ML030980679: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:A Duke NSPowere A Duke Energy Company R. A JONES Vice President Duke Power 29672 / Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax March 28, 2003 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:Document Control Desk | ||
==Subject:== | ==Subject:== | ||
Duke Energy Corporation Oconee Nuclear Station, Units 1 , 2 and 3 Docket Nos. 50-269, 50-270, 50-287 Commitment Change Annual Report Attached is a summary report for Oconee commitment changes made for the last annual reporting period. These changes were made per the guidance defined in NEI 99-04. The changes to these commitments have no adverse effect on compliance with NRC rules and regulations. | Duke Energy Corporation Oconee Nuclear Station, Units 1, 2 and 3 Docket Nos. 50-269, 50-270, 50-287 Commitment Change Annual Report Attached is a summary report for Oconee commitment changes made for the last annual reporting period. These changes were made per the guidance defined in NEI 99-04. The changes to these commitments have no adverse effect on compliance with NRC rules and regulations. | ||
If there are any questions, please contact Judy E Smith @ 864-885-4309. | If there are any questions, please contact Judy E Smith @ 864-885-4309. | ||
Very | Very | ||
: yours, R. | |||
Jones, Site Vice President Attachment AC)OI www duke-energy corn | |||
U. S. Nuclear Regulatory Commission March 28, 2003 Page 2 xc: | U. S. Nuclear Regulatory Commission March 28, 2003 Page 2 xc: | ||
| Line 27: | Line 29: | ||
U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 NRC Senior Resident Inspector Oconee Nuclear Station | U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 NRC Senior Resident Inspector Oconee Nuclear Station | ||
NRC | NRC Number Source Document Onginal Commitment Modified Commitment Notification Required Yes 2002-0-001 ONS ISI plan I n response to PSC 21-82, Modified the commitment to state: Category G06 exams are deleted from the "Water Hammer Concern in ONS ISI plan. | ||
Auxiliary Feedwater Heaters," | Auxiliary Feedwater Heaters," | ||
ONS added category G06 exams to the ONS ISI plan.}} | ONS added category G06 exams to the ONS ISI plan.}} | ||
Latest revision as of 11:16, 16 January 2025
| ML030980679 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/28/2003 |
| From: | Rosalyn Jones Duke Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML030980679 (3) | |
Text
A Duke NSPowere A Duke Energy Company R. A JONES Vice President Duke Power 29672 / Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax March 28, 2003 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:Document Control Desk
Subject:
Duke Energy Corporation Oconee Nuclear Station, Units 1, 2 and 3 Docket Nos. 50-269, 50-270, 50-287 Commitment Change Annual Report Attached is a summary report for Oconee commitment changes made for the last annual reporting period. These changes were made per the guidance defined in NEI 99-04. The changes to these commitments have no adverse effect on compliance with NRC rules and regulations.
If there are any questions, please contact Judy E Smith @ 864-885-4309.
Very
- yours, R.
Jones, Site Vice President Attachment AC)OI www duke-energy corn
U. S. Nuclear Regulatory Commission March 28, 2003 Page 2 xc:
L. A. Reyes, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 L. N. Olshan (addressee only)
NRC Senior Project Manager (MNS)
U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 NRC Senior Resident Inspector Oconee Nuclear Station
NRC Number Source Document Onginal Commitment Modified Commitment Notification Required Yes 2002-0-001 ONS ISI plan I n response to PSC 21-82, Modified the commitment to state: Category G06 exams are deleted from the "Water Hammer Concern in ONS ISI plan.
Auxiliary Feedwater Heaters,"