{{#Wiki_filter:No: I-15-006  March 9, 2015          CONTACT: Diane Screnci, 610-337-5330                                                                      Neil Sheehan, 610-337-5331              NRC To Hold Regulatory Performance Public Meeting Regarding Pilgrim Nuclear Power Plant on March 18th The Nuclear Regulatory Commission will provide details on its annual assessment of safety performance at the Pilgrim nuclear power plant during a public meeting on March 18 in Plymouth, Mass. The NRC will also discuss the results of a team inspection conducted at the plant last fall in rs received by the plant. The meeting is scheduled to begin at 6:30 p.m. in the Grand Ballroom at the Radisson Hotel Plymouth Harbor, at 180 Water St. in Plymouth. Prior to the end of the session, NRC staff will answer  Determinations on plant performance are based on a combination of inspection findings and are cl Pilgrim, which is located in Plymouth and is owned by Entergy Nuclear Operations Inc., operated safely during 2014. However, the plant was under additional NRC scrutiny because of two scrams, or shutdowns, per 7,000 hours of operation; the other involves unplanned scrams with complications. Last fall, a team of NRC inspectors traveled to Pilgrim to evaluate whether the issues behind the unplanned shutdowns had been satisfactorily addressed. The eight-member team found that although the adequate, deficiencies still existed in the implementation of corrective action plans, as well as in  As a result, per agindicators and mean that the plant will continue to receive heightened attention until the NRC can perform a follow-up team inspection and is satisfied the concerns have been resolved. The NRC will conduct that additional inspection once Entergy notifies the agency of its readiness for it.
Page l 2 identified several examples where corrective actions were not completed as intended or were closed prematurelyEntergy to take the steps necessary to put in place corrective actions that will have a lasting impact and reduce the likelihoo severe winter storm at the end of January that resulted in a reactor shutdown. The results of the inspection will be contained in a report to be issued this spring. In 2014, the NRC performed approximately 6,500 hours of inspection at Pilgrim. The NRC issues reports on performance at each plant twice each year: during the mid-cycle, or mid-point, of the year, and at the conclusion of the year. Inspection findings and performance indicators Assessment letters each March, the NRC meets with the public in the vicinity of each plant to discuss the results. website. #  News releases are available through a free listserv subscription or by clicking on the EMAIL UPDATES link on the NRC homepage (www.nrc.gov). E-mail notifications are sent to subscribers when news releases are posted to NRC's website. For the latest news, follow the NRC on www.twitter.com/NRCgov.}}

Revision as of 12:52, 14 June 2018

Press Release-I-15-006: NRC to Hold Regulatory Performance Public Meeting Regarding Pilgrim Nuclear Power Plant on March 18th
ML15069A614
Person / Time
Site: Pilgrim
Issue date: 03/09/2015
From:
Office of Public Affairs Region I
To:
References
Press Release-I-15-006
Download: ML15069A614 (2)


Text

No: I-15-006 March 9, 2015 CONTACT: Diane Screnci, 610-337-5330 Neil Sheehan, 610-337-5331 NRC To Hold Regulatory Performance Public Meeting Regarding Pilgrim Nuclear Power Plant on March 18th The Nuclear Regulatory Commission will provide details on its annual assessment of safety performance at the Pilgrim nuclear power plant during a public meeting on March 18 in Plymouth, Mass. The NRC will also discuss the results of a team inspection conducted at the plant last fall in rs received by the plant. The meeting is scheduled to begin at 6:30 p.m. in the Grand Ballroom at the Radisson Hotel Plymouth Harbor, at 180 Water St. in Plymouth. Prior to the end of the session, NRC staff will answer Determinations on plant performance are based on a combination of inspection findings and are cl Pilgrim, which is located in Plymouth and is owned by Entergy Nuclear Operations Inc., operated safely during 2014. However, the plant was under additional NRC scrutiny because of two scrams, or shutdowns, per 7,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of operation; the other involves unplanned scrams with complications. Last fall, a team of NRC inspectors traveled to Pilgrim to evaluate whether the issues behind the unplanned shutdowns had been satisfactorily addressed. The eight-member team found that although the adequate, deficiencies still existed in the implementation of corrective action plans, as well as in As a result, per agindicators and mean that the plant will continue to receive heightened attention until the NRC can perform a follow-up team inspection and is satisfied the concerns have been resolved. The NRC will conduct that additional inspection once Entergy notifies the agency of its readiness for it.

Page l 2 identified several examples where corrective actions were not completed as intended or were closed prematurelyEntergy to take the steps necessary to put in place corrective actions that will have a lasting impact and reduce the likelihoo severe winter storm at the end of January that resulted in a reactor shutdown. The results of the inspection will be contained in a report to be issued this spring. In 2014, the NRC performed approximately 6,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> of inspection at Pilgrim. The NRC issues reports on performance at each plant twice each year: during the mid-cycle, or mid-point, of the year, and at the conclusion of the year. Inspection findings and performance indicators Assessment letters each March, the NRC meets with the public in the vicinity of each plant to discuss the results. website. # News releases are available through a free listserv subscription or by clicking on the EMAIL UPDATES link on the NRC homepage (www.nrc.gov). E-mail notifications are sent to subscribers when news releases are posted to NRC's website. For the latest news, follow the NRC on www.twitter.com/NRCgov.