|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:RIS 2014-05Qaps102-06882-TNW/DJH June 6, 2014Palo VerdeNuclear Generating StationP.O. Box 52034Phoenix, AZ 85072Mail Station 7636Tel: 623-363-4972 ATTN: Document Control DeskU. S. Nuclear Regulatory Commission Washington, DC 20555-0001 | | {{#Wiki_filter:RIS 2014-05 Qaps 102-06882-TNW/DJH June 6, 2014 Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: 623-363-4972 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 |
|
| |
|
| ==Dear Sir:== | | ==Dear Sir:== |
|
| |
|
| ==Subject:== | | ==Subject:== |
| | | Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2 and 3 Docket Nos. STN 50/528/529/530 Response to Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations This letter provides the Arizona Public Service Company voluntary response to RIS 2014-05, Preparation and Scheduling of Operator Licensing Examinations. |
| Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2 and 3Docket Nos. STN 50/528/529/530 Response to Regulatory Issue Summary (RIS) 2014-05,Preparation and Scheduling of Operator Licensing Examinations This letter provides the Arizona Public Service Company voluntary responseto RIS 2014-05, Preparation and Scheduling of Operator Licensing Examinations. | | Enclosed with this letter is NRC Form 536, which provides the proposed schedule of operator licensing examinations at PVNGS for calendar years 2016 through 2019.There are no commitments made to the NRC by this letter.If you have any questions or require additional information, please contact Mark McGhee, Regulatory Affairs Department Leader, at (623) 393-4972.Sincerely, Thomas N. Weber Department Leader, Regulatory Affairs TNW/DJH |
| Enclosed with this letter is NRC Form 536, which provides theproposed schedule of operator licensing examinations at PVNGS for calendaryears 2016 through 2019.There are no commitments made to the NRC by this letter.If you have any questions or require additional information, please contactMark McGhee, Regulatory Affairs Department Leader, at (623) 393-4972. | |
| Sincerely, Thomas N. WeberDepartment Leader, Regulatory AffairsTNW/DJH | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| NRC Form 536, Operator Licensing Examination Datacc: w/enclosure M. L. DapasV. G. GaddyL. A. HurleyJ. K. RankinM. A. BrownNRCNRCNRCNRCNRCRegion IV, Regional Administrator Region IV, Chief, Operations BranchRegion IV, Licensing Assistant NRR Project Manager PVNGSSenior Resident Inspector PVNGSP o-01A member of the STARS (Strategic Teaming and Resource Sharing) | | NRC Form 536, Operator Licensing Examination Data cc: w/enclosure M. L. Dapas V. G. Gaddy L. A. Hurley J. K. Rankin M. A. Brown NRC NRC NRC NRC NRC Region IV, Regional Administrator Region IV, Chief, Operations Branch Region IV, Licensing Assistant NRR Project Manager PVNGS Senior Resident Inspector PVNGS P o-01 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway |
| AllianceCallaway
| |
| * Comanche Peak | | * Comanche Peak |
| * Diablo Canyon | | * Diablo Canyon |
| * Palo Verde | | * Palo Verde |
| * Wolf Creek Enclosure NRC Form 536Operator Licensing Examination Data NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: | | * Wolf Creek Enclosure NRC Form 536 Operator Licensing Examination Data NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (09-2011) |
| 0913012014 (09-2011) | | Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. |
| Estimated burden per response to comply with this voluntary information collection request: | | Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. |
| 1hour. This information collection is used to plan budgets and resources for operatorexaminations.
| | FACILITY NRC REGION Palo Verde Nuclear Generating Station IV 50-528, 50-529, 50-530 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019 NUMBER OF REACTOR 12 12 12 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS |
| Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information andRegulatory | | -INSTANT 6 6 6 NUMBER OF SENIOR REACTOR 6 6 6 OPERATORS |
| : Affairs, NEOB-10202, (3150-0131),
| | -UPGRADE NUMBER OF SENIOR REACTOR OPERATORS |
| Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required torespond to, the information collection. | | -LIMITED PROPOSED DATES PRIMARY DATE 10/31/2016 04/16/2018 10/14/2019 ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED ____ .________________ |
| FACILITY NRC REGIONPalo Verde Nuclear Generating Station IV50-528, 50-529, 50-530A. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019ESTIMATED NUMBER OFLICENSEE-PREPARED 1 0 1 1EXAMINATIONS ESTIMATED NUMBER OFNRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019NUMBER OF REACTOR 12 12 12OPERATORS NUMBER OF SENIOR REACTOROPERATORS | | NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 25 25 CANDIDATES NRC FORM 536 (09-2011)}} |
| -INSTANT 6 6 6NUMBER OF SENIOR REACTOR 6 6 6OPERATORS | |
| -UPGRADENUMBER OF SENIOR REACTOROPERATORS | |
| -LIMITEDPROPOSED DATESPRIMARY DATE 10/31/2016 04/16/2018 10/14/2019 ALTERNATE DATEC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 2016 CY 2017PROPOSED | |
| ____ .________________ | |
| NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATED NUMBER OF 25 25CANDIDATES NRC FORM 536 (09-2011)}} | |
|
---|
Category:Letter
MONTHYEARIR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24129A1482024-05-0707 May 2024 and Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) IR 05000528/20243012024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24089A1892024-03-28028 March 2024 Present Levels of Financial Protection ML24068A2522024-03-0808 March 2024 License Amendment Request to Revise Technical Specifications 3.5.1 and 3.5.2 Using Risk-Informed Process for Evaluations ML24066A0472024-03-0606 March 2024 Response to Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown and TS IR 05000528/20240122024-03-0404 March 2024 Age-Related Degradation Inspection Report 05000528/2024012, 05000529/2024012 and 05000530/2024012 IR 05000528/20230062024-02-28028 February 2024 Annual Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Report 05000528/2023006 and 05000529/2023006 and 05000530/2023006 ML24053A3972024-02-22022 February 2024 License Renewal - Alloy 600 Management Program Plan ML24047A3632024-02-16016 February 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX177, AMZDFX178, AMZDFX179 Vertical Concrete Cask Identification No. AMZDNE179, AMZDNE178 IR 05000528/20230042024-02-12012 February 2024 Integrated Inspection Report Report 05000528/2023004 and 05000529/2023004 and 05000530/2023004 ML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information 2024-08-08
[Table view] |
Text
RIS 2014-05 Qaps 102-06882-TNW/DJH June 6, 2014 Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: 623-363-4972 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sir:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2 and 3 Docket Nos. STN 50/528/529/530 Response to Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations This letter provides the Arizona Public Service Company voluntary response to RIS 2014-05, Preparation and Scheduling of Operator Licensing Examinations.
Enclosed with this letter is NRC Form 536, which provides the proposed schedule of operator licensing examinations at PVNGS for calendar years 2016 through 2019.There are no commitments made to the NRC by this letter.If you have any questions or require additional information, please contact Mark McGhee, Regulatory Affairs Department Leader, at (623) 393-4972.Sincerely, Thomas N. Weber Department Leader, Regulatory Affairs TNW/DJH
Enclosure:
NRC Form 536, Operator Licensing Examination Data cc: w/enclosure M. L. Dapas V. G. Gaddy L. A. Hurley J. K. Rankin M. A. Brown NRC NRC NRC NRC NRC Region IV, Regional Administrator Region IV, Chief, Operations Branch Region IV, Licensing Assistant NRR Project Manager PVNGS Senior Resident Inspector PVNGS P o-01 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Wolf Creek Enclosure NRC Form 536 Operator Licensing Examination Data NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.
Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Palo Verde Nuclear Generating Station IV 50-528, 50-529, 50-530 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019 NUMBER OF REACTOR 12 12 12 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS
-INSTANT 6 6 6 NUMBER OF SENIOR REACTOR 6 6 6 OPERATORS
-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS
-LIMITED PROPOSED DATES PRIMARY DATE 10/31/2016 04/16/2018 10/14/2019 ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED ____ .________________
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 25 25 CANDIDATES NRC FORM 536 (09-2011)