ML032751627: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 09/29/2003 | | issue date = 09/29/2003 | ||
| title = NRC Regulatory Issue Summary (RIS) 2003-14 - Preparation and Scheduling of Operator Licensing Examinations | | title = NRC Regulatory Issue Summary (RIS) 2003-14 - Preparation and Scheduling of Operator Licensing Examinations | ||
| author name = Pace P | | author name = Pace P | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority | ||
| addressee name = | | addressee name = | ||
Line 14: | Line 14: | ||
| page count = 3 | | page count = 3 | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:Tennessee | {{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 SEP 2 9 2003 10 CFR 55.40 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen: | ||
Valley Authority, Post Office Box 2000, Spring City, Tennessee | In the Matter of ) Docket No. 50-390 Tennessee Valley Authority ) | ||
37381-2000 | WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 - NRC REGULATORY ISSUE | ||
SEP 2 9 2003 10 CFR 55.40 U.S. Nuclear Regulatory | |||
Commission | ==SUMMARY== | ||
ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen: | (RIS) 2003 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS RIS 2003-14 was released by NRC on August 27, 2003, and requested information regarding WBN's projected operator licensing examination schedules and the estimated number of applicants. The information requested by NRC was defined on Form 536. The enclosure to this letter addresses NRC's request and provides an estimate of the examination requirements for WBN. | ||
In the Matter of ) Docket No. 50-390 Tennessee | There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824. | ||
Valley Authority | Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc: See page22C | ||
a U.S. Nuclear Regulatory Commission Page 2 SEP Z 9 2003 cc (Enclosure): | |||
AND SCHEDULING | NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Ms. M. H. Chernoff, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission, Region II ATTN: Mr. Michael E. Ernstes Chief, Operator Licensing and Human Performance Branch Sam Nunn Atlanta Federal Center 61 Forsyth St., Suite 23T85 Atlanta, Georgia 30303 | ||
OF OPERATOR LICENSING | |||
EXAMINATIONS | Enclosure Operator Licensing Examination Data (Data as defined on NRC Form 536) | ||
RIS 2003-14 was released by NRC on August 27, 2003, and requested | FACITY NRC REGION WATTS BAR NUCLEAR PLANT II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY04 CY05 CY06 CY07 ESTIMATED NUMBER OF LICENSEE PREPARED 1 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC PREPARED 0 0 1 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY04 CY05 CY06 CY07 NUMBER OF REACTOR 4 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 3 0 5 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2 0 3 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES 7t26 - 7/30 6/11 - 6/15 PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY04CY05 NUMBER Jne Sepember December Mac June September December ESTIMATED o o o O 0 13 0 0 NUMBER OF CANDIDATES}} | ||
information | |||
regarding WBN's projected | |||
operator licensing | |||
examination | |||
schedules | |||
and the estimated | |||
number of applicants. | |||
The information | |||
requested | |||
by NRC was defined on Form 536. The enclosure | |||
to this letter addresses | |||
NRC's request and provides an estimate of the examination | |||
requirements | |||
for WBN.There are no regulatory | |||
commitments | |||
in this submittal | |||
and should there be questions regarding | |||
this letter, please telephone | |||
me at (423) 365-1824.Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc: See | |||
a U.S. Nuclear Regulatory | |||
Commission | |||
Page 2 SEP Z 9 2003 cc (Enclosure): | |||
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee | |||
37381 Ms. M. H. Chernoff, Project Manager U.S. Nuclear Regulatory | |||
Commission | |||
MS 08G9 One White Flint North 11555 Rockville | |||
Pike Rockville, Maryland 20852-2738 | |||
U.S. Nuclear Regulatory | |||
Commission, Region II ATTN: Mr. Michael E. Ernstes Chief, Operator Licensing | |||
and Human Performance | |||
Branch Sam Nunn Atlanta Federal Center 61 Forsyth St., Suite 23T85 Atlanta, Georgia 30303 | |||
Enclosure Operator Licensing | |||
Examination | |||
Data (Data as defined on NRC Form 536)FACITY NRC REGION WATTS BAR NUCLEAR PLANT II A. PROPOSED EXAMINATION | |||
PREPARATION | |||
SCHEDULE PROPOSED NUMBER CY04 CY05 CY06 CY07 ESTIMATED | |||
NUMBER OF LICENSEE PREPARED 1 0 0 0 EXAMINATIONS | |||
ESTIMATED | |||
NUMBER OF NRC PREPARED 0 0 1 0 EXAMINATIONS | |||
B. INITIAL OPERATOR LICENSE EXAMINATIONS | |||
PROPOSED NUMBER CY04 CY05 CY06 CY07 NUMBER OF REACTOR 4 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 3 0 5 0 OPERATORS | |||
-INSTANT NUMBER OF SENIOR REACTOR 2 0 3 0 OPERATORS | |||
-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS | |||
-LIMITED PROPOSED DATES 7t26 -7/30 6/11 -6/15 PRIMARY DATE ALTERNATE | |||
DATE C. PROPOSED GENERIC FUNDAMENTALS | |||
EXAMINATION (GFE) SCHEDULE PROPOSED CY04CY05 NUMBER Jne Sepember December Mac June September | |||
December ESTIMATED | |||
o o o O 0 13 0 0 NUMBER OF CANDIDATES | |||
}} |
Latest revision as of 02:37, 24 November 2019
ML032751627 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 09/29/2003 |
From: | Pace P Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RIS-03-014 | |
Download: ML032751627 (3) | |
Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 SEP 2 9 2003 10 CFR 55.40 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of ) Docket No. 50-390 Tennessee Valley Authority )
WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 - NRC REGULATORY ISSUE
SUMMARY
(RIS) 2003 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS RIS 2003-14 was released by NRC on August 27, 2003, and requested information regarding WBN's projected operator licensing examination schedules and the estimated number of applicants. The information requested by NRC was defined on Form 536. The enclosure to this letter addresses NRC's request and provides an estimate of the examination requirements for WBN.
There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.
Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc: See page22C
a U.S. Nuclear Regulatory Commission Page 2 SEP Z 9 2003 cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Ms. M. H. Chernoff, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission, Region II ATTN: Mr. Michael E. Ernstes Chief, Operator Licensing and Human Performance Branch Sam Nunn Atlanta Federal Center 61 Forsyth St., Suite 23T85 Atlanta, Georgia 30303
Enclosure Operator Licensing Examination Data (Data as defined on NRC Form 536)
FACITY NRC REGION WATTS BAR NUCLEAR PLANT II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY04 CY05 CY06 CY07 ESTIMATED NUMBER OF LICENSEE PREPARED 1 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC PREPARED 0 0 1 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY04 CY05 CY06 CY07 NUMBER OF REACTOR 4 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 3 0 5 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2 0 3 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES 7t26 - 7/30 6/11 - 6/15 PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY04CY05 NUMBER Jne Sepember December Mac June September December ESTIMATED o o o O 0 13 0 0 NUMBER OF CANDIDATES