ML11347A451: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML11347A451 | | number = ML11347A451 | ||
| issue date = 11/14/2011 | | issue date = 11/14/2011 | ||
| title = | | title = OL - NRC PM Open Items List 11-15-11 R1.docx | ||
| author name = | | author name = | ||
| author affiliation = - No Known Affiliation | | author affiliation = - No Known Affiliation | ||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov] | {{#Wiki_filter:1 WBN2Public Resource From: | ||
Sent: Monday, November 14, 2011 10:53 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, | Boyd, Desiree L [dlboyd@tva.gov] | ||
Sent: | |||
Monday, November 14, 2011 10:53 AM To: | |||
Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: | |||
Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D | |||
==Subject:== | ==Subject:== | ||
NRC PM Open Items List 11-15-11 R1.docx Attachments: | NRC PM Open Items List 11-15-11 R1.docx Attachments: | ||
NRC PM Open Items List 11-15-11 R1. | NRC PM Open Items List 11-15-11 R1.docx Updated - Rev 1. For next phone call. | ||
Thank you, | Thank you, | ||
~*~*~*~*~*~*~*~*~*~*~*~ | |||
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services | Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 | ||
Hearing Identifier: | |||
Watts_Bar_2_Operating_LA_Public Email Number: | |||
Hearing Identifier: | 609 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF2540E3AB) | ||
==Subject:== | ==Subject:== | ||
NRC PM Open Items List 11-15-11 R1.docx | NRC PM Open Items List 11-15-11 R1.docx Sent Date: | ||
Tracking Status: None | 11/14/2011 10:53:06 AM Received Date: | ||
Tracking Status: None | 11/14/2011 10:53:13 AM From: | ||
Tracking Status: None | Boyd, Desiree L Created By: | ||
Tracking Status: None | dlboyd@tva.gov Recipients: | ||
"Arent, Gordon" <garent@tva.gov> | |||
Tracking Status: None "Smith, James D" <jdsmith@tva.gov> | |||
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> | |||
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com> | |||
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov> | |||
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov> | |||
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> | |||
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov> | |||
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov> | |||
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> | |||
Tracking Status: None Post Office: | |||
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 267 11/14/2011 10:53:13 AM NRC PM Open Items List 11-15-11 R1.docx 32903 Options Priority: | |||
Standard Return Notification: | |||
No Reply Requested: | |||
No Sensitivity: | |||
Normal Expiration Date: | |||
Recipients Received: | |||
Page 1 of 3 NRC PM Open Items List 11/15/11 (423) 751-7777 ID 4233658764# | |||
No. | |||
Description Status Additional Comments Resp Org/Person | |||
Page 1 of 3 | : 1. | ||
No. Description Status Additional Comments Resp Org/Person 1. Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Feb. 2012 | Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Feb. 2012 Inspection 4th Qtr 2012 NRC Inspection in 2011 Heinrich/Snyder (Bryan) | ||
: 2. | |||
Inspection | Instrumentation RAI List (Knuettel) | ||
: 1. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule. | : 1. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule. | ||
: 2. Non-props & affidavits | : 2. Non-props & affidavits | ||
: 3. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item. 4. WEC to produce a test report for the incore IITA. | : 3. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item. | ||
: 4. WEC to produce a test report for the incore IITA. | |||
: 5. Submit I&C update letter | : 5. Submit I&C update letter | ||
: 1. Various - see status | : 1. Various - | ||
: 2. 11/18/11 3. Various - see status | see status | ||
: 4. 11/18/11 5. 11/30/11 1. 04038903-2SP: 11/14/11 04038903-4SP: 11/14/11 | : 2. 11/18/11 | ||
: 3. Various - | |||
see status | |||
: 4. 11/18/11 | |||
: 5. 11/30/11 | |||
: 1. 04038903-2SP: 11/14/11 04038903-4SP: 11/14/11 | |||
: 2. Provide NRC non-prop and affidavit for all remaining documents | : 2. Provide NRC non-prop and affidavit for all remaining documents | ||
: 3. WEC to provide the following documents: | : 3. WEC to provide the following documents: | ||
EQLR-171: 11/16/11 EQ-QR-64-GEN: 11/16/11 WNA-CN-00157-WBT: 11/18/11 | EQLR-171: 11/16/11 EQ-QR-64-GEN: 11/16/11 WNA-CN-00157-WBT: 11/18/11 | ||
: 4. IITA In-core EQ report | : 4. IITA In-core EQ report | ||
: 5. Next I&C submittal update Eng/Hilmes (Smith) 3. Exemption to 10CFR50.49 for some Category II cables? | : 5. Next I&C submittal update Eng/Hilmes (Smith) | ||
: 3. | |||
Exemption to 10CFR50.49 for some Category II cables? | |||
11/14/11 Determine if exemption required. NRC may need to establish a license condition. | 11/14/11 Determine if exemption required. NRC may need to establish a license condition. | ||
Hilmes (Stockton) | Hilmes (Stockton) | ||
Page 2 of 3 | |||
Pump Relocation 5/30/12 | Page 2 of 3 No. | ||
TBD Substantial building to complete and equipment in May. Provide document of mitigating equipment and location for unit 2. Hemmer (Smith) 5. Fire Protection Report Questions regarding OMA 1. 11/30/11 2. 11/16/11 1. Submit As-designed U1/U2 FPR | Description Status Additional Comments Resp Org/Person | ||
: 2. Follow-up meeting ENG/Hilmes (Arent) 6. Tech Spec Revisions from latest T/S markup and NRC Review comments | : 4. | ||
Complete Implementation (Hemmer) | |||
Pump Relocation 5/30/12 Bldg Plan 11/14/11 Inspection - | |||
June 2012 Table update - | |||
TBD Substantial building to complete and equipment in May. | |||
Provide document of mitigating equipment and location for unit 2. | |||
Hemmer (Smith) | |||
: 5. | |||
Fire Protection Report Questions regarding OMA | |||
: 1. 11/30/11 | |||
: 2. 11/16/11 | |||
: 1. Submit As-designed U1/U2 FPR | |||
: 2. Follow-up meeting ENG/Hilmes (Arent) | |||
: 6. | |||
Tech Spec Revisions from latest T/S markup and NRC Review comments | |||
: 1. 11/18/11 | : 1. 11/18/11 | ||
: 2. 12/15/11 | : 2. 12/15/11 | ||
| Line 71: | Line 111: | ||
: 2. I-131 DEI | : 2. I-131 DEI | ||
: 3. Diesel Generator Frequency | : 3. Diesel Generator Frequency | ||
: 4. AST FHA Licensing/Elton (Bryan) 7. ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Attachment HH? Arent/Bryan 8. SSER 22/23/24/25 Open Items Response As needed The expanded HH list and status is covered periodically. Licensing 9. Transient Analysis issues Boron dilution RAI response 11/18/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132. ENG/Koontz WEC/Morgan 10. FSAR A107 11/18/11 Current target date for A107 is 11/18/11. Lic/Stockton 11. Develop list of planned License Conditions, Exemptions and Relief Requests (Arent) 1. 11/18/11 2. TBD 3. TBD 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 2. NRR to review current exemptions 3. Verify required notifications made NRR/TVA (Bryan) 12. Verify Tech Spec Setpoints match calcs TS certification 1. 12/2/11 | : 4. AST FHA Licensing/Elton (Bryan) | ||
: 2. Feb 2012 1. SSDs are complete. Six changes to the TSs will be submitted to NRC | : 7. | ||
: 2. TS certification Eng/Hilmes (Bryan) | ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Attachment HH? | ||
Page 3 of 3 | Arent/Bryan | ||
Woods (Bryan) 14. Issue Unit 2 Completion Letter (Arent) 8/1/12 | : 8. | ||
Licensing (Gordon) 17. ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11. NRR 18. ASME Section III N-3 report 8/1/12 | SSER 22/23/24/25 Open Items | ||
===Response=== | |||
As needed The expanded HH list and status is covered periodically. | |||
Licensing | |||
: 9. | |||
Transient Analysis issues Boron dilution RAI response 11/18/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132. | |||
ENG/Koontz WEC/Morgan | |||
: 10. | |||
FSAR A107 11/18/11 Current target date for A107 is 11/18/11. | |||
Lic/Stockton | |||
: 11. | |||
Develop list of planned License Conditions, Exemptions and Relief Requests (Arent) | |||
: 1. 11/18/11 | |||
: 2. TBD | |||
: 3. TBD | |||
: 1. | |||
Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 | |||
: 2. | |||
NRR to review current exemptions | |||
: 3. | |||
Verify required notifications made NRR/TVA (Bryan) | |||
: 12. | |||
Verify Tech Spec Setpoints match calcs TS certification | |||
: 1. 12/2/11 | |||
: 2. Feb 2012 | |||
: 1. SSDs are complete. Six changes to the TSs will be submitted to NRC | |||
: 2. TS certification Eng/Hilmes (Bryan) | |||
Page 3 of 3 No. | |||
Description Status Additional Comments Resp Org/Person | |||
: 13. | |||
Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/ | |||
Woods (Bryan) | |||
: 14. | |||
Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing | |||
: 15. | |||
Submit final as-constructed FSAR figures 7/1/12 Licensing/ | |||
Stockton | |||
: 16. | |||
TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete. | |||
Licensing (Gordon) | |||
: 17. | |||
ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11. | |||
NRR | |||
: 18. | |||
ASME Section III N-3 report 8/1/12 | |||
: 19. | |||
EP Drill Open Items | |||
: a. Duty Specialist | : a. Duty Specialist | ||
: b. Commercial Dose Assessment TBD | : b. Commercial Dose Assessment TBD EP - | ||
: 1. Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 | Deutchmendy (Bryan) | ||
: 20. | |||
Entrainment report revision 11/18/11 Licensing (Arent) | |||
: 0. | |||
Discretionary Actions | |||
: 1. | |||
Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Arent) | |||
: 2. | |||
Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing | |||
: 3. | |||
Status of GSI 199 Eastern Seismicity (Arent) | |||
Fall 2011 No action pending upcoming Generic Letter TVA/NRR | |||
: 4. | |||
Letter to notify NRC when Vital Area Boundary returned to original location Jan. 2012 Security Plan Update - Boundary to be restored. | |||
Lic/Arent}} | |||
Latest revision as of 21:36, 12 January 2025
| ML11347A451 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 11/14/2011 |
| From: | - No Known Affiliation |
| To: | Division of Operating Reactor Licensing |
| References | |
| Download: ML11347A451 (5) | |
Text
1 WBN2Public Resource From:
Boyd, Desiree L [dlboyd@tva.gov]
Sent:
Monday, November 14, 2011 10:53 AM To:
Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:
Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D
Subject:
NRC PM Open Items List 11-15-11 R1.docx Attachments:
NRC PM Open Items List 11-15-11 R1.docx Updated - Rev 1. For next phone call.
Thank you,
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
609 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF2540E3AB)
Subject:
NRC PM Open Items List 11-15-11 R1.docx Sent Date:
11/14/2011 10:53:06 AM Received Date:
11/14/2011 10:53:13 AM From:
Boyd, Desiree L Created By:
dlboyd@tva.gov Recipients:
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 267 11/14/2011 10:53:13 AM NRC PM Open Items List 11-15-11 R1.docx 32903 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
Page 1 of 3 NRC PM Open Items List 11/15/11 (423) 751-7777 ID 4233658764#
No.
Description Status Additional Comments Resp Org/Person
- 1.
Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Feb. 2012 Inspection 4th Qtr 2012 NRC Inspection in 2011 Heinrich/Snyder (Bryan)
- 2.
Instrumentation RAI List (Knuettel)
- 1. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule.
- 2. Non-props & affidavits
- 3. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item.
- 4. WEC to produce a test report for the incore IITA.
- 5. Submit I&C update letter
- 1. Various -
see status
- 2. 11/18/11
- 3. Various -
see status
- 4. 11/18/11
- 5. 11/30/11
- 1. 04038903-2SP: 11/14/11 04038903-4SP: 11/14/11
- 2. Provide NRC non-prop and affidavit for all remaining documents
- 3. WEC to provide the following documents:
EQLR-171: 11/16/11 EQ-QR-64-GEN: 11/16/11 WNA-CN-00157-WBT: 11/18/11
- 4. IITA In-core EQ report
- 5. Next I&C submittal update Eng/Hilmes (Smith)
- 3.
Exemption to 10CFR50.49 for some Category II cables?
11/14/11 Determine if exemption required. NRC may need to establish a license condition.
Hilmes (Stockton)
Page 2 of 3 No.
Description Status Additional Comments Resp Org/Person
- 4.
Complete Implementation (Hemmer)
Pump Relocation 5/30/12 Bldg Plan 11/14/11 Inspection -
June 2012 Table update -
TBD Substantial building to complete and equipment in May.
Provide document of mitigating equipment and location for unit 2.
Hemmer (Smith)
- 5.
Fire Protection Report Questions regarding OMA
- 1. 11/30/11
- 2. 11/16/11
- 1. Submit As-designed U1/U2 FPR
- 2. Follow-up meeting ENG/Hilmes (Arent)
- 6.
Tech Spec Revisions from latest T/S markup and NRC Review comments
- 1. 11/18/11
- 2. 12/15/11
- 3. 11/30/11
- 4. 11/30/11
- 1. CSST A & B - discretionary
- 2. I-131 DEI
- 3. Diesel Generator Frequency
- 7.
ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Attachment HH?
Arent/Bryan
- 8.
SSER 22/23/24/25 Open Items
Response
As needed The expanded HH list and status is covered periodically.
Licensing
- 9.
Transient Analysis issues Boron dilution RAI response 11/18/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132.
ENG/Koontz WEC/Morgan
- 10.
FSAR A107 11/18/11 Current target date for A107 is 11/18/11.
Lic/Stockton
- 11.
Develop list of planned License Conditions, Exemptions and Relief Requests (Arent)
- 1. 11/18/11
- 2. TBD
- 3. TBD
- 1.
Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0
- 2.
NRR to review current exemptions
- 3.
Verify required notifications made NRR/TVA (Bryan)
- 12.
Verify Tech Spec Setpoints match calcs TS certification
- 1. 12/2/11
- 2. Feb 2012
- 1. SSDs are complete. Six changes to the TSs will be submitted to NRC
- 2. TS certification Eng/Hilmes (Bryan)
Page 3 of 3 No.
Description Status Additional Comments Resp Org/Person
- 13.
Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
Woods (Bryan)
- 14.
Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing
- 15.
Submit final as-constructed FSAR figures 7/1/12 Licensing/
Stockton
- 16.
TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon)
- 17.
ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11.
- 18.
ASME Section III N-3 report 8/1/12
- 19.
EP Drill Open Items
- a. Duty Specialist
Deutchmendy (Bryan)
- 20.
Entrainment report revision 11/18/11 Licensing (Arent)
- 0.
Discretionary Actions
- 1.
Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Arent)
- 2.
Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
- 3.
Status of GSI 199 Eastern Seismicity (Arent)
Fall 2011 No action pending upcoming Generic Letter TVA/NRR
- 4.
Letter to notify NRC when Vital Area Boundary returned to original location Jan. 2012 Security Plan Update - Boundary to be restored.