISION 1 OF CALC.DR-067-M-001 ADAMS Accession Number ML17363A442
2015- Facility 12214 116 EC 399633 Change FW Check Valve Test Taps "A" Line - U2 2015- Facility Installation of New 2-1201-1 Valve During 12283 182 WO 1312947-01 Change D2R24 2016- Facility 12587 080 UFSAR 5.4.6.3 Change Revision to UFSAR section 5.4.6.3 2015- DAN 902(3)-3 D-12261 161 4 Rev13 Procedure ISOL CONDR LVL HI/LO 2015- DOP 1300-02 Procedur AUTOMATIC OPERATION OF ISOLATION 12262 162 Rev 27 e CONDENSER 2015- DOP 1300-03 MANUAL OPERATION OF THE ISOLATION 12263 163 Rev 36 Procedure CONDENSER 2015- Facility Hardened Containment Vent System -
12404 289 EC 400578 Change Modification - U3 Online 2016- DOP 6620-21 12510 005 Rev 08 Procedure UNIT 2(3) SBO VENTILATION 2016- DOP 0010-13 12539 033 Rev 07 Procedure SEISMIC EVENT RETRIEVAL/EVALUATION 2016- Facility MOV 2-3906 TO BE CHANGED TO 12593 083 EC 404969 Change MANUALLY OPERATED VALVE 2016- TORUS WATER COOLING MODE OF LOW 12570 167 DOP 1500-02 Procedure PRESSURE COOLANT INJECTION SYSTEM 2016- UFSAR Change Appendix R Elevated Temperature and HPCI 12723 205 No.16-012 Procedure Operation DISPOSITION OF 175 FT-LBF FOR THE 2017- Facility MOUNTING BOLTS ON U3 MSIVS LIMIT 12912 045 EC 618693 Change SWITCH MOUNTING PLATES Applicability Determinations:
0000388891 20171130 2013: UNIT 2 SR 480V MCC BUCKET REPLACEMENT PROJECT BREAKER TRIP SETTING CHANGE AT MCC 2-7826-1F3 FOR MOTOR FOR 2A REACTOR FEED PUMP DISCHARGE VALVE 0000622072 20171115 MOV 2-3201-A 0000388891 20171130 2013: UNIT 2 SR 480V MCC BUCKET REPLACEMENT PROJECT ADAMS Accession Number ML17363A442
ADAMS Accession Number ML17363A442