#REDIRECT [[IR 05000219/1985002]]
{{Adams
| number = ML20138A771
| issue date = 03/07/1986
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-219/85-02. Corrective Actions Examined During Region I Insps on 850514 & 0722-26 Adequate
| author name = Martin T
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee name = Fiedler P
| addressee affiliation = GENERAL PUBLIC UTILITIES CORP.
| docket = 05000219
| license number =
| contact person =
| document report number = NUDOCS 8603200056
| title reference date = 04-24-1985
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000219/1985002]]
 
=Text=
{{#Wiki_filter:::-ti.;a T.1er:ms
r
m
i 4
.
7 Wth]YiO&th&W
,
~w n'
s
MAR 0 71986
Docket No. 50-219
GPU Nuclear Corporation
ATTN: Mr. P. B. Fiedler
Vice President and Director
0yster Creek Nuclear Generating Station
P. O. Box 388
Forked River, NJ 08731
Gentlemen:
Subject: Inspection No. 50-219/85-02
This is in reference to your letter dated April 24, 1985, in response to our
letter dated March 29, 1985. We apologize for the delay in responding to your
letter.
Thank you for informing us of the interim and final corrective actions
documented in your letter. Those actions were examined during NRC Region I
inspections conducted on May 14, 1985 and on July 22-26, 1985 and appeared to
be adequate.
In your response to Violation A, you contend that it was not technically
feasible (or practical) to comply with the commitment in your physical security
plan. However, as demonstrated by your interim and final corrective actions,
it is our view that it was technically feasible to comply with your commitment.
In addition, the measure you implemented on your own to compensate for the
weakness, as described in the first paragraph of your response, did not obviate
the vulnerability that formed the basis for the violation and, therefore, would
not have been accepted for that purpose, if it had been submitted to the NRC.
Further, an obstruction in the same area added to the vulnerability, and the
existence of that obstruction was also not in compliance with NRC requirements.
Therefore, we find that the violation is valid and will remain as cited.
Attachment A to your letter contains information which is exempt from public
disclosure in accordance with 10 CFR 73.21.
Therefore, the attachment will
not be placed in the NRC's Public Document Room and will receive limited
distribution.
Your cooperation with us is appreciated.
Sincerely,
'
Original Signed 3y:
Thomas T. ta-tin
Thomas T. Martin, Director
$[2j@8%$$$o0[19
Division of Radiation Safety and
PDR
Safeguards
G
0FFICIAL RECORD COPY
RL GPU - 0001.0.0
'
'
03/05/86
't y! a.:d l1
f.
0
 
r-
I' . ,
'
GPU Nuclear Corporation
2
W 07 M
cc:
M. Laggart, BWR Licensing Manager
Licensing Manager, Oyster Creek
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State.of New Jersey
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o encl)
Section Chief, DRP
/
,/
RI: RS
S
R
SS
Ke',ig/gcb
oy er
rt'i n
j/[/86
I
0FFICIAL RECORD COPY
RL GPU - 0001.1.0
03/05/86
l
}}

Latest revision as of 23:31, 24 May 2025

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-219/85-02. Corrective Actions Examined During Region I Insps on 850514 & 0722-26 Adequate
ML20138A771
Person / Time
Site: Oyster Creek
Issue date: 03/07/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
References
NUDOCS 8603200056
Download: ML20138A771 (2)


See also: IR 05000219/1985002

Text

-ti.;a T.1er:ms

r

m

i 4

.

7 Wth]YiO&th&W

,

~w n'

s

MAR 0 71986

Docket No. 50-219

GPU Nuclear Corporation

ATTN: Mr. P. B. Fiedler

Vice President and Director

0yster Creek Nuclear Generating Station

P. O. Box 388

Forked River, NJ 08731

Gentlemen:

Subject: Inspection No. 50-219/85-02

This is in reference to your letter dated April 24, 1985, in response to our

letter dated March 29, 1985. We apologize for the delay in responding to your

letter.

Thank you for informing us of the interim and final corrective actions

documented in your letter. Those actions were examined during NRC Region I

inspections conducted on May 14, 1985 and on July 22-26, 1985 and appeared to

be adequate.

In your response to Violation A, you contend that it was not technically

feasible (or practical) to comply with the commitment in your physical security

plan. However, as demonstrated by your interim and final corrective actions,

it is our view that it was technically feasible to comply with your commitment.

In addition, the measure you implemented on your own to compensate for the

weakness, as described in the first paragraph of your response, did not obviate

the vulnerability that formed the basis for the violation and, therefore, would

not have been accepted for that purpose, if it had been submitted to the NRC.

Further, an obstruction in the same area added to the vulnerability, and the

existence of that obstruction was also not in compliance with NRC requirements.

Therefore, we find that the violation is valid and will remain as cited.

Attachment A to your letter contains information which is exempt from public

disclosure in accordance with 10 CFR 73.21.

Therefore, the attachment will

not be placed in the NRC's Public Document Room and will receive limited

distribution.

Your cooperation with us is appreciated.

Sincerely,

'

Original Signed 3y:

Thomas T. ta-tin

Thomas T. Martin, Director

$[2j@8%$$$o0[19

Division of Radiation Safety and

PDR

Safeguards

G

0FFICIAL RECORD COPY

RL GPU - 0001.0.0

'

'

03/05/86

't y! a.:d l1

f.

0

r-

I' . ,

'

GPU Nuclear Corporation

2

W 07 M

cc:

M. Laggart, BWR Licensing Manager

Licensing Manager, Oyster Creek

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State.of New Jersey

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, ORMA (w/o encl)

Section Chief, DRP

/

,/

RI: RS

S

R

SS

Ke',ig/gcb

oy er

rt'i n

j/[/86

I

0FFICIAL RECORD COPY

RL GPU - 0001.1.0

03/05/86

l