Line 15: |
Line 15: |
| | page count = 4 | | | page count = 4 |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:EDO Principal Correspondence Control FROM: DUE: 04/30/12 EDO CONTROL: G20120234 DOC DT: 03/23/12 FINAL REPLY: Senator John F. Kerry TO: Chairman Jaczko FOR SIGNATURE OF : Chairman Jaczko** PRI **CRC NO: 12-0140 DESC: ROUTING: Safety Issues at Seabrook Nuclear Power Plant (EDATS: SECY-2012-0178) |
| | DATE: 04/12/12 Borchardt Weber Virgilio Ash Mamish OGC/GC Leeds, NRR Dean, RI Zobler, OGC Schmidt, OCA ASSIGNED TO: EDO CONTACT: Rihm SPECIAL INSTRUCTIONS OR REMARKS: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). |
| | NRR and Region I to provide input to Roger Rihm, OEDO, if required. |
| | Roger Rihm will coordinate response with OGC and OCA."j-e- Vý-x ý ý 0ý 6 'ý S E C-1 -0 1 -ýVl-~b S: EY1-0I EDATS Number: SECY-2012-0178 Source: SECY.Ifr maion Assigned To: OEDO Other Assignees: |
| | |
| | ==Subject:== |
| | Safety Issues at Seabrook Nuclear Power Plant |
| | |
| | == Description:== |
| | |
| | CC Routing: NRR; Regionl; OGC; OCA ADAMS Accession Numbers -Incoming: ML12104A] |
| | 13 OEDO Due Date: 4/30/2012 11:00 PM SECY Due Date: 5/2/2012 11:00 PM Response/Package: |
| | NON EI Cross Reference Number: G20120234, LTR- 12-0140 Staff Initiated: |
| | NO Related Task: Recurring Item: NO File Routing: EDATS Agency Lesson Learned: NO OEDO Monthly Report Item: NO I, *o s Inor ato Action Type: Letter Priority: |
| | Medium Sensitivity: |
| | None Signature Level: Chairman Jaczko Urgency: NC Approval Level: No Approval Required OEDO Concurrence: |
| | YES OCM Concurrence: |
| | NO OCA Concurrence: |
| | NO Special Instructions: |
| | Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). |
| | NRR and Region I to provide input to Roger Rihm, OEDO, if required. |
| | Roger Rihm will coordinate response with OGC and OCA.)3 Ii Ooum Inomtn I Originator Name: Senator John F. Kerry Originating Organization: |
| | Congress Addressee: |
| | Chairman Jaczko Incoming Task Received: |
| | E-mail Date of Incoming: |
| | 3/23/2012 Document Received by SECY Date: 4/12/2012 Date Response Requested by Originator: |
| | NONE Page 1 of I OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed:- |
| | Apr 11, 2012 17:35 PAPER NUMBER: ACTION OFFICE: LTR-12-0140 EDO LOGGING DATE: 04/07/2012 AUTHOR: AFFILIATION: |
| | ADDRESSEE: |
| | |
| | ==SUBJECT:== |
| | ACTION: DISTRIBUTION: |
| | LETTER DATE: ACKNOWLEDGED SPECIAL HANDLING: REP John Kerry CONG CHRM Gregory Jaczko Concerns mandatory action related to serious safety issues at Seabrook Nuclear Power Plant Signature of Chairman RF, OCA to Ack.03/23/2012 No Commission Correspondence NOTES: SECY rec'd late in afternoon on 4/6 in Billie's box; however, no one was here until Sat., 4/7 (Linda), who logged it in.ADAMS FILE LOCATION: DATE DUE: 05/02/2012 DATE SIGNED: EDO --G20120234 |
| | 'JOHN KERRY COMMITTEES: |
| | MASSACHUSETTS COMMERCE, SCIENCE, AND TRANSPORTATION |
| | * -- ' FINANCE J"LflIffted oltatcva ý* nt FOREIGN RELATIONS SMALL BUSINESS WASHINGTON, DC 20510-2102 1 Bowdoin Square 1 0 th Floor Boston, MA 02114 March 23, 2012 Gregory B. Jaczko Chairman.U.S. Nuclear Regulatory Commission Mail Stop O-16G4 Washington, DC 20555-0001 |
| | |
| | ==Dear Chairman Jaczko:== |
| | I write to raise my concern regarding the lack ofimandatory action taken by the Nuclear Regulatory Commission (NRC) related to serious safety issues at the Seabrook Nuclear Power Plant, located in Seabrook, New Hampshire, on the Massachusetts border. I urge you to take action immediately, before the plant becomes more d'e a`ed4 and poses an even more serious risk to the surrounding communities. |
| | 'According0to anlNRC- iinpectionI'reporfreleased in May 2011, there has been "moderate to severe" degradation of the concrete in a tunhel th'at is a'vital part of the reactoI's cdoling-system used to prevent a nuclear meltdown. |
| | The structure has lost twenty-two percent of its strength due to groundwater saturation. |
| | In the case of the Seabrook plant, an alkali-silica reaction is occurring whereby micro-cracks form as groundwater mixeswith the.concrete. |
| | This degradation poses a nuclear safety threat by weakening the electrical tunnel and possibly-as the NRC acknowledges-the plant's foundation where it comes in contact with groundwater. |
| | Further, it raises serious questions about the plant's ability to withstand an earthquake. |
| | This represents a failure on the part of the NRC to take appropriate action to address known safety problems at the Seabrook Nuclear Power Plant. I urge you to fully address all issues related to the' concrete degradation immediately. |
| | We cannot allow nuclear power plants to operate when there are known safety issues:.Thank you for your'conisideiration on this:matter. |
| | 'If youhave any questions br c6ndems, please contact Meghaf'Leahy at (6171'565-8519:.ncerely, ,, 'John' -Kerry United States enator www: http://www.senate.gov/-kerry/ |
| | PRINTED ON RECYCLED PAPER}} |
|
---|
Category:Congressional Correspondence
MONTHYEARML20192A2392020-07-29029 July 2020 Letter to the Honorable Jeanne Shaheen, Et Al., from Chairman Svinicki Regarding Concerns About Recent Incidents at Seabrook Station and Requests for a Public Information Session and Congressional Briefing ML20119A9872020-05-0505 May 2020 Letter to the Honorable Edward Markey, Et Al., from Chairman Svinicki Responds to Questions About the Seabrook Nuclear Plant Refueling Process During the Ongoing Coronavirus Outbreak ML20111A1402020-04-20020 April 2020 LTR-20-0159 Senator Edward Markey Et Al., Letter Questions About the Seabrook Nuclear Plant Refueling Process During the Ongoing Coronavirus Outbreak ML16174A4032016-06-15015 June 2016 Letter to Senator Edward Markey from Eugene Dacus, OCA Provides Final Response to His Letter on Seabrook Station, Unit 1 Enclosing UFSAR Revisions 11, 12, 13, 14 and 15 ML16141B3062016-05-17017 May 2016 05-17-16, Letter to Senator Edward Markey from Eugene Dacus Provides Second Response for Documents Regarding the Seabrook Station Unit 1 (Rev. 16 of the UFSAR and NextEra Response Letter to the Staff on License Renewal for Seabrook) ML16111B3122016-04-19019 April 2016 04-19-16 Letter to Senator Markey Fm Eugene Dacus Responds to His Letter Requesting Documents Pertaining to the Seabrook Station (Revisions 12-16 for Seabrook'S Updated Final Safety Analysis Reports, Chapter 3) ML16054A7672016-02-23023 February 2016 02-23-16 Letter to Senator Edward Markey from Eugene Dacus Acknowledging His Letter to Chairman Burns Dated 02/17/16 Pertaining to the Seabrook Station ML16054A1172016-02-17017 February 2016 LTR-16-0080 - Senator Edward J. Markey, Letter Request for Documents Related to Safety Issues at Seabrook Station Nuclear Power Plant ML14163A4332014-08-0101 August 2014 Letter to Senator Edward J. Markey from Chairman Macfarlane Information About NRC-Sanctioned Job Shadow Program with China ML14141A6242014-05-20020 May 2014 LTR-14-0288 - Senator Edward J. Markey Ltr. Information About NRC-Sanctioned Job Shadow Program with China ML14043A1382014-02-14014 February 2014 G20140055/LTR-13-0957 - Sen. Edward Markey, Et Al., Ltr Requests the NRC Make No Decision on the 6/1/10, Request for the Seabrook Nuclear Power Plant for a 20 Year Operating License Until the Concrete Degradation Is Well Tested and Remedied ML14037A1262014-02-14014 February 2014 G20140030/LTR-14-0009- Senator Jeanne Shaheen Email Seabrook - Piping/Plumbing (Response) ML14014A2252014-01-14014 January 2014 LTR-13-0957, Response Letter to Senator Edward Markey Et Al., on His Request for NRC to Not Make a Decision for the Seabrook Plants for a 20 Year OL Until the Concrete Degradation Is Well Tested and Remedied ML13354B9522013-12-18018 December 2013 G20140055/LTR-13-0957 - Senator Edward Markey, Et Al., Ltr Requests the NRC Make No Decision on the June 1, 2010, Request for the Seabrook Nuclear Power Plant for a 20 Year Operating License Until the Concrete Degradation Is Well Tested and ML13079A2822013-03-26026 March 2013 G20130209/LTR-13-0224 Ltr. to Rep. E. Markey, Et Al. - Responds to Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Seabrook ML13079A0202013-03-18018 March 2013 G20130209/LTR-13-0224 - Ltr. Representatives Edward J. Markey, John F. Tierney and Bill Keating Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Sea ML12114A0172012-04-13013 April 2012 G20120265/LTR-12-0150/EDATS: SECY-2012-0195 - Ltr. Reps. Edward J. Markey and John F. Tierney to Chairman Jaczko Seabrook Nuclear Power Plant - Degradation of Concrete ML12090A5882012-03-27027 March 2012 G20120213/LTR-12-0123/EDATS: SECY-2012-0147 - Senator Kelly A. Ayotte Ltr. Seabrook Nuclear Station ML12104A1132012-03-23023 March 2012 G20120234/LTR-12-0140/EDATS: SECY-2012-0178 - E-mail Senator John F. Kerry Safety Issues at Seabrook Nuclear Power Plant ML11186A9872011-07-0505 July 2011 Letter from the Acting Secretary to U.S. House of Representatives Edward J. Markey and John F. Tierney ML11164A2412011-06-0808 June 2011 LTR-11-0333 - Incoming Letter from REP Markey and REP Tierney Urging the NRC to Immediately Announce Its Intent to Deny Nextera Energy Seabrook, the License for the Seabrook Nuclear Power Plant ML0326904002003-10-20020 October 2003 G20030575/LTR-03-0618 - Representative John F. Tierney Ltr. Re Seabrook - Tube Degradation (Debbie B. Grinnell, C-10 Reasearch and Education Foundation) ML0205103922002-04-0909 April 2002 G20010147/LTR-01-0204 - Rep. Edward J. Markey Ltr. Re Seabrook Nuclear Plant, Follow Up to Original Response of June 1, 2001 2020-07-29
[Table view] Category:Letter
MONTHYEARIR 05000443/20240032024-10-30030 October 2024 Integrated Inspection Report 05000443/2024003 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24303A0352024-10-29029 October 2024 Operator Licensing Examination Approval IR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 05000443/LER-2024-001, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) 2024-09-25
[Table view] |
Text
EDO Principal Correspondence Control FROM: DUE: 04/30/12 EDO CONTROL: G20120234 DOC DT: 03/23/12 FINAL REPLY: Senator John F. Kerry TO: Chairman Jaczko FOR SIGNATURE OF : Chairman Jaczko** PRI **CRC NO: 12-0140 DESC: ROUTING: Safety Issues at Seabrook Nuclear Power Plant (EDATS: SECY-2012-0178)
DATE: 04/12/12 Borchardt Weber Virgilio Ash Mamish OGC/GC Leeds, NRR Dean, RI Zobler, OGC Schmidt, OCA ASSIGNED TO: EDO CONTACT: Rihm SPECIAL INSTRUCTIONS OR REMARKS: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179).
NRR and Region I to provide input to Roger Rihm, OEDO, if required.
Roger Rihm will coordinate response with OGC and OCA."j-e- Vý-x ý ý 0ý 6 'ý S E C-1 -0 1 -ýVl-~b S: EY1-0I EDATS Number: SECY-2012-0178 Source: SECY.Ifr maion Assigned To: OEDO Other Assignees:
Subject:
Safety Issues at Seabrook Nuclear Power Plant
Description:
CC Routing: NRR; Regionl; OGC; OCA ADAMS Accession Numbers -Incoming: ML12104A]
13 OEDO Due Date: 4/30/2012 11:00 PM SECY Due Date: 5/2/2012 11:00 PM Response/Package:
NON EI Cross Reference Number: G20120234, LTR- 12-0140 Staff Initiated:
NO Related Task: Recurring Item: NO File Routing: EDATS Agency Lesson Learned: NO OEDO Monthly Report Item: NO I, *o s Inor ato Action Type: Letter Priority:
Medium Sensitivity:
None Signature Level: Chairman Jaczko Urgency: NC Approval Level: No Approval Required OEDO Concurrence:
YES OCM Concurrence:
NO OCA Concurrence:
NO Special Instructions:
Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179).
NRR and Region I to provide input to Roger Rihm, OEDO, if required.
Roger Rihm will coordinate response with OGC and OCA.)3 Ii Ooum Inomtn I Originator Name: Senator John F. Kerry Originating Organization:
Congress Addressee:
Chairman Jaczko Incoming Task Received:
E-mail Date of Incoming:
3/23/2012 Document Received by SECY Date: 4/12/2012 Date Response Requested by Originator:
NONE Page 1 of I OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed:-
Apr 11, 2012 17:35 PAPER NUMBER: ACTION OFFICE: LTR-12-0140 EDO LOGGING DATE: 04/07/2012 AUTHOR: AFFILIATION:
ADDRESSEE:
SUBJECT:
ACTION: DISTRIBUTION:
LETTER DATE: ACKNOWLEDGED SPECIAL HANDLING: REP John Kerry CONG CHRM Gregory Jaczko Concerns mandatory action related to serious safety issues at Seabrook Nuclear Power Plant Signature of Chairman RF, OCA to Ack.03/23/2012 No Commission Correspondence NOTES: SECY rec'd late in afternoon on 4/6 in Billie's box; however, no one was here until Sat., 4/7 (Linda), who logged it in.ADAMS FILE LOCATION: DATE DUE: 05/02/2012 DATE SIGNED: EDO --G20120234
'JOHN KERRY COMMITTEES:
MASSACHUSETTS COMMERCE, SCIENCE, AND TRANSPORTATION
- -- ' FINANCE J"LflIffted oltatcva ý* nt FOREIGN RELATIONS SMALL BUSINESS WASHINGTON, DC 20510-2102 1 Bowdoin Square 1 0 th Floor Boston, MA 02114 March 23, 2012 Gregory B. Jaczko Chairman.U.S. Nuclear Regulatory Commission Mail Stop O-16G4 Washington, DC 20555-0001
Dear Chairman Jaczko:
I write to raise my concern regarding the lack ofimandatory action taken by the Nuclear Regulatory Commission (NRC) related to serious safety issues at the Seabrook Nuclear Power Plant, located in Seabrook, New Hampshire, on the Massachusetts border. I urge you to take action immediately, before the plant becomes more d'e a`ed4 and poses an even more serious risk to the surrounding communities.
'According0to anlNRC- iinpectionI'reporfreleased in May 2011, there has been "moderate to severe" degradation of the concrete in a tunhel th'at is a'vital part of the reactoI's cdoling-system used to prevent a nuclear meltdown.
The structure has lost twenty-two percent of its strength due to groundwater saturation.
In the case of the Seabrook plant, an alkali-silica reaction is occurring whereby micro-cracks form as groundwater mixeswith the.concrete.
This degradation poses a nuclear safety threat by weakening the electrical tunnel and possibly-as the NRC acknowledges-the plant's foundation where it comes in contact with groundwater.
Further, it raises serious questions about the plant's ability to withstand an earthquake.
This represents a failure on the part of the NRC to take appropriate action to address known safety problems at the Seabrook Nuclear Power Plant. I urge you to fully address all issues related to the' concrete degradation immediately.
We cannot allow nuclear power plants to operate when there are known safety issues:.Thank you for your'conisideiration on this:matter.
'If youhave any questions br c6ndems, please contact Meghaf'Leahy at (6171'565-8519:.ncerely, ,, 'John' -Kerry United States enator www: http://www.senate.gov/-kerry/