ML081230052: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML081230052
| number = ML081230052
| issue date = 05/07/2008
| issue date = 05/07/2008
| title = Perry, Table 1 - Audited Closed Commitments
| title = Table 1 - Audited Closed Commitments
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO
| author affiliation = NRC/NRR/ADRO
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Table 1 - Audited Closed Commitments Commitment Tracking Number Date and Document Commitment Summary/Description Disposition & Verification Auditor's Assessment of Regulatory Commitment Disposition (adequate, inadequate) L02543 CEI/NRR-3019L 2/26/07 Revised Division 3 Diesel Generator Cross-tie Procedure(s) and Associated Personnel Training to Support GSI-189 Closure Completed 12/28/07. Training was completed on 12/17/07 and documented by attendance sheets. Two new procedures were written to incorporate the new procedures (ONI-SPI C-6 and C-7)  Adequate:  Procedures reference the commitment number in the hidden text. ONI procedures place the commitment references in hidden text to keep the procedures as clear as possible. L02538 CEI/NRR-2992L 1/11/07 Establishment of Technical Specification (TS) Bases for New LCO 3.0.8 Completed 10/2/07. Closure document CN 07-133. Adequate:  Verified incorporated into TS Bases. L02542 CEI/NRR-0879L  7/11/88 IEB 88-04 Emergency Core Cooling System (ECCS) Pump Minimum Flow Limitations Completed 10/26/07. Closure document CEI/NRR-3064L submitted on 10/23/07. Adequate:  Verified that the commitment change was contained in the commitment change summary submitted to the NRC on 10/23/07. L02503 CEI/NRR-2880L  5/18/05 The PNPP Staff Commits to a Number of Activities in Support of an Operating License Transfer Request for Beaver Valley Units 1 & 2, Davis-Besse and Perry Completed 1/10/06. Closure document letter CEI/NRR-2910L submitted on 10/03/05. Adequate:  Verified closure document.
{{#Wiki_filter:Table 1 - Audited Closed Commitments Commitment Date and           Commitment               Disposition &   Auditors Assessment of Regulatory Tracking  Document      Summary/Description            Verification    Commitment Disposition (adequate, Number                                                                            inadequate)
Commitment Tracking Number Date and Document Commitment Summary/Description Disposition & Verification Auditor's Assessment of Regulatory Commitment Disposition (adequate, inadequate) L02498 CEI/NRR-2886L 06/01/05 The PNPP Staff Commits to a Number of Activities in Support of an Operating License Transfer Request for Beaver Valley Units 1 & 2, Davis-Besse and Perry Completed 1/6/06. Closure document CEI/NRR-2910L submitted on 10/03/05. Adequate:  Verified closure document. L02488 CEI/NRR-1114L 04/15/04 CEI/NRR-2669L 01/30/03 The Proposed Change Revises the Reactor Pressure Vessel material Surveillance Program Described within the PNPP USAR from a Plant Specific Program to the BWR Vessel and Internals Project (BWRVIP) Integrated Surveillance Program (ISP). Completed 5/20/05. Closure USAR Change request 05-076. Adequate:  Verified incorporated in to USAR. L02522 CEI/NRR-2838L  12/06/05 Implementation and Use of Delta Protection Suits for Radiological Respiratory Protection Completed 3/13/07. Incorporated into Respiratory Protection Program, procedure NOP-WM-7015. Adequate:  Commitment is clearly listed in commitment section of procedure and references specific step number that is affected. L02510 CEI/NRR-2897L 8/08/05 Revise NQI-1001, Inspection Program Control Completed 12/12/05. Closure is procedure NOP-LP-2018. Adequate:  NQI-1001 was changed to NOP-LP-2018, "Quality Control Inspection of Maintenance and Modification Activities."  Commitment is clearly referenced in the Perry commitment section. L02467 CEI/NRR-2674L 12/09/02 Radial Peaking Factor, Burnup and LHGR Limit Need to be Verified Each Cycle Completed 12/01/05. Closure is calculations. Adequate:  Reload analysis input form includes above listed limits from most recent calculations.
L02543   CEI/NRR-   Revised Division 3 Diesel       Completed      Adequate: Procedures reference the 3019L        Generator Cross-tie       12/28/07. Training  commitment number in the hidden 2/26/07  Procedure(s) and Associated   was completed on      text. ONI procedures place the Personnel Training to Support     12/17/07 and   commitment references in hidden text GSI-189 Closure          documented by     to keep the procedures as clear as attendance                   possible.
Commitment Tracking Number Date and Document Commitment Summary/Description Disposition & Verification Auditor's Assessment of Regulatory Commitment Disposition (adequate, inadequate) L02493 CEI/NRR-2865L 3/21/05 Perform a Verification of Accounting Records and Visual Confirmation of Special Nuclear Material in Accordance with NRC Bulletin 2005-001. Completed 12/21/05. Closure document CEI/NRR-2883L submitted on 5/12/05. Adequate:  Verified closure document.  
sheets. Two new procedures were written to incorporate the new procedures (ONI-SPI C-6 and C-7)
L02538   CEI/NRR-   Establishment of Technical       Completed      Adequate: Verified incorporated into 2992L  Specification (TS) Bases for   10/2/07. Closure                TS Bases.
1/11/07        New LCO 3.0.8           document CN 07-133.
L02542   CEI/NRR-   IEB 88-04 Emergency Core         Completed            Adequate: Verified that the 0879L  Cooling System (ECCS) Pump     10/26/07. Closure commitment change was contained in 7/11/88    Minimum Flow Limitations          document       the commitment change summary CEI/NRR-3064L     submitted to the NRC on 10/23/07.
submitted on 10/23/07.
L02503   CEI/NRR- The PNPP Staff Commits to a         Completed            Adequate: Verified closure 2880L  Number of Activities in Support 1/10/06. Closure               document.
5/18/05     of an Operating License       document letter Transfer Request for Beaver     CEI/NRR-2910L Valley Units 1 & 2, Davis-     submitted on Besse and Perry             10/03/05.


Table 2 - Audited Open Commitments Commitment Tracking Number Date and Document Commitment Summary/Description Auditor's Assessment of Regulatory Commitment Disposition (adequate, inadequate)
Commitment Date and          Commitment                Disposition &    Auditors Assessment of Regulatory Tracking  Document      Summary/Description            Verification    Commitment Disposition (adequate, Number                                                                              inadequate)
F01671 USAR Appendix 1B (01/31/11) Sampling Line Loss Measurements Pending Availability of Staff Guidance Adequate: Due date has been extended but all extensions have been noted in correspondence to the NRC. Measurements have been performed. Licensee is awaiting guidance on submitting test data. L02403 CEI/NRR-2352L 1/06/99 (6/24/08) Testing of Residual Heat Removal Branch Line Off of Feedwater Piping, Amendment 105 Adequate:  Still revising Integrated Leak Rate Test for feedwater penetration changes. Due date is 6/24/08. L02539 CEI/OIE-0690L 1/19/07 (6/30/08) Corrective Action Program (CAP) Independent Assessment Meeting Results Adequate: The final CAP assessment report was completed on 10/4/07. Commitment will be closed following meeting with NRC to discuss assessment results. L02544 CEI/NRR-3019L 2/26/07 (4/40/08) The Procurement of the Portable Equipment, Procedure Development, and Personnel Training on the Equipment is Expected to be Completed by April 30,2008 (Hydrogen Igniters, GSI-189) Adequate: None of the activities are closed at this time. Audit was completed prior to the scheduled completion date. L02546 Letter L 046  2/20/08 (12/23/08) Appropriate Detailed Operational Procedures Will Be Established to Implement the Controls Included in Section 4, "Safety and Technical Evaluations," and Section 5, "Plant Implementation" of NEDO-33091-A   Rev. 2, "Improved BPWS Control Rod Insertion Process." Adequate:  Part of licensee's License Amendment Request to incorporate TSTF-476-A}}
L02498  CEI/NRR- The PNPP Staff Commits to a    Completed 1/6/06.        Adequate: Verified closure 2886L  Number of Activities in Support Closure document                    document.
06/01/05    of an Operating License      CEI/NRR-2910L Transfer Request for Beaver        submitted on Valley Units 1 & 2, Davis-        10/03/05.
Besse and Perry L02488  CEI/NRR-      The Proposed Change            Completed      Adequate: Verified incorporated in to 1114L  Revises the Reactor Pressure    5/20/05. Closure                    USAR.
04/15/04  Vessel material Surveillance      USAR Change CEI/NRR- Program Described within the      request 05-076.
2669L    PNPP USAR from a Plant 01/30/03 Specific Program to the BWR Vessel and Internals Project (BWRVIP) Integrated Surveillance Program (ISP).
L02522  CEI/NRR-  Implementation and Use of          Completed        Adequate: Commitment is clearly 2838L    Delta Protection Suits for          3/13/07.        listed in commitment section of 12/06/05    Radiological Respiratory      Incorporated into    procedure and references specific Protection              Respiratory          step number that is affected.
Protection Program, procedure NOP-WM-7015.
L02510  CEI/NRR-  Revise NQI-1001, Inspection        Completed      Adequate: NQI-1001 was changed 2897L          Program Control        12/12/05. Closure    to NOP-LP-2018, Quality Control 8/08/05                                is procedure NOP-      Inspection of Maintenance and LP-2018.      Modification Activities. Commitment is clearly referenced in the Perry commitment section.
L02467  CEI/NRR- Radial Peaking Factor, Burnup        Completed        Adequate: Reload analysis input 2674L  and LHGR Limit Need to be      12/01/05. Closure  form includes above listed limits from 12/09/02        Verified Each Cycle        is calculations.        most recent calculations.
 
Commitment Date and        Commitment              Disposition &  Auditors Assessment of Regulatory Tracking  Document    Summary/Description          Verification  Commitment Disposition (adequate, Number                                                                        inadequate)
L02493  CEI/NRR-    Perform a Verification of      Completed        Adequate: Verified closure 2865L    Accounting Records and      12/21/05. Closure              document.
3/21/05 Visual Confirmation of Special    document Nuclear Material in        CEI/NRR-2883L Accordance with NRC Bulletin    submitted on 2005-001.                  5/12/05.
 
Table 2 - Audited Open Commitments Commitment   Date and     Commitment Summary/Description               Auditors Assessment of Regulatory Tracking  Document                                            Commitment Disposition (adequate, inadequate)
Number F01671       USAR       Sampling Line Loss Measurements       Adequate: Due date has been extended but all Appendix 1B    Pending Availability of Staff Guidance extensions have been noted in correspondence (01/31/11)                                                to the NRC. Measurements have been performed. Licensee is awaiting guidance on submitting test data.
L02403   CEI/NRR-       Testing of Residual Heat Removal     Adequate: Still revising Integrated Leak Rate 2352L      Branch Line Off of Feedwater Piping,   Test for feedwater penetration changes. Due 1/06/99                Amendment 105                                date is 6/24/08.
(6/24/08)
L02539    CEI/OIE-        Corrective Action Program (CAP)     Adequate: The final CAP assessment report 0690L        Independent Assessment Meeting      was completed on 10/4/07. Commitment will be 1/19/07                    Results                closed following meeting with NRC to discuss (6/30/08)                                                          assessment results.
L02544   CEI/NRR-         The Procurement of the Portable     Adequate: None of the activities are closed at 3019L    Equipment, Procedure Development, and       this time. Audit was completed prior to the 2/26/07    Personnel Training on the Equipment is             scheduled completion date.
(4/40/08)        Expected to be Completed by April 30,2008 (Hydrogen Igniters, GSI-189)
L02546  Letter L      Appropriate Detailed Operational          Adequate: Part of licensees License 046        Procedures Will Be Established to    Amendment Request to incorporate TSTF-476-A 2/20/08     Implement the Controls Included in (12/23/08)       Section 4, Safety and Technical Evaluations, and Section 5, Plant Implementation of NEDO-33091-A Rev. 2, Improved BPWS Control Rod Insertion Process.}}

Latest revision as of 18:15, 14 November 2019

Table 1 - Audited Closed Commitments
ML081230052
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/07/2008
From:
NRC/NRR/ADRO
To:
Goodwin, Cameron/DORL, 415-3719
Shared Package
ML081230058 List:
References
TAC MD8316
Download: ML081230052 (4)


Text

Table 1 - Audited Closed Commitments Commitment Date and Commitment Disposition & Auditors Assessment of Regulatory Tracking Document Summary/Description Verification Commitment Disposition (adequate, Number inadequate)

L02543 CEI/NRR- Revised Division 3 Diesel Completed Adequate: Procedures reference the 3019L Generator Cross-tie 12/28/07. Training commitment number in the hidden 2/26/07 Procedure(s) and Associated was completed on text. ONI procedures place the Personnel Training to Support 12/17/07 and commitment references in hidden text GSI-189 Closure documented by to keep the procedures as clear as attendance possible.

sheets. Two new procedures were written to incorporate the new procedures (ONI-SPI C-6 and C-7)

L02538 CEI/NRR- Establishment of Technical Completed Adequate: Verified incorporated into 2992L Specification (TS) Bases for 10/2/07. Closure TS Bases.

1/11/07 New LCO 3.0.8 document CN 07-133.

L02542 CEI/NRR- IEB 88-04 Emergency Core Completed Adequate: Verified that the 0879L Cooling System (ECCS) Pump 10/26/07. Closure commitment change was contained in 7/11/88 Minimum Flow Limitations document the commitment change summary CEI/NRR-3064L submitted to the NRC on 10/23/07.

submitted on 10/23/07.

L02503 CEI/NRR- The PNPP Staff Commits to a Completed Adequate: Verified closure 2880L Number of Activities in Support 1/10/06. Closure document.

5/18/05 of an Operating License document letter Transfer Request for Beaver CEI/NRR-2910L Valley Units 1 & 2, Davis- submitted on Besse and Perry 10/03/05.

Commitment Date and Commitment Disposition & Auditors Assessment of Regulatory Tracking Document Summary/Description Verification Commitment Disposition (adequate, Number inadequate)

L02498 CEI/NRR- The PNPP Staff Commits to a Completed 1/6/06. Adequate: Verified closure 2886L Number of Activities in Support Closure document document.

06/01/05 of an Operating License CEI/NRR-2910L Transfer Request for Beaver submitted on Valley Units 1 & 2, Davis- 10/03/05.

Besse and Perry L02488 CEI/NRR- The Proposed Change Completed Adequate: Verified incorporated in to 1114L Revises the Reactor Pressure 5/20/05. Closure USAR.

04/15/04 Vessel material Surveillance USAR Change CEI/NRR- Program Described within the request 05-076.

2669L PNPP USAR from a Plant 01/30/03 Specific Program to the BWR Vessel and Internals Project (BWRVIP) Integrated Surveillance Program (ISP).

L02522 CEI/NRR- Implementation and Use of Completed Adequate: Commitment is clearly 2838L Delta Protection Suits for 3/13/07. listed in commitment section of 12/06/05 Radiological Respiratory Incorporated into procedure and references specific Protection Respiratory step number that is affected.

Protection Program, procedure NOP-WM-7015.

L02510 CEI/NRR- Revise NQI-1001, Inspection Completed Adequate: NQI-1001 was changed 2897L Program Control 12/12/05. Closure to NOP-LP-2018, Quality Control 8/08/05 is procedure NOP- Inspection of Maintenance and LP-2018. Modification Activities. Commitment is clearly referenced in the Perry commitment section.

L02467 CEI/NRR- Radial Peaking Factor, Burnup Completed Adequate: Reload analysis input 2674L and LHGR Limit Need to be 12/01/05. Closure form includes above listed limits from 12/09/02 Verified Each Cycle is calculations. most recent calculations.

Commitment Date and Commitment Disposition & Auditors Assessment of Regulatory Tracking Document Summary/Description Verification Commitment Disposition (adequate, Number inadequate)

L02493 CEI/NRR- Perform a Verification of Completed Adequate: Verified closure 2865L Accounting Records and 12/21/05. Closure document.

3/21/05 Visual Confirmation of Special document Nuclear Material in CEI/NRR-2883L Accordance with NRC Bulletin submitted on 2005-001. 5/12/05.

Table 2 - Audited Open Commitments Commitment Date and Commitment Summary/Description Auditors Assessment of Regulatory Tracking Document Commitment Disposition (adequate, inadequate)

Number F01671 USAR Sampling Line Loss Measurements Adequate: Due date has been extended but all Appendix 1B Pending Availability of Staff Guidance extensions have been noted in correspondence (01/31/11) to the NRC. Measurements have been performed. Licensee is awaiting guidance on submitting test data.

L02403 CEI/NRR- Testing of Residual Heat Removal Adequate: Still revising Integrated Leak Rate 2352L Branch Line Off of Feedwater Piping, Test for feedwater penetration changes. Due 1/06/99 Amendment 105 date is 6/24/08.

(6/24/08)

L02539 CEI/OIE- Corrective Action Program (CAP) Adequate: The final CAP assessment report 0690L Independent Assessment Meeting was completed on 10/4/07. Commitment will be 1/19/07 Results closed following meeting with NRC to discuss (6/30/08) assessment results.

L02544 CEI/NRR- The Procurement of the Portable Adequate: None of the activities are closed at 3019L Equipment, Procedure Development, and this time. Audit was completed prior to the 2/26/07 Personnel Training on the Equipment is scheduled completion date.

(4/40/08) Expected to be Completed by April 30,2008 (Hydrogen Igniters, GSI-189)

L02546 Letter L Appropriate Detailed Operational Adequate: Part of licensees License 046 Procedures Will Be Established to Amendment Request to incorporate TSTF-476-A 2/20/08 Implement the Controls Included in (12/23/08) Section 4, Safety and Technical Evaluations, and Section 5, Plant Implementation of NEDO-33091-A Rev. 2, Improved BPWS Control Rod Insertion Process.