ML092440287: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML092440287
| number = ML092440287
| issue date = 09/01/2009
| issue date = 09/01/2009
| title = 2009 Report 22
| title = Report 22
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 09/01/2009 08:10:09 Report 22 07/01/2009
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 09/01/2009 08:10:09 Report 22 07/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oconee ISFSI
-12/31/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Oconee ISFSI-ISFSI OPERATIONAL INSPECTION 3 1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2009 10/15/2009 PB1-SUP-SUPPLEMENTAL FOR WHITE LOSS OF INVENTORY 1 1     IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 95001 08/31/2009 09/04/2009 PB7-PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 6 1     IP Identification and Resolution of Problems 71152B 08/10/2009 08/14/2009 1     IP Identification and Resolution of Problems 71152B 08/24/2009 08/28/2009 PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 1 1, 2, 3 IP Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 2515/175 08/31/2009 09/04/2009 1, 2, 3 IP A lert and Notification System Testing 7111402 08/31/2009 09/04/2009 1, 2, 3 IP Emergency Response Organization Augmentation Testing 7111403 08/31/2009 09/04/2009 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 08/31/2009 09/04/2009 1, 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/31/2009 09/04/2009 1, 2, 3 IP Performance Indicator Verification 71151 08/31/2009 09/04/2009 PSB1-RP-RADIATION PROTECTION OCCUPATIONAL WK1 2 1, 2, 3 IP A ccess Control to Radiologically Significant Areas 7112101 10/12/2009 10/16/2009 1, 2, 3 IP A LARA Planning and Controls 7112102 10/12/2009 10/16/2009 1, 2, 3 IP Radioactive Material Processing and Transportation 7112202 10/12/2009 10/16/2009 1, 2, 3 IP Performance Indicator Verification 71151 10/12/2009 10/16/2009 EB3ISI-UNIT 1 INSERVICE INSPECTION 1 1     IP Inservice Inspection Activities - PWR 7111108P 10/19/2009 10/23/2009 EB3TI172-TI-172 RCS DM BUTT WELD 1 1     IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/19/2009 10/23/2009 EB3SGISI-UNIT 1 STEAM GENERATOR INSERVICE INSP 1 1     IP Inservice Inspection Activities - PWR 7111108P 10/26/2009 10/30/2009 PSB1-RP-RADIATION PROTECTION OCCUPATIONAL WK2 2 1, 2, 3 IP A ccess Control to Radiologically Significant Areas 7112101 10/26/2009 10/30/2009 1, 2, 3 IP A LARA Planning and Controls 7112102 10/26/2009 10/30/2009 1, 2, 3 IP Radioactive Material Processing and Transportation 7112202 10/26/2009 10/30/2009 ISFSI-ISFSI OPERATIONAL INSPECTION 3 1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 12/01/2009 12/31/2009 ISFSI-ISFSI ROUTINE LOADING 3 1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 12/01/2009 04/15/2010 OL EXAM-INITIAL EXAM PREP 3 1     OCONEE/MARCH 2010 EXAM AT POWER FACILITIES V23286 03/08/2010 03/12/2010 This report does not include INPO and OUTAGE activities.
- ISFSI OPERATIONAL INSPECTION 3
1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2009 10/15/2009 PB1-SUP
- SUPPLEMENTAL FOR WHITE LOSS OF INVENTORY 1
1 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 95001 08/31/2009 09/04/2009 PB7-PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 6
1 IP Identification and Resolution of Problems 71152B 08/10/2009 08/14/2009 1
IP Identification and Resolution of Problems 71152B 08/24/2009 08/28/2009 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
1, 2, 3 IP Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 2515/175 08/31/2009 09/04/2009 1, 2, 3 IP Alert and Notification System Testing 7111402 08/31/2009 09/04/2009 1, 2, 3 IP Emergency Response Organization Augmentation Testing 7111403 08/31/2009 09/04/2009 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 08/31/2009 09/04/2009 1, 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/31/2009 09/04/2009 1, 2, 3 IP Performance Indicator Verification 71151 08/31/2009 09/04/2009 PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK1 2
1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 10/12/2009 10/16/2009 1, 2, 3 IP ALARA Planning and Controls 7112102 10/12/2009 10/16/2009 1, 2, 3 IP Radioactive Material Processing and Transportation 7112202 10/12/2009 10/16/2009 1, 2, 3 IP Performance Indicator Verification 71151 10/12/2009 10/16/2009 EB3ISI
- UNIT 1 INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 10/19/2009 10/23/2009 EB3TI172
- TI-172 RCS DM BUTT WELD 1
1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/19/2009 10/23/2009 EB3SGISI
- UNIT 1 STEAM GENERATOR INSERVICE INSP 1
1 IP Inservice Inspection Activities - PWR 7111108P 10/26/2009 10/30/2009 PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK2 2
1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 10/26/2009 10/30/2009 1, 2, 3 IP ALARA Planning and Controls 7112102 10/26/2009 10/30/2009 1, 2, 3 IP Radioactive Material Processing and Transportation 7112202 10/26/2009 10/30/2009 ISFSI
- ISFSI OPERATIONAL INSPECTION 3
1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 12/01/2009 12/31/2009 ISFSI
- ISFSI ROUTINE LOADING 3
1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 12/01/2009 04/15/2010 OL EXAM
- INITIAL EXAM PREP 3
1 OCONEE/MARCH 2010 EXAM AT POWER FACILITIES V23286 03/08/2010 03/12/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 09/01/2009 08:10:09 Report 22 07/01/2009
Enclosure
-12/31/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Oconee OL EXAM-INITIAL EXAM WEEK 3 1     OCONEE/MARCH 2010 EXAM AT POWER FACILITIES V23286 03/29/2010 04/02/2010 PSB1-RP-RP ACCESS CONTROLS 1 1, 2, 3 IP A ccess Control to Radiologically Significant Areas 7112101 04/19/2010 04/23/2010 EB3ISI-UNIT 2 INSERVICE INSPECTION 1 2   IP Inservice Inspection Activities - PWR 7111108P 05/03/2010 05/07/2010 EB3TI172-TI-172 RCS DM BUTT WELDS 1 1, 2, 3 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 05/03/2010 05/07/2010 EB3SGISI-UNIT 2 SGISI 1 2   IP Inservice Inspection Activities - PWR 7111108P 05/10/2010 05/14/2010 PSB1-RP-RP PUBLIC RADIATION PROTECTION 3 1, 2, 3 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 08/02/2010 08/06/2010 1, 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 08/02/2010 08/06/2010 1, 2, 3 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 08/02/2010 08/06/2010 1, 2, 3 IP Performance Indicator Verification 71151 08/02/2010 08/06/2010 PSB1EP-EMERGENCY PREPARENESS EXERCISE 3 1, 2, 3 IP Exercise Evaluation 7111401 08/02/2010 08/06/2010 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 08/02/2010 08/06/2010 1, 2, 3 IP Performance Indicator Verification 71151 08/02/2010 08/06/2010 OL EXAM-INITIAL EXAM - PREP 3 1     OCONEE/OCTOBER 2010 EXAM AT POWER FACILITIES V23339 10/04/2010 10/08/2010 OL EXAM-INITIAL EXAM WEEK 3 1     OCONEE/OCTOBER 2010 EXAM AT POWER FACILITIES V23339 10/25/2010 10/29/2010 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.}}
Inspection / Activity Plan Page 2 of 2 09/01/2009 08:10:09 Report 22 07/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oconee OL EXAM
- INITIAL EXAM WEEK 3
1 OCONEE/MARCH 2010 EXAM AT POWER FACILITIES V23286 03/29/2010 04/02/2010 PSB1-RP
- RP ACCESS CONTROLS 1
1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 04/19/2010 04/23/2010 EB3ISI
- UNIT 2 INSERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 05/03/2010 05/07/2010 EB3TI172
- TI-172 RCS DM BUTT WELDS 1
1, 2, 3 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 05/03/2010 05/07/2010 EB3SGISI
- UNIT 2 SGISI 1
2 IP Inservice Inspection Activities - PWR 7111108P 05/10/2010 05/14/2010 PSB1-RP
- RP PUBLIC RADIATION PROTECTION 3
1, 2, 3 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 08/02/2010 08/06/2010 1, 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 08/02/2010 08/06/2010 1, 2, 3 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 08/02/2010 08/06/2010 1, 2, 3 IP Performance Indicator Verification 71151 08/02/2010 08/06/2010 PSB1EP
- EMERGENCY PREPARENESS EXERCISE 3
1, 2, 3 IP Exercise Evaluation 7111401 08/02/2010 08/06/2010 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 08/02/2010 08/06/2010 1, 2, 3 IP Performance Indicator Verification 71151 08/02/2010 08/06/2010 OL EXAM
- INITIAL EXAM - PREP 3
1 OCONEE/OCTOBER 2010 EXAM AT POWER FACILITIES V23339 10/04/2010 10/08/2010 OL EXAM
- INITIAL EXAM WEEK 3
1 OCONEE/OCTOBER 2010 EXAM AT POWER FACILITIES V23339 10/25/2010 10/29/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure}}

Latest revision as of 09:33, 14 January 2025

Report 22
ML092440287
Person / Time
Site: Oconee, 07200040  
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
Shared Package
ML092440283 List:
References
Download: ML092440287 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2009 08:10:09 Report 22 07/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oconee ISFSI

- ISFSI OPERATIONAL INSPECTION 3

1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2009 10/15/2009 PB1-SUP

- SUPPLEMENTAL FOR WHITE LOSS OF INVENTORY 1

1 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 95001 08/31/2009 09/04/2009 PB7-PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 6

1 IP Identification and Resolution of Problems 71152B 08/10/2009 08/14/2009 1

IP Identification and Resolution of Problems 71152B 08/24/2009 08/28/2009 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1, 2, 3 IP Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 2515/175 08/31/2009 09/04/2009 1, 2, 3 IP Alert and Notification System Testing 7111402 08/31/2009 09/04/2009 1, 2, 3 IP Emergency Response Organization Augmentation Testing 7111403 08/31/2009 09/04/2009 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 08/31/2009 09/04/2009 1, 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/31/2009 09/04/2009 1, 2, 3 IP Performance Indicator Verification 71151 08/31/2009 09/04/2009 PSB1-RP

- RADIATION PROTECTION OCCUPATIONAL WK1 2

1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 10/12/2009 10/16/2009 1, 2, 3 IP ALARA Planning and Controls 7112102 10/12/2009 10/16/2009 1, 2, 3 IP Radioactive Material Processing and Transportation 7112202 10/12/2009 10/16/2009 1, 2, 3 IP Performance Indicator Verification 71151 10/12/2009 10/16/2009 EB3ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 10/19/2009 10/23/2009 EB3TI172

- TI-172 RCS DM BUTT WELD 1

1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/19/2009 10/23/2009 EB3SGISI

- UNIT 1 STEAM GENERATOR INSERVICE INSP 1

1 IP Inservice Inspection Activities - PWR 7111108P 10/26/2009 10/30/2009 PSB1-RP

- RADIATION PROTECTION OCCUPATIONAL WK2 2

1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 10/26/2009 10/30/2009 1, 2, 3 IP ALARA Planning and Controls 7112102 10/26/2009 10/30/2009 1, 2, 3 IP Radioactive Material Processing and Transportation 7112202 10/26/2009 10/30/2009 ISFSI

- ISFSI OPERATIONAL INSPECTION 3

1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 12/01/2009 12/31/2009 ISFSI

- ISFSI ROUTINE LOADING 3

1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 12/01/2009 04/15/2010 OL EXAM

- INITIAL EXAM PREP 3

1 OCONEE/MARCH 2010 EXAM AT POWER FACILITIES V23286 03/08/2010 03/12/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 09/01/2009 08:10:09 Report 22 07/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oconee OL EXAM

- INITIAL EXAM WEEK 3

1 OCONEE/MARCH 2010 EXAM AT POWER FACILITIES V23286 03/29/2010 04/02/2010 PSB1-RP

- RP ACCESS CONTROLS 1

1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 04/19/2010 04/23/2010 EB3ISI

- UNIT 2 INSERVICE INSPECTION 1

2 IP Inservice Inspection Activities - PWR 7111108P 05/03/2010 05/07/2010 EB3TI172

- TI-172 RCS DM BUTT WELDS 1

1, 2, 3 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 05/03/2010 05/07/2010 EB3SGISI

- UNIT 2 SGISI 1

2 IP Inservice Inspection Activities - PWR 7111108P 05/10/2010 05/14/2010 PSB1-RP

- RP PUBLIC RADIATION PROTECTION 3

1, 2, 3 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 08/02/2010 08/06/2010 1, 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 08/02/2010 08/06/2010 1, 2, 3 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 08/02/2010 08/06/2010 1, 2, 3 IP Performance Indicator Verification 71151 08/02/2010 08/06/2010 PSB1EP

- EMERGENCY PREPARENESS EXERCISE 3

1, 2, 3 IP Exercise Evaluation 7111401 08/02/2010 08/06/2010 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 08/02/2010 08/06/2010 1, 2, 3 IP Performance Indicator Verification 71151 08/02/2010 08/06/2010 OL EXAM

- INITIAL EXAM - PREP 3

1 OCONEE/OCTOBER 2010 EXAM AT POWER FACILITIES V23339 10/04/2010 10/08/2010 OL EXAM

- INITIAL EXAM WEEK 3

1 OCONEE/OCTOBER 2010 EXAM AT POWER FACILITIES V23339 10/25/2010 10/29/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure