ML11347A451
| ML11347A451 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 11/14/2011 |
| From: | - No Known Affiliation |
| To: | Division of Operating Reactor Licensing |
| References | |
| Download: ML11347A451 (5) | |
Text
1 WBN2Public Resource From:
Boyd, Desiree L [dlboyd@tva.gov]
Sent:
Monday, November 14, 2011 10:53 AM To:
Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:
Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D
Subject:
NRC PM Open Items List 11-15-11 R1.docx Attachments:
NRC PM Open Items List 11-15-11 R1.docx Updated - Rev 1. For next phone call.
Thank you,
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
609 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF2540E3AB)
Subject:
NRC PM Open Items List 11-15-11 R1.docx Sent Date:
11/14/2011 10:53:06 AM Received Date:
11/14/2011 10:53:13 AM From:
Boyd, Desiree L Created By:
dlboyd@tva.gov Recipients:
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 267 11/14/2011 10:53:13 AM NRC PM Open Items List 11-15-11 R1.docx 32903 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
Page 1 of 3 NRC PM Open Items List 11/15/11 (423) 751-7777 ID 4233658764#
No.
Description Status Additional Comments Resp Org/Person
- 1.
Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Feb. 2012 Inspection 4th Qtr 2012 NRC Inspection in 2011 Heinrich/Snyder (Bryan)
- 2.
Instrumentation RAI List (Knuettel)
- 1. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule.
- 2. Non-props & affidavits
- 3. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item.
- 4. WEC to produce a test report for the incore IITA.
- 5. Submit I&C update letter
- 1. Various -
see status
- 2. 11/18/11
- 3. Various -
see status
- 4. 11/18/11
- 5. 11/30/11
- 1. 04038903-2SP: 11/14/11 04038903-4SP: 11/14/11
- 2. Provide NRC non-prop and affidavit for all remaining documents
- 3. WEC to provide the following documents:
EQLR-171: 11/16/11 EQ-QR-64-GEN: 11/16/11 WNA-CN-00157-WBT: 11/18/11
- 4. IITA In-core EQ report
- 5. Next I&C submittal update Eng/Hilmes (Smith)
- 3.
Exemption to 10CFR50.49 for some Category II cables?
11/14/11 Determine if exemption required. NRC may need to establish a license condition.
Hilmes (Stockton)
Page 2 of 3 No.
Description Status Additional Comments Resp Org/Person
- 4.
Complete Implementation (Hemmer)
Pump Relocation 5/30/12 Bldg Plan 11/14/11 Inspection -
June 2012 Table update -
TBD Substantial building to complete and equipment in May.
Provide document of mitigating equipment and location for unit 2.
Hemmer (Smith)
- 5.
Fire Protection Report Questions regarding OMA
- 1. 11/30/11
- 2. 11/16/11
- 1. Submit As-designed U1/U2 FPR
- 2. Follow-up meeting ENG/Hilmes (Arent)
- 6.
Tech Spec Revisions from latest T/S markup and NRC Review comments
- 1. 11/18/11
- 2. 12/15/11
- 3. 11/30/11
- 4. 11/30/11
- 1. CSST A & B - discretionary
- 2. I-131 DEI
- 3. Diesel Generator Frequency
- 7.
ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Attachment HH?
Arent/Bryan
- 8.
SSER 22/23/24/25 Open Items
Response
As needed The expanded HH list and status is covered periodically.
Licensing
- 9.
Transient Analysis issues Boron dilution RAI response 11/18/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132.
ENG/Koontz WEC/Morgan
- 10.
FSAR A107 11/18/11 Current target date for A107 is 11/18/11.
Lic/Stockton
- 11.
Develop list of planned License Conditions, Exemptions and Relief Requests (Arent)
- 1. 11/18/11
- 2. TBD
- 3. TBD
- 1.
Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0
- 2.
NRR to review current exemptions
- 3.
Verify required notifications made NRR/TVA (Bryan)
- 12.
Verify Tech Spec Setpoints match calcs TS certification
- 1. 12/2/11
- 2. Feb 2012
- 1. SSDs are complete. Six changes to the TSs will be submitted to NRC
- 2. TS certification Eng/Hilmes (Bryan)
Page 3 of 3 No.
Description Status Additional Comments Resp Org/Person
- 13.
Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
Woods (Bryan)
- 14.
Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing
- 15.
Submit final as-constructed FSAR figures 7/1/12 Licensing/
Stockton
- 16.
TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon)
- 17.
ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11.
- 18.
ASME Section III N-3 report 8/1/12
- 19.
EP Drill Open Items
- a. Duty Specialist
Deutchmendy (Bryan)
- 20.
Entrainment report revision 11/18/11 Licensing (Arent)
- 0.
Discretionary Actions
- 1.
Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Arent)
- 2.
Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
- 3.
Status of GSI 199 Eastern Seismicity (Arent)
Fall 2011 No action pending upcoming Generic Letter TVA/NRR
- 4.
Letter to notify NRC when Vital Area Boundary returned to original location Jan. 2012 Security Plan Update - Boundary to be restored.
Lic/Arent