ML15015A376: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 44: Line 44:
RI          RII RIII        RIV  
RI          RII RIII        RIV  


MAIL OE Staff DISTRIBUTION:  NHilton, OE  OE R/F  EN binder  
MAIL OE Staff   DISTRIBUTION:  NHilton, OE  OE R/F  EN binder  


ADAMS Accession Number:  ML15015A376 OFFICE OE/EB: ES OE/EB: BC NAME GGulla RFretz (Acting) DATE 1/15/2015 1/15/2015 OFFICIAL RECORD COPY}}
ADAMS Accession Number:  ML15015A376 OFFICE OE/EB: ES OE/EB: BC NAME GGulla RFretz (Acting) DATE 1/15/2015 1/15/2015 OFFICIAL RECORD COPY}}

Revision as of 08:57, 9 July 2018

EN-15-001, Issuance of Final Significance Determination and Notice of Violation, Arkansas Nuclear One, Units 1 and 2, Entergy Operations, Inc., (EA-14-088)
ML15015A376
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/15/2015
From: Fretz R J, Gulla G J
NRC/OE
To:
Entergy Operations
Gulla G J
References
EA-14-088 EN-15-001
Download: ML15015A376 (2)


Text

January 15, 2015 EN-15-001 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION

Licensee: Entergy Operations, Inc. (EA-14-088) Arkansas Nuclear One, Units 1 and 2 Docket: 05-313,05-368

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation (NOV) will be issued on or about January 21, 2015, to Entergy Operations, Inc. (Entergy) for two violations associated with a Yellow Significance Determination Process finding for Arkansas Nuclear One (ANO) Units 1 and 2. The Yellow finding represents an issue of substantial safety significance and will require additional NRC inspections.

The finding involves Entergy's failure to design, construct, and maintain ANO Units 1 and 2 auxiliary building and emergency diesel fuel storage building flood barriers so that they could protect safety-related equipment from flooding. Issues identified include over 100 unsealed conduits that penetrated flood barriers, degraded seals that allowed fire water to leak to the adjacent buildings, floor drains and associated lines that did not contain isolation valves and unused ventilation penetrations that were not covered by blind flanges.

The violations associated with the finding are 10 CFR Part 50, Appendix B, Criterion III, "Design Control" and Criterion V, "Instructions, Procedures and Drawings." These regulations require, in part, that measures shall be established to assure that applicable regulatory requirements and the design bases for those structures, systems and components affecting quality are correctly translated into specifications, drawings, procedures and instructions and that those activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures or drawings, respectively. The violations are considered an escalated enforcement action because they are associated with a Yellow finding.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:

Mailing of Final Significance Determination January 21, 2015 Telephone Notification of Licensee January 21, 2015

The state of Arkansas will be notified.

CONTACTS: Gerry Gulla, OE/EB Robert Fretz, OE/EB (301) 415-2872 (301) 415-1980 Distribution: EN-15-001, January 15, 2015 OWFN OWFN TWFN Regional Offices Chairman Burns Comm. Svinicki Comm. Ostendorff

Comm. Baran SECY OCA OPA OIP EDO DEDR DEDMRS OE OGC NRR OI OIG OCFO OIS RES ACRS FSME NRO

3WFN NMSS NSIR OPS CENTER

RI RII RIII RIV

MAIL OE Staff DISTRIBUTION: NHilton, OE OE R/F EN binder

ADAMS Accession Number: ML15015A376 OFFICE OE/EB: ES OE/EB: BC NAME GGulla RFretz (Acting) DATE 1/15/2015 1/15/2015 OFFICIAL RECORD COPY