05000440/FIN-2005006-08: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{finding
{{finding
| title = Unreported Safety-Stream Unavailability For Rhr
| title = Unreported SAFETY-STREAM Unavailability for RHR
| docket = 05000440
| docket = 05000440
| inspection report = IR 05000440/2005006
| inspection report = IR 05000440/2005006

Latest revision as of 23:03, 29 May 2018

08
Site: Perry FirstEnergy icon.png
Report IR 05000440/2005006 Section 4OA5
Date counted Jun 30, 2005 (2005Q2)
Type: TEV: Severity level IV
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure:
Inspectors (proximate) G Roach
C Acosta
J Rutkowski
M Franke
R Powell
C Lipa
INPO aspect
'