ML11347A451: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11347A451
| number = ML11347A451
| issue date = 11/14/2011
| issue date = 11/14/2011
| title = 2011/11/14 Watts Bar 2 OL - NRC PM Open Items List 11-15-11 R1.docx
| title = OL - NRC PM Open Items List 11-15-11 R1.docx
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
{{#Wiki_filter:1 WBN2Public Resource From:
Sent: Monday, November 14, 2011 10:53 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Rober t H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D
Boyd, Desiree L [dlboyd@tva.gov]
Sent:
Monday, November 14, 2011 10:53 AM To:
Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:
Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D


==Subject:==
==Subject:==
NRC PM Open Items List 11-15-11 R1.docx Attachments:
NRC PM Open Items List 11-15-11 R1.docx Attachments:
NRC PM Open Items List 11-15-11 R1.docxUpdated - Rev 1. For next phone call.  
NRC PM Open Items List 11-15-11 R1.docx Updated - Rev 1. For next phone call.
 
Thank you,  
Thank you,  
    ~*~*~*~*~*~*~*~*~*~*~*~
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services  
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764


dlboyd@tva.gov 423-365-8764
Hearing Identifier:
 
Watts_Bar_2_Operating_LA_Public Email Number:
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 609   Mail Envelope Properties   (7AB41F650F76BD44B5BCAB7C0CCABFAF2540E3AB)
609 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF2540E3AB)  


==Subject:==
==Subject:==
NRC PM Open Items List 11-15-11 R1.docx Sent Date:   11/14/2011 10:53:06 AM Received Date: 11/14/2011 10:53:13 AM From:   Boyd, Desiree L Created By:   dlboyd@tva.gov Recipients:     "Arent, Gordon" <garent@tva.gov>
NRC PM Open Items List 11-15-11 R1.docx Sent Date:
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
11/14/2011 10:53:06 AM Received Date:
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com> Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
11/14/2011 10:53:13 AM From:
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Boyd, Desiree L Created By:
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov> Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> Tracking Status: None  
dlboyd@tva.gov Recipients:  
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 267 11/14/2011 10:53:13 AM NRC PM Open Items List 11-15-11 R1.docx 32903 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:


Post Office:  TVANUCXVS2.main.tva.gov Files    Size      Date & Time MESSAGE    267      11/14/2011 10:53:13 AM  NRC PM Open Items List 11-15-11 R1.docx    32903 
Page 1 of 3 NRC PM Open Items List 11/15/11 (423) 751-7777 ID 4233658764#
 
No.
Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
Description Status Additional Comments Resp Org/Person
Page 1 of 3     NRC PM Open Items List 11/15/11 (423) 751-7777 ID 4233658764#
: 1.
No. Description Status Additional Comments Resp Org/Person 1. Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Feb. 2012  
Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Feb. 2012 Inspection 4th Qtr 2012 NRC Inspection in 2011 Heinrich/Snyder (Bryan)
 
: 2.
Inspection  
Instrumentation RAI List (Knuettel)
 
4 th Qtr 2012 NRC Inspection in 2011 Heinrich/Snyder (Bryan) 2. Instrumentation RAI List (Knuettel)
: 1. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule.
: 1. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule.
: 2. Non-props & affidavits
: 2. Non-props & affidavits
: 3. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item. 4. WEC to produce a test report for the incore IITA.
: 3. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item.
: 4. WEC to produce a test report for the incore IITA.
: 5. Submit I&C update letter
: 5. Submit I&C update letter
: 1. Various - see status
: 1. Various -
: 2. 11/18/11 3. Various - see status
see status
: 4. 11/18/11 5. 11/30/11 1. 04038903-2SP: 11/14/11 04038903-4SP: 11/14/11
: 2. 11/18/11
: 3. Various -
see status
: 4. 11/18/11
: 5. 11/30/11
: 1. 04038903-2SP: 11/14/11 04038903-4SP: 11/14/11
: 2. Provide NRC non-prop and affidavit for all remaining documents
: 2. Provide NRC non-prop and affidavit for all remaining documents
: 3. WEC to provide the following documents:
: 3. WEC to provide the following documents:
EQLR-171: 11/16/11 EQ-QR-64-GEN: 11/16/11 WNA-CN-00157-WBT: 11/18/11
EQLR-171: 11/16/11 EQ-QR-64-GEN: 11/16/11 WNA-CN-00157-WBT: 11/18/11
: 4. IITA In-core EQ report
: 4. IITA In-core EQ report
: 5. Next I&C submittal update Eng/Hilmes (Smith) 3. Exemption to 10CFR50.49 for some Category II cables?
: 5. Next I&C submittal update Eng/Hilmes (Smith)
: 3.
Exemption to 10CFR50.49 for some Category II cables?
11/14/11 Determine if exemption required. NRC may need to establish a license condition.
11/14/11 Determine if exemption required. NRC may need to establish a license condition.
Hilmes (Stockton)
Hilmes (Stockton)  
Page 2 of 3     No. Description Status Additional Comments Resp Org/Person 4. Complete Implementation (Hemmer)
 
Pump Relocation 5/30/12 Bldg Plan 11/14/11 Inspection - June 2012 Table update -
Page 2 of 3 No.
TBD Substantial building to complete and equipment in May. Provide document of mitigating equipment and location for unit 2. Hemmer (Smith) 5. Fire Protection Report Questions regarding OMA 1. 11/30/11 2. 11/16/11 1. Submit As-designed U1/U2 FPR
Description Status Additional Comments Resp Org/Person
: 2. Follow-up meeting ENG/Hilmes (Arent) 6. Tech Spec Revisions from latest T/S markup and NRC Review comments
: 4.
Complete Implementation (Hemmer)
Pump Relocation 5/30/12 Bldg Plan 11/14/11 Inspection -
June 2012 Table update -
TBD Substantial building to complete and equipment in May.
Provide document of mitigating equipment and location for unit 2.
Hemmer (Smith)
: 5.
Fire Protection Report Questions regarding OMA
: 1. 11/30/11
: 2. 11/16/11
: 1. Submit As-designed U1/U2 FPR
: 2. Follow-up meeting ENG/Hilmes (Arent)
: 6.
Tech Spec Revisions from latest T/S markup and NRC Review comments
: 1. 11/18/11
: 1. 11/18/11
: 2. 12/15/11
: 2. 12/15/11
Line 71: Line 111:
: 2. I-131 DEI
: 2. I-131 DEI
: 3. Diesel Generator Frequency
: 3. Diesel Generator Frequency
: 4. AST FHA Licensing/Elton (Bryan) 7. ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Attachment HH? Arent/Bryan 8. SSER 22/23/24/25 Open Items Response As needed The expanded HH list and status is covered periodically. Licensing 9. Transient Analysis issues Boron dilution RAI response 11/18/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132. ENG/Koontz WEC/Morgan 10. FSAR A107 11/18/11 Current target date for A107 is 11/18/11. Lic/Stockton 11. Develop list of planned License Conditions, Exemptions and Relief Requests (Arent) 1. 11/18/11 2. TBD 3. TBD 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 2. NRR to review current exemptions 3. Verify required notifications made NRR/TVA (Bryan) 12. Verify Tech Spec Setpoints match calcs TS certification 1. 12/2/11
: 4. AST FHA Licensing/Elton (Bryan)
: 2. Feb 2012 1. SSDs are complete. Six changes to the TSs will be submitted to NRC
: 7.
: 2. TS certification Eng/Hilmes (Bryan)
ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Attachment HH?
Page 3 of 3     No. Description Status Additional Comments Resp Org/Person 13. Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
Arent/Bryan
Woods (Bryan) 14. Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing 15. Submit final as-constructed FSAR figures 7/1/12 Licensing/ Stockton 16. TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
: 8.
Licensing (Gordon) 17. ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11. NRR 18. ASME Section III N-3 report 8/1/12   19. EP Drill Open Items
SSER 22/23/24/25 Open Items  
 
===Response===
As needed The expanded HH list and status is covered periodically.
Licensing
: 9.
Transient Analysis issues Boron dilution RAI response 11/18/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132.
ENG/Koontz WEC/Morgan
: 10.
FSAR A107 11/18/11 Current target date for A107 is 11/18/11.
Lic/Stockton
: 11.
Develop list of planned License Conditions, Exemptions and Relief Requests (Arent)
: 1. 11/18/11
: 2. TBD
: 3. TBD
: 1.
Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0
: 2.
NRR to review current exemptions
: 3.
Verify required notifications made NRR/TVA (Bryan)
: 12.
Verify Tech Spec Setpoints match calcs TS certification
: 1. 12/2/11
: 2. Feb 2012
: 1. SSDs are complete. Six changes to the TSs will be submitted to NRC
: 2. TS certification Eng/Hilmes (Bryan)  
 
Page 3 of 3 No.
Description Status Additional Comments Resp Org/Person
: 13.
Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
Woods (Bryan)
: 14.
Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing
: 15.
Submit final as-constructed FSAR figures 7/1/12 Licensing/
Stockton
: 16.
TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon)
: 17.
ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11.
NRR
: 18.
ASME Section III N-3 report 8/1/12
: 19.
EP Drill Open Items
: a. Duty Specialist
: a. Duty Specialist
: b. Commercial Dose Assessment TBD EP - Deutchmendy (Bryan) 20. Entrainment report revision 11/18/11 Licensing (Arent)0. Discretionary Actions
: b. Commercial Dose Assessment TBD EP -
: 1. Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Arent) 2. Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing 3. Status of GSI 199 Eastern Seismicity (Arent) Fall 2011 No action pending upcoming Generic Letter TVA/NRR 4. Letter to notify NRC when Vital Area Boundary returned to original location Jan. 2012 Security Plan Update - Boundary to be restored. Lic/Arent}}
Deutchmendy (Bryan)
: 20.
Entrainment report revision 11/18/11 Licensing (Arent)
: 0.
Discretionary Actions
: 1.
Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Arent)
: 2.
Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
: 3.
Status of GSI 199 Eastern Seismicity (Arent)
Fall 2011 No action pending upcoming Generic Letter TVA/NRR
: 4.
Letter to notify NRC when Vital Area Boundary returned to original location Jan. 2012 Security Plan Update - Boundary to be restored.
Lic/Arent}}

Latest revision as of 21:36, 12 January 2025

OL - NRC PM Open Items List 11-15-11 R1.docx
ML11347A451
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/14/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML11347A451 (5)


Text

1 WBN2Public Resource From:

Boyd, Desiree L [dlboyd@tva.gov]

Sent:

Monday, November 14, 2011 10:53 AM To:

Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:

Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D

Subject:

NRC PM Open Items List 11-15-11 R1.docx Attachments:

NRC PM Open Items List 11-15-11 R1.docx Updated - Rev 1. For next phone call.

Thank you,

~*~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764

Hearing Identifier:

Watts_Bar_2_Operating_LA_Public Email Number:

609 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF2540E3AB)

Subject:

NRC PM Open Items List 11-15-11 R1.docx Sent Date:

11/14/2011 10:53:06 AM Received Date:

11/14/2011 10:53:13 AM From:

Boyd, Desiree L Created By:

dlboyd@tva.gov Recipients:

"Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Smith, James D" <jdsmith@tva.gov>

Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>

Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None Post Office:

TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 267 11/14/2011 10:53:13 AM NRC PM Open Items List 11-15-11 R1.docx 32903 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

Page 1 of 3 NRC PM Open Items List 11/15/11 (423) 751-7777 ID 4233658764#

No.

Description Status Additional Comments Resp Org/Person

1.

Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Feb. 2012 Inspection 4th Qtr 2012 NRC Inspection in 2011 Heinrich/Snyder (Bryan)

2.

Instrumentation RAI List (Knuettel)

1. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule.
2. Non-props & affidavits
3. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item.
4. WEC to produce a test report for the incore IITA.
5. Submit I&C update letter
1. Various -

see status

2. 11/18/11
3. Various -

see status

4. 11/18/11
5. 11/30/11
1. 04038903-2SP: 11/14/11 04038903-4SP: 11/14/11
2. Provide NRC non-prop and affidavit for all remaining documents
3. WEC to provide the following documents:

EQLR-171: 11/16/11 EQ-QR-64-GEN: 11/16/11 WNA-CN-00157-WBT: 11/18/11

4. IITA In-core EQ report
5. Next I&C submittal update Eng/Hilmes (Smith)
3.

Exemption to 10CFR50.49 for some Category II cables?

11/14/11 Determine if exemption required. NRC may need to establish a license condition.

Hilmes (Stockton)

Page 2 of 3 No.

Description Status Additional Comments Resp Org/Person

4.

Complete Implementation (Hemmer)

Pump Relocation 5/30/12 Bldg Plan 11/14/11 Inspection -

June 2012 Table update -

TBD Substantial building to complete and equipment in May.

Provide document of mitigating equipment and location for unit 2.

Hemmer (Smith)

5.

Fire Protection Report Questions regarding OMA

1. 11/30/11
2. 11/16/11
1. Submit As-designed U1/U2 FPR
2. Follow-up meeting ENG/Hilmes (Arent)
6.

Tech Spec Revisions from latest T/S markup and NRC Review comments

1. 11/18/11
2. 12/15/11
3. 11/30/11
4. 11/30/11
1. CSST A & B - discretionary
2. I-131 DEI
3. Diesel Generator Frequency
4. AST FHA Licensing/Elton (Bryan)
7.

ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Attachment HH?

Arent/Bryan

8.

SSER 22/23/24/25 Open Items

Response

As needed The expanded HH list and status is covered periodically.

Licensing

9.

Transient Analysis issues Boron dilution RAI response 11/18/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132.

ENG/Koontz WEC/Morgan

10.

FSAR A107 11/18/11 Current target date for A107 is 11/18/11.

Lic/Stockton

11.

Develop list of planned License Conditions, Exemptions and Relief Requests (Arent)

1. 11/18/11
2. TBD
3. TBD
1.

Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0

2.

NRR to review current exemptions

3.

Verify required notifications made NRR/TVA (Bryan)

12.

Verify Tech Spec Setpoints match calcs TS certification

1. 12/2/11
2. Feb 2012
1. SSDs are complete. Six changes to the TSs will be submitted to NRC
2. TS certification Eng/Hilmes (Bryan)

Page 3 of 3 No.

Description Status Additional Comments Resp Org/Person

13.

Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/

Woods (Bryan)

14.

Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing

15.

Submit final as-constructed FSAR figures 7/1/12 Licensing/

Stockton

16.

TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.

Licensing (Gordon)

17.

ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11.

NRR

18.

ASME Section III N-3 report 8/1/12

19.

EP Drill Open Items

a. Duty Specialist
b. Commercial Dose Assessment TBD EP -

Deutchmendy (Bryan)

20.

Entrainment report revision 11/18/11 Licensing (Arent)

0.

Discretionary Actions

1.

Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Arent)

2.

Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing

3.

Status of GSI 199 Eastern Seismicity (Arent)

Fall 2011 No action pending upcoming Generic Letter TVA/NRR

4.

Letter to notify NRC when Vital Area Boundary returned to original location Jan. 2012 Security Plan Update - Boundary to be restored.

Lic/Arent