ML092440287: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML092440287 | | number = ML092440287 | ||
| issue date = 09/01/2009 | | issue date = 09/01/2009 | ||
| title = | | title = Report 22 | ||
| author name = | | author name = | ||
| author affiliation = NRC/RGN-II | | author affiliation = NRC/RGN-II | ||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 09/01/2009 08:10:09 Report 22 07/01/2009 | {{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 09/01/2009 08:10:09 Report 22 07/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oconee ISFSI | ||
-12/31/2010 Unit Number Planned Dates Start | - ISFSI OPERATIONAL INSPECTION 3 | ||
1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2009 10/15/2009 PB1-SUP | |||
- SUPPLEMENTAL FOR WHITE LOSS OF INVENTORY 1 | |||
1 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 95001 08/31/2009 09/04/2009 PB7-PI&R | |||
- PROBLEM IDENTIFICATION AND RESOLUTION 6 | |||
1 IP Identification and Resolution of Problems 71152B 08/10/2009 08/14/2009 1 | |||
IP Identification and Resolution of Problems 71152B 08/24/2009 08/28/2009 PSB1EP | |||
- EMERGENCY PREPAREDNESS INSPECTION 1 | |||
1, 2, 3 IP Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 2515/175 08/31/2009 09/04/2009 1, 2, 3 IP Alert and Notification System Testing 7111402 08/31/2009 09/04/2009 1, 2, 3 IP Emergency Response Organization Augmentation Testing 7111403 08/31/2009 09/04/2009 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 08/31/2009 09/04/2009 1, 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/31/2009 09/04/2009 1, 2, 3 IP Performance Indicator Verification 71151 08/31/2009 09/04/2009 PSB1-RP | |||
- RADIATION PROTECTION OCCUPATIONAL WK1 2 | |||
1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 10/12/2009 10/16/2009 1, 2, 3 IP ALARA Planning and Controls 7112102 10/12/2009 10/16/2009 1, 2, 3 IP Radioactive Material Processing and Transportation 7112202 10/12/2009 10/16/2009 1, 2, 3 IP Performance Indicator Verification 71151 10/12/2009 10/16/2009 EB3ISI | |||
- UNIT 1 INSERVICE INSPECTION 1 | |||
1 IP Inservice Inspection Activities - PWR 7111108P 10/19/2009 10/23/2009 EB3TI172 | |||
- TI-172 RCS DM BUTT WELD 1 | |||
1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/19/2009 10/23/2009 EB3SGISI | |||
- UNIT 1 STEAM GENERATOR INSERVICE INSP 1 | |||
1 IP Inservice Inspection Activities - PWR 7111108P 10/26/2009 10/30/2009 PSB1-RP | |||
- RADIATION PROTECTION OCCUPATIONAL WK2 2 | |||
1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 10/26/2009 10/30/2009 1, 2, 3 IP ALARA Planning and Controls 7112102 10/26/2009 10/30/2009 1, 2, 3 IP Radioactive Material Processing and Transportation 7112202 10/26/2009 10/30/2009 ISFSI | |||
- ISFSI OPERATIONAL INSPECTION 3 | |||
1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 12/01/2009 12/31/2009 ISFSI | |||
- ISFSI ROUTINE LOADING 3 | |||
1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 12/01/2009 04/15/2010 OL EXAM | |||
- INITIAL EXAM PREP 3 | |||
1 OCONEE/MARCH 2010 EXAM AT POWER FACILITIES V23286 03/08/2010 03/12/2010 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | This report shows only on-site and announced inspection procedures. | ||
Inspection / Activity Plan Page 2 of 2 09/01/2009 08:10:09 Report 22 07/01/2009 | Enclosure | ||
-12/31/2010 Unit Number Planned Dates Start | |||
This report shows only on-site and announced inspection procedures.}} | Inspection / Activity Plan Page 2 of 2 09/01/2009 08:10:09 Report 22 07/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oconee OL EXAM | ||
- INITIAL EXAM WEEK 3 | |||
1 OCONEE/MARCH 2010 EXAM AT POWER FACILITIES V23286 03/29/2010 04/02/2010 PSB1-RP | |||
- RP ACCESS CONTROLS 1 | |||
1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 04/19/2010 04/23/2010 EB3ISI | |||
- UNIT 2 INSERVICE INSPECTION 1 | |||
2 IP Inservice Inspection Activities - PWR 7111108P 05/03/2010 05/07/2010 EB3TI172 | |||
- TI-172 RCS DM BUTT WELDS 1 | |||
1, 2, 3 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 05/03/2010 05/07/2010 EB3SGISI | |||
- UNIT 2 SGISI 1 | |||
2 IP Inservice Inspection Activities - PWR 7111108P 05/10/2010 05/14/2010 PSB1-RP | |||
- RP PUBLIC RADIATION PROTECTION 3 | |||
1, 2, 3 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 08/02/2010 08/06/2010 1, 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 08/02/2010 08/06/2010 1, 2, 3 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 08/02/2010 08/06/2010 1, 2, 3 IP Performance Indicator Verification 71151 08/02/2010 08/06/2010 PSB1EP | |||
- EMERGENCY PREPARENESS EXERCISE 3 | |||
1, 2, 3 IP Exercise Evaluation 7111401 08/02/2010 08/06/2010 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 08/02/2010 08/06/2010 1, 2, 3 IP Performance Indicator Verification 71151 08/02/2010 08/06/2010 OL EXAM | |||
- INITIAL EXAM - PREP 3 | |||
1 OCONEE/OCTOBER 2010 EXAM AT POWER FACILITIES V23339 10/04/2010 10/08/2010 OL EXAM | |||
- INITIAL EXAM WEEK 3 | |||
1 OCONEE/OCTOBER 2010 EXAM AT POWER FACILITIES V23339 10/25/2010 10/29/2010 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Enclosure}} | |||
Latest revision as of 09:33, 14 January 2025
| ML092440287 | |
| Person / Time | |
|---|---|
| Site: | Oconee, 07200040 |
| Issue date: | 09/01/2009 |
| From: | NRC/RGN-II |
| To: | |
| Shared Package | |
| ML092440283 | List: |
| References | |
| Download: ML092440287 (2) | |
Text
Inspection / Activity Plan Page 1 of 2 09/01/2009 08:10:09 Report 22 07/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oconee ISFSI
- ISFSI OPERATIONAL INSPECTION 3
1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2009 10/15/2009 PB1-SUP
- SUPPLEMENTAL FOR WHITE LOSS OF INVENTORY 1
1 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 95001 08/31/2009 09/04/2009 PB7-PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 6
1 IP Identification and Resolution of Problems 71152B 08/10/2009 08/14/2009 1
IP Identification and Resolution of Problems 71152B 08/24/2009 08/28/2009 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
1, 2, 3 IP Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 2515/175 08/31/2009 09/04/2009 1, 2, 3 IP Alert and Notification System Testing 7111402 08/31/2009 09/04/2009 1, 2, 3 IP Emergency Response Organization Augmentation Testing 7111403 08/31/2009 09/04/2009 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 08/31/2009 09/04/2009 1, 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/31/2009 09/04/2009 1, 2, 3 IP Performance Indicator Verification 71151 08/31/2009 09/04/2009 PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK1 2
1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 10/12/2009 10/16/2009 1, 2, 3 IP ALARA Planning and Controls 7112102 10/12/2009 10/16/2009 1, 2, 3 IP Radioactive Material Processing and Transportation 7112202 10/12/2009 10/16/2009 1, 2, 3 IP Performance Indicator Verification 71151 10/12/2009 10/16/2009 EB3ISI
- UNIT 1 INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 10/19/2009 10/23/2009 EB3TI172
1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/19/2009 10/23/2009 EB3SGISI
- UNIT 1 STEAM GENERATOR INSERVICE INSP 1
1 IP Inservice Inspection Activities - PWR 7111108P 10/26/2009 10/30/2009 PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK2 2
1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 10/26/2009 10/30/2009 1, 2, 3 IP ALARA Planning and Controls 7112102 10/26/2009 10/30/2009 1, 2, 3 IP Radioactive Material Processing and Transportation 7112202 10/26/2009 10/30/2009 ISFSI
- ISFSI OPERATIONAL INSPECTION 3
1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 12/01/2009 12/31/2009 ISFSI
- ISFSI ROUTINE LOADING 3
1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 12/01/2009 04/15/2010 OL EXAM
- INITIAL EXAM PREP 3
1 OCONEE/MARCH 2010 EXAM AT POWER FACILITIES V23286 03/08/2010 03/12/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 09/01/2009 08:10:09 Report 22 07/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oconee OL EXAM
- INITIAL EXAM WEEK 3
1 OCONEE/MARCH 2010 EXAM AT POWER FACILITIES V23286 03/29/2010 04/02/2010 PSB1-RP
- RP ACCESS CONTROLS 1
1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 04/19/2010 04/23/2010 EB3ISI
- UNIT 2 INSERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 05/03/2010 05/07/2010 EB3TI172
1, 2, 3 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 05/03/2010 05/07/2010 EB3SGISI
- UNIT 2 SGISI 1
2 IP Inservice Inspection Activities - PWR 7111108P 05/10/2010 05/14/2010 PSB1-RP
- RP PUBLIC RADIATION PROTECTION 3
1, 2, 3 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 08/02/2010 08/06/2010 1, 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 08/02/2010 08/06/2010 1, 2, 3 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 08/02/2010 08/06/2010 1, 2, 3 IP Performance Indicator Verification 71151 08/02/2010 08/06/2010 PSB1EP
- EMERGENCY PREPARENESS EXERCISE 3
1, 2, 3 IP Exercise Evaluation 7111401 08/02/2010 08/06/2010 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 08/02/2010 08/06/2010 1, 2, 3 IP Performance Indicator Verification 71151 08/02/2010 08/06/2010 OL EXAM
- INITIAL EXAM - PREP 3
1 OCONEE/OCTOBER 2010 EXAM AT POWER FACILITIES V23339 10/04/2010 10/08/2010 OL EXAM
- INITIAL EXAM WEEK 3
1 OCONEE/OCTOBER 2010 EXAM AT POWER FACILITIES V23339 10/25/2010 10/29/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.