ML20199K057: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:'The Light
{{#Wiki_filter:'
  '  c o mp a ny8"'h L'** P' ject untric cennating sinitonP.                           o. no. 289 w d.wonh, Toa. 774as Ilotliton 1.lghting & Power November 13,1997 ST-HL-AE-005789 File No. G02 STl30470405 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 50uth Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthlv Oneratine Renorts for October 1997 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for October 1997.
'The Light c o mp a ny8"'h L'** P' ject untric cennating sinitonP. o. no. 289 w d.wonh, Toa. 774as Ilotliton 1.lghting & Power November 13,1997 ST-HL-AE-005789 File No. G02 STl30470405 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 50uth Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthlv Oneratine Renorts for October 1997 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for October 1997.
If you should have any questions on this matter, please contact T. E. Underwood at (512)972-7108.
If you should have any questions on this matter, please contact T. E. Underwood at (512)972-7108.
Sincerely,
Sincerely,
                                                                  $hh M. A. McDurnett
$hh
                                                                                      'ffs/
'ffs/
Director, Nuclear Licensing RLH/sl
M. A. McDurnett Director, Nuclear Licensing RLH/sl
                                                                                                                      \
\\
                                                                                                                        \
\\
Attachments: 1) STPEGS Unit 1 Monthly Operating Repor:- October 1997                                             'l
Attachments: 1) STPEGS Unit 1 Monthly Operating Repor:- October 1997
'l
: 2) STPEGS Unit 2 Monthly Operating Report - October 1997
: 2) STPEGS Unit 2 Monthly Operating Report - October 1997
                                                                                                              '(c3' yv
'(c3' yv
                                                , ,4 9711280304 971031                                                             l ***'''**
,,4 9711280304 971031 l bNbNllblbbblflbN!
bNbNllblbbblflbN!
ApocK050004y8 gp, Project Manager on Behalf of the Participants in the South Texas Project
gp,   ApocK050004y8 Project Manager on Behalf of the Participants in the South Texas Project


              .-          . -  .    .~ --          ..  ..      -              . . -    - - . . _ . - . . . -
.~
Houston Lighting & Power Company                                   ST-ilL-AE-5789 South Texas Project Electric Generating Station                     File No.: G02 Page 2 Ellis W. Merschoff                             Rufus S. Scott Regional Administrator, Region IV             Associate General Counsel U. S. Nuclear Regulatory Commission           110tston Lighting & Power Company 611 Ryan Plaza Drive, Suite 400               P. O. Box 61067 Arlington, TX 76011-8064                       Ilouston,TX 77208 Thomas W. Alexion                             Institute of Nuclear Power Project Manager, Mail Code 13113               Operations - Records Center U. S. Nuclear Regulatory Commission           700 Galleria Parkway Washington, DC 20555-0001                     Atlanta, GA 30339-5957                                 ;
Houston Lighting & Power Company ST-ilL-AE-5789 South Texas Project Electric Generating Station File No.:
David P. Loveless                             Dr. Bertram Wolfe Sr. Resident inspector                         15453 Via Vaquero c/o U. S. Nuclear Regulatory Comm.             Monte Sereno, CA 95030 P. O. Box 910 1            Bay City, TX 77404-0910                       Richard A. Ratliff Buree's of Radiation Control l
G02 Page 2 Ellis W. Merschoff Rufus S. Scott Regional Administrator, Region IV Associate General Counsel U. S. Nuclear Regulatory Commission 110tston Lighting & Power Company 611 Ryan Plaza Drive, Suite 400 P. O. Box 61067 Arlington, TX 76011-8064 Ilouston,TX 77208 Thomas W. Alexion Institute of Nuclear Power Project Manager, Mail Code 13113 Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway Washington, DC 20555-0001 Atlanta, GA 30339-5957 David P. Loveless Dr. Bertram Wolfe Sr. Resident inspector 15453 Via Vaquero c/o U. S. Nuclear Regulatory Comm.
J. R. Newman, Esquire                       Texas Department ofIIcalth Morgan, Lewis & Bockius                     1100 West 49th Street I800 M Street, N.W.                         Austin, TX 78756-3189 Washington, DC 20036-5869 J. R. Egan, Esquire M. T. liardt/W. C. Gunst                     Egan & Associates, P.C.
Monte Sereno, CA 95030 P. O. Box 910 Bay City, TX 77404-0910 Richard A. Ratliff 1
City Nblic Service                           2300 N Street, N.W.
Buree's of Radiation Control J. R. Newman, Esquire Texas Department ofIIcalth l
P. O. Box 1771                             Washington, D.C. 20037 San Antonio,TX 78296 J. C. Lanier/M. B. Lee                       U. S. Nuclear Regulatory Commission City of Austin                               Attention: Document Control Desk Electric Utility Department                 Washington, D.C. 20555-0001 72: Barton Springs Road Austin,TX 78704 Central Power and Light Company -
Morgan, Lewis & Bockius 1100 West 49th Street I800 M Street, N.W.
Austin, TX 78756-3189 Washington, DC 20036-5869 J. R. Egan, Esquire M. T. liardt/W. C. Gunst Egan & Associates, P.C.
City Nblic Service 2300 N Street, N.W.
P. O. Box 1771 Washington, D.C. 20037 San Antonio,TX 78296 J. C. Lanier/M. B. Lee U. S. Nuclear Regulatory Commission City of Austin Attention: Document Control Desk Electric Utility Department Washington, D.C. 20555-0001 72: Barton Springs Road Austin,TX 78704 Central Power and Light Company -
ATTN: G. E. Vaughn/C. A. Johnson.
ATTN: G. E. Vaughn/C. A. Johnson.
P. O. Box 289, Mail Code: N5012 -
P. O. Box 289, Mail Code: N5012 -
Wadsworth,TX 77483 1
Wadsworth,TX 77483 1


        ,                    .          . -      . - . .  .,.      ..          . . ~       . . - _ .  -    - . .          . .-- .- - ..-_. - . . . .
.. ~
y*                     :,---.
y*
e               ,
e h
h i
i f
1
1
                                                                                                                                                          ,1 f
,1 SOUTil TEXAS PROJECT '
SOUTil TEXAS PROJECT '
e ELECTRIC GENERATING STATION
e                                                                             ..
)
ELECTRIC GENERATING STATION
UNIT I' MONhILY OPERATING REPORT OCTOBER 1997 -
                                                                                                                                                            )
UNIT I' MONhILY OPERATING REPORT                                                               ,
OCTOBER 1997 -
IlOUSTON LIGIITING AND POWER CO.
IlOUSTON LIGIITING AND POWER CO.
3 NRC DOCKET NO 50 498 -                                                             ,
3 NRC DOCKET NO 50 498 -
1,1 CENSE NO. NPi.76 Reviewed By: T                                                         8 8l /3/f 7 T.E. UNDERWOOD                                           Date Approved By:              !              -                            t([/J/f 7                           +
1,1 CENSE NO. NPi.76 Reviewed By: T 8 8l /3/f 7 T.E. UNDERWOOD Date t([/J/f 7 Approved By:
                                                            . G.L. PARKEY-             6                             Date' l     1
+
                                                                                                                                                            )
. G.L. PARKEY-6 Date' l
t A.       .m..-               g 1
1
)
t A.
.m..-
g 1
j
j


Line 65: Line 69:


==SUMMARY==
==SUMMARY==
 
- South Texas Project Unit I began the reporting period shutdown for refueling and scheduled -
                          - South Texas Project Unit I began the reporting period shutdown for refueling and scheduled -                       >
maintenance.
maintenance.                                                                                                     ,
The unit was returned to service on October 4, at 1433. On October 6, at 1115 a relief valve on the #11 Moisture Separator Reheater opened with the unit at 75% reactor power. The unit was removed from service at 132! to investigate the cause and make the necessary repairs. Following repairs, the unit was returned to service on October 8, at 0530 and full power achieved on October 11; at 1425.
The unit was returned to service on October 4, at 1433. On October 6, at 1115 a relief valve on the #11 Moisture Separator Reheater opened with the unit at 75% reactor power. The unit was removed from service at 132! to investigate the cause and make the necessary repairs. Following repairs, the unit was         ,
returned to service on October 8, at 0530 and full power achieved on October 11; at 1425.                         ;
The unit operated for the remainder of the period at full pcwer with no unit shutdowns or significant power reductions.
The unit operated for the remainder of the period at full pcwer with no unit shutdowns or significant power reductions.
i:
i:
Line 75: Line 77:
4 J
4 J
l f
l f
9   g     ==W   d pr               &4 -iW F T4'f W *                           '
9 g
$ f
 
==W d
pr 7
T t
&4
-iW F
T4'f W
Y e 2
'E 1r*-
'8''
9 w
* ^
r P-
-b--
+-R*'
'1


      . - . . -      .-            -      - ~ - .     - .      -. .. ~ - . -                   ..    ---          . - . -    -        . _ _ ~ .
- ~ -.
1   ,
-... ~ -. -
l OPERATING DATA REPORT DOCKET NO. - 50498 UNIT 1 DATE Nov. I 1.1997 COMPLETED BY RL 11111
. _ _ ~.
,                                                                                                        TELEPHONE 512 972-7667                       .
1 l
OPERATING STATUS
OPERATING DATA REPORT DOCKET NO. - 50498 UNIT 1 DATE Nov. I 1.1997 COMPLETED BY RL 11111 TELEPHONE 512 972-7667 OPERATING STATUS 1.
: 1.           REPORTING PERIOD: 10/1/97-10'31/97 GROSS IlOURS IN REPORTING PERIOD: 245
REPORTING PERIOD: 10/1/97-10'31/97 GROSS IlOURS IN REPORTING PERIOD: 245 2.
: 2.           CURRENTLY AUTilORIZED POWER LEVEL (Mwt): .3.800                 ,
CURRENTLY AUTilORIZED POWER LEVEL (Mwt):.3.800 MAXIMUM DEPENDADI E CAPACITY (MWe Net): 1250.6 DESIGN ELECTRICAL RA flNG (MWe Net): 1250.6 3.
MAXIMUM DEPENDADI E CAPACITY (MWe Net): 1250.6 DESIGN ELECTRICAL RA flNG (MWe Net): 1250.6 l
POWER LEVEL TO WillCil RESTRICTED (IF ANY) (MWe-Net): Nant l
: 3.           POWER LEVEL TO WillCil RESTRICTED (IF ANY) (MWe-Net): Nant
4.
: 4.           REASONS FOR RESTRlCTION(IF ANY): N/A                                                                           ,
REASONS FOR RESTRlCTION(IF ANY): N/A TlilS MONTH YR TO DATE CUMULATIVE-5.
TlilS MONTH         YR TO DATE           CUMULATIVE-
NUMBER OF llOURS REACTOR CRITICAL 6.82.1 6.728.4 56.607.9
: 5.       NUMBER OF llOURS REACTOR CRITICAL                           6.82.1             6.728.4           56.607.9
.i 6.
.i
REACTOR RESERVE S11UTDOWN ilOURS Q
: 6.       REACTOR RESERVE S11UTDOWN ilOURS                                   Q                   Q                     Q 7,       llOURS GENERATOR ON 1.INE                                   6263             . 6.646.8           55.200.2
Q Q
: 8.       UNIT RESERVE SHUTDOWN llOURS                                       Q                   Q                     Q t
7, llOURS GENERATOR ON 1.INE 6263
: 9.       GROSS TilERMAL ENERGY GbNERATED (MWil)                 2.170.904         24.908.398         204.143.663
. 6.646.8 55.200.2 8.
.                        10. GROSS ELECTRICAL ENERGY GENERATED (MWH)                       741.631           8.523.391         69.585.101
UNIT RESERVE SHUTDOWN llOURS Q
: 11. NET ELECTRICAL, ENERGY GENERATED (MWil)                       707.637           8.171.851         66.211.371
Q Q
                        - 12. REACTOR SERVICE FACTOR                                           91.6 %               92.2 %               20.,3%
t 9.
: 13. REACTOR AVAILABILITY FACTOP                                   . 91.6%               92.2 %               70.3 %
GROSS TilERMAL ENERGY GbNERATED (MWil) 2.170.904 24.908.398 204.143.663
: 14. UNIT SERVICE FACTOR                                             84.1 %               91.1 %               68.6 %
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 741.631 8.523.391 69.585.101
: 15. UNIT AVAILABILITY FACTOR                                       84.1 %               91.1 %               68.6 %
: 11. NET ELECTRICAL, ENERGY GENERATED (MWil) 707.637 8.171.851 66.211.371
: 16. UNIT CAPACITY FACTOR (Usmg MDC)                                 76.0 %               89.6 %               618%         '
- 12. REACTOR SERVICE FACTOR 91.6 %
: 17. U' NIT CAPACITY FACTOR (Using Design MWe)                   16 0 %               89 3 %               65.8 %
92.2 %
: 18. UNIT FORCED OUTAGE RATE                                         fLDS                 04 %               20.8%
20.,3%
: 13. REACTOR AVAILABILITY FACTOP
. 91.6%
92.2 %
70.3 %
: 14. UNIT SERVICE FACTOR 84.1 %
91.1 %
68.6 %
: 15. UNIT AVAILABILITY FACTOR 84.1 %
91.1 %
68.6 %
: 16. UNIT CAPACITY FACTOR (Usmg MDC) 76.0 %
89.6 %
618%
17.
U' NIT CAPACITY FACTOR (Using Design MWe) 16 0 %
89 3 %
65.8 %
: 18. UNIT FORCED OUTAGE RATE fLDS 04 %
20.8%
L 19. - SilUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
L 19. - SilUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
p N/A k   __
p N/A k
20.- IP SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A i
20.- IP SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A i
o
o
                            ,            _                                    ,                                                    ,~
,~


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT 1 DATE Nov. I1. [222 COMPLETED BY R.L. Hill
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT 1 DATE Nov. I1. [222 COMPLETED BY R.L. Hill
                                                            'lELEPHONE 512 972-7667 MONTil OCTOBER DAY     AVERAGE DAILY POWER                   DAY   AVERAGE DAILY POWER LEVEL                                         LEVEL (MWe Net)                                     (MWe-Net) 1             0                           17             1260 2             0                           18             1260 1             0                           19             1263 4             81                           20             1212
'lELEPHONE 512 972-7667 MONTil OCTOBER DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe Net)
!        5            462                           21             1261 i
(MWe-Net) 1 0
6           321                           22             1261 7             0                             23             1262 8           182                           24             1260 9           E10                           25             1260
17 1260 2
!        10           luta                           26             1261 l       11           1212                           27             1262 i
0 18 1260 1
12           1216                           28             1261 13           1218                           29             1261 l
0 19 1263 4
l4           1260                           30             J260 i5           1261                           31             1260 16           .1260
81 20 1212 5
462 21 1261 i
6 321 22 1261 7
0 23 1262 8
182 24 1260 9
E10 25 1260 10 luta 26 1261 l
11 1212 27 1262 i
12 1216 28 1261 13 1218 29 1261 l
l4 1260 30 J260 i5 1261 31 1260 16
.1260


UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-493 UNIT 1 DATE Nov. I L 1907
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-493 UNIT 1 DATE Nov. I L 1907 COMPLETED BY RL llill i
* COMPLETED BY RL llill                                 i TELEPilONE 512 972-7667                           l REPORT MONTil OCTOBER
TELEPilONE 512 972-7667 l
                    ~
REPORT MONTil OCTOBER
2'           3                   4       5 l
~
Reason     Method of Licenwe     Sys**m   Component       Cause & Corrective Action to Prevent Recurrence No.      Date  Type        Duration Shutting     Event   Code     Code (flours)
2' 3
Down   Report #
4 5
keactor 4         N/A     N/A       N/A     Refueling and scheduled maintenance outage.
l No.
97-05    970913  S             77.2      C N/A     TA       TRB       Main Turbine Overspeed Trip Test.
Date Type Duration Reason Method of Licenwe Sys**m Component Cause & Corrective Action to Prevent Recurrence (flours)
97-06    971004  S              1.3      B          1 N/A       SB       RV       While gradually increasing pow er level, a relief valve ca 97-07    971006    F          40.1      A          I the # 1 I Moisture Separator Reheater (MSR) opened with the unit at 75% reactor power. It sas determined that the valve opened below setpoint pressure due to i
Shutting Event Code Code Down Report #
keactor 97-05 970913 S
77.2 C
4 N/A N/A N/A Refueling and scheduled maintenance outage.
97-06 971004 S
1.3 B
1 N/A TA TRB Main Turbine Overspeed Trip Test.
97-07 971006 F
40.1 A
I N/A SB RV While gradually increasing pow er level, a relief valve ca the # 1 I Moisture Separator Reheater (MSR) opened with the unit at 75% reactor power. It sas determined that the valve opened below setpoint pressure due to i
degredation/ failure of the main disc seal. De failed valve was replaced. Similar valves that were worked in the refueling outage were disassembled and inspected with no discrepancies noted.
degredation/ failure of the main disc seal. De failed valve was replaced. Similar valves that were worked in the refueling outage were disassembled and inspected with no discrepancies noted.
De root cause of the seal degradation has not yet been
De root cause of the seal degradation has not yet been
                                                                                                ?-termined. Further analysis will be performed.
?-termined. Further analysis will be performed.
3                             4                         5 I                    2 Method:                       IEEE 805-1983             IEEE 803-1983 F. Forced             hoason:
I 2
A-Equipment Failure (Explain)           1-Manua!
3 4
S: Scheduled l                       B-Maintenance or Test                   2-Manual Scram C-Refueling                             3-Automatic Scram D-Regulatory Restriction               4-Cont. of Existing E-Operator Training & License Exam       Outage F-Administrative                       5-Reduction G-Operational Error (Explain)           a Other li-Other (Explain)
5 Method:
                                                                                                                          -                                n
IEEE 805-1983 IEEE 803-1983 F. Forced hoason:
S: Scheduled A-Equipment Failure (Explain) 1-Manua!
l B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) a Other li-Other (Explain) n


PORYS AND SAFETY VALVE  
PORYS AND SAFETY VALVE  


==SUMMARY==
==SUMMARY==
There were no PORV or Safety Valves challenged during the reporting peri-A.
There were no PORV or Safety Valves challenged during the reporting peri-A.
4
4


SOUTil TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTiiLY OPER ATING REPORT OCTOBER 1997 IlOUSTON LIGitTING AND POWER CO.
SOUTil TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTiiLY OPER ATING REPORT OCTOBER 1997 IlOUSTON LIGitTING AND POWER CO.
NRC DOCKET NO. 50-499 LICENSC NO. NPF 50 Reviewed By:   T 6. l b ~                                                                                                 n l F3 N7 '
NRC DOCKET NO. 50-499 LICENSC NO. NPF 50 Reviewed By:
T.E. UNDERWOdD                                                                                             Dat6 Approved By:                                                                    d** ~ "'
T 6. l b ~
                                                                                                                                                        " M/f 7 R.E. h1ASSE                                                                                               Date I.___._______.____._________.____________.____   _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ . . _ _
n l F3 N7 T.E. UNDERWOdD Dat6
" M/f 7 d** ~ "'
Approved By:
R.E. h1ASSE Date I.___._______.____._________.____________.____


MONTIILY  
MONTIILY  


==SUMMARY==
==SUMMARY==
South Texas Project Unit 2 operated during the reponing period at full power with no unit shutdowns or significant power reductions,
South Texas Project Unit 2 operated during the reponing period at full power with no unit shutdowns or significant power reductions,


N                     1'\                         .N1 1
N 1'\\
OPERATING DATA REPORT DOCENT, 50-499 UNIT 2 DATE Nov.11.1997 COMPLETE'.) BY R L. Hill TELEP'.10NE 512 972-?667 OPERATING STATUS
.N1 1
: 1.             REPORTING PERIOD: 10/1/97-10/31/97 GROSS IlOURS IN REPORTING PERIOD: 24.1
OPERATING DATA REPORT DOCENT, 50-499 UNIT 2 DATE Nov.11.1997 COMPLETE'.) BY R L. Hill TELEP'.10NE 512 972-?667 OPERATING STATUS 1.
: 2.             CURRENTLY AUTilORIZED POWER LEVEL (Mwt): .3100 MAXIMUM DFPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN tILECT R! CAL RATING (MWO-Net): 1250.6
REPORTING PERIOD: 10/1/97-10/31/97 GROSS IlOURS IN REPORTING PERIOD: 24.1 2.
: 3.             POWER LEVEL TO WillCil RESTRICTED (IF ANY) (MWe-Net): Nonc
CURRENTLY AUTilORIZED POWER LEVEL (Mwt):.3100 MAXIMUM DFPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN tILECT R! CAL RATING (MWO-Net): 1250.6 3.
: 4.             REASONS FOR RESTRICTION (IF ANY): N/A Tills MONTil                             YR TO DATE       CUMULATIVE
POWER LEVEL TO WillCil RESTRICTED (IF ANY) (MWe-Net): Nonc 4.
: 5.         NUMiiER OF llOURS REACTOR CRITICAL                                                             231Q                 6.798.1           53.352.5
REASONS FOR RESTRICTION (IF ANY): N/A Tills MONTil YR TO DATE CUMULATIVE 5.
: 6.         REACTOR RESERVE SilUTDOWN llOURS                                                                           Q               Q                 Q
NUMiiER OF llOURS REACTOR CRITICAL 231Q 6.798.1 53.352.5 6.
: 7.         IlOURS GENERATOR ON LINE                                                                       2410                 6.721.9           iL9.1dd
REACTOR RESERVE SilUTDOWN llOURS Q
: 8.         UNIT RESERVE SilUTDOWN llOURS                                                                               Q               Q                 Q
Q Q
: 9.         G00SS TilERMAL ENERGY GENERATED (MWil)                                     2.843.3 3                             25.305.519       102.122.129
7.
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWii)                                                 974.475                       8.631.587         65.380.868 11         NET ELECTRIC AL ENERGY GENERATED (MWil)                                             933.920                       8.262 031         62.369.307
IlOURS GENERATOR ON LINE 2410 6.721.9 iL9.1dd 8.
: 12. REACTOR SERVICE FACTOR                                                                       100.0 %                         232%               72.7 %
UNIT RESERVE SilUTDOWN llOURS Q
: 13. REACTOR AVA LABILITY FACTOR                                                                   100 0 %                       93.2 %             72.7 %
Q Q
: 14. UNIT SERVIC E FACTOli                                                                         100.0 %                     92.1 %             70.8 %
9.
: 15. UNIT AVAILABILITY FACTOR                                                                   100 & %                       92 1%             70.8 %
G00SS TilERMAL ENERGY GENERATED (MWil) 2.843.3 3 25.305.519 102.122.129
: 16. IMIT CAPACITY FACTOR (Using MDC)                                                               100.2 %                     20 4 %             68.0 %
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWii) 974.475 8.631.587 65.380.868 11 NET ELECTRIC AL ENERGY GENERATED (MWil) 933.920 8.262 031 62.369.307
: 17. UNIT CAPACITY FACTOR (Using Design MWe)                                                     1012%                         90.6 %             68.0 %
: 12. REACTOR SERVICE FACTOR 100.0 %
18 UNIT FORCED OUTAGE RATE                                                                                     Qa%             2.2%             20.1 %
232%
72.7 %
: 13. REACTOR AVA LABILITY FACTOR 100 0 %
93.2 %
72.7 %
: 14. UNIT SERVIC E FACTOli 100.0 %
92.1 %
70.8 %
: 15. UNIT AVAILABILITY FACTOR 100 & %
92 1%
70.8 %
: 16. IMIT CAPACITY FACTOR (Using MDC) 100.2 %
20 4 %
68.0 %
: 17. UNIT CAPACITY FACTOR (Using Design MWe) 1012%
90.6 %
68.0 %
18 UNIT FORCED OUTAGE RATE Qa%
2.2%
20.1 %
li. SilVTDOWNS SCilEDIILED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACH):
li. SilVTDOWNS SCilEDIILED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACH):
N/A
N/A
: 20. [F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A l
: 20. [F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A l
l l
l l
--    _a- - - - - - _ - ._ _ _                   __----    _ - - - _ _ - . _ _ _ _ - - - - - __-            _ _ - - _ _ _ _ _ _ . -                        ___ _              .
_a- - - - - - _ -._ _ _
Q
Q


l         .
l l
l AVERAGE DAILY UNIT POWEP. LEVEL DOCKETNO. 50-499 UNIT 2 DATE Nov.1 ~1.1997 COMPLETED BY E!dlill TELEPlIONE 512 972-7667 MONTil OCTOBER DAY                   AVERAGE DAILY POWER                                                                                                 DAY   AVERAGE DAILY IOWER LEVEL                                                                                                                       LEVEL (MWe Net)                                                                                                                   (MWe-Net) 1                 J228                                                                                                         17             1251 2                   1232                                                                                                         18             J25%
AVERAGE DAILY UNIT POWEP. LEVEL DOCKETNO. 50-499 UNIT 2 DATE Nov.1 ~1.1997 COMPLETED BY E!dlill TELEPlIONE 512 972-7667 MONTil OCTOBER DAY AVERAGE DAILY POWER DAY AVERAGE DAILY IOWER LEVEL LEVEL (MWe Net)
3                   1212                                                                                                         19             1212 4                   1211                                                                                                         20             1216 5                 1211                                                                                                         21             1252 6                 1211                                                                                                         22             1211 7                 1248                                                                                                         23             1211 8               12it                                                                                                         24             1252 9                 1251                                                                                                         25             1216 10                 1251                                                                                                         26             1218 11                 J211                                                                                                         27             1218 12               1214                                                                                                         28             1211 13               1214                                                                                                         29             1260 14               1212                                                                                                         30             .!218 15             1252                                                                                                         31             1258 16             1252
(MWe-Net) 1 J228 17 1251 2
  ,1 -         _ _ _ - - - - - _ -                    - _ _ - - _ - _ - _ - - _ _ - _ _ - _ - _ - - _ _ _ _ - - - - _ _ _ - - - - - _ _ _ - - - _ _ _ _                          ___ __ - _ _
1232 18 J25%
3 1212 19 1212 4
1211 20 1216 5
1211 21 1252 6
1211 22 1211 7
1248 23 1211 8
12it 24 1252 9
1251 25 1216 10 1251 26 1218 11 J211 27 1218 12 1214 28 1211 13 1214 29 1260 14 1212 30
.!218 15 1252 31 1258 16 1252
,1 -


i l
i l
UNIT SIIUTDOWNS AND POWER REDUCTIONS                                                             .
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-409 UNIT 2 DATE Nov.11 1997 COMPLETED BY R.L llill
DOCKETNO. 50-409 UNIT 2 DATE Nov.11 1997 COMPLETED BY R.L llill
'ELEP110NE 512 972-7667 REPORTMONTil OCTOBER I
                                                                                                                                        'ELEP110NE 512 972-7667 REPORTMONTil OCTOBER I                     2l           3 System 4       5 Component      Cause & Corrective Action to Prevent Recurrence No.     Date         Type     Duration   Reason
2l 3
* Method on   Licensee Shutting   Event     Code       Code (Ifours)
4 5
Down     Report #
No.
Date Type Duration Reason
* Method on Licensee System Component Cause & Corrective Action to Prevent Recurrence (Ifours)
Shutting Event Code Code Down Report #
Reactor TilERE WERE NO UNIT SilUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING TIIE REPORTING PERIOD i
Reactor TilERE WERE NO UNIT SilUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING TIIE REPORTING PERIOD i
3                     4                       5 1                          2 Reason:                                 Method:                         IEEE 805-1983           iEEE 803-1983 F: Forced S: Scheduled               A-Equipment Faisre (Explain)             1-Manual I
1 2
B-Maintenance or Test                   2-Manual Scram                                                                         '
3 4
C-Refueling                             3-Automstic Scram D-Regulatory Restriction                 4-Cont. of Existing E-Operatar Training & License Exam       Outage F-Administrative                         5-Reduction G-Operational Error (Explain)           9-Other II-Other(Explain)
5 F: Forced Reason:
L - - ------ .    .
Method:
IEEE 805-1983 iEEE 803-1983 S: Scheduled A-Equipment Faisre (Explain) 1-Manual I
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automstic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operatar Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other II-Other(Explain)
L - - ------.


PORYS AND SAFETY VALVE  
PORYS AND SAFETY VALVE  


==SUMMARY==
==SUMMARY==
 
8 There were no PORV or Safety Valves challenged during the reponing per 3d.}}
There were no PORV or Safety Valves challenged during the reponing per 3d.
8}}

Latest revision as of 02:54, 24 May 2025

Monthly Operating Repts for Oct 1997 for South Texas Project Unit 1 & 2
ML20199K057
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/31/1997
From: Hill R, Mcburnett M
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ST-HL-AE-005789, ST-HL-AE-5789, NUDOCS 9711280304
Download: ML20199K057 (14)


Text

'

'The Light c o mp a ny8"'h L'** P' ject untric cennating sinitonP. o. no. 289 w d.wonh, Toa. 774as Ilotliton 1.lghting & Power November 13,1997 ST-HL-AE-005789 File No. G02 STl30470405 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 50uth Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthlv Oneratine Renorts for October 1997 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for October 1997.

If you should have any questions on this matter, please contact T. E. Underwood at (512)972-7108.

Sincerely,

$hh

'ffs/

M. A. McDurnett Director, Nuclear Licensing RLH/sl

\\

\\

Attachments: 1) STPEGS Unit 1 Monthly Operating Repor:- October 1997

'l

2) STPEGS Unit 2 Monthly Operating Report - October 1997

'(c3' yv

,,4 9711280304 971031 l bNbNllblbbblflbN!

ApocK050004y8 gp, Project Manager on Behalf of the Participants in the South Texas Project

.~

Houston Lighting & Power Company ST-ilL-AE-5789 South Texas Project Electric Generating Station File No.:

G02 Page 2 Ellis W. Merschoff Rufus S. Scott Regional Administrator, Region IV Associate General Counsel U. S. Nuclear Regulatory Commission 110tston Lighting & Power Company 611 Ryan Plaza Drive, Suite 400 P. O. Box 61067 Arlington, TX 76011-8064 Ilouston,TX 77208 Thomas W. Alexion Institute of Nuclear Power Project Manager, Mail Code 13113 Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway Washington, DC 20555-0001 Atlanta, GA 30339-5957 David P. Loveless Dr. Bertram Wolfe Sr. Resident inspector 15453 Via Vaquero c/o U. S. Nuclear Regulatory Comm.

Monte Sereno, CA 95030 P. O. Box 910 Bay City, TX 77404-0910 Richard A. Ratliff 1

Buree's of Radiation Control J. R. Newman, Esquire Texas Department ofIIcalth l

Morgan, Lewis & Bockius 1100 West 49th Street I800 M Street, N.W.

Austin, TX 78756-3189 Washington, DC 20036-5869 J. R. Egan, Esquire M. T. liardt/W. C. Gunst Egan & Associates, P.C.

City Nblic Service 2300 N Street, N.W.

P. O. Box 1771 Washington, D.C. 20037 San Antonio,TX 78296 J. C. Lanier/M. B. Lee U. S. Nuclear Regulatory Commission City of Austin Attention: Document Control Desk Electric Utility Department Washington, D.C. 20555-0001 72: Barton Springs Road Austin,TX 78704 Central Power and Light Company -

ATTN: G. E. Vaughn/C. A. Johnson.

P. O. Box 289, Mail Code: N5012 -

Wadsworth,TX 77483 1

.. ~

y*

e h

i f

1

,1 SOUTil TEXAS PROJECT '

e ELECTRIC GENERATING STATION

)

UNIT I' MONhILY OPERATING REPORT OCTOBER 1997 -

IlOUSTON LIGIITING AND POWER CO.

3 NRC DOCKET NO 50 498 -

1,1 CENSE NO. NPi.76 Reviewed By: T 8 8l /3/f 7 T.E. UNDERWOOD Date t([/J/f 7 Approved By:

+

. G.L. PARKEY-6 Date' l

1

)

t A.

.m..-

g 1

j

i MONTHLY

SUMMARY

- South Texas Project Unit I began the reporting period shutdown for refueling and scheduled -

maintenance.

The unit was returned to service on October 4, at 1433. On October 6, at 1115 a relief valve on the #11 Moisture Separator Reheater opened with the unit at 75% reactor power. The unit was removed from service at 132! to investigate the cause and make the necessary repairs. Following repairs, the unit was returned to service on October 8, at 0530 and full power achieved on October 11; at 1425.

The unit operated for the remainder of the period at full pcwer with no unit shutdowns or significant power reductions.

i:

f 4

4 J

l f

9 g

$ f

==W d

pr 7

T t

&4

-iW F

T4'f W

Y e 2

'E 1r*-

'8

9 w

  • ^

r P-

-b--

+-R*'

'1

- ~ -.

-... ~ -. -

. _ _ ~.

1 l

OPERATING DATA REPORT DOCKET NO. - 50498 UNIT 1 DATE Nov. I 1.1997 COMPLETED BY RL 11111 TELEPHONE 512 972-7667 OPERATING STATUS 1.

REPORTING PERIOD: 10/1/97-10'31/97 GROSS IlOURS IN REPORTING PERIOD: 245 2.

CURRENTLY AUTilORIZED POWER LEVEL (Mwt):.3.800 MAXIMUM DEPENDADI E CAPACITY (MWe Net): 1250.6 DESIGN ELECTRICAL RA flNG (MWe Net): 1250.6 3.

POWER LEVEL TO WillCil RESTRICTED (IF ANY) (MWe-Net): Nant l

4.

REASONS FOR RESTRlCTION(IF ANY): N/A TlilS MONTH YR TO DATE CUMULATIVE-5.

NUMBER OF llOURS REACTOR CRITICAL 6.82.1 6.728.4 56.607.9

.i 6.

REACTOR RESERVE S11UTDOWN ilOURS Q

Q Q

7, llOURS GENERATOR ON 1.INE 6263

. 6.646.8 55.200.2 8.

UNIT RESERVE SHUTDOWN llOURS Q

Q Q

t 9.

GROSS TilERMAL ENERGY GbNERATED (MWil) 2.170.904 24.908.398 204.143.663

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 741.631 8.523.391 69.585.101
11. NET ELECTRICAL, ENERGY GENERATED (MWil) 707.637 8.171.851 66.211.371

- 12. REACTOR SERVICE FACTOR 91.6 %

92.2 %

20.,3%

13. REACTOR AVAILABILITY FACTOP

. 91.6%

92.2 %

70.3 %

14. UNIT SERVICE FACTOR 84.1 %

91.1 %

68.6 %

15. UNIT AVAILABILITY FACTOR 84.1 %

91.1 %

68.6 %

16. UNIT CAPACITY FACTOR (Usmg MDC) 76.0 %

89.6 %

618%

17.

U' NIT CAPACITY FACTOR (Using Design MWe) 16 0 %

89 3 %

65.8 %

18. UNIT FORCED OUTAGE RATE fLDS 04 %

20.8%

L 19. - SilUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

p N/A k

20.- IP SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A i

o

,~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT 1 DATE Nov. I1. [222 COMPLETED BY R.L. Hill

'lELEPHONE 512 972-7667 MONTil OCTOBER DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe Net)

(MWe-Net) 1 0

17 1260 2

0 18 1260 1

0 19 1263 4

81 20 1212 5

462 21 1261 i

6 321 22 1261 7

0 23 1262 8

182 24 1260 9

E10 25 1260 10 luta 26 1261 l

11 1212 27 1262 i

12 1216 28 1261 13 1218 29 1261 l

l4 1260 30 J260 i5 1261 31 1260 16

.1260

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-493 UNIT 1 DATE Nov. I L 1907 COMPLETED BY RL llill i

TELEPilONE 512 972-7667 l

REPORT MONTil OCTOBER

~

2' 3

4 5

l No.

Date Type Duration Reason Method of Licenwe Sys**m Component Cause & Corrective Action to Prevent Recurrence (flours)

Shutting Event Code Code Down Report #

keactor 97-05 970913 S

77.2 C

4 N/A N/A N/A Refueling and scheduled maintenance outage.

97-06 971004 S

1.3 B

1 N/A TA TRB Main Turbine Overspeed Trip Test.

97-07 971006 F

40.1 A

I N/A SB RV While gradually increasing pow er level, a relief valve ca the # 1 I Moisture Separator Reheater (MSR) opened with the unit at 75% reactor power. It sas determined that the valve opened below setpoint pressure due to i

degredation/ failure of the main disc seal. De failed valve was replaced. Similar valves that were worked in the refueling outage were disassembled and inspected with no discrepancies noted.

De root cause of the seal degradation has not yet been

?-termined. Further analysis will be performed.

I 2

3 4

5 Method:

IEEE 805-1983 IEEE 803-1983 F. Forced hoason:

S: Scheduled A-Equipment Failure (Explain) 1-Manua!

l B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) a Other li-Other (Explain) n

PORYS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting peri-A.

4

SOUTil TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTiiLY OPER ATING REPORT OCTOBER 1997 IlOUSTON LIGitTING AND POWER CO.

NRC DOCKET NO. 50-499 LICENSC NO. NPF 50 Reviewed By:

T 6. l b ~

n l F3 N7 T.E. UNDERWOdD Dat6

" M/f 7 d** ~ "'

Approved By:

R.E. h1ASSE Date I.___._______.____._________.____________.____

MONTIILY

SUMMARY

South Texas Project Unit 2 operated during the reponing period at full power with no unit shutdowns or significant power reductions,

N 1'\\

.N1 1

OPERATING DATA REPORT DOCENT, 50-499 UNIT 2 DATE Nov.11.1997 COMPLETE'.) BY R L. Hill TELEP'.10NE 512 972-?667 OPERATING STATUS 1.

REPORTING PERIOD: 10/1/97-10/31/97 GROSS IlOURS IN REPORTING PERIOD: 24.1 2.

CURRENTLY AUTilORIZED POWER LEVEL (Mwt):.3100 MAXIMUM DFPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN tILECT R! CAL RATING (MWO-Net): 1250.6 3.

POWER LEVEL TO WillCil RESTRICTED (IF ANY) (MWe-Net): Nonc 4.

REASONS FOR RESTRICTION (IF ANY): N/A Tills MONTil YR TO DATE CUMULATIVE 5.

NUMiiER OF llOURS REACTOR CRITICAL 231Q 6.798.1 53.352.5 6.

REACTOR RESERVE SilUTDOWN llOURS Q

Q Q

7.

IlOURS GENERATOR ON LINE 2410 6.721.9 iL9.1dd 8.

UNIT RESERVE SilUTDOWN llOURS Q

Q Q

9.

G00SS TilERMAL ENERGY GENERATED (MWil) 2.843.3 3 25.305.519 102.122.129

10. GROSS ELECTRICAL ENERGY GENERATED (MWii) 974.475 8.631.587 65.380.868 11 NET ELECTRIC AL ENERGY GENERATED (MWil) 933.920 8.262 031 62.369.307
12. REACTOR SERVICE FACTOR 100.0 %

232%

72.7 %

13. REACTOR AVA LABILITY FACTOR 100 0 %

93.2 %

72.7 %

14. UNIT SERVIC E FACTOli 100.0 %

92.1 %

70.8 %

15. UNIT AVAILABILITY FACTOR 100 & %

92 1%

70.8 %

16. IMIT CAPACITY FACTOR (Using MDC) 100.2 %

20 4 %

68.0 %

17. UNIT CAPACITY FACTOR (Using Design MWe) 1012%

90.6 %

68.0 %

18 UNIT FORCED OUTAGE RATE Qa%

2.2%

20.1 %

li. SilVTDOWNS SCilEDIILED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACH):

N/A

20. [F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A l

l l

_a- - - - - - _ -._ _ _

Q

l l

AVERAGE DAILY UNIT POWEP. LEVEL DOCKETNO. 50-499 UNIT 2 DATE Nov.1 ~1.1997 COMPLETED BY E!dlill TELEPlIONE 512 972-7667 MONTil OCTOBER DAY AVERAGE DAILY POWER DAY AVERAGE DAILY IOWER LEVEL LEVEL (MWe Net)

(MWe-Net) 1 J228 17 1251 2

1232 18 J25%

3 1212 19 1212 4

1211 20 1216 5

1211 21 1252 6

1211 22 1211 7

1248 23 1211 8

12it 24 1252 9

1251 25 1216 10 1251 26 1218 11 J211 27 1218 12 1214 28 1211 13 1214 29 1260 14 1212 30

.!218 15 1252 31 1258 16 1252

,1 -

i l

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-409 UNIT 2 DATE Nov.11 1997 COMPLETED BY R.L llill

'ELEP110NE 512 972-7667 REPORTMONTil OCTOBER I

2l 3

4 5

No.

Date Type Duration Reason

  • Method on Licensee System Component Cause & Corrective Action to Prevent Recurrence (Ifours)

Shutting Event Code Code Down Report #

Reactor TilERE WERE NO UNIT SilUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING TIIE REPORTING PERIOD i

1 2

3 4

5 F: Forced Reason:

Method:

IEEE 805-1983 iEEE 803-1983 S: Scheduled A-Equipment Faisre (Explain) 1-Manual I

B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automstic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operatar Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other II-Other(Explain)

L - - ------.

PORYS AND SAFETY VALVE

SUMMARY

8 There were no PORV or Safety Valves challenged during the reponing per 3d.