| {{#Wiki_filter:B. Keith Taber Vice President Vogtle -Units I & 2 April 13, 2015 Southern Nuclear Operating Company, Inc. 7821 River Road Waynesboro, GA 30830 Tel 706.826.3151 Docket Nos.: 50-424 50-425 72-1039 AlTN: Document Control Desk SOUTHERN A COMPANY NL-15-0606 Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety Safeguards U. S. Nuclear Regulatory Commission Washington, D. C. 20555-0001 Vogtle Electric Generating Plant -Units 1 and 2 Registration of Soent Fuel Cask Use Ladies and Gentlemen: Southern Nuclear Operating Company (SNC) operates the Vogtle Electric Generating Plant (Vogtle) Independent Spent Fuel Storage Installation (ISFSI) in accordance with the general license provisions of 1 0 CFR 72.21 0. The requirements of 10 CFR 72.212(b)(2) include the registration of a spent fuel cask within 30 days of using a cask for the storage of spent nuclear fuel. Accordingly, SNC provides the following registration information for HI-STORM 100 spent fuel cask systems placed into storage in the Vogtle ISFSI during the past 30 days. Cask Certificate: Cask Model: MPC Serial Number: Overpack Serial Number: Number of Fuel Bundles: Placed in Service: Cask Certificate: Cask Model: MPC Serial Number: Overpack Serial Number: Number of Fuel Bundles: Placed in Service: 72-1 014, Amendment 9 HI-STORM 100S, Version B 0343 218-824 32 March 17, 2015 72-1014, Amendment 9 HI-STORM 100S, Version B 0337 218-818 32 March 27, 2015 Cask Certificate: Cask Model: MPC Serial Number: Overpack Serial Number: Number of Fuel Bundles: Placed in Service: 72-1014, Amendment 9 HI-STORM 1 OOS, Version B 0338 218-819 32 Aprii3,2015 This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369. B. Keith Taber Vice President Vogtle 1& 2 BKT/ KCW cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bast, Executive Vice President & Chief Nuclear Officer Mr. D. R. Madison, Vice President-Fleet Operations Mr. M. D. Meier, Vice President-Regulatory Affairs Mr. B. K. Taber, Vice President-Vogtle 1 & 2 Mr. B. J. Adams, Vice President-Engineering Mr. G.W. Gunn, Regulatory Affairs Manager-Vogtle 1 & 2 RType: CVC7000 U.S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager-Vogtle 1 & 2 Mr. l. M. Cain, Senior Resident Inspector-Vogtle 1 & 2 Mr. R. P. Carrion, Senior Reactor Inspector, Region II}} | | {{#Wiki_filter:B. Keith Taber Vice President Vogtle -Units I & 2 April 13, 2015 Southern Nuclear Operating |
| | : Company, Inc. 7821 River Road Waynesboro, GA 30830 Tel 706.826.3151 Docket Nos.: 50-424 50-425 72-1039 AlTN: Document Control Desk SOUTHERN A COMPANY NL-15-0606 |
| | : Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety Safeguards U. S. Nuclear Regulatory Commission Washington, D. C. 20555-0001 Vogtle Electric Generating Plant -Units 1 and 2 Registration of Soent Fuel Cask Use Ladies and Gentlemen: |
| | Southern Nuclear Operating Company (SNC) operates the Vogtle Electric Generating Plant (Vogtle) |
| | Independent Spent Fuel Storage Installation (ISFSI) in accordance with the general license provisions of 1 0 CFR 72.21 0. The requirements of 10 CFR 72.212(b)(2) include the registration of a spent fuel cask within 30 days of using a cask for the storage of spent nuclear fuel. Accordingly, SNC provides the following registration information for HI-STORM 100 spent fuel cask systems placed into storage in the Vogtle ISFSI during the past 30 days. Cask Certificate: |
| | Cask Model: MPC Serial Number: Overpack Serial Number: Number of Fuel Bundles: |
| | Placed in Service: |
| | Cask Certificate: |
| | Cask Model: MPC Serial Number: Overpack Serial Number: Number of Fuel Bundles: |
| | Placed in Service: 72-1 014, Amendment 9 HI-STORM 100S, Version B 0343 218-824 32 March 17, 2015 72-1014, Amendment 9 HI-STORM 100S, Version B 0337 218-818 32 March 27, 2015 Cask Certificate: |
| | Cask Model: MPC Serial Number: Overpack Serial Number: Number of Fuel Bundles: |
| | Placed in Service: |
| | 72-1014, Amendment 9 HI-STORM 1 OOS, Version B 0338 218-819 32 Aprii3,2015 This letter contains no NRC commitments. |
| | If you have any questions, please contact Ken McElroy at (205) 992-7369. |
| | B. Keith Taber Vice President Vogtle 1& 2 BKT/ KCW cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, |
| | : Chairman, President |
| | & CEO Mr. D. G. Bast, Executive Vice President |
| | & Chief Nuclear Officer Mr. D. R. Madison, Vice President-Fleet Operations Mr. M. D. Meier, Vice President-Regulatory Affairs Mr. B. K. Taber, Vice President-Vogtle 1 & 2 Mr. B. J. Adams, Vice President-Engineering Mr. G.W. Gunn, Regulatory Affairs Manager-Vogtle 1 & 2 RType: CVC7000 U.S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager-Vogtle 1 & 2 Mr. l. M. Cain, Senior Resident Inspector-Vogtle 1 & 2 Mr. R. P. Carrion, Senior Reactor Inspector, Region II}} |
|
---|
Category:Letter
MONTHYEARAEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask ML24274A3032024-10-0909 October 2024 Amendment 19 to Certificate of Compliance 1014 for Hi-Storm 100 Multi-Purpose Canister Storage System Request for Additional Information ML24240A1182024-10-0808 October 2024 0 Issuance Letter Amendment 18 to Renewed Certificate of Compliance No. 1014 for the HI-STORM 100 Cask System SVP-24-059, Correction to Registration of Use of Casks to Store Spent Fuel2024-10-0404 October 2024 Correction to Registration of Use of Casks to Store Spent Fuel AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 ML24263A2062024-09-19019 September 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for LaSalle County Station - Holtec MPC-68MCBS NL-24-0351, – ISFSI - Registration of Spent Fuel Cask Use2024-09-13013 September 2024 – ISFSI - Registration of Spent Fuel Cask Use ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, (Vegp), Unit 2, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 (Vegp), Unit 2, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24222A8592024-08-0909 August 2024 International - HI-STORM 100 Multipurpose Canister Storage System Amendment 19 Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, (Vegp), Unit 4, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 (Vegp), Unit 4, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 SVP-24-048, Registration of Use of Casks to Store Spent Fuel2024-07-31031 July 2024 Registration of Use of Casks to Store Spent Fuel IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 ML24178A4312024-07-29029 July 2024 Issuance of Certificate of Compliance No. 1014, Amendment No. 16 for the HI-STORM 100 Cask System, Cover Letter IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in SVP-24-040, Registration of Use of Casks to Store Spent Fuel2024-06-25025 June 2024 Registration of Use of Casks to Store Spent Fuel NL-24-0199, Request for Specific Exemption2024-06-25025 June 2024 Request for Specific Exemption NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements ML24183A2752024-05-30030 May 2024 Registration of Use of Casks to Store Spent Fuel 2024-09-09
[Table view] |
Text
B. Keith Taber Vice President Vogtle -Units I & 2 April 13, 2015 Southern Nuclear Operating
- Company, Inc. 7821 River Road Waynesboro, GA 30830 Tel 706.826.3151 Docket Nos.: 50-424 50-425 72-1039 AlTN: Document Control Desk SOUTHERN A COMPANY NL-15-0606
- Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety Safeguards U. S. Nuclear Regulatory Commission Washington, D. C. 20555-0001 Vogtle Electric Generating Plant -Units 1 and 2 Registration of Soent Fuel Cask Use Ladies and Gentlemen:
Southern Nuclear Operating Company (SNC) operates the Vogtle Electric Generating Plant (Vogtle)
Independent Spent Fuel Storage Installation (ISFSI) in accordance with the general license provisions of 1 0 CFR 72.21 0. The requirements of 10 CFR 72.212(b)(2) include the registration of a spent fuel cask within 30 days of using a cask for the storage of spent nuclear fuel. Accordingly, SNC provides the following registration information for HI-STORM 100 spent fuel cask systems placed into storage in the Vogtle ISFSI during the past 30 days. Cask Certificate:
Cask Model: MPC Serial Number: Overpack Serial Number: Number of Fuel Bundles:
Placed in Service:
Cask Certificate:
Cask Model: MPC Serial Number: Overpack Serial Number: Number of Fuel Bundles:
Placed in Service: 72-1 014, Amendment 9 HI-STORM 100S, Version B 0343 218-824 32 March 17, 2015 72-1014, Amendment 9 HI-STORM 100S, Version B 0337 218-818 32 March 27, 2015 Cask Certificate:
Cask Model: MPC Serial Number: Overpack Serial Number: Number of Fuel Bundles:
Placed in Service:
72-1014, Amendment 9 HI-STORM 1 OOS, Version B 0338 218-819 32 Aprii3,2015 This letter contains no NRC commitments.
If you have any questions, please contact Ken McElroy at (205) 992-7369.
B. Keith Taber Vice President Vogtle 1& 2 BKT/ KCW cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski,
- Chairman, President
& CEO Mr. D. G. Bast, Executive Vice President
& Chief Nuclear Officer Mr. D. R. Madison, Vice President-Fleet Operations Mr. M. D. Meier, Vice President-Regulatory Affairs Mr. B. K. Taber, Vice President-Vogtle 1 & 2 Mr. B. J. Adams, Vice President-Engineering Mr. G.W. Gunn, Regulatory Affairs Manager-Vogtle 1 & 2 RType: CVC7000 U.S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager-Vogtle 1 & 2 Mr. l. M. Cain, Senior Resident Inspector-Vogtle 1 & 2 Mr. R. P. Carrion, Senior Reactor Inspector, Region II