Revision as of 10:33, 1 April 2018

Enclosurequest for Additional Information [Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, Llc'S Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation]
ML18058A024
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/23/2018
From: Pamela Longmire
Spent Fuel Licensing Branch
To: VanNoordennen G
Duke Energy Corp
Longmire P
Shared Package
ML18058A022 List:
References
CAC 001028, EPID L-2017-FPR-0075
Download: ML18058A024 (1)


Text

Enclosure REQUEST FOR ADDITIONAL INFORMATION REGARDING ZIONSOLUTIONS, LLC'S DECOMMISSIONING FUNDING PLAN UPDATE FOR ZION INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NOS. 72-1037, 50-0295 AND 50-0304 Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination. The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate. Background By letter dated March 30, 2017, ZionSolutions LLC (ZS) submitted, for U.S. Nuclear Regulatory Commission (NRC) staff review and approval, a decommissioning funding plan update (DFP Update) for the independent spent fuel storage installation at Zion (Agencywide Documents Access and Management System Accession No. ML17094A735). The NRC staff reviewed ZS's DFP update and believes ZS's submittal was not sufficient to meet the intent of the requirement in 72.30(c). Specifically, the DFP update does not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been specifically considered.

RAI 1 For the ISFSI at Zion, provide a revised DFP that includes the effect on decommissioning costs of each of the events listed in 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.