ML031150402: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Withdrawn   NRC Generic Letter 1988
{{#Wiki_filter:Withdrawn NRC Generic Letter 1988-13, Operator Licensing Examinations, dated August 8, 1988, has been withdrawn.
-13, "Operator Licensing Examinations," dated August 8, 1988, has been withdrawn.
ADAMS Accession Number: ML031150402 See Federal Register notice 81 FR 31969, dated May 20, 2016  
ADAMS Accession Number: ML031150402 See Federal Register notice 81 FR 31969, dated May 20, 2016


-V a °UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON.
-V a °UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555 AUG 0 8 198 TO ALL POWER REACTOR LICENSEES AND APPLICANTS FOR AN OPERATING LICENSE Gentlemen:
D. C. 20555 AUG 0 8 198 TO ALL POWER REACTOR LICENSEES AND APPLICANTS FOR AN OPERATING LICENSE Gentlemen:


==Subject:==
==Subject:==
OPERATOR LICENSING EXAMINATIONS (GENERIC LETTER 88-13)To plan for the Office of Nuclear Reactor Regulation (NRR) resources to be consistent with your operator licensing needs, NRR needs the best estimate of your operator licensing examination requirements for fiscal years 1989, 1990, 1991, and 1992.Please provide the anticipated number of candidates and dates for each requested licensing examination site visit in the proposed format provided as Enclosure 1.Also, please provide the dates for your scheduled requalification examinations during the same fiscal years in the proposed format provided as Enclosure 2.Your voluntary input will be used to update the schedules you provided in response to Generic Letter 87-14.In the absence of overriding circumstances, budget limitations dictate that the staff limit initial and replacement examinations to two visits per site each year, with one additional site visit per year dedicated to requalification examinations.
OPERATOR LICENSING EXAMINATIONS (GENERIC LETTER 88-13)
Every attempt will be made to provide examination services at the times requested, however, excessive demand during any particular time period may require rescheduling site visits to maintain the examiner workload within reasonable limits. Specific examination dates will be confirmed or rescheduled through direct liaison with the NRC Regional Offices.In an effort to optimize examiner utilization, the United States Nuclear Regulatory Commisslon (NRC) intends to implement a national examination schedule on October 1, 1989. This schedule will enable the NRC to equalize the workload of examiners across the nation so that Regional and contract examiners are employed at a relatively constant rate throughout the year.As currently planned, the FY 1990 schedule will become the baseline for future fiscal year national examination schedules.
To plan for the Office of Nuclear Reactor Regulation (NRR) resources to be consistent with your operator licensing needs, NRR needs the best estimate of your operator licensing examination requirements for fiscal years 1989, 1990, 1991, and 1992.
It is envisioned that, with minor modifications, the same schedule will be used year after year, thereby allowing you to plan your training efforts with greater confidence that your licensing examinations will be administered on their designated dates, while at the same time enabling NRC to more efficiently employ its limited examiner staff.As in the past, it is imperative that you provide your best estimate of your examination needs for each fiscal year through 1992. Your submittal will not guarantee that the staff can administer examinations on the dates requested, however, every effort will be made to do so. Once the national schedule is implemented, your operator licensing and requalification examinations should be expected on approximately the same dates every year. Your estimates of licensing examination requirements for future fiscal years will be solicited primarily to determine the number of candidates to be examined so that NRC may modify its budget and staffing accordingly.
Please provide the anticipated number of candidates and dates for each requested licensing examination site visit in the proposed format provided as Enclosure 1.
Also, please provide the dates for your scheduled requalification examinations during the same fiscal years in the proposed format provided as Enclosure 2.
Your voluntary input will be used to update the schedules you provided in response to Generic Letter 87-14.
In the absence of overriding circumstances, budget limitations dictate that the staff limit initial and replacement examinations to two visits per site each year, with one additional site visit per year dedicated to requalification examinations. Every attempt will be made to provide examination services at the times requested, however, excessive demand during any particular time period may require rescheduling site visits to maintain the examiner workload within reasonable limits. Specific examination dates will be confirmed or rescheduled through direct liaison with the NRC Regional Offices.
In an effort to optimize examiner utilization, the United States Nuclear Regulatory Commisslon (NRC) intends to implement a national examination schedule on October 1, 1989. This schedule will enable the NRC to equalize the workload of examiners across the nation so that Regional and contract examiners are employed at a relatively constant rate throughout the year.
As currently planned, the FY 1990 schedule will become the baseline for future fiscal year national examination schedules. It is envisioned that, with minor modifications, the same schedule will be used year after year, thereby allowing you to plan your training efforts with greater confidence that your licensing examinations will be administered on their designated dates, while at the same time enabling NRC to more efficiently employ its limited examiner staff.
As in the past, it is imperative that you provide your best estimate of your examination needs for each fiscal year through 1992.
Your submittal will not guarantee that the staff can administer examinations on the dates requested, however, every effort will be made to do so. Once the national schedule is implemented, your operator licensing and requalification examinations should be expected on approximately the same dates every year. Your estimates of licensing examination requirements for future fiscal years will be solicited primarily to determine the number of candidates to be examined so that NRC may modify its budget and staffing accordingly.
LhT/V FD CT&
LhT/V FD CT&
I-2-A; 2 E .3 Your schedules, to be submitted on the enclosed suggested formats, should be returned to Mr. John Hannon, Chief, Operator Licensing Branch, OWFN-1OD-18, U.S. Nuclear Regulatory Commission, Washington, DC 20555, with a courtesy copy to the appropriate Regional Administrator by September 1, 1988. We appreciate your assistance in this matter and invite you to address any questions concerning this request or your response to Mr. John Hannon at (301) 492-1031.This request is covered by Office of Management and Budget Clearance Number 3150-0131 which expires August 31, 1988. The estimated average burden is two man-hours per licensee response, including assessment of the new requirements, searching data sources, gathering and analyzing the data, and preparing the required reports. Comments on the accuracy of this estimate and suggestions to reduce the burden may be directed to the Office of Management and Budget, Room 3208, New Executive Office Building, Washington, DC 20503, and to the U. S. Nuclear Regulatory Commission, Records and Reports Management Branch, Oftice of Administration and Resource Management, Washington, DC 20555, Sincerely, Frank J. agl ssociate Director for Projects Office of Nuclear Reactor Regulation Enclosuress
 
: 1. Proposed Operat'r Licensing Examination Schedule Format 2. Proposed Requalification Examination Schedule Format I Enclosure 1 PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT NRC Region Facility FY 1989 (1O/l/88-9/30/89)
I A; 2 E.3 Your schedules, to be submitted on the enclosed suggested formats, should be returned to Mr. John Hannon, Chief, Operator Licensing Branch, OWFN-1OD-18, U.S. Nuclear Regulatory Commission, Washington, DC 20555, with a courtesy copy to the appropriate Regional Administrator by September 1, 1988.
FY 1990 FY 1991 FY 1992 (10/1/89-9/30/90)
We appreciate your assistance in this matter and invite you to address any questions concerning this request or your response to Mr. John Hannon at (301) 492-1031.
(10/1/90-9/30/91)
This request is covered by Office of Management and Budget Clearance Number 3150-0131 which expires August 31, 1988. The estimated average burden is two man-hours per licensee response, including assessment of the new requirements, searching data sources, gathering and analyzing the data, and preparing the required reports. Comments on the accuracy of this estimate and suggestions to reduce the burden may be directed to the Office of Management and Budget, Room 3208, New Executive Office Building, Washington, DC 20503, and to the U. S. Nuclear Regulatory Commission, Records and Reports Management Branch, Oftice of Administration and Resource Management, Washington, DC 20555, Sincerely, Frank J.
(10/1/91-9/30/92)
agl ssociate Director for Projects Office of Nuclear Reactor Regulation Enclosuress
: 1. Date#RO#SRO fSRO#SRO Instant Upgrade Limited 2. Date#RO#SRO#SRO#SRO Instant Upgrade Limited Please indicate initial cold license examinations by placing an asterisk (*)by the date. Please indicate examinations intended to extend an Operator's license to a second or subsequent unit with two asterisks
: 1. Proposed Operat'r Licensing Examination Schedule Format
(**) (e.g., if Unit One is in operation and Unit Two is approaching fuel load and three RO candidates with no previous license are to be examined on both Units One and Two and five RO candidates licensed on Unit One are to be examined to extend their licenses to Unit Two, then indicate "RO 3,5**.")
: 2. Proposed Requalification Examination Schedule Format I
Enclosure 2 Facility FY (10/1/88 1. Date 2. Datb 3. Datv 4. Date PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FORMAT NRC Region 1989 FY 1990 FY 1991-9/30/89)
PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT NRC Region Facility FY 1989 (1O/l/88-9/30/89)
FY 1990 FY 1991 FY 1992 (10/1/89-9/30/90) (10/1/90-9/30/91) (10/1/91-9/30/92)
: 1. Date
#RO
#SRO fSRO
#SRO Instant Upgrade Limited
: 2. Date
#RO
#SRO
#SRO
#SRO Instant Upgrade Limited Please indicate initial cold license examinations by placing an asterisk (*)
by the date. Please indicate examinations intended to extend an Operator's license to a second or subsequent unit with two asterisks (**) (e.g., if Unit One is in operation and Unit Two is approaching fuel load and three RO candidates with no previous license are to be examined on both Units One and Two and five RO candidates licensed on Unit One are to be examined to extend their licenses to Unit Two, then indicate "RO 3,5**.")
Facility FY (10/1/88
: 1. Date
: 2.
Datb
: 3.
Datv
: 4.
Date PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FORMAT NRC Region 1989 FY 1990 FY 1991
-9/30/89)
(10/1/89-9/30/90)
(10/1/89-9/30/90)
(10/1/90-9/30/91)
(10/1/90-9/30/91)
(10/1 ee Date Date Dat e Date Date Dat Date Date Dat Date Date Dat FY 1992./91-9/30/92) te te te te}}
(10/1 ee Date Date Dat e
Date Date Dat Date Date Dat Date Date Dat FY 1992
./91-9/30/92) te te te te}}

Latest revision as of 10:27, 16 January 2025

Withdrawn NRC Generic Letter 1988-013: Operator Licensing Examinations
ML031150402
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River, Crane
Issue date: 08/08/1988
From: Miraglia F
Office of Nuclear Reactor Regulation
To:
References
GL-88-013, NUDOCS 8808170150
Download: ML031150402 (5)


Text

Withdrawn NRC Generic Letter 1988-13, Operator Licensing Examinations, dated August 8, 1988, has been withdrawn.

ADAMS Accession Number: ML031150402 See Federal Register notice 81 FR 31969, dated May 20, 2016

-V a °UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555 AUG 0 8 198 TO ALL POWER REACTOR LICENSEES AND APPLICANTS FOR AN OPERATING LICENSE Gentlemen:

Subject:

OPERATOR LICENSING EXAMINATIONS (GENERIC LETTER 88-13)

To plan for the Office of Nuclear Reactor Regulation (NRR) resources to be consistent with your operator licensing needs, NRR needs the best estimate of your operator licensing examination requirements for fiscal years 1989, 1990, 1991, and 1992.

Please provide the anticipated number of candidates and dates for each requested licensing examination site visit in the proposed format provided as Enclosure 1.

Also, please provide the dates for your scheduled requalification examinations during the same fiscal years in the proposed format provided as Enclosure 2.

Your voluntary input will be used to update the schedules you provided in response to Generic Letter 87-14.

In the absence of overriding circumstances, budget limitations dictate that the staff limit initial and replacement examinations to two visits per site each year, with one additional site visit per year dedicated to requalification examinations. Every attempt will be made to provide examination services at the times requested, however, excessive demand during any particular time period may require rescheduling site visits to maintain the examiner workload within reasonable limits. Specific examination dates will be confirmed or rescheduled through direct liaison with the NRC Regional Offices.

In an effort to optimize examiner utilization, the United States Nuclear Regulatory Commisslon (NRC) intends to implement a national examination schedule on October 1, 1989. This schedule will enable the NRC to equalize the workload of examiners across the nation so that Regional and contract examiners are employed at a relatively constant rate throughout the year.

As currently planned, the FY 1990 schedule will become the baseline for future fiscal year national examination schedules. It is envisioned that, with minor modifications, the same schedule will be used year after year, thereby allowing you to plan your training efforts with greater confidence that your licensing examinations will be administered on their designated dates, while at the same time enabling NRC to more efficiently employ its limited examiner staff.

As in the past, it is imperative that you provide your best estimate of your examination needs for each fiscal year through 1992.

Your submittal will not guarantee that the staff can administer examinations on the dates requested, however, every effort will be made to do so. Once the national schedule is implemented, your operator licensing and requalification examinations should be expected on approximately the same dates every year. Your estimates of licensing examination requirements for future fiscal years will be solicited primarily to determine the number of candidates to be examined so that NRC may modify its budget and staffing accordingly.

LhT/V FD CT&

I A; 2 E.3 Your schedules, to be submitted on the enclosed suggested formats, should be returned to Mr. John Hannon, Chief, Operator Licensing Branch, OWFN-1OD-18, U.S. Nuclear Regulatory Commission, Washington, DC 20555, with a courtesy copy to the appropriate Regional Administrator by September 1, 1988.

We appreciate your assistance in this matter and invite you to address any questions concerning this request or your response to Mr. John Hannon at (301) 492-1031.

This request is covered by Office of Management and Budget Clearance Number 3150-0131 which expires August 31, 1988. The estimated average burden is two man-hours per licensee response, including assessment of the new requirements, searching data sources, gathering and analyzing the data, and preparing the required reports. Comments on the accuracy of this estimate and suggestions to reduce the burden may be directed to the Office of Management and Budget, Room 3208, New Executive Office Building, Washington, DC 20503, and to the U. S. Nuclear Regulatory Commission, Records and Reports Management Branch, Oftice of Administration and Resource Management, Washington, DC 20555, Sincerely, Frank J.

agl ssociate Director for Projects Office of Nuclear Reactor Regulation Enclosuress

1. Proposed Operat'r Licensing Examination Schedule Format
2. Proposed Requalification Examination Schedule Format I

PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT NRC Region Facility FY 1989 (1O/l/88-9/30/89)

FY 1990 FY 1991 FY 1992 (10/1/89-9/30/90) (10/1/90-9/30/91) (10/1/91-9/30/92)

1. Date
  1. RO
  1. SRO fSRO
  1. SRO Instant Upgrade Limited
2. Date
  1. RO
  1. SRO
  1. SRO
  1. SRO Instant Upgrade Limited Please indicate initial cold license examinations by placing an asterisk (*)

by the date. Please indicate examinations intended to extend an Operator's license to a second or subsequent unit with two asterisks (**) (e.g., if Unit One is in operation and Unit Two is approaching fuel load and three RO candidates with no previous license are to be examined on both Units One and Two and five RO candidates licensed on Unit One are to be examined to extend their licenses to Unit Two, then indicate "RO 3,5**.")

Facility FY (10/1/88

1. Date
2.

Datb

3.

Datv

4.

Date PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FORMAT NRC Region 1989 FY 1990 FY 1991

-9/30/89)

(10/1/89-9/30/90)

(10/1/90-9/30/91)

(10/1 ee Date Date Dat e

Date Date Dat Date Date Dat Date Date Dat FY 1992

./91-9/30/92) te te te te