Other: ML070510476, ML073230158, ML073230169, ML073510242, ML081000213, ML082050406, ML082050433, ML082070154, ML083010366, ML083570153, ML091130122, ML092330075, NL-08-119, Proprietary Review of Audit Report for the Corrective Actions Associated with Generic Letter 2004-02, NL-08-171, Planned Replacement of Internal Recirculation Pump Bearings in Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
|
MONTHYEARML0603800992006-02-0909 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors (TAC MC4689 & MC4690) Project stage: RAI ML0705104762007-02-0909 February 2007 Licensee Slides 2-9-07 Project stage: Other ML0704701232007-02-26026 February 2007 Summary of February 9, 2007, Meeting with Entergy on the Response to Generic Letter 2004-02 for Indian Point Nuclear Generating Unit Nos. 2 and 3 Project stage: Meeting ML0726808352007-09-17017 September 2007 Request for Extension of Completion Date for Corrective Actions and Modifications Required by GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0730402912007-10-24024 October 2007 Request for Extension of Completion Date for Indian Point Unit 3 Corrective Actions and Modifications Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressu Project stage: Request ML0732301582007-11-20020 November 2007 Unit No.3 - Denial of Extension Request for Corrective Actions Required by Generic Letter 2004-02 Project stage: Other ML0732301692007-11-20020 November 2007 Approval of Extension Request for Corrective Actions Required by Generic Letter 2004-02 Project stage: Other ML0734600422007-12-0303 December 2007 Revised Request for Extension of Completion Date for Indian Point Unit 3 Corrective Actions & Modifications Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Project stage: Request ML0733800442007-12-0303 December 2007 LB Order (Censure of Sherwood Martinelli) Project stage: Request NL-05-0133, Revised Request for Extension of Completion Date for Indian Point Unit 3 Corrective Actions & Modifications Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents a2007-12-0303 December 2007 Revised Request for Extension of Completion Date for Indian Point Unit 3 Corrective Actions & Modifications Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Project stage: Request ML0735102422007-12-20020 December 2007 Approval of Revised Extension Request for Corrective Actions Required by Generic Letter 2004-02 Project stage: Other ML0802900972008-01-31031 January 2008 Draft Open Items from Staff Audit of Corrective Actions to Address Generic Letter 2004 02 Project stage: Draft Other ML0806701352008-02-28028 February 2008 Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0808801782008-03-27027 March 2008 Summary of February 28, 2008, Meeting with Entergy on the Response to Generic Letter 2004-02 for Indian Point Nuclear Generating Unit Nos. 2 and 3 Project stage: Meeting NL-08-054, Request for Extension of Completion Dates for Indian Point, Units 2 & 3, Corrective Actions Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Wat2008-03-28028 March 2008 Request for Extension of Completion Dates for Indian Point, Units 2 & 3, Corrective Actions Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Wate Project stage: Request ML0809900852008-03-28028 March 2008 Request for Extension of Completion Dates for Indian Point, Units 2 & 3, Corrective Actions Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Wate Project stage: Request ML0810002132008-04-10010 April 2008 Approval of Revised Extension Request for Corrective Actions Required by Generic Letter 2004-02 Project stage: Other ML0820701542008-07-21021 July 2008 Proprietary Review of Audit Report for the Corrective Actions Associated with Generic Letter 2004-02 Project stage: Other 05000003/LER-2008-001, Attempted Introduction of Contraband Into the Plant Protected Area Due to Personnel Error2008-07-21021 July 2008 Attempted Introduction of Contraband Into the Plant Protected Area Due to Personnel Error Project stage: Request NL-08-119, Proprietary Review of Audit Report for the Corrective Actions Associated with Generic Letter 2004-022008-07-21021 July 2008 Proprietary Review of Audit Report for the Corrective Actions Associated with Generic Letter 2004-02 Project stage: Other ML0820504062008-07-29029 July 2008 Report on Results of Staff Audit of Corrective Actions Address Generic Letter 2004-02 Project stage: Other ML0820504332008-07-29029 July 2008 Audit Report-Indian Point Nuclear Generating Unit Nos. 2 and 3 - Report on Result of Staff Audit of Corrective Actions to Address Generic Letter 2004-02 Project stage: Other ML0825505742008-09-17017 September 2008 Summary of Telephone Conference Call Held on August 7, 2008, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Pertaining to the Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3), License Project stage: Request ML0825902152008-09-17017 September 2008 Request for Additional Information Regarding Responses to Generic Letter 2004 - 02 Project stage: RAI ML0829105722008-10-17017 October 2008 Lr Hearing - Draft Telecon Summary of September 15, 2008 Re Reactor Vessel Neutron Embrittlement Project stage: Request ML0830102392008-10-17017 October 2008 Request for Extension of Completion Dates for Indian Point Units 2 and 3 Corrective Actions Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Wate Project stage: Request NL-08-153, Request for Extension of Completion Dates for Indian Point Units 2 and 3 Corrective Actions Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Wat2008-10-17017 October 2008 Request for Extension of Completion Dates for Indian Point Units 2 and 3 Corrective Actions Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Wate Project stage: Request ML0830103662008-10-30030 October 2008 Approval of Revised Extension Request for Corrective Actions Required by Generic Letter 2004-02 Project stage: Other ML0832300542008-11-19019 November 2008 Request for Additional Information Regarding Generic Letter 2004-02 Project stage: RAI ML0835701532008-12-0101 December 2008 Planned Replacement of Internal Recirculation Pump Bearings in Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other NL-08-171, Planned Replacement of Internal Recirculation Pump Bearings in Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-12-0101 December 2008 Planned Replacement of Internal Recirculation Pump Bearings in Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other NL-09-021, Response to Request for Additional Information Regarding Generic Letter 2004-022009-02-0202 February 2009 Response to Request for Additional Information Regarding Generic Letter 2004-02 Project stage: Response to RAI ML0911301222009-04-28028 April 2009 Telcom with Entergy on April 16, 2009, on Chemical Effects Testing for Generic Letter 2004-02 Project stage: Other ML0921903102009-07-29029 July 2009 Request for Extension of Completion Dates for Indian Point, Units 2 and 3 Corrective Actions Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Wat Project stage: Request ML0923300752009-08-25025 August 2009 Approval of Revised Extension Request for Corrective Actions Required by Generic Letter 2004-02 Project stage: Other ML0926400612009-09-24024 September 2009 Summary of Conference Call with Entergy on Proposed Response to a Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML0932903162009-11-19019 November 2009 Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML1011702372010-04-29029 April 2010 Request for Additional Information Regarding Generic Letter 2004-02 Project stage: RAI ML1016501692010-06-18018 June 2010 June 9, 2010 Summary of Conference Call with Entergy on Proposed Response to Request for Additional Information on Generic Letter 2004-02 Project stage: RAI 2008-02-28
[Table View] |
Text
/
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, N.Y. 10511-0249 IIL---
Tel (914) 734-6700 J.E. Pollock Site Vice President Administration December 1, 2008 Indian Point Nuclear Generating Unit No. 3 Docket No. 50-286 NL-08-1171 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Planned Replacement of Internal Recirculation Pump Bearings in Response to Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors"
REFERENCES:
- 1) Entergy letter NL-08-153, 10/17/08, "Request for Extension of Completion Dates for Indian Point Units 2 and 3 Corrective Actions Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors"
- 2) NRC Generic Letter 2004-02, 09/13/04, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors"
- 3) NRC letter to Indian Point Vice President of Operations, 10/30/08, "indian Point Nuclear Generating Unit Nos. 2 and 3 - Approval of Revised Extension Request for Corrective Actions Required by Generic Letter 2004-02 (TAC Nos. MC4689 and MC4690)"
- 4) WCAP-16406-P, Revision 1; Evaluation of Downstream Sump Debris Effects in Support of GSI-1 91.
Dear Sir or Madam:
On October 17, 2008, Entergy Nuclear Operations, Inc (Entergy) submitted an extension request (Reference 1) to GL 2004-02 (Reference 2). The NRC evaluated the information provided in the extension request and determined that it was acceptable to extend the completion dates for Unit 2 and Unit 3 for the remaining modifications and licensing activities until August 31, 2009 (Reference 3). Entergy stated in Reference 1 that the internal recirculation pump bearings needed to be replaced and that the pump vendor was in the process of identifying a suitable replacement S'J¢2
NL-08-171 Page 2 of 2 bearing material. Entergy also stated that bearing procurement and delivery would be expedited and that the NRC would be notified by December 1, 2008 should these plans not support installation of the replacement bearings during refueling outage 3R15 (spring 2009). On November 25, 2008, Entergy and NRC staff held a teleconference whereby Entergy presented the results of our actions. This submittal formalizes that discussion.
The internal recirculation pumps are Ingersoll Rand model 267-APKD, 3 stage, double suction pumps, with nickel impregnated carbon bearings. This bearing material was selected for this application because it has self lubricating properties that allow for dry starts of the pump. In order to meet performance requirements with debris laden fluid conditions, as analyzed under the guidance of WCAP-1 6406 Revision 1 (Reference 4), the pump manufacturer indicates that some of the existing bearings need to be replaced with a harder material and others require a modification to break down the pressure differential across the bearings. The latter situation requires a modification to the internal recirculation top bearing housing that involves the design and fabrication of a new casting that will allow the continued use of a dry start bearing material in this location. At this time, the casting is the critical path item, and its design, development and manufacture do not support installation during 3R15. Entergy plans to submit an additional extension request to permit bearing replacement during 3R1 6 (spring 2011).
There are no new commitments being made in this submittal.
Should you have any questions or require additional information, please contact Mr. R. Walpole, Manager, Licensing at (914) 734-6710.
I declare under the penalty of perjury that the foregoing is true and correct. Executed on December
, 2008.
Sincerely, J. E. Pollock Site-Vice President Indian Point Energy Center cc:
Mr. John P. Boska, Senior Project Manager, NRC NRR DORL Mr. Samuel J. Collins, Regional Administrator, NRC Region 1 NRC Resident Inspector,.IP3 Mr. Robert Callender, Vice President, NYSERDA Mr. Paul Eddy, New York State Dept. of Public Service