| number = ML13246A304
| number = ML13246A304
| issue date = 08/30/2013
| issue date = 08/30/2013
| title = Callaway Plant, Unit 1 - Verbal Authorization Email, Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval (TAC No. MF2642)
| title = Verbal Authorization Email, Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval
| author name = Lyon C F
| author name = Lyon C
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Elwood T B, Heflin A C, Maglio S A
| addressee name = Elwood T, Heflin A, Maglio S
| addressee affiliation = Ameren Corp, Union Electric Co
| addressee affiliation = Ameren Corp, Union Electric Co
| docket = 05000483
| docket = 05000483
| license number = NPF-030
| license number = NPF-030
| contact person = Lyon C F
| contact person = Lyon C
| case reference number = TAC MF2642
| case reference number = TAC MF2642
| document type = Code Relief or Alternative, E-Mail
| document type = Code Relief or Alternative, E-Mail
| page count = 1
| page count = 1
| project = TAC:MF2642
| project = TAC:MF2642
| stage =  
| stage = Approval
}}
}}


=Text=
=Text=
{{#Wiki_filter:1Burkhardt, JanetFrom:Lyon, FredSent:Friday, August 30, 2013 10:58 AMTo:Maglio, Scott A (SMaglio@ameren.com); 'Elwood, Thomas B' (TElwood@ameren.com)Cc:Lupold, Timothy; Billerbeck, John; Markley, Michael; Singal, Balwant; Drake, James; OKeefe, NeilSubject:Verbal Authorization for Relief Request PR-07 (TAC No. MF2642)By letter dated August 29, 2013, Union Electric Company (dba Ameren Missouri, the licensee), submitted alternative request PR-07 to the NRC requesting use of ASME OM Code, Case OMN-20, Inservice Test Frequency, for the IST program. The NRC staff determines that for alternative request PR-07, the proposed alternative provides reasonable assurance that the affected components are operationally ready. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(a)(3)(ii),
{{#Wiki_filter:1 Burkhardt, Janet From:
and is in compliance with the ASME OM Code requirements. All other ASME OM Code requirements for which relief was not specifically requested and approved remain applicable. Therefore, by phoncon on August 30, 2013, between you and T. Lupold, NRR/DE/EPNB/BC, and B. Singal NRR/DORL/LPL4/BC(A), et al., the NRC staff gave verbal authorization for alternative request PR-07 at Callaway Plant for the remainder of the third 10-year IST program interval which is scheduled to end on December 19, 2014. The staff's written safety evaluation will follow as a matter of routine. 
Lyon, Fred Sent:
Friday, August 30, 2013 10:58 AM To:
Maglio, Scott A (SMaglio@ameren.com); 'Elwood, Thomas B' (TElwood@ameren.com)
Cc:
Lupold, Timothy; Billerbeck, John; Markley, Michael; Singal, Balwant; Drake, James; OKeefe, Neil


Thanks, Fred Lyon NRR/DORL/LPL4/PM
==Subject:==
}}
Verbal Authorization for Relief Request PR-07 (TAC No. MF2642)
By {{letter dated|date=August 29, 2013|text=letter dated August 29, 2013}}, Union Electric Company (dba Ameren Missouri, the licensee), submitted alternative request PR-07 to the NRC requesting use of ASME OM Code, Case OMN-20, Inservice Test Frequency, for the IST program.
The NRC staff determines that for alternative request PR-07, the proposed alternative provides reasonable assurance that the affected components are operationally ready. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(a)(3)(ii),
and is in compliance with the ASME OM Code requirements. All other ASME OM Code requirements for which relief was not specifically requested and approved remain applicable.
Therefore, by phoncon on August 30, 2013, between you and T. Lupold, NRR/DE/EPNB/BC, and B. Singal NRR/DORL/LPL4/BC(A), et al., the NRC staff gave verbal authorization for alternative request PR-07 at Callaway Plant for the remainder of the third 10-year IST program interval which is scheduled to end on December 19, 2014.
The staffs written safety evaluation will follow as a matter of routine.
Thanks, Fred Lyon NRR/DORL/LPL4/PM}}

Latest revision as of 05:48, 11 January 2025

Verbal Authorization Email, Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval
ML13246A304
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/30/2013
From: Lyon C
Plant Licensing Branch IV
To: Elwood T, Heflin A, Maglio S
Ameren Corp, Union Electric Co
Lyon C
References
TAC MF2642
Download: ML13246A304 (1)


Text

1 Burkhardt, Janet From:

Lyon, Fred Sent:

Friday, August 30, 2013 10:58 AM To:

Maglio, Scott A (SMaglio@ameren.com); 'Elwood, Thomas B' (TElwood@ameren.com)

Cc:

Lupold, Timothy; Billerbeck, John; Markley, Michael; Singal, Balwant; Drake, James; OKeefe, Neil

Subject:

Verbal Authorization for Relief Request PR-07 (TAC No. MF2642)

By letter dated August 29, 2013, Union Electric Company (dba Ameren Missouri, the licensee), submitted alternative request PR-07 to the NRC requesting use of ASME OM Code, Case OMN-20, Inservice Test Frequency, for the IST program.

The NRC staff determines that for alternative request PR-07, the proposed alternative provides reasonable assurance that the affected components are operationally ready. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(a)(3)(ii),

and is in compliance with the ASME OM Code requirements. All other ASME OM Code requirements for which relief was not specifically requested and approved remain applicable.

Therefore, by phoncon on August 30, 2013, between you and T. Lupold, NRR/DE/EPNB/BC, and B. Singal NRR/DORL/LPL4/BC(A), et al., the NRC staff gave verbal authorization for alternative request PR-07 at Callaway Plant for the remainder of the third 10-year IST program interval which is scheduled to end on December 19, 2014.

The staffs written safety evaluation will follow as a matter of routine.

Thanks, Fred Lyon NRR/DORL/LPL4/PM