| issue date = 12/28/2010 | | issue date = 12/28/2010 | ||
| title = Draft Request for Additional Information | | title = Draft Request for Additional Information | ||
| author name = Ennis R | | author name = Ennis R | ||
| author affiliation = NRC/NRR/DORL/LPLI-2 | | author affiliation = NRC/NRR/DORL/LPLI-2 | ||
| addressee name = Chernoff H | | addressee name = Chernoff H | ||
| addressee affiliation = NRC/NRR/DORL/LPLI-2 | | addressee affiliation = NRC/NRR/DORL/LPLI-2 | ||
| docket = 05000272 | | docket = 05000272 | ||
| license number = | | license number = | ||
| contact person = Ennis R | | contact person = Ennis R, NRR/DORL, 415-1420 | ||
| case reference number = TAC ME4923 | | case reference number = TAC ME4923 | ||
| document type = Memoranda, Request for Additional Information (RAI) | | document type = Memoranda, Request for Additional Information (RAI) | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:December 28, 2010 | {{#Wiki_filter:December 28, 2010 MEMORANDUM TO: | ||
Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: | |||
MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: | Richard B. Ennis, Senior Project Manager /ra/ | ||
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
==SUBJECT:== | ==SUBJECT:== | ||
SALEM NUCLEAR GENERATING STATION, UNIT NO. 1, DRAFT REQUEST FOR ADDITIONAL INFORMATION | SALEM NUCLEAR GENERATING STATION, UNIT NO. 1, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NO. ME4923) | ||
The attached draft request for information (RAI) was transmitted on December 28, 2010, to Mr. Jeff Keenan of PSEG Nuclear LLC (the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s {{letter dated|date=October 21, 2010|text=October 21, 2010, letter}} which submitted the results of the steam generator tube inspections performed at Salem Nuclear Generating Station (Salem), Unit No. 1, during refueling outage 1R20. | |||
The attached draft request for information (RAI) was transmitted on December 28, 2010, to Mr. Jeff Keenan of PSEG Nuclear LLC (the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee | This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees submittal. | ||
=s October 21, 2010, letter which submitted the results of the steam generator tube inspections performed at Salem Nuclear Generating Station (Salem), Unit No. 1, during refueling outage 1R20. | |||
This memorandum and the attachment do not convey or represent an NRC staff position regarding the | |||
Docket No. 50-272 | Docket No. 50-272 | ||
| Line 35: | Line 32: | ||
Draft RAI | Draft RAI | ||
December 28, 2010 | December 28, 2010 MEMORANDUM TO: | ||
Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: | |||
MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: | Richard B. Ennis, Senior Project Manager /ra/ | ||
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
==SUBJECT:== | ==SUBJECT:== | ||
SALEM NUCLEAR GENERATING STATION, UNIT NO. 1, DRAFT REQUEST FOR ADDITIONAL INFORMATION | SALEM NUCLEAR GENERATING STATION, UNIT NO. 1, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NO. ME4923) | ||
The attached draft request for information (RAI) was transmitted on December 28, 2010, to Mr. Jeff Keenan of PSEG Nuclear LLC (the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s {{letter dated|date=October 21, 2010|text=October 21, 2010, letter}} which submitted the results of the steam generator tube inspections performed at Salem Nuclear Generating Station (Salem), Unit No. 1, during refueling outage 1R20. | |||
The attached draft request for information (RAI) was transmitted on December 28, 2010, to Mr. Jeff Keenan of PSEG Nuclear LLC (the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee | This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's submittal. | ||
=s October 21, 2010, letter which submitted the results of the steam generator tube inspections performed at Salem Nuclear Generating Station (Salem), Unit No. 1, during refueling outage 1R20. | |||
This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's submittal. | |||
Docket No. 50-272 | Docket No. 50-272 | ||
==Attachment:== | ==Attachment:== | ||
Draft RAI | Draft RAI DISTRIBUTION PUBLIC RidsNrrDorlLpl1-2 AJohnson, CSGB LPLI-2 Reading RidsNrrPMSalem KKarwoski, DCI RidsNrrDorlDpr Abodoako, CSGB ACCESSION NO.: ML OFFICE LPLI-2/PM NAME REnnis DATE 12/28/10 OFFICIAL RECORD COPY | ||
DISTRIBUTION PUBLIC | |||
ACCESSION NO.: | |||
DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE INSPECTION REPORT FOR REFUELING OUTAGE 1R20 SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 DOCKET NO. 50-272 By {{letter dated|date=October 21, 2010|text=letter dated October 21, 2010}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102980089), PSEG Nuclear LLC (the licensee) submitted the results of the steam generator (SG) tube inspections performed at Salem Nuclear Generating Station (Salem), Unit No. 1, during refueling outage 1R20 (spring 2010). This report was submitted in accordance with the requirements in Salem Unit 1 Technical Specification (TS) 6.9.1.10. | |||
The Nuclear Regulatory Commission (NRC) staff has reviewed the information provided by the licensee and would like to discuss the following issues to clarify the submittal. | The Nuclear Regulatory Commission (NRC) staff has reviewed the information provided by the licensee and would like to discuss the following issues to clarify the submittal. | ||
: 1. Please clarify the number of tubes with overexpansions (designated as OXP) and with hydraulic underexpansions (ETL). Please provide the maximum distance that any of the bottom of the tube expansion transition locations are from the top of the tubesheet. | : 1. Please clarify the number of tubes with overexpansions (designated as OXP) and with hydraulic underexpansions (ETL). Please provide the maximum distance that any of the bottom of the tube expansion transition locations are from the top of the tubesheet. | ||
: 2. Please confirm that no degradation was observed during examination of previously installed tube plugs. | : 2. Please confirm that no degradation was observed during examination of previously installed tube plugs. | ||
: 3. Please discuss the extent to which any new dents/dings were observed during 1R20. | : 3. Please discuss the extent to which any new dents/dings were observed during 1R20. | ||
: 4. In addition to the tube in Row 54, Column 35 in steam generator 13, which other tubes were preventively plugged for wear at the anti-vibration bars in that steam generator? | : 4. In addition to the tube in Row 54, Column 35 in steam generator 13, which other tubes were preventively plugged for wear at the anti-vibration bars in that steam generator? | ||
Attachment}} | Attachment}} | ||
Latest revision as of 00:49, 14 January 2025
| ML103630461 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 12/28/2010 |
| From: | Richard Ennis Plant Licensing Branch 1 |
| To: | Chernoff H Plant Licensing Branch 1 |
| Ennis R, NRR/DORL, 415-1420 | |
| References | |
| TAC ME4923 | |
| Download: ML103630461 (3) | |
Text
December 28, 2010 MEMORANDUM TO:
Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Richard B. Ennis, Senior Project Manager /ra/
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNIT NO. 1, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NO. ME4923)
The attached draft request for information (RAI) was transmitted on December 28, 2010, to Mr. Jeff Keenan of PSEG Nuclear LLC (the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s October 21, 2010, letter which submitted the results of the steam generator tube inspections performed at Salem Nuclear Generating Station (Salem), Unit No. 1, during refueling outage 1R20.
This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees submittal.
Docket No. 50-272
Attachment:
Draft RAI
December 28, 2010 MEMORANDUM TO:
Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Richard B. Ennis, Senior Project Manager /ra/
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNIT NO. 1, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NO. ME4923)
The attached draft request for information (RAI) was transmitted on December 28, 2010, to Mr. Jeff Keenan of PSEG Nuclear LLC (the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s October 21, 2010, letter which submitted the results of the steam generator tube inspections performed at Salem Nuclear Generating Station (Salem), Unit No. 1, during refueling outage 1R20.
This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's submittal.
Docket No. 50-272
Attachment:
Draft RAI DISTRIBUTION PUBLIC RidsNrrDorlLpl1-2 AJohnson, CSGB LPLI-2 Reading RidsNrrPMSalem KKarwoski, DCI RidsNrrDorlDpr Abodoako, CSGB ACCESSION NO.: ML OFFICE LPLI-2/PM NAME REnnis DATE 12/28/10 OFFICIAL RECORD COPY
DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE INSPECTION REPORT FOR REFUELING OUTAGE 1R20 SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 DOCKET NO. 50-272 By letter dated October 21, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102980089), PSEG Nuclear LLC (the licensee) submitted the results of the steam generator (SG) tube inspections performed at Salem Nuclear Generating Station (Salem), Unit No. 1, during refueling outage 1R20 (spring 2010). This report was submitted in accordance with the requirements in Salem Unit 1 Technical Specification (TS) 6.9.1.10.
The Nuclear Regulatory Commission (NRC) staff has reviewed the information provided by the licensee and would like to discuss the following issues to clarify the submittal.
- 1. Please clarify the number of tubes with overexpansions (designated as OXP) and with hydraulic underexpansions (ETL). Please provide the maximum distance that any of the bottom of the tube expansion transition locations are from the top of the tubesheet.
- 2. Please confirm that no degradation was observed during examination of previously installed tube plugs.
- 3. Please discuss the extent to which any new dents/dings were observed during 1R20.
- 4. In addition to the tube in Row 54, Column 35 in steam generator 13, which other tubes were preventively plugged for wear at the anti-vibration bars in that steam generator?