05000266/FIN-2014403-01: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{finding
{{finding
| title = Licensee-Identified Violation
| title = LICENSEE-IDENTIFIED Violation
| docket = 05000266, 05000301
| docket = 05000266, 05000301
| inspection report = IR 05000266/2014403
| inspection report = IR 05000266/2014403

Revision as of 23:21, 29 May 2018

01
Site: Point Beach NextEra Energy icon.png
Report IR 05000266/2014403 Section 4OA5
Date counted Dec 31, 2014 (2014Q4)
Type: NCV: Green
cornerstone Physical Protection
Identified by: Licensee-identified
Inspection Procedure: IP 2201/004
Inspectors (proximate) G Hansen
R Daley
Violation of: 10 CFR 73, PHYSICAL PROTECTION OF PLANTS AND MATERIALS
INPO aspect
'