{{#Wiki_filter:BFN-16Table 13.5-1CONTROL ROD DRIVE SYSTEM TESTS(Unit 1)                    Reactor Pressure,psig        Preop (With Core Loaded)Test Description        Tests          0                  600              800           1000Position IndicationAllAllNormal Insert/Withdraw TimesAllAll        4*CouplingAllAllFrictionAll          4*Scram Times (Normal Accumulated Pressure)AllAll  4*  4*      AllScram Times (Minimum Accumulator   Pressure)          4*Scram Times (Zero Accumulator Pressure)          4*Scram Times (Scram Discharge Volume High Level)AllScram Times, Rated Power (Normal Accumulator Pressure)          4** *Value refers to the four slowest drives as determined from the normal accumulator pressure scram test at ambient reactorpressure which are compatible with the Rod Worth Minimizer and withdrawal sequence requirements.**Scram times of the four slowest rods will be determined at 25, 50, and 100 percent of rated power during planned reactorscrams at these power levels.Table 13.5-2MAJOR PLANT TRANSIENTS           TEST CONDITION            Nominal Power, Percent of Rated 2550      7580  100 Nominal Core Flow, Percent of Rated           TEST TITLE            36        100        100        70          100Feedwater Pump Trip        ACMain Steam Isolation Valves (One Valve)CACMain Steam Isolation Valves (All Valves)   CTurbine-Generator Stop Valve Fast CloseBATurbine-Generator Contorl Valve Fast Close            AAARecirculation Pump Trip (One Pump)        CB        CRecirculation Pump Trip (Two Pumps)CC        CLoss of Generator and Offsite Power  CA - Unit 1  B - Units 2, 3    C - Units 1, 2, 3 BFN-16Table 13.5-3STABILITY TESTS           TEST CONDITION    Nominal Power, Percent of Rated 254050  254760753765801005097    Nominal Core Flow, Percent of RatedTEST TITLE47      70      100    NC    48      70      100    NC    48      70    100    NC    109Flux Response to RodsCACAACAAACAPressure Regulator SetpointCACAACACCCAPressure REgulator Backup RegulatorCCCCFeedwater System SetpointCACAACACCCABFeedwater System Drop HeaterABypass ValveCAC    BAACACCCCBFlow ControlCCC CCCCCCNC= Natural Circulation A - unit 1    B - units 2, 3    C - units 1, 2, 3 BFN-16TABLE 13.5-4STARTUP TEST PROGRAM (UNIT 1)OPEN50% Flow Line75% Flow Line100% Flow LinePower1 .%VESSHEAT15-3530-5040-6015-3537-5750-7065-8527-4755-7570-9095-10040-6020%Flow2.%ORUP4870104NC4870102NC4870100NC105%TEST CONDITION (See Figure 13.5-2)COLDTEST1322A5A544A7A766A81Chemical & RadiochemicalXXXXXX2Radiation MeasurementsXXXXX3Fuel LoadingX4Full Core Shutdown MarginX5Control Rod Drive SystemXXXXX6SRM Performance & Control Rod SequenceXXXXX7Not Applicable8Not Applicable9Not Applicable10IRM CalibrationXXX11LPRM CalibrationXXXX12APRM CalibrationXXXXXX13Process ComputerXXXX14RCIC SystemXM15HPCI SystemXM16Reactor Vessel TemperatureXXXX17System ExpansionXXX18Core Power DistributionXXXXX19Core PerformanceXXXXXXXXXXXXX20Elec. Output & Heat RateX21Flux Response to RodsMMMMMMMXMMMX22Press. Reg.:  Setpoint ChangesMMMMMMMXMMMX                   :  Backup RegulatorMMMM23FW System:  FW Pump TripMM                   :  Water Level Stpt. Chg.MAMMAMMMMAXMAMAMAX                   :  Heater LossM*24Bypass ValvesMAMAMAMMAMAMAXMAMAMAX25Main Steam Iso. Valves:  Each Vlv.XM,SPM,SPM,SP                                      :  Full Iso.M,SE26Relief ValvesXMM,SEM27Turbine :  Stop Valve TripM,SE            :  Control Valve TripM,SPM,SEA,SE29Flow ControlLMAMAMAMAMAMAMAMAMA30Recirc. System:  One Pump TripMM                         :  Two Pump TripMMM                         :  Flow CalibrationXXXXXX31Loss of T-G & Offsite PowerM,SELSE32Recirc. Loop ControlXXXX35Recirc. And Jet Pump CalibrationX36Equalizer OpenMM39Water Level verification in ReactorVesselXXX70Reactor Water Cleanup SystemX71Residual Heat Removal System**72Drywell Atmosphere Cooling SystemXX73Cooling Water SystemsXX90Vibration**XXXXXX92Steam Separator and DryerXXXSPXXSPX*,XXSP93Not Applicable1Power is in percent of rated power, 3293Mwt.M=Master Manual Control ModeSP=Scram Possibility2Flow is in percent of rated flow, 102.5x105 lbs/hrA=Automatic Control ModeNC=Natural Circulation* = 90% rated powerL=Local Manual Control ModeSE=Scram Expected** = Actual test condition to be determinedX=Test independent of flow control mode.
{{#Wiki_filter:BFN-16Table 13.5-1 CONTROL ROD DRIVE SYSTEM TESTS (Unit 1)                    Reactor Pressure,psig        Preop (With Core Loaded)
BFN-16TABLE 13.5-5STARTUP TEST PROGRAM (UNIT 2)OPEN50% Flow Control Line75% Flow Control Line100% Flow Control LinePower, %1VESSEL15-3530-5040-60255337-5750-7065-853755-7570-9095-1005095-100Flow, %2ORHEAT4770104NC1164870102NC4870100NC109TEST CONDITION (See Figure 2)COLDTESTUP12D2E2A2F3C3D3E3A4C4D4E4A4F1Chemical & RadiochemicalXXXXXX2Radiation MeasurementsXXXXXX3Fuel LoadingX4Full Core Shutdown MarginX5CRDXXXXX6SRM Perf. & Control Rod Seq.XXX9Water Level MeasurementXXX10IRM CalibrationXXX11LPRM CalibrationXXXX12APRM CalibrationXXXXX13Process ComputerXXX6X14RCICXM15HPCIXXX16Selected Process TemperaturesXXXX17System ExpansionXXX18Core Power DistributionXXXX19Core PerformanceXXXXXXXXXXXXXX20Steam ProductionX21Flux Response to RodsMMMM22Press. Reg.:  Setpoint ChangesMMMMMM                   :  Backup RegulatorMMMM23FW System:  FW Pump TripM                   :  Water Level Stpt. Chg.M,AM,AM,AM,AM,AM,AM24Bypass ValvesM,AM,AXM,AMA,M,AM,AMM25Main Steam Iso. Valves:  Each Vlv. X9M,SPM,SP                                      :  Full Iso.M,SE26Relief Valve:  CapacityM                   :  Actuation3X9MM27Turbine Trip andM,SE5    Generator Load RejectionM,SPM,SF529Flow ControlAAAAAAAAM,AM,A30Recirc. System :  Trip One PumpM7,M8M7,M7M7,M7                            Trip Both PumpsMM7M                           Sys. PerformanceXXXXXXXX                            Non-Cavit. Verif.X1231Loss of T-G & Offsite PowerM,SE532Recirc. MG Set Speed ControlL,MMMMMMMMMM33Turbine Stop Valve Surv. TestMMMM,SP1134Vibration Measurements 4X13XXXXXXXXXXXXX35Recirc. System Flow CalibrationXXX70Reactor Water Cleanup SystemX71Residual Heat Removal System**X72Drywell Atmosphere Cooling System10XX73Cooling Water Systems10XX74Offgas System*XXXX1Percent of rated power, 3293 Mwt7Included only to meet Test 34 RequirementsL= Local Manual Flow Control mode2Percent of rated flow, 102.5 x 106 lb/hr8Trip the Generator Field BreakerM= Master Manual Flow Control Mode3Also obtain data with Tests 25, Full Iso & Test 279Heat up tests of MSIVs & Relief Valves areA= Automatic flow Control Mode4Obtain data with test 30       to check operation onlyX=Test Independent of Flow Control Mode5Perform Test 5, timing of 4 slowest control rods10Unit II only (cf. Page 36)SP= Scram Possibility           in conjunction with these scrams11Determine Maximum power without scramSE= Scram Expected6Perform the Dynamic System Test Case12From Test Condition 2E to 5NC= Natural Circulation13Not required if 50% power testing will       be done within about 2 months*Applies to unit 3 and, subsequent to equipment installation, to unit 2.
Test Description        Tests          0                  600              800 1000Position IndicationAllAllNormal Insert/Withdraw TimesAllAll        4*
BFN-16TABLE 13.5-6STARTUP TEST PROGRAM (UNIT 3)OPEN50% Flow Control Line75% Flow Control Line100% Flow Control LinePower, %1VESSEL15-3530-5040-602537-5750-7065-853755-7570-9095-10050Flow, %2ORHEAT4770104NC4870102NC4870100NCTEST CONDITION (See Figure 2)COLDTESTUP12D2E2A3C3D3E3A4C4D4E4A1Chemical & RadiochemicalXXXXXX2Radiation MeasurementXXXXXX3Fuel LoadingX4Full Core Shutdown MarginX5CRDXXX10X6SRM Perf. & Control Rod Seq.XXX9Water Level MeasurementXXX10IRM PerformanceXXX11LPRM CalibrationXXXX12APRM CalibrationXXXXX13Process ComputerXXX6X14RCICXX15HPCIXX16Selected Process TemperatureXX17System ExpansionXXX18Core Power DistributionXXXX19Core PerformanceXXXXXXXXXXX20Steam ProductionX21Flux Response to RodsXXXX22Press. Reg.:  Setpoint ChangesXXXXXX                   :  Backup RegulatorXXXX23FW System:  FW Pump TripX                   :  Water Level Stpt. Chg.XXXXXX24Bypass ValvesXXXXXXXX25Main Steam Iso. Valves:  Each Vlv.X9X,SPX,SP                                      :  Full Iso.X,SP26Relief Valve:  CapacityX                   :  Actuations3X9XX27Turbine Trip andX,SE5    Generator Load RejectionX,SPX,SE530Recirc. System :  Trip One PumpX7,X8X7,X7X7,X7                            Trip Both PumpsXXX                           Sys. PerformanceXXXXX                            Non-Cavit. Verif.X1231Loss of T-G & Offsite PowerX,SE532Recirc. MG Set Speed ControlL,ML,ML,ML,ML,ML,ML,ML,ML,M33Turbine Stop Valve Surv. TestXXXX,SP1134Vibration Measurements 4X13XXXXXXXXXX35Recirc. System Flow CalibrationXXX70Reactor Water Cleanup SystemX71Residual Heat Removal SystemX72Drywell Atmospheric Cooling SystemXX73Cooling Water SystemsXX74Offgas SystemXXXX75Reactor Shutdown From Outside ControlRoomX141Percent of rated power, 3293 MWt7Included only to meet Test 34 RequirementsL= Local Manual Flow Control Mode2Percent of rated flow, 102.5 x 106 lb/hr8Trip the Generator Field BreakerM= Master Manual Flow Control Mode3Also obtain data with Tests 25, Full Iso & Test 279Heat up tests of MSIVs & Relief Valves areA= Automatic Flow Control Mode4Obtain data with Test 30        to check operation onlyx=Test Indepentent of Flow Control Mode5Perform Test 5, timing of 4 slowest control rods10RSCS cleared ( 40%)SP= Scram Possibility     in conjunction with these scrams11Determine maximum power without scram SE= Scram Expected6Perform the Dynamic System Test Case12From Test Condition 2E to 5NC= Natural Circulation13Not required if 50% power testing will be done in about 2 months14At greater than 10% generator output}}
CouplingAllAllFrictionAll          4*
Scram Times (Normal Accumulated Pressure)AllAll  4*  4*      All Scram Times (Minimum Accumulator Pressure)          4*
Scram Times (Zero Accumulator Pressure)          4*
Scram Times (Scram Discharge Volume
 
High Level)
AllScram Times, Rated Power (Normal
 
Accumulator Pressure)          4**
*Value refers to the four slowest drives as determined from the normal accumulator pressure scram test at ambient reactor pressure which are compatible with the Rod Worth Minimizer and withdrawal sequence requirements.
**Scram times of the four slowest rods will be determined at 25, 50, and 100 percent of rated power during planned reactor scrams at these power levels.
Table 13.5-2 MAJOR PLANT TRANSIENTS
 
TEST CONDITION            Nominal Power, Percent of Rated 2550      7580  100 Nominal Core Flow, Percent of Rated TEST TITLE            36        100        100        70          100 Feedwater Pump Trip        A CMain Steam Isolation Valves (One Valve)CACMain Steam Isolation Valves (All Valves)
CTurbine-Generator Stop Valve Fast Close BATurbine-Generator Contorl Valve
 
Fast Close            AAARecirculation Pump Trip (One Pump)        CB        C Recirculation Pump Trip (Two Pumps)CC        C Loss of Generator and Offsite Power  CA - Unit 1  B - Units 2, 3    C - Units 1, 2, 3 BFN-16Table 13.5-3 STABILITY TESTS TEST CONDITION    Nominal Power, Percent of Rated 254050  254760753765801005097    Nominal Core Flow, Percent of Rated TEST TITLE47      70      100    NC    48      70      100    NC    48      70    100    NC    109 Flux Response to RodsCACAACAAACAPressure Regulator SetpointCACAACA CCCAPressure REgulator Backup RegulatorCCCCFeedwater System SetpointCACAACACCCABFeedwater System Drop
 
HeaterABypass ValveCAC    BAACACCCCBFlow ControlCCC CCCCCC NC= Natural Circulation A - unit 1    B - units 2, 3    C - units 1, 2, 3 BFN-16TABLE 13.5-4 STARTUP TEST PROGRAM (UNIT 1)
OPEN50% Flow Line 75% Flow Line 100% Flow Line Power1 .%VESSHEAT15-3530-5040-6015-3537-5750-7065-8527-4755-7570-9095-10040-6020%Flow2.%ORUP4870104NC4870102NC4870100NC105%TEST CONDITION (See Figure 13.5-2)COLD TEST1322A5A544A7A766A81Chemical & RadiochemicalXXXXXX2Radiation MeasurementsXXXXX3Fuel Loading X4Full Core Shutdown Margin X5Control Rod Drive SystemXXXXX6SRM Performance & Control Rod SequenceXXX XX7Not Applicable8Not Applicable9Not Applicable10IRM CalibrationXXX11LPRM Calibration XXXX12APRM CalibrationXXXXXX13Process ComputerXXXX14RCIC SystemXM15HPCI System XM16Reactor Vessel Temperature XXXX17System ExpansionXXX18Core Power Distribution XXXXX19Core PerformanceXXXXXXXXXXXXX20Elec. Output & Heat Rate X21Flux Response to RodsMMMMMMMXMMMX22Press. Reg.:  Setpoint ChangesMMMMMMMXMMMX
                  :  Backup Regulator MMMM23FW System:  FW Pump Trip MM                   :  Water Level Stpt. Chg.MAMMAMMMMAXMAMAMAX
                  :  Heater Loss M*24Bypass ValvesMAMAMAMMAMAMAXMAMAMAX25Main Steam Iso. Valves:  Each Vlv.
XM,SPM,SPM,SP                                      :  Full Iso.
M,SE26Relief ValvesXMM,SEM27Turbine :  Stop Valve Trip M,SE            :  Control Valve Trip M,SPM,SEA,SE29Flow ControlLMAMAMAMAMAMAMAMAMA30Recirc. System:  One Pump Trip MM                         :  Two Pump Trip MMM                         :  Flow Calibration XXXXXX31Loss of T-G & Offsite Power M,SELSE32Recirc. Loop ControlXXXX35Recirc. And Jet Pump Calibration X36Equalizer Open MM39Water Level verification in Reactor VesselXXX70Reactor Water Cleanup System X71Residual Heat Removal System**72Drywell Atmosphere Cooling System XX73Cooling Water Systems XX90Vibration**XXXXXX92Steam Separator and DryerXXXSPXXSPX*,XXSP93Not Applicable 1Power is in percent of rated power, 3293Mwt.
M=Master Manual Control Mode SP=Scram Possibility 2Flow is in percent of rated flow, 102.5x10 5 lbs/hrA=Automatic Control Mode NC=Natural Circulation
* = 90% rated power L=Local Manual Control Mode SE=Scram Expected
** = Actual test condition to be determined X=Test independent of flow control mode.
BFN-16TABLE 13.5-5 STARTUP TEST PROGRAM (UNIT 2)
OPEN50% Flow Control Line 75% Flow Control Line 100% Flow Control Line Power, %1 VESSEL15-3530-5040-60255337-5750-7065-853755-7570-9095-1005095-100Flow, %2ORHEAT4770104NC1164870102NC4870100NC109TEST CONDITION (See Figure 2)
COLDTESTUP12D2E2A2F3C3D3E3A4C4D4E4A4F1Chemical & RadiochemicalXXXXXX2Radiation MeasurementsXXXXXX3Fuel Loading X4Full Core Shutdown Margin X5CRDXXXXX6SRM Perf. & Control Rod Seq.XXX9Water Level Measurement XXX10IRM CalibrationXXX11LPRM Calibration XXXX12APRM Calibration XXXXX13Process ComputerXXX6X14RCICXM15HPCIXXX16Selected Process Temperatures XXXX17System ExpansionXXX18Core Power Distribution XXXX19Core PerformanceXXXXXXXXXXXXXX20Steam Production X21Flux Response to Rods MMMM22Press. Reg.:  Setpoint Changes MMMMMM                   :  Backup Regulator MMMM23FW System:  FW Pump Trip M                   :  Water Level Stpt. Chg.
M,AM,AM,AM,AM,AM,A M24Bypass Valves M,AM,AXM,AMA,M,AM,AMM25Main Steam Iso. Valves:  Each Vlv.
X9M,SPM,SP                                      :  Full Iso.
M,SE26Relief Valve:  Capacity M                   :  Actuation 3X9MM27Turbine Trip and M,SE5    Generator Load Rejection M,SPM,SF529Flow ControlAAAAAAAAM,AM,A30Recirc. System :  Trip One Pump M7,M8M7,M7M7,M7                            Trip Both Pumps MM7M                           Sys. PerformanceXXXXXXXX                            Non-Cavit. Verif.
X1231Loss of T-G & Offsite Power M,SE532Recirc. MG Set Speed ControlL,MMMMMMMMMM33Turbine Stop Valve Surv. Test MMMM,SP1134Vibration Measurements 4 X13XXXXXXXXXXXXX35Recirc. System Flow CalibrationXXX70Reactor Water Cleanup System X71Residual Heat Removal System**
X72Drywell Atmosphere Cooling System 10XX73Cooling Water Systems 10XX74Offgas System*
XXXX1Percent of rated power, 3293 Mwt 7Included only to meet Test 34 RequirementsL= Local Manual Flow Control mode 2Percent of rated flow, 102.5 x 10 6 lb/hr8Trip the Generator Field BreakerM= Master Manual Flow Control Mode 3Also obtain data with Tests 25, Full Iso & Test 27 9Heat up tests of MSIVs & Relief Valves areA= Automatic flow Control Mode 4Obtain data with test 30 to check operation onlyX=Test Independent of Flow Control Mode 5Perform Test 5, timing of 4 slowest control rods 10Unit II only (cf. Page 36)SP= Scram Possibility in conjunction with these scrams 11Determine Maximum power without scramSE= Scram Expected 6Perform the Dynamic System Test Case 12From Test Condition 2E to 5NC= Natural Circulation 13Not required if 50% power testing will be done within about 2 months
*Applies to unit 3 and, subsequent to equipment installation, to unit 2.
BFN-16TABLE 13.5-6 STARTUP TEST PROGRAM (UNIT 3)
OPEN50% Flow Control Line75% Flow Control Line 100% Flow Control Line Power, %1 VESSEL15-3530-5040-602537-5750-7065-853755-7570-9095-10050Flow, %2ORHEAT4770104NC4870102NC4870100NCTEST CONDITION (See Figure 2)
COLDTESTUP12D2E2A3C3D3E3A4C4D4E4A1Chemical & RadiochemicalXXXXXX2Radiation MeasurementXXXXXX3Fuel Loading X4Full Core Shutdown Margin X5CRDXXX10X6SRM Perf. & Control Rod Seq.XXX9Water Level MeasurementXXX10IRM PerformanceXXX11LPRM Calibration XXXX12APRM CalibrationXXXXX13Process ComputerXXX6X14RCICXX15HPCIXX16Selected Process Temperature XX17System ExpansionXXX18Core Power Distribution XXXX19Core PerformanceXXXXXXXXXXX20Steam Production X21Flux Response to Rods XXXX22Press. Reg.:  Setpoint Changes XXXXXX                   :  Backup Regulator XXXX23FW System:  FW Pump Trip X                   :  Water Level Stpt. Chg.
XXXXXX24Bypass Valves XXXXXXXX25Main Steam Iso. Valves:  Each Vlv.
X9X,SPX,SP                                      :  Full Iso.
X,SP26Relief Valve:  Capacity X                   :  Actuations 3X9XX27Turbine Trip and X,SE5    Generator Load Rejection X,SPX,SE530Recirc. System :  Trip One Pump X7,X8X7,X7X7,X7                            Trip Both Pumps XXX                           Sys. PerformanceXXXXX                            Non-Cavit. Verif.
X1231Loss of T-G & Offsite Power X,SE532Recirc. MG Set Speed ControlL,ML,ML,ML,ML,ML,ML,ML,ML,M33Turbine Stop Valve Surv. Test XXXX,SP1134Vibration Measurements 4X13XXXXXXXXXX35Recirc. System Flow Calibration XXX70Reactor Water Cleanup System X71Residual Heat Removal System X72Drywell Atmospheric Cooling System XX73Cooling Water Systems XX74Offgas System XXXX75Reactor Shutdown From Outside Control RoomX141Percent of rated power, 3293 MWt 7Included only to meet Test 34 RequirementsL= Local Manual Flow Control Mode 2Percent of rated flow, 102.5 x 10 6 lb/hr8Trip the Generator Field BreakerM= Master Manual Flow Control Mode 3Also obtain data with Tests 25, Full Iso & Test 27 9Heat up tests of MSIVs & Relief Valves areA= Automatic Flow Control Mode 4Obtain data with Test 30        to check operation onlyx=Test Indepentent of Flow Control Mode 5Perform Test 5, timing of 4 slowest control rods 10RSCS cleared ( 40%)SP= Scram Possibility in conjunction with these scrams 11Determine maximum power without scram SE= Scram Expected 6Perform the Dynamic System Test Case 12From Test Condition 2E to 5NC= Natural Circulation 13Not required if 50% power testing will be
 
done in about 2 months 14At greater than 10% generator output}}

Revision as of 05:14, 29 June 2018

Browns Ferry Nuclear Plant Updated Final Safety Analysis Report (Ufsar), Amendment 27, 13.5 Table - Startup and Power Test Program
ML18024A309
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/05/2017
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18018A778 List: ... further results
References
Download: ML18024A309 (5)


Text

BFN-16Table 13.5-1 CONTROL ROD DRIVE SYSTEM TESTS (Unit 1) Reactor Pressure,psig Preop (With Core Loaded)

Test Description Tests 0 600 800 1000Position IndicationAllAllNormal Insert/Withdraw TimesAllAll 4*

CouplingAllAllFrictionAll 4*

Scram Times (Normal Accumulated Pressure)AllAll 4* 4* All Scram Times (Minimum Accumulator Pressure) 4*

Scram Times (Zero Accumulator Pressure) 4*

Scram Times (Scram Discharge Volume

High Level)

AllScram Times, Rated Power (Normal

Accumulator Pressure) 4**

  • Value refers to the four slowest drives as determined from the normal accumulator pressure scram test at ambient reactor pressure which are compatible with the Rod Worth Minimizer and withdrawal sequence requirements.
    • Scram times of the four slowest rods will be determined at 25, 50, and 100 percent of rated power during planned reactor scrams at these power levels.

Table 13.5-2 MAJOR PLANT TRANSIENTS

TEST CONDITION Nominal Power, Percent of Rated 2550 7580 100 Nominal Core Flow, Percent of Rated TEST TITLE 36 100 100 70 100 Feedwater Pump Trip A CMain Steam Isolation Valves (One Valve)CACMain Steam Isolation Valves (All Valves)

CTurbine-Generator Stop Valve Fast Close BATurbine-Generator Contorl Valve

Fast Close AAARecirculation Pump Trip (One Pump) CB C Recirculation Pump Trip (Two Pumps)CC C Loss of Generator and Offsite Power CA - Unit 1 B - Units 2, 3 C - Units 1, 2, 3 BFN-16Table 13.5-3 STABILITY TESTS TEST CONDITION Nominal Power, Percent of Rated 254050 254760753765801005097 Nominal Core Flow, Percent of Rated TEST TITLE47 70 100 NC 48 70 100 NC 48 70 100 NC 109 Flux Response to RodsCACAACAAACAPressure Regulator SetpointCACAACA CCCAPressure REgulator Backup RegulatorCCCCFeedwater System SetpointCACAACACCCABFeedwater System Drop

HeaterABypass ValveCAC BAACACCCCBFlow ControlCCC CCCCCC NC= Natural Circulation A - unit 1 B - units 2, 3 C - units 1, 2, 3 BFN-16TABLE 13.5-4 STARTUP TEST PROGRAM (UNIT 1)

OPEN50% Flow Line 75% Flow Line 100% Flow Line Power1 .%VESSHEAT15-3530-5040-6015-3537-5750-7065-8527-4755-7570-9095-10040-6020%Flow2.%ORUP4870104NC4870102NC4870100NC105%TEST CONDITION (See Figure 13.5-2)COLD TEST1322A5A544A7A766A81Chemical & RadiochemicalXXXXXX2Radiation MeasurementsXXXXX3Fuel Loading X4Full Core Shutdown Margin X5Control Rod Drive SystemXXXXX6SRM Performance & Control Rod SequenceXXX XX7Not Applicable8Not Applicable9Not Applicable10IRM CalibrationXXX11LPRM Calibration XXXX12APRM CalibrationXXXXXX13Process ComputerXXXX14RCIC SystemXM15HPCI System XM16Reactor Vessel Temperature XXXX17System ExpansionXXX18Core Power Distribution XXXXX19Core PerformanceXXXXXXXXXXXXX20Elec. Output & Heat Rate X21Flux Response to RodsMMMMMMMXMMMX22Press. Reg.: Setpoint ChangesMMMMMMMXMMMX

Backup Regulator MMMM23FW System: FW Pump Trip MM  : Water Level Stpt. Chg.MAMMAMMMMAXMAMAMAX
Heater Loss M*24Bypass ValvesMAMAMAMMAMAMAXMAMAMAX25Main Steam Iso. Valves: Each Vlv.

XM,SPM,SPM,SP  : Full Iso.

M,SE26Relief ValvesXMM,SEM27Turbine : Stop Valve Trip M,SE  : Control Valve Trip M,SPM,SEA,SE29Flow ControlLMAMAMAMAMAMAMAMAMA30Recirc. System: One Pump Trip MM  : Two Pump Trip MMM  : Flow Calibration XXXXXX31Loss of T-G & Offsite Power M,SELSE32Recirc. Loop ControlXXXX35Recirc. And Jet Pump Calibration X36Equalizer Open MM39Water Level verification in Reactor VesselXXX70Reactor Water Cleanup System X71Residual Heat Removal System**72Drywell Atmosphere Cooling System XX73Cooling Water Systems XX90Vibration**XXXXXX92Steam Separator and DryerXXXSPXXSPX*,XXSP93Not Applicable 1Power is in percent of rated power, 3293Mwt.

M=Master Manual Control Mode SP=Scram Possibility 2Flow is in percent of rated flow, 102.5x10 5 lbs/hrA=Automatic Control Mode NC=Natural Circulation

  • = 90% rated power L=Local Manual Control Mode SE=Scram Expected
    • = Actual test condition to be determined X=Test independent of flow control mode.

BFN-16TABLE 13.5-5 STARTUP TEST PROGRAM (UNIT 2)

OPEN50% Flow Control Line 75% Flow Control Line 100% Flow Control Line Power, %1 VESSEL15-3530-5040-60255337-5750-7065-853755-7570-9095-1005095-100Flow, %2ORHEAT4770104NC1164870102NC4870100NC109TEST CONDITION (See Figure 2)

COLDTESTUP12D2E2A2F3C3D3E3A4C4D4E4A4F1Chemical & RadiochemicalXXXXXX2Radiation MeasurementsXXXXXX3Fuel Loading X4Full Core Shutdown Margin X5CRDXXXXX6SRM Perf. & Control Rod Seq.XXX9Water Level Measurement XXX10IRM CalibrationXXX11LPRM Calibration XXXX12APRM Calibration XXXXX13Process ComputerXXX6X14RCICXM15HPCIXXX16Selected Process Temperatures XXXX17System ExpansionXXX18Core Power Distribution XXXX19Core PerformanceXXXXXXXXXXXXXX20Steam Production X21Flux Response to Rods MMMM22Press. Reg.: Setpoint Changes MMMMMM  : Backup Regulator MMMM23FW System: FW Pump Trip M  : Water Level Stpt. Chg.

M,AM,AM,AM,AM,AM,A M24Bypass Valves M,AM,AXM,AMA,M,AM,AMM25Main Steam Iso. Valves: Each Vlv.

X9M,SPM,SP  : Full Iso.

M,SE26Relief Valve: Capacity M  : Actuation 3X9MM27Turbine Trip and M,SE5 Generator Load Rejection M,SPM,SF529Flow ControlAAAAAAAAM,AM,A30Recirc. System : Trip One Pump M7,M8M7,M7M7,M7 Trip Both Pumps MM7M Sys. PerformanceXXXXXXXX Non-Cavit. Verif.

X1231Loss of T-G & Offsite Power M,SE532Recirc. MG Set Speed ControlL,MMMMMMMMMM33Turbine Stop Valve Surv. Test MMMM,SP1134Vibration Measurements 4 X13XXXXXXXXXXXXX35Recirc. System Flow CalibrationXXX70Reactor Water Cleanup System X71Residual Heat Removal System**

X72Drywell Atmosphere Cooling System 10XX73Cooling Water Systems 10XX74Offgas System*

XXXX1Percent of rated power, 3293 Mwt 7Included only to meet Test 34 RequirementsL= Local Manual Flow Control mode 2Percent of rated flow, 102.5 x 10 6 lb/hr8Trip the Generator Field BreakerM= Master Manual Flow Control Mode 3Also obtain data with Tests 25, Full Iso & Test 27 9Heat up tests of MSIVs & Relief Valves areA= Automatic flow Control Mode 4Obtain data with test 30 to check operation onlyX=Test Independent of Flow Control Mode 5Perform Test 5, timing of 4 slowest control rods 10Unit II only (cf. Page 36)SP= Scram Possibility in conjunction with these scrams 11Determine Maximum power without scramSE= Scram Expected 6Perform the Dynamic System Test Case 12From Test Condition 2E to 5NC= Natural Circulation 13Not required if 50% power testing will be done within about 2 months

  • Applies to unit 3 and, subsequent to equipment installation, to unit 2.

BFN-16TABLE 13.5-6 STARTUP TEST PROGRAM (UNIT 3)

OPEN50% Flow Control Line75% Flow Control Line 100% Flow Control Line Power, %1 VESSEL15-3530-5040-602537-5750-7065-853755-7570-9095-10050Flow, %2ORHEAT4770104NC4870102NC4870100NCTEST CONDITION (See Figure 2)

COLDTESTUP12D2E2A3C3D3E3A4C4D4E4A1Chemical & RadiochemicalXXXXXX2Radiation MeasurementXXXXXX3Fuel Loading X4Full Core Shutdown Margin X5CRDXXX10X6SRM Perf. & Control Rod Seq.XXX9Water Level MeasurementXXX10IRM PerformanceXXX11LPRM Calibration XXXX12APRM CalibrationXXXXX13Process ComputerXXX6X14RCICXX15HPCIXX16Selected Process Temperature XX17System ExpansionXXX18Core Power Distribution XXXX19Core PerformanceXXXXXXXXXXX20Steam Production X21Flux Response to Rods XXXX22Press. Reg.: Setpoint Changes XXXXXX  : Backup Regulator XXXX23FW System: FW Pump Trip X  : Water Level Stpt. Chg.

XXXXXX24Bypass Valves XXXXXXXX25Main Steam Iso. Valves: Each Vlv.

X9X,SPX,SP  : Full Iso.

X,SP26Relief Valve: Capacity X  : Actuations 3X9XX27Turbine Trip and X,SE5 Generator Load Rejection X,SPX,SE530Recirc. System : Trip One Pump X7,X8X7,X7X7,X7 Trip Both Pumps XXX Sys. PerformanceXXXXX Non-Cavit. Verif.

X1231Loss of T-G & Offsite Power X,SE532Recirc. MG Set Speed ControlL,ML,ML,ML,ML,ML,ML,ML,ML,M33Turbine Stop Valve Surv. Test XXXX,SP1134Vibration Measurements 4X13XXXXXXXXXX35Recirc. System Flow Calibration XXX70Reactor Water Cleanup System X71Residual Heat Removal System X72Drywell Atmospheric Cooling System XX73Cooling Water Systems XX74Offgas System XXXX75Reactor Shutdown From Outside Control RoomX141Percent of rated power, 3293 MWt 7Included only to meet Test 34 RequirementsL= Local Manual Flow Control Mode 2Percent of rated flow, 102.5 x 10 6 lb/hr8Trip the Generator Field BreakerM= Master Manual Flow Control Mode 3Also obtain data with Tests 25, Full Iso & Test 27 9Heat up tests of MSIVs & Relief Valves areA= Automatic Flow Control Mode 4Obtain data with Test 30 to check operation onlyx=Test Indepentent of Flow Control Mode 5Perform Test 5, timing of 4 slowest control rods 10RSCS cleared ( 40%)SP= Scram Possibility in conjunction with these scrams 11Determine maximum power without scram SE= Scram Expected 6Perform the Dynamic System Test Case 12From Test Condition 2E to 5NC= Natural Circulation 13Not required if 50% power testing will be

done in about 2 months 14At greater than 10% generator output