ENS 57859: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 22: Line 22:
This event is being reported as eight-hour notification in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the 'A' emergency diesel generator.
This event is being reported as eight-hour notification in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the 'A' emergency diesel generator.
The NRC Resident Inspector was notified.
The NRC Resident Inspector was notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250812en.html#en57859
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250813en.html#en57859
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1

Latest revision as of 06:20, 13 August 2025

ENS 57859 +/-
Where
Summer South Carolina Electric & Gas Company icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+3.65 h0.152 days <br />0.0217 weeks <br />0.005 months <br />)
Opened: Howard Garrett
09:51 Aug 11, 2025
NRC Officer: Josue Ramirez
Last Updated: Aug 11, 2025
57859 - NRC Website
Loading map...