ML18024A742: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/23/2018
| issue date = 01/23/2018
| title = LTR-18-0027 Armond Cohen, Nuclear Innovation Alliance, Maria Korsnick, Nuclear Energy Institute and Daniel Blee, Nuclear Infrastructure Council, Paper Re Ensuring the Future of Us Nuclear Energy:Creating a Streamlined and Predictable Licens
| title = LTR-18-0027 Armond Cohen, Nuclear Innovation Alliance, Maria Korsnick, Nuclear Energy Institute and Daniel Blee, Nuclear Infrastructure Council, Paper Re Ensuring the Future of Us Nuclear Energy:Creating a Streamlined and Predictable Licens
| author name = Cohen A, Korsnick M, Blee D C
| author name = Cohen A, Korsnick M, Blee D
| author affiliation = Nuclear Innovation Alliance, Nuclear Energy Institute (NEI), United States Nuclear Infrastructure Council (NIC)
| author affiliation = Nuclear Innovation Alliance, Nuclear Energy Institute (NEI), United States Nuclear Infrastructure Council (NIC)
| addressee name = Svinicki K L
| addressee name = Svinicki K
| addressee affiliation = NRC/Chairman
| addressee affiliation = NRC/Chairman
| docket = PROJ0689
| docket = PROJ0689
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:January 23, 2018   The Honorable Kristine Svinicki Chairman U.S. Nuclear Regulatory Commission Rockville, Maryland 20852  
{{#Wiki_filter:January 23, 2018 The Honorable Kristine Svinicki Chairman U.S. Nuclear Regulatory Commission Rockville, Maryland 20852


==Dear Chairman Svinicki:==
==Dear Chairman Svinicki:==
The undersigned   New innovative U.S. technologies currently in design, development and licensing are setting a new standard for nuclear energy. However, this technology leadership is at risk. To ensure continued American leadership in global nuclear markets, the U.S. government should act promptly to create a streamlined and predictable licensing pathway for advanced reactors, thereby supporting innovation, commercialization and deployment of new nuclear technologies. To ensure that advanced reactors are licensed and built in the U.S., near-term regulatory reforms are necessary. These reforms should focus on achieving the following near-term objectives:   Reversing the trend of increasing regulatory costs and excessively long reviews; Aligning the regulatory framework for advanced reactors with their inherent enhanced safety; Defining licensing options clearly, including options for staged applications and approval; and Providing additional flexibility for changes during construction. We welcome your leadership and that of the Commission to addressing common ground reform and modernization of the licensing pathway for advanced reactors. We look forward to a continued dialogue on this important technology innovation issue. Please note that while the paper reflects the consensus of the undersigned organizations, it does not necessarily reflect the specific views of individual members of these organizations. Sincerely,     Nuclear Innovation Alliance Nuclear Energy Institute U.S. Nuclear Infrastructure Council             Attachment Copies to: Hon. Stephen Burns Hon. Jeff Baran Ensuring the Future of U.S. Nuclear Energy Creating a Streamlined and Predictable Licensing Pathway to Deployment   January 23, 2018 Vision for the Future of Nuclear Energy With a modernized NRC licensing process, the reviews of advanced reactors will become more efficient and timely, while continuing to protect public health, safety and security. This updated licensing process will enable the development, licensing and deployment of more innovative, cost-competitive and safer nuclear reactor technologies. NRC reviews will become more safety-focused and predictable, and technology developers will be able to use a variety of licensing pathways to obtain NRC design approvals and achieve project milestones. Utilities and users of the industrial heat and energy produced by these technologies will choose advanced nuclear energy for its versatility and competitive economics. This will result in part from regulatory changes that recognize their enhanced safety and security. Regulators and developers will incorporate lessons from early deployments to streamline the licensing and construction of advanced technology projects. The Regulatory Environment for Advanced Reactors and the Need for Change The U.S. nuclear industry is at a tipping point. The U.S. led the world into the age of nuclear energy and continues to be the global leader in technology innovation. The U.S. nuclear reactor fleet is the largest in the world, and the U.S. Nuclear Regulatory Commission rules are viewed as the world standard for ensuring nuclear plant safety and security. U.S. companies have developed and licensed large, modern, light water reactor nuclear plant designs that offer improved efficiency and safety. New advanced reactor technologiesmany of which are being developed with support from the Department of Energyare among the designs setting a new standard for nuclear innovation. However, this technology leadership is at risk without licensing modernization. To mitigate that risk and ensure continued U.S. leadership in global nuclear markets, the U.S. government should act promptly to create a streamlined and predictable licensing pathway for advanced reactors, thereby supporting innovation, commercialization and deployment of new nuclear technologies. To ensure that advanced reactors are licensed and built in the U.S., near-term regulatory changes are needed. These changes should focus on achieving the following near-term objectives: Reversing a trend of increasing regulatory costs and unnecessarily long reviews; Aligning the regulatory framework for advanced reactors with their inherent enhanced safety and simplified design bases; Defining licensing options clearly, including options for staged application and approval; and Providing additional flexibility for changes during construction. Current Environment The U.S. nuclear power industry has a history of commitment to safety and continuous improvement in design, operations and maintenance. Building on lessons learned by operating plants over the past several decades, the industry has developed new designs that offer marked Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment     2  improvements in safety, ease of maintenance and operations. These efforts have grown, with numerous designs at various stages of development for small modular light water reactors (LWRs) and non-light water reactors (non-LWRs). New reactor designs, including those certified, under review and planned for submittal, are of safety and/or use simplified, inherent, passive, or other innovative means to accomplish their attributes may promote more e The latest round of reactor licensing efforts for traditional LWRs has illuminated the need for flexibility in building them, but it also suggests the same need for upcoming small modular LWRs and advanced non-LWR designs. To date, however, the NRC reactor license review process has remained largely unchanged. While the NRC staff has been engaged in an active dialogue with interested stakeholders, as yet there is little evidence of improved efficiencies in the reviews of advanced LWR designs. Over-regulation and protracted reviews by the NRC are driving some U.S. companies out of the domestic market altogether, shifting their focus to the international market, where they hope regulators are able to make a finding of sufficient safety faster and at a lower cost than the NRC. matter it has, because the NRC now requires more effort from applicants to demonstrate that a design satisfies that standard. Applications for designs with improved safety features require ever greater detail, adding time and expense without enhancing safety. In some cases information is requested from the applicant that would normally not be available until a system is actually built. Licensing reactors is becoming more time-consuming and less certain even as the designs are becoming inherently safer. The industry has contributed to this situation by acquiescing to the for unnecessary, burdensome detail. For its part, the NRC should also acknowledge its contribution to this situation, and urgently refocus its licensing reviews on issues that are safety significant. Another challenge to U.S. innovation regarding advanced technologies is the need for clearly defined pathways for a staged license application. Pre-application NRC-applicant interactions have at times been ineffective in accelerating or simplifying NRC approvals of plans for addressing issues prior to the review of an application for a complete reactor design. The industry needs a clearly defined yet flexible process for license application approval that provides the option of licensing one portion of the design at a time. A staged, incremental, license application review and approval process would reduce licensing risk and enable developers to win investment and customer support incrementally. This approach will be valuable to some applicants and should be an available option. Although licensing options exist today, they need to be documented and further developed before applicants can apply them with confidence that they are viable, and will avoid significant disputes and costly delays. While the NRC staff has made useful progress in becoming familiar with the need for these pathways over the past two years, continued progress in this area should be a top priority.
 
Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment     3  Flexibility to make changes during construction also is essential to the deployment of new -of-a-uction experience demonstrates the need for greater flexibility to modify the licensing basis during construction. A requirement for prior regulatory approval of such changes can delay multi-year construction projects with, in most cases, no safety benefit. The result is significant increase in costs and project risk with associated difficulties financing nuclear projects. The problem could be reduced if license applications were less detailed and more safety focused on performance outcomes. To resolve this issue fully, industry self-discipline, NRC process revisions, and possibly rulemaking to revise 10 CFR Part 52 may be required. There is significant demand for new, advanced LWRs and non-LWRs. However, the promise of advanced technologies and the future of U.S. commercial nuclear power are coupled with the development of a more effective safety-focused and efficient regulatory review. With such improvements, the regulator can operate more effectively and U.S builders can more efficiently license, deploy, and export advanced reactors to meet the need for clean, reliable energy for electricity generation and other uses. Details of actions needed to achieve these objectives are discussed below. Reversing Increasing Regulatory Costs and Excessively Long Reviews Applicants need a process that gives them confidence the NRC can and will review designs and license applications in a timely, predictable and cost-effective manner and without imposing unnecessary regulatory burden. To improve near-term pre-application and licensing activities, NRC must exercise greater regulatory discipline by conducting appropriately safety-focused reviews, combined with guidance and process improvements identified through 10 CFR Part 52 lessons-learned activities. One major contributor to the current inefficiency is the increasing level of detail the NRC assurance of adequate protection of public health and safety. Over time, the amount of information the NRC has required for licensing reviews of similar plant designs has expanded. This expansion in scope has extended NRC project review schedules and increased the level of effort required by both the industry and the NRC. Much of this detail is unnecessary for the NRC to make and document its safety findings and meet the adequate protection standard. Inconsistent NRC management engagement and decision-making have also contributed to a staff culture where it is acceptable to demand more details in licensing submittals, without a direct nexus to safety. maintain over the life of the plant, and inflates the scope of details that cannot be changed without NRC approval. NRC must focus its review to consider only the information needed for determining reasonable assurance of adequate protection of public health and safety. An important element of the industry effort is to focus NRC licensing reviews on areas that are safety significant and change NRC practices for required level of detail in applications. (In most Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment     4  cases this should be accomplished through revisions to regulatory review guidance.) Active involvement and close oversight by the Chairman and Commissioners of the NRC is needed to achieve these outcomes and ultimately evolve the culture at the NRC to ensure the principles of good regulation are met. In the near-term the industry is highlighting the need to improve timeliness and efficiency during 10 CFR Part 50 and 10 CFR Part 52 regulatory reviews and has placed a high priority on effecting change in this process. Aligning the Regulatory Framework for Advanced Reactors with their Enhanced Safety The current regulatory framework was developed for and is based on LWR designs. Since most of the advanced reactors under development are cooled by fluids other than water (e.g., gases, liquid metals and molten salts) and are not susceptible to the same types of accidents, the NRC should tailor its guidance and regulations to appropriately address these advanced designs. Many advanced reactor designs are inherently safe even with the loss of both AC and DC power, feature even larger safety margins, and allow for longer times of accident progression. New designs also are less complex, with passive safety features and far fewer systems than large LWRs, significantly reducing the likelihood and magnitude of offsite releases. As a result, radiological releases are expected to have no impact on public health and safety even with smaller emergency planning zones. Accordingly, the NRC should scale emergency planning requirements and reviews to be commensurate with the accident source term, fission product release, and associated dose characteristics. The NRC has initiated rulemaking that has the potential to address this issue. The Commission should focus on promptly resolving this issue. Additionally, designers are incorporating engineered physical security systems, hardware and other features into the reactor design, making physical security less reliant on armed responders. These enhanced features justify regulatory changes to reduce the number of armed guards and consider eliminating onsite response forces altogether. Re-examination of security and emergency planning requirements is needed to remove unnecessary licensing burdens and reduce licensing and operating costs for advanced technologies. These changes would make the rules appropriate to the characteristics of the new reactors, rather than to traditional large LWRs, and thus improve the economic viability of new technologies. NRC consideration of these features is needed to make use of their security and economic benefits. The NRC staff is developing a recommendation on whether to move forward with rulemaking to change security requirements. The Commission should ensure that any new rulemaking appropriately aligns the security requirements for advanced reactors commensurate with their risk. The NRC also should modernize its process for setting design requirements for advanced reactors to be more systematic, predictable and repeatable, thus ensuring that consistent requirements are established for different technologies. The modernized process should account for the unique characteristics of the advanced non-LWRs and enhanced safety features of these reactors. This effort is expected to result in a more technology-inclusive, performance-based and safety-focused regulatory process needed to restore stakeholder confidence. The effort relies on revisions to the regulatory review guidance under Parts 50 and 52. It builds upon NRC, DOE and industry work over the last decade to develop the technical basis for an efficient, modernized Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment     5  regulatory process that is safety-focused and is applicable to all plant designs. This work was documented in a series of papers that provide the starting point for the ongoing work on the utility-led Licensing Modernization Project. The result will provide processes for determining the important safety significant attributes of an advanced reactor design. NEI is working in collaboration with the industry and DOE to develop guidance for integrating these processes with existing regulations, for NRC review and endorsement. The guidance will outline the application of these concepts under 10 CFR Parts 50 and 52 and identify where exemptions are necessary. Judging from the pace of progress over the last decade, it will take more than five years to develop and implement an entirely new regulatory framework for advanced non- near-term efforts, with NRC engagement, will define the principles for establishing a new regulatory framework in the long-term and address recognized challenges in a manner that enables near-term advanced reactor development. Defining Licensing Options Clearly, including Staged Application and Approval The industry has recognized that for some non-LWRs, it needs a clearly defined, flexible process for license application approval that provides an optional mechanism for licensing one portion of the design at a time. In principle, NRC regulations allow for a staged, incremental, license application review and approval process for licensing one portion of the design at a time. These provisions are not well-defined and have not been recently used. Thus, applicants are uncertain about their viability to address specific development risks much earlier in the licensing process. The industry is collaborating with the NRC to develop regulatory engagement planning guidance that better defines the different licensing pathways that could be used by designers, based in part NRC review and acceptance of certain aspects of the design, even before they have the final design completed for the entire facility. This effort is also intended to clarify pre-application interactions with NRC and desired outcomes. These interactions need to become more effective in identifying key safety issues and acceptable methods for resolving them. This is important for further reduction of regulatory review time and costs. Addressing these concerns will help to remove unnecessary barriers to innovation. Providing Additional Flexibility for Changes during Construction Utilities and other end-users that will build future reactors need the ability to make changes during construction, without unduly slowing construction. The need for prior NRC approvals of the changes, no matter how minor, has increased costs, both by causing construction delays or by maintaining the engineering and licensing organization on standby, ready to quickly develop and submit license amendments. These issues, in part, will be addressed by reducing the level of detail in the licensing basis and thereby reducing the need for license amendments. Ensuring Tier 2* designation will also help provide flexibility. However, additional process improvements are Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment     6  needed for situations which require license amendments, to allow construction to proceed without delays. To fully accomplish this objective, new or revised guidance will be needed and revisions to Part 52 may be needed. In summary, the industry and the NRC have a longstanding shared commitment to safety. As we move forward with advanced reactor technologies we will continue to place the highest priority on the shared fundamental tenet of protecting public health and safety while recognizing that the new designs need an updated licensing process with improved execution. The changes outlined in this paper are needed to enable the use of new and innovative advanced reactor technologies and are essential to achieving the goal of ensuring the future of nuclear technology in the United Mccloskey, Bridin Attachments:
The undersigned organizations are pleased to convey to you the attached paper, Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment.
NIA-NEI-NIC Lette r fo r Cha ir man Svinick i.pdf; White Paper -Ensuring the Fut ur e of U.S. Nuclear Energy.pdf From: TSCHILTZ , Michael [mailto:mdt@nei
New innovative U.S. technologies currently in design, development and licensing are setting a new standard for nuclear energy. However, this technology leadership is at risk. To ensure continued American leadership in global nuclear markets, the U.S. government should act promptly to create a streamlined and predictable licensing pathway for advanced reactors, thereby supporting innovation, commercialization and deployment of new nuclear technologies.
.org] Sent: Tuesday, January 23 , 2018 5:00 PM To: Vietti-Cook, Annette <Annette.Vietti-Cook@nrc.gov
To ensure that advanced reactors are licensed and built in the U.S., near-term regulatory reforms are necessary. These reforms should focus on achieving the following near-term objectives:
>  
Reversing the trend of increasing regulatory costs and excessively long reviews; Aligning the regulatory framework for advanced reactors with their inherent enhanced safety; Defining licensing options clearly, including options for staged applications and approval; and Providing additional flexibility for changes during construction.
We welcome your leadership and that of the Commission to addressing common ground reform and modernization of the licensing pathway for advanced reactors. We look forward to a continued dialogue on this important technology innovation issue.
Please note that while the paper reflects the consensus of the undersigned organizations, it does not necessarily reflect the specific views of individual members of these organizations.
Sincerely, Nuclear Innovation Alliance             Nuclear Energy Institute         U.S. Nuclear Infrastructure Council Attachment Copies to:       Hon. Stephen Burns Hon. Jeff Baran
 
Ensuring the Future of U.S. Nuclear Energy Creating a Streamlined and Predictable Licensing Pathway to Deployment January 23, 2018
 
Vision for the Future of Nuclear Energy With a modernized NRC licensing process, the reviews of advanced reactors will become more efficient and timely, while continuing to protect public health, safety and security. This updated licensing process will enable the development, licensing and deployment of more innovative, cost-competitive and safer nuclear reactor technologies. NRC reviews will become more safety-focused and predictable, and technology developers will be able to use a variety of licensing pathways to obtain NRC design approvals and achieve project milestones. Utilities and users of the industrial heat and energy produced by these technologies will choose advanced nuclear energy for its versatility and competitive economics. This will result in part from regulatory changes that recognize their enhanced safety and security. Regulators and developers will incorporate lessons from early deployments to streamline the licensing and construction of advanced technology projects.
The Regulatory Environment for Advanced Reactors and the Need for Change The U.S. nuclear industry is at a tipping point. The U.S. led the world into the age of nuclear energy and continues to be the global leader in technology innovation. The U.S. nuclear reactor fleet is the largest in the world, and the U.S. Nuclear Regulatory Commission rules are viewed as the world standard for ensuring nuclear plant safety and security. U.S. companies have developed and licensed large, modern, light water reactor nuclear plant designs that offer improved efficiency and safety. New advanced reactor technologies-many of which are being developed with support from the Department of Energy-are among the designs setting a new standard for nuclear innovation.
However, this technology leadership is at risk without licensing modernization. To mitigate that risk and ensure continued U.S. leadership in global nuclear markets, the U.S. government should act promptly to create a streamlined and predictable licensing pathway for advanced reactors, thereby supporting innovation, commercialization and deployment of new nuclear technologies.
To ensure that advanced reactors are licensed and built in the U.S., near-term regulatory changes are needed.
These changes should focus on achieving the following near-term objectives:
* Reversing a trend of increasing regulatory costs and unnecessarily long reviews;
* Aligning the regulatory framework for advanced reactors with their inherent enhanced safety and simplified design bases;
* Defining licensing options clearly, including options for staged application and approval; and
* Providing additional flexibility for changes during construction.
Current Environment The U.S. nuclear power industry has a history of commitment to safety and continuous improvement in design, operations and maintenance. Building on lessons learned by operating plants over the past several decades, the industry has developed new designs that offer marked 1
 
Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment improvements in safety, ease of maintenance and operations. These efforts have grown, with numerous designs at various stages of development for small modular light water reactors (LWRs) and non-light water reactors (non-LWRs).
New reactor designs, including those certified, under review and planned for submittal, are consistent with the NRCs advanced reactor policy in that they will provide enhanced margins of safety and/or use simplified, inherent, passive, or other innovative means to accomplish their safety and security functions. The Commission policy also notes that incorporating the above attributes may promote more efficient and effective design reviews.
The latest round of reactor licensing efforts for traditional LWRs has illuminated the need for flexibility in building them, but it also suggests the same need for upcoming small modular LWRs and advanced non-LWR designs. To date, however, the NRC reactor license review process has remained largely unchanged. While the NRC staff has been engaged in an active dialogue with interested stakeholders, as yet there is little evidence of improved efficiencies in the reviews of advanced LWR designs. Over-regulation and protracted reviews by the NRC are driving some U.S. companies out of the domestic market altogether, shifting their focus to the international market, where they hope regulators are able to make a finding of sufficient safety faster and at a lower cost than the NRC.
While in theory the standard of adequate protection has not changed for decades, as a practical matter it has, because the NRC now requires more effort from applicants to demonstrate that a design satisfies that standard. Applications for designs with improved safety features require ever greater detail, adding time and expense without enhancing safety. In some cases information is requested from the applicant that would normally not be available until a system is actually built.
Licensing reactors is becoming more time-consuming and less certain even as the designs are becoming inherently safer. The industry has contributed to this situation by acquiescing to the escalation in the Agencys requests for unnecessary, burdensome detail. For its part, the NRC should also acknowledge its contribution to this situation, and urgently refocus its licensing reviews on issues that are safety significant.
Another challenge to U.S. innovation regarding advanced technologies is the need for clearly defined pathways for a staged license application. Pre-application NRC-applicant interactions have at times been ineffective in accelerating or simplifying NRC approvals of plans for addressing issues prior to the review of an application for a complete reactor design. The industry needs a clearly defined yet flexible process for license application approval that provides the option of licensing one portion of the design at a time. A staged, incremental, license application review and approval process would reduce licensing risk and enable developers to win investment and customer support incrementally. This approach will be valuable to some applicants and should be an available option. Although licensing options exist today, they need to be documented and further developed before applicants can apply them with confidence that they are viable, and will avoid significant disputes and costly delays. While the NRC staff has made useful progress in becoming familiar with the need for these pathways over the past two years, continued progress in this area should be a top priority.
2
 
Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment Flexibility to make changes during construction also is essential to the deployment of new technologies and first-of-a-kind designs. Recent construction experience demonstrates the need for greater flexibility to modify the licensing basis during construction. A requirement for prior regulatory approval of such changes can delay multi-year construction projects with, in most cases, no safety benefit. The result is significant increase in costs and project risk with associated difficulties financing nuclear projects. The problem could be reduced if license applications were less detailed and more safety focused on performance outcomes. To resolve this issue fully, industry self-discipline, NRC process revisions, and possibly rulemaking to revise 10 CFR Part 52 may be required.
There is significant demand for new, advanced LWRs and non-LWRs. However, the promise of advanced technologies and the future of U.S. commercial nuclear power are coupled with the development of a more effective safety-focused and efficient regulatory review. With such improvements, the regulator can operate more effectively and U.S builders can more efficiently license, deploy, and export advanced reactors to meet the need for clean, reliable energy for electricity generation and other uses.
Details of actions needed to achieve these objectives are discussed below.
Reversing Increasing Regulatory Costs and Excessively Long Reviews Applicants need a process that gives them confidence the NRC can and will review designs and license applications in a timely, predictable and cost-effective manner and without imposing unnecessary regulatory burden. To improve near-term pre-application and licensing activities, NRC must exercise greater regulatory discipline by conducting appropriately safety-focused reviews, combined with guidance and process improvements identified through 10 CFR Part 52 lessons-learned activities.
One major contributor to the current inefficiency is the increasing level of detail the NRC requires in the docketed license application to support the agencys finding of reasonable assurance of adequate protection of public health and safety. Over time, the amount of information the NRC has required for licensing reviews of similar plant designs has expanded.
This expansion in scope has extended NRC project review schedules and increased the level of effort required by both the industry and the NRC. Much of this detail is unnecessary for the NRC to make and document its safety findings and meet the adequate protection standard. Inconsistent NRC management engagement and decision-making have also contributed to a staff culture where it is acceptable to demand more details in licensing submittals, without a direct nexus to safety.
This regulatory creep lengthens NRC review time, increases the information licensees must maintain over the life of the plant, and inflates the scope of details that cannot be changed without NRC approval. NRC must focus its review to consider only the information needed for determining reasonable assurance of adequate protection of public health and safety. An important element of the industry effort is to focus NRC licensing reviews on areas that are safety significant and change NRC practices for required level of detail in applications. (In most 3
 
Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment cases this should be accomplished through revisions to regulatory review guidance.) Active involvement and close oversight by the Chairman and Commissioners of the NRC is needed to achieve these outcomes and ultimately evolve the culture at the NRC to ensure the principles of good regulation are met.
In the near-term the industry is highlighting the need to improve timeliness and efficiency during 10 CFR Part 50 and 10 CFR Part 52 regulatory reviews and has placed a high priority on effecting change in this process.
Aligning the Regulatory Framework for Advanced Reactors with their Enhanced Safety The current regulatory framework was developed for and is based on LWR designs. Since most of the advanced reactors under development are cooled by fluids other than water (e.g., gases, liquid metals and molten salts) and are not susceptible to the same types of accidents, the NRC should tailor its guidance and regulations to appropriately address these advanced designs. Many advanced reactor designs are inherently safe even with the loss of both AC and DC power, feature even larger safety margins, and allow for longer times of accident progression. New designs also are less complex, with passive safety features and far fewer systems than large LWRs, significantly reducing the likelihood and magnitude of offsite releases. As a result, radiological releases are expected to have no impact on public health and safety even with smaller emergency planning zones. Accordingly, the NRC should scale emergency planning requirements and reviews to be commensurate with the accident source term, fission product release, and associated dose characteristics. The NRC has initiated rulemaking that has the potential to address this issue. The Commission should focus on promptly resolving this issue.
Additionally, designers are incorporating engineered physical security systems, hardware and other features into the reactor design, making physical security less reliant on armed responders.
These enhanced features justify regulatory changes to reduce the number of armed guards and consider eliminating onsite response forces altogether. Re-examination of security and emergency planning requirements is needed to remove unnecessary licensing burdens and reduce licensing and operating costs for advanced technologies. These changes would make the rules appropriate to the characteristics of the new reactors, rather than to traditional large LWRs, and thus improve the economic viability of new technologies. NRC consideration of these features is needed to make use of their security and economic benefits. The NRC staff is developing a recommendation on whether to move forward with rulemaking to change security requirements.
The Commission should ensure that any new rulemaking appropriately aligns the security requirements for advanced reactors commensurate with their risk.
The NRC also should modernize its process for setting design requirements for advanced reactors to be more systematic, predictable and repeatable, thus ensuring that consistent requirements are established for different technologies. The modernized process should account for the unique characteristics of the advanced non-LWRs and enhanced safety features of these reactors. This effort is expected to result in a more technology-inclusive, performance-based and safety-focused regulatory process needed to restore stakeholder confidence. The effort relies on revisions to the regulatory review guidance under Parts 50 and 52. It builds upon NRC, DOE and industry work over the last decade to develop the technical basis for an efficient, modernized 4
 
Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment regulatory process that is safety-focused and is applicable to all plant designs. This work was documented in a series of papers that provide the starting point for the ongoing work on the utility-led Licensing Modernization Project.
The result will provide processes for determining the important safety significant attributes of an advanced reactor design. NEI is working in collaboration with the industry and DOE to develop guidance for integrating these processes with existing regulations, for NRC review and endorsement. The guidance will outline the application of these concepts under 10 CFR Parts 50 and 52 and identify where exemptions are necessary. Judging from the pace of progress over the last decade, it will take more than five years to develop and implement an entirely new regulatory framework for advanced non-LWRs. However, the industrys near-term efforts, with NRC engagement, will define the principles for establishing a new regulatory framework in the long-term and address recognized challenges in a manner that enables near-term advanced reactor development.
Defining Licensing Options Clearly, including Staged Application and Approval The industry has recognized that for some non-LWRs, it needs a clearly defined, flexible process for license application approval that provides an optional mechanism for licensing one portion of the design at a time. In principle, NRC regulations allow for a staged, incremental, license application review and approval process for licensing one portion of the design at a time. These provisions are not well-defined and have not been recently used. Thus, applicants are uncertain about their viability to address specific development risks much earlier in the licensing process.
The industry is collaborating with the NRC to develop regulatory engagement planning guidance that better defines the different licensing pathways that could be used by designers, based in part on a Nuclear Innovation Alliance report that clarifies options to consider in defining major portions for a Standard Design Approval. The goal is to reduce designers uncertainty about NRC review and acceptance of certain aspects of the design, even before they have the final design completed for the entire facility. This effort is also intended to clarify pre-application interactions with NRC and desired outcomes. These interactions need to become more effective in identifying key safety issues and acceptable methods for resolving them. This is important for further reduction of regulatory review time and costs. Addressing these concerns will help to remove unnecessary barriers to innovation.
Providing Additional Flexibility for Changes during Construction Utilities and other end-users that will build future reactors need the ability to make changes during construction, without unduly slowing construction. The need for prior NRC approvals of the changes, no matter how minor, has increased costs, both by causing construction delays or by maintaining the engineering and licensing organization on standby, ready to quickly develop and submit license amendments. These issues, in part, will be addressed by reducing the level of detail in the licensing basis and thereby reducing the need for license amendments. Ensuring Tier 1 obligations are focused on safety significant features and eliminating the NRCs use of the Tier 2* designation will also help provide flexibility. However, additional process improvements are 5
 
Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment needed for situations which require license amendments, to allow construction to proceed without delays. To fully accomplish this objective, new or revised guidance will be needed and revisions to Part 52 may be needed.
In summary, the industry and the NRC have a longstanding shared commitment to safety. As we move forward with advanced reactor technologies we will continue to place the highest priority on the shared fundamental tenet of protecting public health and safety while recognizing that the new designs need an updated licensing process with improved execution. The changes outlined in this paper are needed to enable the use of new and innovative advanced reactor technologies and are essential to achieving the goal of ensuring the future of nuclear technology in the United States and the nations role as a leader in technology innovation.
6
 
Mccloskey, Bridin Attachments:                                               NIA- NEI- NIC Lette r fo r Chairman Svinicki.pdf; White Paper - Ensuring the Future of U.S.
Nuclear Energy.pdf From: TSCHILTZ, Michael [mailto:mdt@nei .org]
Sent: Tuesday, January 23, 2018 5:00 PM To: Vietti-Cook, Annette <Annette .Vietti-Cook@nrc.gov>


==Subject:==
==Subject:==
[External_Sender]
[External_Sender] COVER LEDER AND PAPER Here is the cover letter and the paper that we discussed .
COVER LEDER AND PAPER Here is the cover letter and the paper that we discussed. Thanks Mike Tschiltz Senior Director New Plant, SMRs and Advanced Reactors Nuclear Energy Institute 1201 F Street NW, Suite 1100 Washington , DC 20004 www.nei.org P: 202.739.8083 M: 202.471.0277 E: mdt@nei.org This e l ec tronic m ess ag e 1ra11smissio11 co 111ai11s information ji-0111 th e Nuclear Energy ln s tilllt e. Inc. Th e information is in/e nd e d so l e ly for /h e us e of lh e addr essee and it s u se by any olher person is 1101 authorized.
Thanks Mike Tschiltz Senior Director New Plant, SMRs and Advanced Reactors Nuclear Energy Institute 1201 F Street NW, Suite 1100 Washington, DC 20004 www.nei.org P: 202.739.8083 M: 202.471.0277 E: mdt@nei.org This electronic message 1ra11smissio11 co111ai11s information ji-0111 the Nuclear Energy lnstilllte. Inc. Th e information is in/ended solely for /h e use of lhe addressee and its use by any olher person is 1101 authorized. lfyou are not 1he i111ended recipie111, you have received this comm1111ica tio11 in error. and any review. use. disclosure. copying or distrib111ion of rhe co111e111s of1his co1111111111ication is srricliy proh ibi1ed. lfyou have received !his electronic rra11s111issio11 in error, please notify rhe sender immedialely by 1e/ephone or by electronic mail and perma11e111ly delete 1he original message. IRS Circular 230 disclosure: To ensure compliance wilh requireme111s imposed by 1he IRS and 01her taxing au1horilies, we inform you thal any lax advice contained in this co111mu11icatio11 (including any auach111e111s) is 1101 intended or wri11e11 10 be used. and cannot be used.for the purpose of(i) avoiding penallies that may be imposed 011 any raxpayer or (ii) pro11101i11g. marketing or recom111e11di11g lo anolher party any 1ra11saction or mauer addressed herein.
l fyou are not 1h e i111 e nd ed r eci pi e 111, yo u hav e r ece iv ed this co mm1111i ca tio11 in error. and an y review. us e. disclosur e. copy in g or distrib111ion of rhe co 111 e 111s of1his co 1111111111i c ation i s srricliy proh i bi1 ed. lfyou hav e received !his e l ec troni c rra11s111issio11 in er ror, pl e as e notify rh e sender imm e dial e l y by 1 e/ep hon e or by electro ni c mail and p e rma11 e 111l y d e l e t e 1h e original message. IRS Circular 230 disclosur e: To e nsur e compliance wilh requir e m e 111s imposed by 1he IRS and 01her taxing au1horilies , we inform yo u thal any lax advi ce co ntain ed in this co111mu11icatio11 (including an y auach111e111s) is 1101 intended or wri11e11 10 be us ed. and cannot b e us ed.fo r th e purpos e of(i) avoiding p e nalli es that ma y be impos e d 011 any raxpayer or (ii) pro11101i11g. mark et ing or recom111 e 11di11g lo anolh e r party an y 1ra11saction or mauer addressed h ere in. Sent through www.intennedia.com 1}}
Sent through www.intennedia.com 1}}

Latest revision as of 18:28, 3 February 2020

LTR-18-0027 Armond Cohen, Nuclear Innovation Alliance, Maria Korsnick, Nuclear Energy Institute and Daniel Blee, Nuclear Infrastructure Council, Paper Re Ensuring the Future of Us Nuclear Energy:Creating a Streamlined and Predictable Licens
ML18024A742
Person / Time
Site: Nuclear Energy Institute
Issue date: 01/23/2018
From: Cohen A, Korsnick M, Blee D
Nuclear Innovation Alliance, Nuclear Energy Institute, United States Nuclear Infrastructure Council (NIC)
To: Kristine Svinicki
NRC/Chairman
Shared Package
ML18024A743 List:
References
LTR-18-0027
Download: ML18024A742 (9)


Text

January 23, 2018 The Honorable Kristine Svinicki Chairman U.S. Nuclear Regulatory Commission Rockville, Maryland 20852

Dear Chairman Svinicki:

The undersigned organizations are pleased to convey to you the attached paper, Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment.

New innovative U.S. technologies currently in design, development and licensing are setting a new standard for nuclear energy. However, this technology leadership is at risk. To ensure continued American leadership in global nuclear markets, the U.S. government should act promptly to create a streamlined and predictable licensing pathway for advanced reactors, thereby supporting innovation, commercialization and deployment of new nuclear technologies.

To ensure that advanced reactors are licensed and built in the U.S., near-term regulatory reforms are necessary. These reforms should focus on achieving the following near-term objectives:

Reversing the trend of increasing regulatory costs and excessively long reviews; Aligning the regulatory framework for advanced reactors with their inherent enhanced safety; Defining licensing options clearly, including options for staged applications and approval; and Providing additional flexibility for changes during construction.

We welcome your leadership and that of the Commission to addressing common ground reform and modernization of the licensing pathway for advanced reactors. We look forward to a continued dialogue on this important technology innovation issue.

Please note that while the paper reflects the consensus of the undersigned organizations, it does not necessarily reflect the specific views of individual members of these organizations.

Sincerely, Nuclear Innovation Alliance Nuclear Energy Institute U.S. Nuclear Infrastructure Council Attachment Copies to: Hon. Stephen Burns Hon. Jeff Baran

Ensuring the Future of U.S. Nuclear Energy Creating a Streamlined and Predictable Licensing Pathway to Deployment January 23, 2018

Vision for the Future of Nuclear Energy With a modernized NRC licensing process, the reviews of advanced reactors will become more efficient and timely, while continuing to protect public health, safety and security. This updated licensing process will enable the development, licensing and deployment of more innovative, cost-competitive and safer nuclear reactor technologies. NRC reviews will become more safety-focused and predictable, and technology developers will be able to use a variety of licensing pathways to obtain NRC design approvals and achieve project milestones. Utilities and users of the industrial heat and energy produced by these technologies will choose advanced nuclear energy for its versatility and competitive economics. This will result in part from regulatory changes that recognize their enhanced safety and security. Regulators and developers will incorporate lessons from early deployments to streamline the licensing and construction of advanced technology projects.

The Regulatory Environment for Advanced Reactors and the Need for Change The U.S. nuclear industry is at a tipping point. The U.S. led the world into the age of nuclear energy and continues to be the global leader in technology innovation. The U.S. nuclear reactor fleet is the largest in the world, and the U.S. Nuclear Regulatory Commission rules are viewed as the world standard for ensuring nuclear plant safety and security. U.S. companies have developed and licensed large, modern, light water reactor nuclear plant designs that offer improved efficiency and safety. New advanced reactor technologies-many of which are being developed with support from the Department of Energy-are among the designs setting a new standard for nuclear innovation.

However, this technology leadership is at risk without licensing modernization. To mitigate that risk and ensure continued U.S. leadership in global nuclear markets, the U.S. government should act promptly to create a streamlined and predictable licensing pathway for advanced reactors, thereby supporting innovation, commercialization and deployment of new nuclear technologies.

To ensure that advanced reactors are licensed and built in the U.S., near-term regulatory changes are needed.

These changes should focus on achieving the following near-term objectives:

  • Reversing a trend of increasing regulatory costs and unnecessarily long reviews;
  • Aligning the regulatory framework for advanced reactors with their inherent enhanced safety and simplified design bases;
  • Defining licensing options clearly, including options for staged application and approval; and
  • Providing additional flexibility for changes during construction.

Current Environment The U.S. nuclear power industry has a history of commitment to safety and continuous improvement in design, operations and maintenance. Building on lessons learned by operating plants over the past several decades, the industry has developed new designs that offer marked 1

Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment improvements in safety, ease of maintenance and operations. These efforts have grown, with numerous designs at various stages of development for small modular light water reactors (LWRs) and non-light water reactors (non-LWRs).

New reactor designs, including those certified, under review and planned for submittal, are consistent with the NRCs advanced reactor policy in that they will provide enhanced margins of safety and/or use simplified, inherent, passive, or other innovative means to accomplish their safety and security functions. The Commission policy also notes that incorporating the above attributes may promote more efficient and effective design reviews.

The latest round of reactor licensing efforts for traditional LWRs has illuminated the need for flexibility in building them, but it also suggests the same need for upcoming small modular LWRs and advanced non-LWR designs. To date, however, the NRC reactor license review process has remained largely unchanged. While the NRC staff has been engaged in an active dialogue with interested stakeholders, as yet there is little evidence of improved efficiencies in the reviews of advanced LWR designs. Over-regulation and protracted reviews by the NRC are driving some U.S. companies out of the domestic market altogether, shifting their focus to the international market, where they hope regulators are able to make a finding of sufficient safety faster and at a lower cost than the NRC.

While in theory the standard of adequate protection has not changed for decades, as a practical matter it has, because the NRC now requires more effort from applicants to demonstrate that a design satisfies that standard. Applications for designs with improved safety features require ever greater detail, adding time and expense without enhancing safety. In some cases information is requested from the applicant that would normally not be available until a system is actually built.

Licensing reactors is becoming more time-consuming and less certain even as the designs are becoming inherently safer. The industry has contributed to this situation by acquiescing to the escalation in the Agencys requests for unnecessary, burdensome detail. For its part, the NRC should also acknowledge its contribution to this situation, and urgently refocus its licensing reviews on issues that are safety significant.

Another challenge to U.S. innovation regarding advanced technologies is the need for clearly defined pathways for a staged license application. Pre-application NRC-applicant interactions have at times been ineffective in accelerating or simplifying NRC approvals of plans for addressing issues prior to the review of an application for a complete reactor design. The industry needs a clearly defined yet flexible process for license application approval that provides the option of licensing one portion of the design at a time. A staged, incremental, license application review and approval process would reduce licensing risk and enable developers to win investment and customer support incrementally. This approach will be valuable to some applicants and should be an available option. Although licensing options exist today, they need to be documented and further developed before applicants can apply them with confidence that they are viable, and will avoid significant disputes and costly delays. While the NRC staff has made useful progress in becoming familiar with the need for these pathways over the past two years, continued progress in this area should be a top priority.

2

Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment Flexibility to make changes during construction also is essential to the deployment of new technologies and first-of-a-kind designs. Recent construction experience demonstrates the need for greater flexibility to modify the licensing basis during construction. A requirement for prior regulatory approval of such changes can delay multi-year construction projects with, in most cases, no safety benefit. The result is significant increase in costs and project risk with associated difficulties financing nuclear projects. The problem could be reduced if license applications were less detailed and more safety focused on performance outcomes. To resolve this issue fully, industry self-discipline, NRC process revisions, and possibly rulemaking to revise 10 CFR Part 52 may be required.

There is significant demand for new, advanced LWRs and non-LWRs. However, the promise of advanced technologies and the future of U.S. commercial nuclear power are coupled with the development of a more effective safety-focused and efficient regulatory review. With such improvements, the regulator can operate more effectively and U.S builders can more efficiently license, deploy, and export advanced reactors to meet the need for clean, reliable energy for electricity generation and other uses.

Details of actions needed to achieve these objectives are discussed below.

Reversing Increasing Regulatory Costs and Excessively Long Reviews Applicants need a process that gives them confidence the NRC can and will review designs and license applications in a timely, predictable and cost-effective manner and without imposing unnecessary regulatory burden. To improve near-term pre-application and licensing activities, NRC must exercise greater regulatory discipline by conducting appropriately safety-focused reviews, combined with guidance and process improvements identified through 10 CFR Part 52 lessons-learned activities.

One major contributor to the current inefficiency is the increasing level of detail the NRC requires in the docketed license application to support the agencys finding of reasonable assurance of adequate protection of public health and safety. Over time, the amount of information the NRC has required for licensing reviews of similar plant designs has expanded.

This expansion in scope has extended NRC project review schedules and increased the level of effort required by both the industry and the NRC. Much of this detail is unnecessary for the NRC to make and document its safety findings and meet the adequate protection standard. Inconsistent NRC management engagement and decision-making have also contributed to a staff culture where it is acceptable to demand more details in licensing submittals, without a direct nexus to safety.

This regulatory creep lengthens NRC review time, increases the information licensees must maintain over the life of the plant, and inflates the scope of details that cannot be changed without NRC approval. NRC must focus its review to consider only the information needed for determining reasonable assurance of adequate protection of public health and safety. An important element of the industry effort is to focus NRC licensing reviews on areas that are safety significant and change NRC practices for required level of detail in applications. (In most 3

Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment cases this should be accomplished through revisions to regulatory review guidance.) Active involvement and close oversight by the Chairman and Commissioners of the NRC is needed to achieve these outcomes and ultimately evolve the culture at the NRC to ensure the principles of good regulation are met.

In the near-term the industry is highlighting the need to improve timeliness and efficiency during 10 CFR Part 50 and 10 CFR Part 52 regulatory reviews and has placed a high priority on effecting change in this process.

Aligning the Regulatory Framework for Advanced Reactors with their Enhanced Safety The current regulatory framework was developed for and is based on LWR designs. Since most of the advanced reactors under development are cooled by fluids other than water (e.g., gases, liquid metals and molten salts) and are not susceptible to the same types of accidents, the NRC should tailor its guidance and regulations to appropriately address these advanced designs. Many advanced reactor designs are inherently safe even with the loss of both AC and DC power, feature even larger safety margins, and allow for longer times of accident progression. New designs also are less complex, with passive safety features and far fewer systems than large LWRs, significantly reducing the likelihood and magnitude of offsite releases. As a result, radiological releases are expected to have no impact on public health and safety even with smaller emergency planning zones. Accordingly, the NRC should scale emergency planning requirements and reviews to be commensurate with the accident source term, fission product release, and associated dose characteristics. The NRC has initiated rulemaking that has the potential to address this issue. The Commission should focus on promptly resolving this issue.

Additionally, designers are incorporating engineered physical security systems, hardware and other features into the reactor design, making physical security less reliant on armed responders.

These enhanced features justify regulatory changes to reduce the number of armed guards and consider eliminating onsite response forces altogether. Re-examination of security and emergency planning requirements is needed to remove unnecessary licensing burdens and reduce licensing and operating costs for advanced technologies. These changes would make the rules appropriate to the characteristics of the new reactors, rather than to traditional large LWRs, and thus improve the economic viability of new technologies. NRC consideration of these features is needed to make use of their security and economic benefits. The NRC staff is developing a recommendation on whether to move forward with rulemaking to change security requirements.

The Commission should ensure that any new rulemaking appropriately aligns the security requirements for advanced reactors commensurate with their risk.

The NRC also should modernize its process for setting design requirements for advanced reactors to be more systematic, predictable and repeatable, thus ensuring that consistent requirements are established for different technologies. The modernized process should account for the unique characteristics of the advanced non-LWRs and enhanced safety features of these reactors. This effort is expected to result in a more technology-inclusive, performance-based and safety-focused regulatory process needed to restore stakeholder confidence. The effort relies on revisions to the regulatory review guidance under Parts 50 and 52. It builds upon NRC, DOE and industry work over the last decade to develop the technical basis for an efficient, modernized 4

Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment regulatory process that is safety-focused and is applicable to all plant designs. This work was documented in a series of papers that provide the starting point for the ongoing work on the utility-led Licensing Modernization Project.

The result will provide processes for determining the important safety significant attributes of an advanced reactor design. NEI is working in collaboration with the industry and DOE to develop guidance for integrating these processes with existing regulations, for NRC review and endorsement. The guidance will outline the application of these concepts under 10 CFR Parts 50 and 52 and identify where exemptions are necessary. Judging from the pace of progress over the last decade, it will take more than five years to develop and implement an entirely new regulatory framework for advanced non-LWRs. However, the industrys near-term efforts, with NRC engagement, will define the principles for establishing a new regulatory framework in the long-term and address recognized challenges in a manner that enables near-term advanced reactor development.

Defining Licensing Options Clearly, including Staged Application and Approval The industry has recognized that for some non-LWRs, it needs a clearly defined, flexible process for license application approval that provides an optional mechanism for licensing one portion of the design at a time. In principle, NRC regulations allow for a staged, incremental, license application review and approval process for licensing one portion of the design at a time. These provisions are not well-defined and have not been recently used. Thus, applicants are uncertain about their viability to address specific development risks much earlier in the licensing process.

The industry is collaborating with the NRC to develop regulatory engagement planning guidance that better defines the different licensing pathways that could be used by designers, based in part on a Nuclear Innovation Alliance report that clarifies options to consider in defining major portions for a Standard Design Approval. The goal is to reduce designers uncertainty about NRC review and acceptance of certain aspects of the design, even before they have the final design completed for the entire facility. This effort is also intended to clarify pre-application interactions with NRC and desired outcomes. These interactions need to become more effective in identifying key safety issues and acceptable methods for resolving them. This is important for further reduction of regulatory review time and costs. Addressing these concerns will help to remove unnecessary barriers to innovation.

Providing Additional Flexibility for Changes during Construction Utilities and other end-users that will build future reactors need the ability to make changes during construction, without unduly slowing construction. The need for prior NRC approvals of the changes, no matter how minor, has increased costs, both by causing construction delays or by maintaining the engineering and licensing organization on standby, ready to quickly develop and submit license amendments. These issues, in part, will be addressed by reducing the level of detail in the licensing basis and thereby reducing the need for license amendments. Ensuring Tier 1 obligations are focused on safety significant features and eliminating the NRCs use of the Tier 2* designation will also help provide flexibility. However, additional process improvements are 5

Ensuring the Future of U.S. Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment needed for situations which require license amendments, to allow construction to proceed without delays. To fully accomplish this objective, new or revised guidance will be needed and revisions to Part 52 may be needed.

In summary, the industry and the NRC have a longstanding shared commitment to safety. As we move forward with advanced reactor technologies we will continue to place the highest priority on the shared fundamental tenet of protecting public health and safety while recognizing that the new designs need an updated licensing process with improved execution. The changes outlined in this paper are needed to enable the use of new and innovative advanced reactor technologies and are essential to achieving the goal of ensuring the future of nuclear technology in the United States and the nations role as a leader in technology innovation.

6

Mccloskey, Bridin Attachments: NIA- NEI- NIC Lette r fo r Chairman Svinicki.pdf; White Paper - Ensuring the Future of U.S.

Nuclear Energy.pdf From: TSCHILTZ, Michael .org

Sent: Tuesday, January 23, 2018 5:00 PM To: Vietti-Cook, Annette <Annette .Vietti-Cook@nrc.gov>

Subject:

[External_Sender] COVER LEDER AND PAPER Here is the cover letter and the paper that we discussed .

Thanks Mike Tschiltz Senior Director New Plant, SMRs and Advanced Reactors Nuclear Energy Institute 1201 F Street NW, Suite 1100 Washington, DC 20004 www.nei.org P: 202.739.8083 M: 202.471.0277 E: mdt@nei.org This electronic message 1ra11smissio11 co111ai11s information ji-0111 the Nuclear Energy lnstilllte. Inc. Th e information is in/ended solely for /h e use of lhe addressee and its use by any olher person is 1101 authorized. lfyou are not 1he i111ended recipie111, you have received this comm1111ica tio11 in error. and any review. use. disclosure. copying or distrib111ion of rhe co111e111s of1his co1111111111ication is srricliy proh ibi1ed. lfyou have received !his electronic rra11s111issio11 in error, please notify rhe sender immedialely by 1e/ephone or by electronic mail and perma11e111ly delete 1he original message. IRS Circular 230 disclosure: To ensure compliance wilh requireme111s imposed by 1he IRS and 01her taxing au1horilies, we inform you thal any lax advice contained in this co111mu11icatio11 (including any auach111e111s) is 1101 intended or wri11e11 10 be used. and cannot be used.for the purpose of(i) avoiding penallies that may be imposed 011 any raxpayer or (ii) pro11101i11g. marketing or recom111e11di11g lo anolher party any 1ra11saction or mauer addressed herein.

Sent through www.intennedia.com 1