|
|
Line 14: |
Line 14: |
| | page count = 3 | | | page count = 3 |
| | project = EPID:L-2017-LLA-0353, EPID:L-2017-LLE-0028, EPID:L-2017-LLA-0353, EPID:L-2017-LLE-0028 | | | project = EPID:L-2017-LLA-0353, EPID:L-2017-LLE-0028, EPID:L-2017-LLA-0353, EPID:L-2017-LLE-0028 |
| | stage = | | | stage = Other |
| }} | | }} |
|
| |
|
Revision as of 12:01, 1 April 2018
Letter Sequence Acceptance Review |
---|
EPID:L-2017-LLA-0353, Request for License Amendment and Exemption Deletion of Operator Action and Request for Exemption from Section III.G.2.b of 10 CFR 50, Appendix R (LAR 17-05) (Withdrawn, Closed) EPID:L-2017-LLE-0028, Request for License Amendment and Exemption Deletion of Operator Action and Request for Exemption from Section III.G.2.b of 10 CFR 50, Appendix R (LAR 17-05) (Withdrawn, Closed) EPID:L-2017-LLA-0353, Request for License Amendment and Exemption Deletion of Operator Action and Request for Exemption from Section III.G.2.b of 10 CFR 50, Appendix R (LAR 17-05) (Withdrawn, Closed) EPID:L-2017-LLE-0028, Request for License Amendment and Exemption Deletion of Operator Action and Request for Exemption from Section III.G.2.b of 10 CFR 50, Appendix R (LAR 17-05) (Withdrawn, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report L-2023-053, Core Operating Limits Report for Cycle 232023-04-0505 April 2023 Core Operating Limits Report for Cycle 23 ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-023, Revised Steam Generator Tube Inspection Report2023-03-0303 March 2023 Revised Steam Generator Tube Inspection Report ML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter 2024-01-29
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 29, 2017 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy Seabrook, LLC Mail Stop: EX/JB 700 Universe Blvd. Juno Beach, FL 33408 SUBJECT: SEABROOK STATION, UNIT NO. 1 -WITHDRAWAL OF REQUESTED LICENSING ACTION RE: AMENDMENT TO DELETE OPERA TOR ACTION AND REQUEST FOR EXEMPTION SUBMITTED TO NRC FOR ACCEPTANCE REVIEW (EPID L-2017-LLA-0353 AND EPID L-2017-LLE-0028) Dear Mr. Nazar: By letter dated October 10, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17283A398), as supplemented by letter dated December 14, 2017 (ADAMS Package Accession No. ML 17348A865), NextEra Energy Seabrook, LLC (NextEra) submitted a license amendment and exemption request for Seabrook Station, Unit No. 1 (Seabrook). The proposed amendment would update the fire protection program to remove a commitment to perform an operator action to trip the station offsite power circuit breakers during a fire in the train A switchgear room. The December 14, 2017, supplement removed the request for exemption. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of the NextEra request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. By letter dated December 27, 2017 (ADAMS Accession No. ML 17361A319), you requested to withdraw the application from NRC review. The NRC acknowledges your request to withdraw the application. NRC staff activities on the review have ceased and the associated Enterprise Project Identifiers have been closed. The NRC staff notes the supplement provided by letter dated December 14, 2017, was unresponsive to the cited informational needs found in the staff's letter dated November 29, 2017, (ADAMS Accession No. ML 17332A341 ). Specifically, your responses to TECH2, TECH6, M. Nazar -2-and TECH? were either not responsive to the questions asked or lacked sufficient information such that it is unlikely that the NRC staff could complete its detailed technical review in an appropriate timeframe, given the information insufficiencies. For example, in the case of TECH6, while your response provided other trip capabilities, there was no supporting information regarding whether or not these other capabilities were susceptible to the same fire damage as the shunt cable trip, which information the question asked for. Without this information, the NRC staff has no basis to consider that those other trip capabilities would remain available in the event of a fire that damages the manual trip ( shunt trip) cables. The responses to TECH2 and TECH? indicate to the NRC staff indicate that there are deficencies related to the use of NRC guidance or completeness of technical analysis, or both. Additionally, the NRC identified that your response to REG2 contained apparently conflicting statements. At one point in the response you state, " ... deletion of the operator action to trip the station offsite power breakers for a fire in the train A essential switchgear room is adverse to the fire protection program (FPP) in that a manual action that utilizes a circuit protected from damage is being replaced with credit for operation of a circuit that may be subject to fire damage." However, later on in your response, you state, " ... removal of the operator action to trip the station offsite power breakers and the deviation from BTP CMEB 9.5.1 separation requirements are justified and do not adversely affect the ability to achieve and maintain safe shutdown conditions in the event of a fire." Given these apparently conflicting statements, the NRC staff is uncertain whether it is the NextEra position that the proposed changes adversely impact Seabrook's ability to achieve and maintain shutdown. Therefore, should you decide to re-submit the request, the NRC staff expects that these comments be adequately addressed. If you have any questions, please contact me at (301) 415-2048 or Justin.Poole@nrc.gov. Docket No. 50-443 cc: Distribution via Listserv Sincere! -------Justin C. Poole, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation M. Nazar -3 -SUBJECT: SEABROOK STATION, UNIT NO. 1 -WITHDRAWAL OF REQUESTED LICENSING ACTION RE: AMENDMENT TO DELETE OPERATOR ACTION AND REQUEST FOR EXEMPTION SUBMITTED TO NRC FOR ACCEPTANCE REVIEW (EPID L-2017-LLA-0353 AND EPID L-2017-LLE-0028) DATED DECEMBER 29, 2017 DISTRIBUTION: PUBLIC PM Reading File RidsACRS_MailCTR Resource RidsNrrDraAplb Resource RidsNrrDorlLpl1 Resource RidsNrrLALRonewicz Resource RidsNrrPMSeabrook Resource RidsRgn1 MailCenter Resource DFrumkin, NRR ADAMS A ccess1on N ML 17356A228 o.: OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NAME JPoole LRonewicz DATE 12/22/2017 12/22/2017 OFFICE NRR/DORL/LPL 1/PM NAME JPoole DATE 12/29/2017 *b ., 1y e-ma1 NRR/DRNAPLB/BC(A) JRobinson* 12/22/2017 OFFICIAL RECORD COPY NRR/DORL/LPL 1/BC JDanna 12/29/2017