{{#Wiki_filter:March 8, 2018 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD  20852  
{{#Wiki_filter:March 8, 2018  
 
Technical Specifications Task Force 11921 Rockville Pike, Suite 100  
 
Rockville, MD  20852  


==SUBJECT:==
==SUBJECT:==
ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-568, "CLARIFY APPLICABILITY OF BWR/4 TS 3.6.2.5 AND TS 3.6.3.2" (EPID L-2017-PMP-0024)
ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-568, "CLARIFY APPLICABILITY OF BWR/4 TS 3.6.2.5 AND TS 3.6.3.2" (EPID L-2017-PMP-0024)  


==Dear Members of the Technical Specifications Task Force:==
==Dear Members of the Technical Specifications Task Force:==
By letter dated December 19, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17353A437), you submitted to the U.S. Nuclear Regulatory Commission (NRC) a request to incorporate Traveler TSTF-568, "Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2," into the standard technical specifications. Section 170.21 of Title 10 of the Code of Federal Regulations requires that Travelers are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours have been billed accordingly. The NRC staff estimates that the review will require approximately 530 staff hours including project management time.
 
The NRC staff has completed a preliminary review of your submission and determined it is sufficiently complete and appropriate to initiate a more comprehensive review. The review will generally follow the schedule below.
By letter dated December 19, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17353A437), you subm itted to the U.S. Nuclear Regulatory Commission (NRC) a request to incorporate Traveler TSTF-568, "Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2," into the standard technical specifications.
MILESTONE SCHEDULE DATE Issue Request for Additional Information April 17, 2018 Issue Draft Safety Evaluation September 28, 2018 Issue Final Safety Evaluation December 19, 2018 The dates are provided for draft and final safety evaluations (SEs) have been expedited at your request. In order to meet these dates the TSTF will need to respond to RAIs in 30 days and provide comments to the draft SE in 15 days. If you have any questions, please contact me at (301) 415-1774 or via e-mail to Michelle.Honcharik@nrc.gov.        Sincerely,                    /RA/  Michelle C. Honcharik, Senior Project Manager      Technical Specifications Branch      Division of Safety Systems Office of Nuclear Reactor Regulation  
Section 170.21 of Title 10 of the Code of Federal Regulations requires that Travelers are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours have been billed accordingly. The NRC staff estimates that the review will require approximately 530 staff hours including project management time.  
 
The NRC staff has completed a preliminary review of your submission and determined it is sufficiently complete and appropriate to initiate a more comprehensive review. The review will generally follow the schedule below.  
 
MILESTONE SCHEDULE DATE Issue Request for Additional Information April 17, 2018 Issue Draft Safety Evaluation September 28, 2018 Issue Final Safety Evaluation December 19, 2018 The dates are provided for draft and final safety evaluations (SEs) have been expedited at your request. In order to meet these dates the TSTF will need to respond to RAIs in 30 days and provide comments to the draft SE in 15 days. If you have any questions, please contact me at  
 
(301) 415-1774 or via e-mail to Michelle.Honcharik@nrc.gov
.        Sincerely,  
                     /RA/  Michelle C. Honcharik, Senior Project Manager      Technical Specifications Branch      Division of Safety Systems Office of Nuclear Reactor Regulation  


Project No. 753   
Project No. 753   


ML18057A163;    *concurred via e-mail NRR-106 OFFICE DSS/STSB DSS/STSB* NAME MHoncharik VCusumano DATE 2/26/2018 3/8/2018 Technical Specifications Task Force  Project No. 753   cc:  Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention:  Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.
ML18057A163;    *concurred via e-mail NRR-106 OFFICE DSS/STSB DSS/STSB* NAME MHoncharik VCusumano DATE 2/26/2018 3/8/2018 Technical Specifications Task Force  Project No. 753 cc:  Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100  
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Email: jmiksa@entergy.com  
 
Rockville, MD 20852 Attention:  Brian D. Mann E-mail: brian.mann@excelservices.com  
 
James P. Miksa Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043  
 
Email: jmiksa@entergy.com  
 
Jordan L. Vaughan Duke Energy EC2ZF / P.O. Box 1006
 
Charlotte, NC 28202
 
Email: jordan.vaughan@duke-energy.com
 
Lisa L. Williams Energy Northwest Columbia Generating Station PO Box 968
 
Mail Drop PE20 Richland, WA 99352-0968 E-mail: llwilliams@energy-northwest.com
 
David M. Gullott Exelon Generation
 
4300 Winfield Road
 
Warrenville IL 60555 Email: David.Gullott@exeloncorp.com
 
Wesley Sparkman


Jordan L. Vaughan Duke Energy EC2ZF / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com
Southern Nuclear Operating Company


Lisa L. Williams Energy Northwest Columbia Generating Station PO Box 968 Mail Drop PE20 Richland, WA 99352-0968 E-mail: llwilliams@energy-northwest.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 Email: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com}}
42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com}}

Revision as of 01:35, 29 June 2018

Acceptance for Review Regarding Traveler TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 (EPID L-2017-PMP-0024)
ML18057A163
Person / Time
Site: Technical Specifications Task Force
Issue date: 03/08/2018
From: Honcharik M C
NRC/NRR/DSS/STSB
To:
Technical Specifications Task Force
Honcharik M C
References
EPID L-2017-PMP-0024
Download: ML18057A163 (3)


Text

March 8, 2018

Technical Specifications Task Force 11921 Rockville Pike, Suite 100

Rockville, MD 20852

SUBJECT:

ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-568, "CLARIFY APPLICABILITY OF BWR/4 TS 3.6.2.5 AND TS 3.6.3.2" (EPID L-2017-PMP-0024)

Dear Members of the Technical Specifications Task Force:

By letter dated December 19, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17353A437), you subm itted to the U.S. Nuclear Regulatory Commission (NRC) a request to incorporate Traveler TSTF-568, "Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2," into the standard technical specifications.

Section 170.21 of Title 10 of the Code of Federal Regulations requires that Travelers are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours have been billed accordingly. The NRC staff estimates that the review will require approximately 530 staff hours including project management time.

The NRC staff has completed a preliminary review of your submission and determined it is sufficiently complete and appropriate to initiate a more comprehensive review. The review will generally follow the schedule below.

MILESTONE SCHEDULE DATE Issue Request for Additional Information April 17, 2018 Issue Draft Safety Evaluation September 28, 2018 Issue Final Safety Evaluation December 19, 2018 The dates are provided for draft and final safety evaluations (SEs) have been expedited at your request. In order to meet these dates the TSTF will need to respond to RAIs in 30 days and provide comments to the draft SE in 15 days. If you have any questions, please contact me at

(301) 415-1774 or via e-mail to Michelle.Honcharik@nrc.gov

. Sincerely,

/RA/ Michelle C. Honcharik, Senior Project Manager Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation

Project No. 753

ML18057A163; *concurred via e-mail NRR-106 OFFICE DSS/STSB DSS/STSB* NAME MHoncharik VCusumano DATE 2/26/2018 3/8/2018 Technical Specifications Task Force Project No. 753 cc: Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100

Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com

James P. Miksa Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043

Email: jmiksa@entergy.com

Jordan L. Vaughan Duke Energy EC2ZF / P.O. Box 1006

Charlotte, NC 28202

Email: jordan.vaughan@duke-energy.com

Lisa L. Williams Energy Northwest Columbia Generating Station PO Box 968

Mail Drop PE20 Richland, WA 99352-0968 E-mail: llwilliams@energy-northwest.com

David M. Gullott Exelon Generation

4300 Winfield Road

Warrenville IL 60555 Email: David.Gullott@exeloncorp.com

Wesley Sparkman

Southern Nuclear Operating Company

42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com