ML16343A194: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:IINNDDIIAANNAA AANNDD MMIICCHHIIGGAANN PPOOWWEERRDD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTTUUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISSRREEPPOORRTTRevision:16.6Table:14.1-5 Page:1 of 1UNIT 1DONALD C. COOK NUCLEAR PLANT UNIT 1 SGTP PROGRAM INPUTASSUMPTIONS FOR RCS VOLUMES1INITIAL CONDITIONSINPUT ASSUMPTIONS0% SGTP30% SGTPReactor Vessel (ft3)46434643Steam Generators (ft3 - Total)435723442 (2)Reactor Coolant Pumps (ft3 - Total)324324Loop Piping (ft3 - Total)11851185Surge Line Piping (ft3)4343Pressurizer (ft3)18341834Total RCS Volume (ft3) (Ambient Conditions)12,38611,471Total RCS Volume (ft3)(Hot Conditions includes 3% for thermal expansion)12,75811,815 1 The volumes presented in this table represent the reactor coolant system volumes from theWestinghouse IMP database SEC-LIS-4428-C3. Note that the volumes documented in thistable are slightly different than those used in the Westinghouse analysis of record, but havebeen evaluated for acceptability as documented in letter AEP-99-485.2 The SG tube volume is assumed to be 762 ft3/SG (3048 ft3 total). The increase in SG tubeplugging from 0% to 30% results in a total reduction in SG tube volume of approximately 915 ft3. The reduction between the SG tube volume and SG tube plugging is assumed to be a linearrelationship; e.g. at 15% SGTP, total volume reduction is 0.15*(3048 ft3) = 457.2 ft3. | ||
}} |
Revision as of 17:55, 4 May 2018
ML16343A194 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 10/24/2016 |
From: | Indiana Michigan Power Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16336A263 | List:
|
References | |
AEP-NRC-2016-42 | |
Download: ML16343A194 (1) | |
Text
IINNDDIIAANNAA AANNDD MMIICCHHIIGGAANN PPOOWWEERRDD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTTUUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISSRREEPPOORRTTRevision:16.6Table:14.1-5 Page:1 of 1UNIT 1DONALD C. COOK NUCLEAR PLANT UNIT 1 SGTP PROGRAM INPUTASSUMPTIONS FOR RCS VOLUMES1INITIAL CONDITIONSINPUT ASSUMPTIONS0% SGTP30% SGTPReactor Vessel (ft3)46434643Steam Generators (ft3 - Total)435723442 (2)Reactor Coolant Pumps (ft3 - Total)324324Loop Piping (ft3 - Total)11851185Surge Line Piping (ft3)4343Pressurizer (ft3)18341834Total RCS Volume (ft3) (Ambient Conditions)12,38611,471Total RCS Volume (ft3)(Hot Conditions includes 3% for thermal expansion)12,75811,815 1 The volumes presented in this table represent the reactor coolant system volumes from theWestinghouse IMP database SEC-LIS-4428-C3. Note that the volumes documented in thistable are slightly different than those used in the Westinghouse analysis of record, but havebeen evaluated for acceptability as documented in letter AEP-99-485.2 The SG tube volume is assumed to be 762 ft3/SG (3048 ft3 total). The increase in SG tubeplugging from 0% to 30% results in a total reduction in SG tube volume of approximately 915 ft3. The reduction between the SG tube volume and SG tube plugging is assumed to be a linearrelationship; e.g. at 15% SGTP, total volume reduction is 0.15*(3048 ft3) = 457.2 ft3.