| title = Summary of February 9, 2007, Meeting with Entergy on the Response to Generic Letter 2004-02 for Indian Point Nuclear Generating Unit Nos. 2 and 3 (TAC Nos. MC4689 and MC4690)
| title = Summary of February 9, 2007, Meeting with Entergy on the Response to Generic Letter 2004-02 for Indian Point Nuclear Generating Unit Nos. 2 and 3
| author name = Boska J
| author name = Boska J
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:February 26, 2007 LICENSEE:       Entergy Nuclear Operations, Inc.
{{#Wiki_filter:February 26, 2007 LICENSEE:
FACILITY:       Indian Point Nuclear Generating Unit Nos. 2 and 3
Entergy Nuclear Operations, Inc.
FACILITY:
Indian Point Nuclear Generating Unit Nos. 2 and 3


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF FEBRUARY 9, 2007, MEETING WITH ENTERGY ON THE RESPONSE TO GENERIC LETTER 2004-02 FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MC4689 AND MC4690)
OF FEBRUARY 9, 2007, MEETING WITH ENTERGY ON THE RESPONSE TO GENERIC LETTER 2004-02 FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MC4689 AND MC4690)
Line 29: Line 30:
The licensee presented information on how they are responding to the NRC concerns expressed in NRC GL 2004-02. See the NRC's Agencywide Documents Access and Management System (ADAMS) accession number ML070510476 for the handouts used by the licensee. The licensee described the existing containment sump configuration for both units, and the modifications completed and those under consideration to address GL 2004-02. They noted that the improved sump strainers have already been installed in Unit 2, and will be installed in Unit 3 during the spring 2007 refueling outage. Additional changes may be needed to fully address chemical effects. The licensee discussed their strategy for handling post-loss-of-coolant-accident debris, including a circuitous flowpath to the sumps through the incore instrumentation tunnel. The NRC staff provided feedback on certain aspects of the licensee's approach, which the licensee indicated they would consider in finalizing their approach.
The licensee presented information on how they are responding to the NRC concerns expressed in NRC GL 2004-02. See the NRC's Agencywide Documents Access and Management System (ADAMS) accession number ML070510476 for the handouts used by the licensee. The licensee described the existing containment sump configuration for both units, and the modifications completed and those under consideration to address GL 2004-02. They noted that the improved sump strainers have already been installed in Unit 2, and will be installed in Unit 3 during the spring 2007 refueling outage. Additional changes may be needed to fully address chemical effects. The licensee discussed their strategy for handling post-loss-of-coolant-accident debris, including a circuitous flowpath to the sumps through the incore instrumentation tunnel. The NRC staff provided feedback on certain aspects of the licensee's approach, which the licensee indicated they would consider in finalizing their approach.
Members of the public were in attendance, both in person and on the meeting teleconference.
Members of the public were in attendance, both in person and on the meeting teleconference.
No Public Meeting Feedback forms were submitted. Please direct any inquiries to me at 301-415-2901, or by email to jpb1@nrc.gov.
No Public Meeting Feedback forms were submitted. Please direct any inquiries to me at 301-415-2901, or by email to jpb1@nrc.gov.  
                                              /RA/
/RA/
John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286


==Enclosure:==
==Enclosure:==
List of Attendees cc w/encl: See next page
List of Attendees cc w/encl: See next page


February 26, 2007 LICENSEE:       Entergy Nuclear Operations, Inc.
February 26, 2007 LICENSEE:
FACILITY:       Indian Point Nuclear Generating Unit Nos. 2 and 3
Entergy Nuclear Operations, Inc.
FACILITY:
Indian Point Nuclear Generating Unit Nos. 2 and 3


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF FEBRUARY 9, 2007, MEETING WITH ENTERGY ON THE RESPONSE TO GENERIC LETTER 2004-02 FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MC4689 AND MC4690)
OF FEBRUARY 9, 2007, MEETING WITH ENTERGY ON THE RESPONSE TO GENERIC LETTER 2004-02 FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MC4689 AND MC4690)
Line 48: Line 49:
The licensee presented information on how they are responding to the NRC concerns expressed in NRC GL 2004-02. See the NRC's Agencywide Documents Access and Management System (ADAMS) accession number ML070510476 for the handouts used by the licensee. The licensee described the existing containment sump configuration for both units, and the modifications completed and those under consideration to address GL 2004-02. They noted that the improved sump strainers have already been installed in Unit 2, and will be installed in Unit 3 during the spring 2007 refueling outage. Additional changes may be needed to fully address chemical effects. The licensee discussed their strategy for handling post-loss-of-coolant-accident debris, including a circuitous flowpath to the sumps through the incore instrumentation tunnel. The NRC staff provided feedback on certain aspects of the licensee's approach, which the licensee indicated they would consider in finalizing their approach.
The licensee presented information on how they are responding to the NRC concerns expressed in NRC GL 2004-02. See the NRC's Agencywide Documents Access and Management System (ADAMS) accession number ML070510476 for the handouts used by the licensee. The licensee described the existing containment sump configuration for both units, and the modifications completed and those under consideration to address GL 2004-02. They noted that the improved sump strainers have already been installed in Unit 2, and will be installed in Unit 3 during the spring 2007 refueling outage. Additional changes may be needed to fully address chemical effects. The licensee discussed their strategy for handling post-loss-of-coolant-accident debris, including a circuitous flowpath to the sumps through the incore instrumentation tunnel. The NRC staff provided feedback on certain aspects of the licensee's approach, which the licensee indicated they would consider in finalizing their approach.
Members of the public were in attendance, both in person and on the meeting teleconference.
Members of the public were in attendance, both in person and on the meeting teleconference.
No Public Meeting Feedback forms were submitted. Please direct any inquiries to me at 301-415-2901, or by email to jpb1@nrc.gov.
No Public Meeting Feedback forms were submitted. Please direct any inquiries to me at 301-415-2901, or by email to jpb1@nrc.gov.  
                                              /RA/
/RA/
John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286


==Enclosure:==
==Enclosure:==
 
List of Attendees cc w/encl: See next page Package: ML07 Memo: ML070470123 OFFICE LPL1-1/PM LPL1-1/LA LPL1-1/BC(A)
List of Attendees cc w/encl: See next page Package: ML07             Memo: ML070470123 OFFICE LPL1-1/PM             LPL1-1/LA         LPL1-1/BC(A)
NAME JBoska SLittle DPickett DATE 2/21/07 2/22/07 2/26/07 Official Record Copy
NAME       JBoska           SLittle           DPickett DATE       2/21/07         2/22/07           2/26/07 Official Record Copy


DATED: February 26, 2007
DATED: February 26, 2007
Line 64: Line 64:


Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Mr. Gary J. Taylor                             Ms. Charlene D. Faison Chief Executive Officer                         Manager, Licensing Entergy Operations, Inc.                        Entergy Nuclear Operations, Inc.
Mr. Gary J. Taylor Chief Executive Officer Entergy Operations, Inc.
1340 Echelon Parkway                           440 Hamilton Avenue Jackson, MS 39213                               White Plains, NY 10601 Mr. John T. Herron                             Mr. Michael J. Columb Senior Vice President and                       Director of Oversight Chief Operating Officer                       Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.                440 Hamilton Avenue 440 Hamilton Avenue                             White Plains, NY 10601 White Plains, NY 10601 Mr. James Comiotes Mr. Fred R. Dacimo                             Director, Nuclear Safety Assurance Site Vice President                             Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Fred R. Dacimo Site Vice President Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.                Indian Point Energy Center Indian Point Energy Center                      450 Broadway, GSB 450 Broadway, GSB                               P.O. Box 249 P.O. Box 249                                   Buchanan, NY 10511-0249 Buchanan, NY 10511-0249 Mr. Patric Conroy Mr. Paul Rubin                                  Manager, Licensing General Manager, Plant Operations               Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. Paul Rubin General Manager, Plant Operations Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.               Indian Point Energy Center Indian Point Energy Center                     450 Broadway, GSB 450 Broadway                                    P. O. Box 249 P.O. Box 249                                    Buchanan, NY 10511-0249 Buchanan, NY 10511-0249 Assistant General Counsel Mr. Oscar Limpias                              Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway P.O. Box 249 Buchanan, NY 10511-0249 Mr. Oscar Limpias Vice President Engineering Entergy Nuclear Operations, Inc.
Vice President Engineering                      440 Hamilton Avenue Entergy Nuclear Operations, Inc.                White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601                         Mr. Peter R. Smith, President New York State Energy, Research, and Mr. Christopher Schwarz                          Development Authority Vice President, Operations Support              17 Columbia Circle Entergy Nuclear Operations, Inc.                Albany, NY 12203-6399 440 Hamilton Avenue White Plains, NY 10601                          Mr. Paul Eddy New York State Department Mr. John F. McCann                                of Public Service Director, Licensing                            3 Empire State Plaza Entergy Nuclear Operations, Inc.                Albany, NY 12223 440 Hamilton Avenue White Plains, NY 10601
440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Columb Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. James Comiotes Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. Patric Conroy Manager, Licensing Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P. O. Box 249 Buchanan, NY 10511-0249 Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza Albany, NY 12223


Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Regional Administrator, Region I               Mr. William T. Russell U.S. Nuclear Regulatory Commission             PWR SRC Consultant 475 Allendale Road                             400 Plantation Lane King of Prussia, PA 19406                       Stevensville, MD 21666-3232 Senior Resident Inspectors Office             Mr. Jim Riccio Indian Point 2                                 Greenpeace U. S. Nuclear Regulatory Commission             702 H Street, NW P.O. Box 59                                     Suite 300 Buchanan, NY 10511                             Washington, DC 20001 Senior Resident Inspectors Office             Mr. Phillip Musegaas Indian Point 3                                 Riverkeeper, Inc.
Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspectors Office Indian Point 2 U. S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Senior Resident Inspectors Office Indian Point 3 U. S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Raymond L. Albanese Four County Coordinator 200 Bradhurst Avenue Unit 4 Westchester County Hawthorne, NY 10532 Mr. William DiProfio PWR SRC Consultant 139 Depot Road East Kingston, NH 03827 Mr. Garry Randolph PWR SRC Consultant 1750 Ben Franklin Drive, 7E Sarasota, FL 34236 Mr. William T. Russell PWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232 Mr. Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001 Mr. Phillip Musegaas Riverkeeper, Inc.
U. S. Nuclear Regulatory Commission             828 South Broadway P.O. Box 59                                     Tarrytown, NY 10591 Buchanan, NY 10511 Mr. Mark Jacobs Mr. Charles Donaldson, Esquire                 IPSEC Assistant Attorney General                     46 Highland Drive New York Department of Law                     Garrison, NY 10524 120 Broadway New York, NY 10271                             Mr. Michael Kansler President Mayor, Village of Buchanan                     Entergy Nuclear Operations, Inc.
828 South Broadway Tarrytown, NY 10591 Mr. Mark Jacobs IPSEC 46 Highland Drive Garrison, NY 10524 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
236 Tate Avenue                                440 Hamilton Avenue Buchanan, NY 10511                             White Plains, NY 10601 Mr. Raymond L. Albanese Four County Coordinator 200 Bradhurst Avenue Unit 4 Westchester County Hawthorne, NY 10532 Mr. William DiProfio PWR SRC Consultant 139 Depot Road East Kingston, NH 03827 Mr. Garry Randolph PWR SRC Consultant 1750 Ben Franklin Drive, 7E Sarasota, FL 34236}}
440 Hamilton Avenue White Plains, NY 10601}}

Latest revision as of 03:13, 15 January 2025

Summary of February 9, 2007, Meeting with Entergy on the Response to Generic Letter 2004-02 for Indian Point Nuclear Generating Unit Nos. 2 and 3
ML070470123
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 02/26/2007
From: Boska J
NRC/NRR/ADRO/DORL/LPLI-1
To:
Boska J, NRR, 301-415-2901
References
TAC MC4689, TAC MC4690
Download: ML070470123 (5)


Text

February 26, 2007 LICENSEE:

Entergy Nuclear Operations, Inc.

FACILITY:

Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF FEBRUARY 9, 2007, MEETING WITH ENTERGY ON THE RESPONSE TO GENERIC LETTER 2004-02 FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MC4689 AND MC4690)

On February 9, 2007, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of Entergy Nuclear Operations, Inc. (licensee), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the licensee's response to NRC Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage On Emergency Recirculation During Design-Basis Accidents At Pressurized-Water Reactors" and potential revisions to the plant licensing basis.

A list of attendees is provided as Enclosure 1, but may not be all-inclusive.

The licensee presented information on how they are responding to the NRC concerns expressed in NRC GL 2004-02. See the NRC's Agencywide Documents Access and Management System (ADAMS) accession number ML070510476 for the handouts used by the licensee. The licensee described the existing containment sump configuration for both units, and the modifications completed and those under consideration to address GL 2004-02. They noted that the improved sump strainers have already been installed in Unit 2, and will be installed in Unit 3 during the spring 2007 refueling outage. Additional changes may be needed to fully address chemical effects. The licensee discussed their strategy for handling post-loss-of-coolant-accident debris, including a circuitous flowpath to the sumps through the incore instrumentation tunnel. The NRC staff provided feedback on certain aspects of the licensee's approach, which the licensee indicated they would consider in finalizing their approach.

Members of the public were in attendance, both in person and on the meeting teleconference.

No Public Meeting Feedback forms were submitted. Please direct any inquiries to me at 301-415-2901, or by email to jpb1@nrc.gov.

/RA/

John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

List of Attendees cc w/encl: See next page

February 26, 2007 LICENSEE:

Entergy Nuclear Operations, Inc.

FACILITY:

Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF FEBRUARY 9, 2007, MEETING WITH ENTERGY ON THE RESPONSE TO GENERIC LETTER 2004-02 FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MC4689 AND MC4690)

On February 9, 2007, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of Entergy Nuclear Operations, Inc. (licensee), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the licensee's response to NRC Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage On Emergency Recirculation During Design-Basis Accidents At Pressurized-Water Reactors" and potential revisions to the plant licensing basis.

A list of attendees is provided as Enclosure 1, but may not be all-inclusive.

The licensee presented information on how they are responding to the NRC concerns expressed in NRC GL 2004-02. See the NRC's Agencywide Documents Access and Management System (ADAMS) accession number ML070510476 for the handouts used by the licensee. The licensee described the existing containment sump configuration for both units, and the modifications completed and those under consideration to address GL 2004-02. They noted that the improved sump strainers have already been installed in Unit 2, and will be installed in Unit 3 during the spring 2007 refueling outage. Additional changes may be needed to fully address chemical effects. The licensee discussed their strategy for handling post-loss-of-coolant-accident debris, including a circuitous flowpath to the sumps through the incore instrumentation tunnel. The NRC staff provided feedback on certain aspects of the licensee's approach, which the licensee indicated they would consider in finalizing their approach.

Members of the public were in attendance, both in person and on the meeting teleconference.

No Public Meeting Feedback forms were submitted. Please direct any inquiries to me at 301-415-2901, or by email to jpb1@nrc.gov.

/RA/

John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

List of Attendees cc w/encl: See next page Package: ML07 Memo: ML070470123 OFFICE LPL1-1/PM LPL1-1/LA LPL1-1/BC(A)

NAME JBoska SLittle DPickett DATE 2/21/07 2/22/07 2/26/07 Official Record Copy

DATED: February 26, 2007

SUMMARY

OF FEBRUARY 9, 2007, MEETING WITH ENTERGY ON THE RESPONSE TO GENERIC LETTER 2004-02 FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MC4689 AND MC4690)

PUBLIC LPL1-1 R/F RidsNrrDorlLpl1-1 RidsNrrDirsItsb RidsNrrPMJBoska RidsNrrLASLittle ECobey, RI RidsOGCRp RidsAcrsAcnwMailCenter RidsNrrOd RidsRgn1MailCenter MScott LWhitney RArchitzel DHarrison JLamb, EDO Region I JLehning THafer SUnikewicz JWermiel ABoatright MYoder PKlein SSmith SLu MKotzalas MHart cc: Plant Mailing list

Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Mr. Gary J. Taylor Chief Executive Officer Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Fred R. Dacimo Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. Paul Rubin General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway P.O. Box 249 Buchanan, NY 10511-0249 Mr. Oscar Limpias Vice President Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Columb Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. James Comiotes Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. Patric Conroy Manager, Licensing Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P. O. Box 249 Buchanan, NY 10511-0249 Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza Albany, NY 12223

Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspectors Office Indian Point 2 U. S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Senior Resident Inspectors Office Indian Point 3 U. S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Raymond L. Albanese Four County Coordinator 200 Bradhurst Avenue Unit 4 Westchester County Hawthorne, NY 10532 Mr. William DiProfio PWR SRC Consultant 139 Depot Road East Kingston, NH 03827 Mr. Garry Randolph PWR SRC Consultant 1750 Ben Franklin Drive, 7E Sarasota, FL 34236 Mr. William T. Russell PWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232 Mr. Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001 Mr. Phillip Musegaas Riverkeeper, Inc.

828 South Broadway Tarrytown, NY 10591 Mr. Mark Jacobs IPSEC 46 Highland Drive Garrison, NY 10524 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601