ML081210179: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML081210179
| number = ML081210179
| issue date = 04/22/2008
| issue date = 04/22/2008
| title = 2008/04/22-Entergy's Nineteenth Supplemental Disclosure
| title = Entergy'S Nineteenth Supplemental Disclosure
| author name = Teplinsky E
| author name = Teplinsky E
| author affiliation = Entergy Nuclear Operations, Inc, Entergy Nuclear Vermont Yankee, LLC, Pillsbury, Winthrop, Shaw, Pittman, LLP
| author affiliation = Entergy Nuclear Operations, Inc, Entergy Nuclear Vermont Yankee, LLC, Pillsbury, Winthrop, Shaw, Pittman, LLP
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:J DOCKETED USNRC April 22, 2008 (2:58pm) April 22, 2008 OFFICE OF SECRETARY RULEMAKINGS AND UNITED STATES OF AMERICA ADJUDICATIONS STAFF NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of ))Entergy Nuclear Vermont Yankee, LLC ) Docket No. 50-271-LR and Entergy Nuclear Operations, Inc. ) ASLBP No. 06-849-03-LR
{{#Wiki_filter:J       DOCKETED USNRC April 22, 2008 (2:58pm)                                                                           April 22, 2008 OFFICE OF SECRETARY RULEMAKINGS AND                             UNITED STATES OF AMERICA ADJUDICATIONS STAFF                   NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of                                 )
)(Vermont Yankee Nuclear Power Station) )ENTERGY'S NINETEENTH SUPPLEMENTAL DISCLOSURE Pursuant to 10 C.F.R. § 2.336(d), Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. ("Entergy")
                                                                    )
hereby supplements its disclosures as follows. Entergy is providing to each party and to the State of New Hampshire, by separate cover, one (1) compact disk. This disk contains subsequently obtained or developed non-proprietary documents identified as relevant to the admitted contentions.
Entergy Nuclear Vermont Yankee, LLC               )       Docket No. 50-271-LR and Entergy Nuclear Operations, Inc.             )       ASLBP No. 06-849-03-LR
In addition, one (1) disk containing documents that contain proprietary information is being provided to NEC and DPS pursuant to the Non-Disclosure Agreements executed by these parties.Respectfully Submitted, Elina Teplinsky*
                                                                    )
PILLSBURY WINTHROP SHAW PITTMAN LLP 2300 N Street, N.W.Washington, DC 20037-1128 Tel. (202) 663-9009 Counsel for Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc.Dated: April 22, 2008*Admitted in Virginia only. Practice limited to federal nuclear energy regulatory matters.400807044vl
(Vermont Yankee Nuclear Power Station)           )
-O3s UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.(Vermont Yankee Nuclear Power Station)))))))Docket No. 50-271-LR ASLBP No. 06-849-03-LR CERTIFICATE OF SERVICE I hereby certify that copies of "Entergy's Nineteenth Supplemental Disclosures" dated April 22, 2008, were served on the persons listed below by deposit in the U.S. Mail, first class, postage prepaid, and where indicated by an asterisk by electronic mail, this 2 2 nd day of April, 2008.*Administrative Judge Alex S. Karlin, Esq., Chairman Atomic Safety and Licensing Boardw Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ask2 (,rc_.gov2
ENTERGY'S NINETEENTH SUPPLEMENTAL DISCLOSURE Pursuant to 10 C.F.R. § 2.336(d), Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. ("Entergy") hereby supplements its disclosures as follows. Entergy is providing to each party and to the State of New Hampshire, by separate cover, one (1) compact disk. This disk contains subsequently obtained or developed non-proprietary documents identified as relevant to the admitted contentions. In addition, one (1) disk containing documents that contain proprietary information is being provided to NEC and DPS pursuant to the Non-Disclosure Agreements executed by these parties.
*Administrative Judge Dr. Thomas S. Elleman Atomic Safety and Licensing Board 5207 Creedmoor Road, #101, Raleigh, NC 27612.Office of Commission Appellate Adjudication Mail Stop 0-16 C1 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Respectfully Submitted, Elina Teplinsky*
*Administrative Judge Dr. Richard E. Wardwell Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 rewt(iW;nrc.gov
PILLSBURY WINTHROP SHAW PITTMAN LLP 2300 N Street, N.W.
*Secretary Att'n: Rulemakings and Adjudications Staff Mail Stop 0-16 Cl U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001r hearin gdocket(nrc.gov Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 4 00807044vi  
Washington, DC 20037-1128 Tel. (202) 663-9009 Counsel for Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc.
*Lloyd Subin, Esq.*Mary Baty, Esq.*Steven C. Hamrick, Esq.*David E. Roth, Esq.Office of the General Counsel Mail Stop 0- 15 D21 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 LBS3@anrc.gov; mcb I (lnrc.gov; schI m-c.gov;der(4ýiii'c.gov
Dated: April 22, 2008
*Anthony Z. Roisman, Esq.National Legal Scholars Law Firm 84 East Thetford Road Lyme, NH 03768* Peter C. L. Roth, Esq.Senor Assistant Attorney General Environmental Protection Bureau 33 Capitol Street Concord, NH 03301 Peter. Roth6'2dloj .nh.gcov*Marcia Carpenter Law Clerk to Judge Alex S. Karlin, Esq.Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 MXC7(_.7 nrc.gov*Ronald A. Shems, Esq.*Karen Tyler, Esq.Shems, Dunkiel, Kassel & Saunders, PLLC 91 College Street Burlington, VT 05401 rstie.gM_
          *Admitted in Virginia only. Practice limited to federal nuclear energy regulatory matters.
sdksla w.com ktyIer(ihsdkslaw.com
400807044vl
*Sarah Hofmann, Esq.Director of Public Advocacy Department of Public Service 112 State Street -Drawer 20 Montpelier, VT 05620-2601 Sarah .ho fnann({i)state.vt.us Elina Teplinsky 400807044vl 2
                                - O3s
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of ))Entergy Nuclear Vermont Yankee, LLC ) Docket No. 50-271 -LR and Entergy Nuclear Operations, Inc. ) ASLBP No. 06-849-03-LR
 
)(Vermont Yankee Nuclear Power Station) )Certification of Supplemental Disclosure Affidavit of H. Michael Metell County of Windham )) ss.State of Vermont )I, H. Michael Metell, being duly sworn, state: I am the License Renewal Project Manager for Entergy Nuclear Operations, Inc. My business address is 320 Governor Hunt Road, P.O. Box 250, Vernon, VT 05354. I am authorized to provide this certification, pursuant to 10 C.F.R. § 2.336(c), on behalf of Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. ("Entergy").
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of                                 )
                                                )
Entergy Nuclear Vermont Yankee, LLC             )     Docket No. 50-271-LR and Entergy Nuclear Operations, Inc.            )      ASLBP No. 06-849-03-LR
                                                )
(Vermont Yankee Nuclear Power Station)          )
CERTIFICATE OF SERVICE I hereby certify that copies of "Entergy's Nineteenth Supplemental Disclosures" dated April 22, 2008, were served on the persons listed below by deposit in the U.S. Mail, first class, postage prepaid, and where indicated by an asterisk by electronic mail, this     2 2 nd day of April, 2008.
  *Administrative Judge                                  *Administrative Judge Alex S. Karlin, Esq., Chairman                       Dr. Richard E. Wardwell Atomic Safety and Licensing Boardw                   Atomic Safety and Licensing Board Mail Stop T-3 F23                                     Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission                    U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001                          Washington, D.C. 20555-0001 ask2 (,rc_.gov2                                       rewt(iW;nrc.gov
  *Administrative Judge                                 *Secretary Dr. Thomas S. Elleman                                 Att'n: Rulemakings and Adjudications Staff Atomic Safety and Licensing Board                     Mail Stop 0-16 Cl 5207 Creedmoor Road, #101,                             U.S. Nuclear Regulatory Commission Raleigh, NC 27612.                                    Washington, D.C. 20555-0001 se*r;wn r c*)v, hearin gdocket(nrc.gov Office of Commission Appellate Adjudication            Atomic Safety and Licensing Board Mail Stop 0-16 C1                                      Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission                     U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001                            Washington, D.C. 20555-0001 4
00807044vi
 
*Lloyd Subin, Esq.                             *Marcia Carpenter
*Mary Baty, Esq.                             Law Clerk to Judge Alex S. Karlin, Esq.
*Steven C. Hamrick, Esq.                     Atomic Safety and Licensing Board
*David E. Roth, Esq.                         Mail Stop T-3 F23 Office of the General Counsel                 U.S. Nuclear Regulatory Commission Mail Stop 0- 15 D21                           Washington, D.C. 20555-0001 U.S. Nuclear Regulatory Commission           MXC7(_.7 nrc.gov Washington, D.C. 20555-0001 LBS3@anrc.gov; mcb I(lnrc.gov;schI m-c.gov; der(4ýiii'c.gov
*Anthony Z. Roisman, Esq.                     *Ronald A. Shems, Esq.
National Legal Scholars Law Firm              *Karen Tyler, Esq.
84 East Thetford Road                        Shems, Dunkiel, Kassel & Saunders, PLLC Lyme, NH 03768                                91 College Street Burlington, VT 05401 rstie.gM_ sdksla w.com ktyIer(ihsdkslaw.com
* Peter C. L. Roth, Esq.                      *Sarah Hofmann, Esq.
Senor Assistant Attorney General              Director of Public Advocacy Environmental Protection Bureau              Department of Public Service 33 Capitol Street                              112 State Street - Drawer 20 Concord, NH 03301                            Montpelier, VT 05620-2601 Peter. Roth6'2dloj .nh.gcov                  Sarah .hofnann({i)state.vt.us Elina Teplinsky 400807044vl                                 2
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of                               )
                                                )
Entergy Nuclear Vermont Yankee, LLC             )     Docket No. 50-271 -LR and Entergy Nuclear Operations, Inc.           )     ASLBP No. 06-849-03-LR
                                                )
(Vermont Yankee Nuclear Power Station)         )
Certification of Supplemental Disclosure Affidavit of H. Michael Metell County of Windham               )
                                )       ss.
State of Vermont                 )
I, H. Michael Metell, being duly sworn, state:
I am the License Renewal Project Manager for Entergy Nuclear Operations, Inc. My business address is 320 Governor Hunt Road, P.O. Box 250, Vernon, VT 05354. I am authorized to provide this certification, pursuant to 10 C.F.R. § 2.336(c), on behalf of Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. ("Entergy").
To the best of my knowledge, information and belief, Entergy's thirteenth supplemental disclosure in the above captioned proceeding discloses all documents or information required to be disclosed that were developed or obtained subsequent to the previous disclosure and have been identified as relevant to the admitted contentions.
To the best of my knowledge, information and belief, Entergy's thirteenth supplemental disclosure in the above captioned proceeding discloses all documents or information required to be disclosed that were developed or obtained subsequent to the previous disclosure and have been identified as relevant to the admitted contentions.
Further, to the best of my knowledge, information and belief, these disclosures are accurate and complete as of this date.4007710260 Further the affiant sayeth not.Subscribed and sworn to before me this t_ day of April, 2008 Notary Pub My commission expires: Z, -/0 2-0 /..Dov,.,,.. .............OT."0AR".4 'C , .)'-,i "" .5 2 400771026v0 Vermont Yankee License Renewal Proceeding Proprietary Log for Documents Determined Relevant and Responsive to NEC Contentions Supplement 19 Disclosure, April 22, 2008 No. Type of Document Date Entity Claiming Document Title Document Proprietary Status 1 Calculations July 2007 Structural Integrity Environmental Fatigue Evaluation of Reactor Recirculation Inlet Nozzle and Vessel Associates, Inc. Shell/Bottom Head 2 Report December 2007 Structural Integrity Summary Report of Plant-Specific Environmental Fatigue Analyses for the Vermont Associates, Inc. Yankee Nuclear Power Station 400807050vl}}
Further, to the best of my knowledge, information and belief, these disclosures are accurate and complete as of this date.
4007710260
 
Further the affiant sayeth not.
Subscribed and sworn to before me this t_day of April, 2008
                                                      ..,'",**J. Dov,.,,
OT."0AR".
Notary Pub My commission expires:       Z, -/0     2-0 /
4   'C   .)',
                                                  -,i""           *.'''      .5 2
400771026v0
 
Vermont Yankee License Renewal Proceeding Proprietary Log for Documents Determined Relevant and Responsive to NEC Contentions Supplement 19 Disclosure, April 22, 2008 No.     Type of         Document Date     Entity Claiming                                       Document Title Document                           Proprietary Status 1   Calculations July 2007           Structural Integrity Environmental Fatigue Evaluation of Reactor Recirculation Inlet Nozzle and Vessel Associates, Inc. Shell/Bottom Head 2     Report       December 2007       Structural Integrity Summary Report of Plant-Specific Environmental Fatigue Analyses for the Vermont Associates, Inc. Yankee Nuclear Power Station 400807050vl}}

Latest revision as of 04:00, 13 March 2020

Entergy'S Nineteenth Supplemental Disclosure
ML081210179
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 04/22/2008
From: Teplinsky E
Entergy Nuclear Operations, Entergy Nuclear Vermont Yankee, Pillsbury, Winthrop, Shaw, Pittman, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-271-LR, ASLBP 06-849-03-LR, RAS M-35
Download: ML081210179 (6)


Text

J DOCKETED USNRC April 22, 2008 (2:58pm) April 22, 2008 OFFICE OF SECRETARY RULEMAKINGS AND UNITED STATES OF AMERICA ADJUDICATIONS STAFF NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

Entergy Nuclear Vermont Yankee, LLC ) Docket No. 50-271-LR and Entergy Nuclear Operations, Inc. ) ASLBP No. 06-849-03-LR

)

(Vermont Yankee Nuclear Power Station) )

ENTERGY'S NINETEENTH SUPPLEMENTAL DISCLOSURE Pursuant to 10 C.F.R. § 2.336(d), Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. ("Entergy") hereby supplements its disclosures as follows. Entergy is providing to each party and to the State of New Hampshire, by separate cover, one (1) compact disk. This disk contains subsequently obtained or developed non-proprietary documents identified as relevant to the admitted contentions. In addition, one (1) disk containing documents that contain proprietary information is being provided to NEC and DPS pursuant to the Non-Disclosure Agreements executed by these parties.

Respectfully Submitted, Elina Teplinsky*

PILLSBURY WINTHROP SHAW PITTMAN LLP 2300 N Street, N.W.

Washington, DC 20037-1128 Tel. (202) 663-9009 Counsel for Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc.

Dated: April 22, 2008

  • Admitted in Virginia only. Practice limited to federal nuclear energy regulatory matters.

400807044vl

- O3s

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

Entergy Nuclear Vermont Yankee, LLC ) Docket No. 50-271-LR and Entergy Nuclear Operations, Inc. ) ASLBP No. 06-849-03-LR

)

(Vermont Yankee Nuclear Power Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of "Entergy's Nineteenth Supplemental Disclosures" dated April 22, 2008, were served on the persons listed below by deposit in the U.S. Mail, first class, postage prepaid, and where indicated by an asterisk by electronic mail, this 2 2 nd day of April, 2008.

  • Administrative Judge *Administrative Judge Alex S. Karlin, Esq., Chairman Dr. Richard E. Wardwell Atomic Safety and Licensing Boardw Atomic Safety and Licensing Board Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Washington, D.C. 20555-0001 ask2 (,rc_.gov2 rewt(iW;nrc.gov
  • Administrative Judge *Secretary Dr. Thomas S. Elleman Att'n: Rulemakings and Adjudications Staff Atomic Safety and Licensing Board Mail Stop 0-16 Cl 5207 Creedmoor Road, #101, U.S. Nuclear Regulatory Commission Raleigh, NC 27612. Washington, D.C. 20555-0001 se*r;wn r c*)v, hearin gdocket(nrc.gov Office of Commission Appellate Adjudication Atomic Safety and Licensing Board Mail Stop 0-16 C1 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Washington, D.C. 20555-0001 4

00807044vi

  • Lloyd Subin, Esq. *Marcia Carpenter
  • Mary Baty, Esq. Law Clerk to Judge Alex S. Karlin, Esq.
  • Steven C. Hamrick, Esq. Atomic Safety and Licensing Board
  • David E. Roth, Esq. Mail Stop T-3 F23 Office of the General Counsel U.S. Nuclear Regulatory Commission Mail Stop 0- 15 D21 Washington, D.C. 20555-0001 U.S. Nuclear Regulatory Commission MXC7(_.7 nrc.gov Washington, D.C. 20555-0001 LBS3@anrc.gov; mcb I(lnrc.gov;schI m-c.gov; der(4ýiii'c.gov
  • Anthony Z. Roisman, Esq. *Ronald A. Shems, Esq.

National Legal Scholars Law Firm *Karen Tyler, Esq.

84 East Thetford Road Shems, Dunkiel, Kassel & Saunders, PLLC Lyme, NH 03768 91 College Street Burlington, VT 05401 rstie.gM_ sdksla w.com ktyIer(ihsdkslaw.com

  • Peter C. L. Roth, Esq. *Sarah Hofmann, Esq.

Senor Assistant Attorney General Director of Public Advocacy Environmental Protection Bureau Department of Public Service 33 Capitol Street 112 State Street - Drawer 20 Concord, NH 03301 Montpelier, VT 05620-2601 Peter. Roth6'2dloj .nh.gcov Sarah .hofnann({i)state.vt.us Elina Teplinsky 400807044vl 2

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

Entergy Nuclear Vermont Yankee, LLC ) Docket No. 50-271 -LR and Entergy Nuclear Operations, Inc. ) ASLBP No. 06-849-03-LR

)

(Vermont Yankee Nuclear Power Station) )

Certification of Supplemental Disclosure Affidavit of H. Michael Metell County of Windham )

) ss.

State of Vermont )

I, H. Michael Metell, being duly sworn, state:

I am the License Renewal Project Manager for Entergy Nuclear Operations, Inc. My business address is 320 Governor Hunt Road, P.O. Box 250, Vernon, VT 05354. I am authorized to provide this certification, pursuant to 10 C.F.R. § 2.336(c), on behalf of Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. ("Entergy").

To the best of my knowledge, information and belief, Entergy's thirteenth supplemental disclosure in the above captioned proceeding discloses all documents or information required to be disclosed that were developed or obtained subsequent to the previous disclosure and have been identified as relevant to the admitted contentions.

Further, to the best of my knowledge, information and belief, these disclosures are accurate and complete as of this date.

4007710260

Further the affiant sayeth not.

Subscribed and sworn to before me this t_day of April, 2008

..,'",**J. Dov,.,,

OT."0AR".

Notary Pub My commission expires: Z, -/0 2-0 /

4 'C .)',

-,i"" *. .5 2

400771026v0

Vermont Yankee License Renewal Proceeding Proprietary Log for Documents Determined Relevant and Responsive to NEC Contentions Supplement 19 Disclosure, April 22, 2008 No. Type of Document Date Entity Claiming Document Title Document Proprietary Status 1 Calculations July 2007 Structural Integrity Environmental Fatigue Evaluation of Reactor Recirculation Inlet Nozzle and Vessel Associates, Inc. Shell/Bottom Head 2 Report December 2007 Structural Integrity Summary Report of Plant-Specific Environmental Fatigue Analyses for the Vermont Associates, Inc. Yankee Nuclear Power Station 400807050vl