{{#Wiki_filter:July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD  
{{#Wiki_filter:July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD  


In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2)  
In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2) ) )  
) )  
)  
)  
)  
)  
Line 27: Line 26:
subject to disclosure under the parties' disclosure agreement.
subject to disclosure under the parties' disclosure agreement.
2  3. Tangible Things  Other than documents provided or listed, no relevant tangible things have been identified.
2  3. Tangible Things  Other than documents provided or listed, no relevant tangible things have been identified.
Respectfully submitted,  
Respectfully submitted,


     /s/ signed electronically by                Tyson R. Smith Darani M. Reddick Winston & Strawn LLP  
     /s/ signed electronically by                Tyson R. Smith Darani M. Reddick Winston & Strawn LLP  
Line 39: Line 38:
Detroit, Michigan 48226 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of July 2015  
Detroit, Michigan 48226 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of July 2015  


DC:775605.1 Fermi2LicenseRenewalDTESupplementalDisclosuresJuly2015PUBLICAttachmentADocIDDateAuthorRecipientDescriptionContentionDTE005505/14/2015MichaelJKoenemannRandallDWestmorelandRevisedCalculationandRAIResponseCRAFT8-SAMAPopulationsDTE005515/28/2015 NRCSummaryofMarch27,2015conferencecallbetweenNRCandDTEJP4MutualSAMAs;CRAFT8-SAMAPopulationsDTE005525/8/2015DTENRCDTEReponsetoSAMARAIsJP4MutualSAMAs;CRAFT8-SAMAPopulationsDTE005535/14/2015AngelaRudolphRandallWestmoreland;MichaelLake;MichaelKoenemannRevisedCalculationandRAIResponseCRAFT8-SAMAPopulationsDTE005545/5/2015Enercon Fermi2WinMACCSAssessmentofSevereAccidentConsequences,Rev.1JP4MutualSAMAs;CRAFT8-SAMAPopulationsDTE005555/5/2015DTE DTERAIResponseReviewandApprovalRecordCRAFT8-SAMAPopulations July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2)  
DC:775605.1 Fermi2LicenseRenewal DTESupplementalDisclosuresJuly2015PUBLIC AttachmentA DocIDDateAuthorRecipientDescriptionContentionDTE005505/14/2015MichaelJKoenemannRandallDWestmorelandRevisedCalculationandRAIResponseCRAFT 8-SAMAPopulationsDTE005515/28/2015 NRC SummaryofMarch27,2015conferencecallbetweenNRCandDTE JP 4MutualSAMAs;CRAFT 8-SAMAPopulationsDTE005525/8/2015DTENRCDTEReponsetoSAMARAIs JP 4MutualSAMAs;CRAFT 8-SAMAPopulationsDTE005535/14/2015AngelaRudolph RandallWestmoreland;MichaelLake;MichaelKoenemannRevisedCalculationandRAIResponseCRAFT 8-SAMAPopulationsDTE005545/5/2015Enercon Fermi2WinMACCSAssessmentofSevereAccidentConsequences,Rev.1 JP 4MutualSAMAs;CRAFT 8-SAMAPopulationsDTE005555/5/2015DTE DTE RAIResponseReviewandApprovalRecordCRAFT 8-SAMAPopulations July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2) ) )  
) )  
)  
)  
)  
)  
Line 49: Line 47:
: 4. I hereby certify under penalty of perjury that the foregoing is true and complete to the best of my knowledge, information, and belief.  
: 4. I hereby certify under penalty of perjury that the foregoing is true and complete to the best of my knowledge, information, and belief.  


2      Executed in accord with 10 C.F.R. § 2.304(d),  
2      Executed in accord with 10 C.F.R. § 2.304(d),    /s/ signed electronically by        Jon P. Christinidis DTE Electric Company  
     /s/ signed electronically by        Jon P. Christinidis DTE Electric Company  


One Energy Plaza  
One Energy Plaza  
Line 58: Line 55:
this 1st day of July 2015  
this 1st day of July 2015  


DC:775606.1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2)  
DC:775606.1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2) ) )  
) )  
)  
)  
)  
)  
) Docket No. 50-341-LR CERTIFICATE OF SERVICE  I hereby certify that copies of the foregoing "APPLICANT'S SUPPLEMENTAL DISCLOSURES" and "CERTIFICATION OF SUPPLEMENTAL DISCLOSURES" have been served via the Electronic Information Exchange ("EIE") this 1st day of July 2015, which to the best of my knowledge resulted in transmittal of the foregoing to those on the EIE Service List for the captioned proceeding.
) Docket No. 50-341-LR CERTIFICATE OF SERVICE  I hereby certify that copies of the foregoing "APPLICANT'S SUPPLEMENTAL DISCLOSURES" and "CERTIFICATION OF SUPPLEMENTAL DISCLOSURES" have been served via the Electronic Information Exchange ("EIE") this 1st day of July 2015, which to the best of my knowledge resulted in transmittal of the foregoing to those on the EIE Service List for the captioned proceeding.
Respectfully submitted,  
Respectfully submitted,  
     /s/ signed electronically by                Darani M. Reddick Winston & Strawn LLP  
     /s/ signed electronically by                Darani M. Reddick Winston & Strawn LLP  



Revision as of 02:06, 9 July 2018

DTE Supplemental Disclosures July 2015
ML15182A038
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/01/2015
From: Christinidis J P, Reddick D M, Smith T R
DTE Electric Company, Winston & Strawn, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-341-LR, ASLBP 14-933-01-LR-BD01, RAS 28000
Download: ML15182A038 (6)


Text

July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2) ) )

)

)

) Docket No. 50-341-LR APPLICANT'S SUPPLEMENTAL DISCLOSURES Pursuant to 10 C.F.R. § 2.336, the Joint Motion on Mandatory Disclosures dated February 23, 2015, and the Licensing Board's Order, dated February 27, 2015, DTE Electric Company ("DTE" or "Applicant"), hereby supplements its disclosures with respect to the admitted contentions.

1. Testifying Witnesses DTE has not yet identified the persons upon whom it will rely as witnesses with respect to the admitted contentions. In accordance with 10 C.F.R. § 2.336(b), DTE will supplement this disclosu re after testifying witnesses are identified. 2. Documents and Data Collections A description by category of all non-privileged documents and data compilations in the possession, custody, or control of DTE that are relevant to the admitted contentions and subject to disclosure under the parties' disclosure agreement is provided in Attachment A. DTE did not identify any proprietary documents that are relevant to the admitted contentions and

subject to disclosure under the parties' disclosure agreement.

2 3. Tangible Things Other than documents provided or listed, no relevant tangible things have been identified.

Respectfully submitted,

/s/ signed electronically by Tyson R. Smith Darani M. Reddick Winston & Strawn LLP

1700 K Street, NW

Washington, DC 20006 Jon P. Christinidis DTE Electric Company

One Energy Plaza

Detroit, Michigan 48226 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of July 2015

DC:775605.1 Fermi2LicenseRenewal DTESupplementalDisclosuresJuly2015PUBLIC AttachmentA DocIDDateAuthorRecipientDescriptionContentionDTE005505/14/2015MichaelJKoenemannRandallDWestmorelandRevisedCalculationandRAIResponseCRAFT 8-SAMAPopulationsDTE005515/28/2015 NRC SummaryofMarch27,2015conferencecallbetweenNRCandDTE JP 4MutualSAMAs;CRAFT 8-SAMAPopulationsDTE005525/8/2015DTENRCDTEReponsetoSAMARAIs JP 4MutualSAMAs;CRAFT 8-SAMAPopulationsDTE005535/14/2015AngelaRudolph RandallWestmoreland;MichaelLake;MichaelKoenemannRevisedCalculationandRAIResponseCRAFT 8-SAMAPopulationsDTE005545/5/2015Enercon Fermi2WinMACCSAssessmentofSevereAccidentConsequences,Rev.1 JP 4MutualSAMAs;CRAFT 8-SAMAPopulationsDTE005555/5/2015DTE DTE RAIResponseReviewandApprovalRecordCRAFT 8-SAMAPopulations July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2) ) )

)

)

) Docket No. 50-341-LR CERTIFICATION OF SUPPLEMENTAL DISCLOSURES I, Jon P. Christinidis do hereby state as follows:

1. I am employed as Expert Attorney - Regulatory and Nuclear for DTE Electric Company. Working with other attorneys for the Applicant, I have been responsible for managing the searches, collection, and compilation of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 C.F.R. § 2.336.
2. A search was conducted of documents, data compilations, and tangible things under the custody and control of the Applicant for the types of information specified in 10 C.F.R. § 2.336(a). The search was based on information and documents reasonably available to the Applicant. The searches encompassed both electronic and paper documents.
3. I hereby certify that to the best of my knowledge, information, and belief all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336(a) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of May 30, 2015.
4. I hereby certify under penalty of perjury that the foregoing is true and complete to the best of my knowledge, information, and belief.

2 Executed in accord with 10 C.F.R. § 2.304(d), /s/ signed electronically by Jon P. Christinidis DTE Electric Company

One Energy Plaza

Detroit, Michigan 48226 Dated at Detroit, Michigan

this 1st day of July 2015

DC:775606.1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2) ) )

)

)

) Docket No. 50-341-LR CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing "APPLICANT'S SUPPLEMENTAL DISCLOSURES" and "CERTIFICATION OF SUPPLEMENTAL DISCLOSURES" have been served via the Electronic Information Exchange ("EIE") this 1st day of July 2015, which to the best of my knowledge resulted in transmittal of the foregoing to those on the EIE Service List for the captioned proceeding.

Respectfully submitted,

/s/ signed electronically by Darani M. Reddick Winston & Strawn LLP

1700 K Street, NW

Washington, DC 20006 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of July 2015