IR 05000182/2015201: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:June 25, 2015 | ||
==SUBJECT:== | ==SUBJECT:== | ||
Line 33: | Line 33: | ||
Sincerely, | Sincerely, | ||
/RA by MDeSouza for/ | /RA by MDeSouza for/ | ||
Kevin Hsueh, Chief | |||
Research and Test Reactors Oversight Branch | |||
Division of Policy and Rulemaking | |||
Office of Nuclear Reactor Regulation | |||
Operations Logs and Records | Docket No. 50-182 License No. R-87 | ||
Enclosure: | |||
As stated | |||
cc w/ encl: See next page | |||
ML15170A191 | |||
TEMPLATE #: NRC-002 OFFICE PROB:RI | |||
PROB:BC NAME GMorlang | |||
KHsueh DATE 6/25/2015 | |||
6/25/2015 | |||
Purdue University | |||
Docket No. 50-182 | |||
cc: | |||
Leah Jamieson, Dean College of Engineering Purdue University West Lafayette, IN 47907 | |||
Mayor City of West Lafayette 609 W. Navajo West Lafayette, IN 47906 | |||
Manager Epidemiology Res Center/Indoor & Radiological Health Indiana Department of Health 2525 N. Shadeland Ave., E3 Indianapolis, IN 46219 | |||
P.E., Director Consumer Protection Indiana State Department of Health 2 North Meridian Street, 5D Indianapolis, IN 46204 | |||
Mr. Ed Merritt Reactor Supervisor Department of Nuclear Engineering Purdue University West Lafayette, IN 47907 | |||
Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611 | |||
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION | |||
Docket No: | |||
50-182 | |||
License No: | |||
R-87 | |||
Report No: | |||
50-182/2015-201 | |||
Licensee: | |||
Purdue University | |||
Facility: | |||
Purdue University Reactor | |||
Location: | |||
West Lafayette, IN | |||
Dates: | |||
June 8 to 11, 2015 | |||
Inspectors: | |||
Gary Mike Morlang | |||
Approved by: | |||
Kevin Hsueh, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation | |||
EXECUTIVE SUMMARY | |||
Purdue University Purdue University Reactor NRC Inspection Report No. 50-182/2015-201 | |||
The primary focus of this routine, announced inspection was the onsite review of selected aspects of the Purdue Universitys (the licensees) Class II research reactor facility safety programs including operations logs and records; procedures; surveillance and limiting conditions for operation; health physics; effluents and environmental monitoring; committees, audits, and reviews; and transportation. The licensees programs were acceptably directed toward the protection of public health and safety and were in compliance with U.S. Nuclear Regulatory Commission requirements. | |||
Operations Logs and Records | |||
* Within the scope of this review, the licensees operations record keeping program conformed to Technical Specification requirements. | * Within the scope of this review, the licensees operations record keeping program conformed to Technical Specification requirements. | ||
Procedures | Procedures | ||
* The inspector found that appropriate procedures were in effect and new procedures were being prepared as needed. | * The inspector found that appropriate procedures were in effect and new procedures were being prepared as needed. | ||
Surveillance and Limiting Conditions for Operation | Surveillance and Limiting Conditions for Operation | ||
* Surveillance testing was observed to be performed in accordance with requirements as stated in the Technical Specifications. | * Surveillance testing was observed to be performed in accordance with requirements as stated in the Technical Specifications. | ||
Health Physics | Health Physics | ||
* The inspector verified that the licensees health physics program was effective in minimizing radiation doses to individuals through training, notices to workers, radiation monitoring and surveys, and calibrated equipment. | * The inspector verified that the licensees health physics program was effective in minimizing radiation doses to individuals through training, notices to workers, radiation monitoring and surveys, and calibrated equipment. | ||
Effluent and Environmental Monitoring | Effluent and Environmental Monitoring | ||
* Effluent monitoring satisfied license and regulatory requirements and releases were within the specified regulatory limits. | * Effluent monitoring satisfied license and regulatory requirements and releases were within the specified regulatory limits. | ||
Committees, Audits, and Reviews | Committees, Audits, and Reviews | ||
* The Committee on Reactor Operations provided the oversight required by the Technical Specifications. | * The Committee on Reactor Operations provided the oversight required by the Technical Specifications. | ||
Transportation | Transportation | ||
* The licensee had not shipped any radioactive material since the last inspection. | * The licensee had not shipped any radioactive material since the last inspection. | ||
REPORT DETAILS Summary of Facility Status The Purdue Universitys (the licensees) one kilowatt research reactor had not operated since April 2013 because of electronic equipment problems and lack of licensed staff personnel. The electronic equipment problems have been repaired and new licensed staff personnel were in place. | REPORT DETAILS | ||
Summary of Facility Status | |||
The Purdue Universitys (the licensees) one kilowatt research reactor had not operated since April 2013 because of electronic equipment problems and lack of licensed staff personnel. The electronic equipment problems have been repaired and new licensed staff personnel were in place. | |||
1. | |||
Operations Logs and Records | |||
a. | |||
Inspection Scope (IP 69001) | |||
The inspector reviewed selected parts of the following reactor operations records to verify that the requirements of Technical Specifications Section 6.5, Operating Records, were being met: | |||
* Purdue University Reactor (PUR) Procedures Manual | |||
* | |||
PUR Procedure 91-1, Reactor Startup, Operation and Shutdown, dated June 1991 | |||
* | |||
Reactor Logbook No. 57, September 4, 2014 to present | |||
* | |||
Reactor Logbook No. 53, June 26, 2012 to September 3, 2014 | |||
* | |||
Annual Report for January 1 to December 31, 2013, dated May 2014 | |||
* | |||
Annual Report for January 1 to December 31, 2014, dated March 2015 | |||
* | |||
File of completed Pre-start Checklists, including those for 2012 to 2015 | |||
b. | |||
Observations and Findings | |||
The PUR procedures specified a records system that was commensurate with Technical Specification requirements. Procedures called for operational data to be recorded in the reactor logbooks, startup checklists, and shutdown checklists. | |||
Data recorded indicated that the reactor was operated within reactor license and Technical Specification parameters prior to the shutdown in 2013. Records indicated the electronic repairs were completed and the reactor deemed operation on March 20, 2015. | Data recorded indicated that the reactor was operated within reactor license and Technical Specification parameters prior to the shutdown in 2013. Records indicated the electronic repairs were completed and the reactor deemed operation on March 20, 2015. | ||
c. Conclusion The licensees operations record keeping program conformed to Technical Specification requirements. | c. | ||
Conclusion | |||
The licensees operations record keeping program conformed to Technical Specification requirements. | |||
- 2 - | |||
2. | |||
Procedures | |||
The inspector reviewed the following to ensure that the requirements of Technical Specifications Section 6.3, Operating Procedures, were being met: | |||
a. | |||
Inspection Scope (IP 69001) | |||
The inspector reviewed the following to ensure that the requirements of Technical Specifications Section 6.3, Operating Procedures, were being met: | |||
* PUR Procedures Manual | |||
* | |||
PUR 91-1, Reactor Startup, Operation and Shutdown, dated June 1991 | |||
* | |||
PUR 07-01, Partial or complete disassembly and reassembly of the PUR core, dated September 7, 2007 | |||
* | |||
PUR-03-01-EP, Emergency Procedure, dated March 25, 2003 | |||
* | |||
PUR-05-01, Sample Irradiation, dated June 14, 2005 | |||
* | |||
PUR 07-05, Procedure for core loading, dated September 1, 2007 | |||
* | |||
PUR M-1, Procedure for Checking Meter Contact Switches, dated June 16, 1995 | |||
* | |||
PUR M-2, Procedure for checking the Source Missing Interlock, dated June 8, 1995 | |||
* | |||
PUR M-3, Procedure for determining magnet current settings and checking the fast scrams, dated June 29, 1995 | |||
* | |||
PUR M-4, Procedure for measuring Shim-safety rod drop times, dated July 28, 1995 | |||
* | |||
PUR M-5A, Calibration of Radiation Area Monitors, dated April 25, 2011 | |||
* | |||
PUR M-6, Determining Excess Reactivity, dated July 27, 1995 | |||
b. | |||
Observations and Findings | |||
The inspector reviewed the licensees written procedures and revisions to procedures. The procedures reviewed were thorough and of the appropriate level of detail. The Procedures Manual included lists of Approved Procedures, Maintenance Procedures, and Emergency Procedures, all of which were reviewed and approved by the Committee for Reactor Operations (CORO). The inspector noted that Technical Specifications Section 6.4.8 requires all temporary pen and ink procedure changes initiated by the reactor supervisor to be subsequently reviewed by the CORO. A number of temporary changes had been made to several maintenance procedures over many years. These maintenance procedures had been rewritten and were being reviewed by the CORO at the time of the inspection. The licensee was informed that failure to have the pen and ink procedure changes reviewed by the CORO was identified as an Unresolved Item1 (URI) pending corrective actions and implementation of controls to prevent recurrence. This issue was reviewed during the inspection and will remain open until the CORO has approved the new procedures (URI-50-182/2010-201-01). | |||
_____________ | _____________ | ||
1An Unresolved Item is a matter about which more information is required to determine whether the issue in question is an acceptable item, a deviation, a nonconformance, or a violation. | |||
- 3 - | |||
c. | |||
Conclusion | |||
The inspector found that appropriate procedures were in effect and new procedures were being prepared as needed. A URI was noted for failure to have temporary pen and ink changes to maintenance procedures reviewed by the CORO. | |||
3. Surveillance and Limiting Conditions for Operation a. Inspection Scope (IP 69001 and IP 92701) | 3. | ||
The inspectors reviewed the following to determine if the periodic surveillance tests on safety systems were performed as stipulated in TECHNICAL SPECIFICATION Section 4.0, Surveillance Requirements: | |||
Surveillance and Limiting Conditions for Operation | |||
a. | |||
Inspection Scope (IP 69001 and IP 92701) | |||
The inspectors reviewed the following to determine if the periodic surveillance tests on safety systems were performed as stipulated in TECHNICAL SPECIFICATION Section 4.0, Surveillance Requirements: | |||
* PUR-1 Maintenance Log | |||
* | |||
File of completed Pre-start Checklists including those for 2014 and 2015 | |||
* | |||
Procedure 91-1, Reactor Startup, Operations and Shutdown, dated June 1991 | |||
* | |||
Procedure 95-7-RR, Calibration of Regulating Rod, dated July 25, 1995 | |||
* | |||
Procedure 95-7-SS, Calibration of Shim Safety Rod, dated July 28, 1995 | |||
* | |||
PUR 07-01, Partial or complete disassembly and reassembly of the PUR core, dated September 7, 2007 | |||
* | |||
PUR 07-05, Procedure for core loading, dated September 1, 2007 | |||
* | |||
Reactor Logbook No. 57, September 4, 2014 to present | |||
* | |||
Reactor Logbook No. 56, June 26, 2012 to September 3, 2014 | |||
b. | |||
Observations and Findings | |||
Surveillance requirements were primarily done as part of the pre-start checkout; surveillance such as control rod drop time tests and water chemistry tests were documented with individual procedures or in the Console Log Books. Checks and calibrations were completed as required by Technical Specifications. | |||
The licensee had developed a new tracking system to ensure the required annual, semiannual, quarterly, monthly and weekly administrative and technical specification surveillance items were completed in a timely manner. Technical Specification requirements were annotated in red. | The licensee had developed a new tracking system to ensure the required annual, semiannual, quarterly, monthly and weekly administrative and technical specification surveillance items were completed in a timely manner. Technical Specification requirements were annotated in red. | ||
c. Conclusion Surveillance test were observed to be performed in accordance with requirements as stated in the Technical Specifications. | c. | ||
Conclusion | |||
Surveillance test were observed to be performed in accordance with requirements as stated in the Technical Specifications. | |||
- 4 - | |||
4. | |||
Health Physics | |||
a. | |||
Inspection Scope (IP 69001) | |||
The inspector reviewed the following to verify compliance with Title 10 of the Code of Federal Regulations (10 CFR) Part 20 requirements: | |||
* Radiation Safety Manual | |||
* | |||
Annual Report for January 1 to December 31, 2013, dated May 2014 | |||
* | |||
Annual Report for January 1 to December 31, 2014, dated March 2015 | |||
* | |||
Personnel dosimetry records | |||
* | |||
Radiation Monitor Calibration Logbook, March 2013 to present | |||
* | |||
2013 and 2014 Audit of Radiation Safety Program Content and Implementation | |||
* | |||
Reactor Air and Water Reports for 2013, 2014 and to date in 2015 | |||
b. | |||
Observations and Findings | |||
The inspector reviewed records of radiation surveys performed by a Radiological and Emergency Management (REM) health physics specialist, and found activity levels to be generally consistent with background radiation. A copy of the current NRC Form 3 notice to radiation workers required by 10 CFR Part 19 was posted at the entrance to the reactor bay. | |||
Dosimetry results were reviewed by the inspectors and PUR-1 facilities associated exposures were in conformance with 10 CFR Part 20 and administrative limits. The maximum whole body exposure during 2014 was 28 millirem and the maximum exposure to extremities was 15 millirem. The maximum whole body exposure for year-to-date 2015 was 44 millirem and the maximum exposure to extremities was 29 millirem. All results were below 10 CFR Part 20 limits. | Dosimetry results were reviewed by the inspectors and PUR-1 facilities associated exposures were in conformance with 10 CFR Part 20 and administrative limits. The maximum whole body exposure during 2014 was 28 millirem and the maximum exposure to extremities was 15 millirem. The maximum whole body exposure for year-to-date 2015 was 44 millirem and the maximum exposure to extremities was 29 millirem. All results were below 10 CFR Part 20 limits. | ||
Line 136: | Line 310: | ||
The inspector reviewed Radiation Safety Training records given every 2 years to permanent reactor staff and found them to be up-to-date. | The inspector reviewed Radiation Safety Training records given every 2 years to permanent reactor staff and found them to be up-to-date. | ||
c. Conclusion The inspector verified that the licensees health physics program was effective in minimizing radiation doses to individuals through training, notices to workers, radiation monitoring and surveys, and calibrated equipment. | c. | ||
Conclusion | |||
The inspector verified that the licensees health physics program was effective in minimizing radiation doses to individuals through training, notices to workers, radiation monitoring and surveys, and calibrated equipment. | |||
- 5 - | |||
5. | |||
Effluent and Environmental Monitoring | |||
a. | |||
Inspection Scope (IP 69001) | |||
The inspector reviewed the following to verify compliance with the requirements of 10 CFR Part 20: | |||
The inspector reviewed the following to verify compliance with the requirements of 10 CFR Part 20: | |||
* Annual Report for January 1 to December 31, 2013, dated May 2014 | |||
* | |||
Annual Report for January 1 to December 31, 2014, dated March 2015 | |||
* | |||
Reactor Air and Water Annual Report for 2013 and 2014 | |||
* | |||
Reactor Continuous Air Monitor Filter Data Worksheets for 2013 and 2014 | |||
* | |||
Reactor Water Data Worksheets for 2013 and 2014 | |||
b. | |||
Observation and Findings | |||
The inspectors reviewed air and water data collected by REM staff that would indicate if fuel integrity had been compromised or breached. There were no indications of nuclear fuel or its byproducts having been detected in the water or air samples. Licensee air samples showed that all samples were below minimum detectable activity. | |||
The licensee also reported the results of several thermoluminescent dosimeters placed around the PUR-1 facility as environmental radiation monitors, including the Electrical Engineering classroom above the reactor bay. In all cases the TLDs indicated no significant difference from background radiation levels. | The licensee also reported the results of several thermoluminescent dosimeters placed around the PUR-1 facility as environmental radiation monitors, including the Electrical Engineering classroom above the reactor bay. In all cases the TLDs indicated no significant difference from background radiation levels. | ||
c. Conclusion Effluent monitoring satisfied license and regulatory requirements and releases were within the specified regulatory limits. | c. | ||
Conclusion | |||
Effluent monitoring satisfied license and regulatory requirements and releases were within the specified regulatory limits. | |||
6. | |||
Committees, Audits, and Reviews | |||
a. | |||
Inspection Scope (IP 69001 and IP 92701) | |||
The inspectors reviewed the following to verify compliance with the requirements of TS Section 6.2, Review and Audit: | |||
* Annual Report for January 1 to December 31, 2013, dated May 2014 | |||
* | |||
Annual Report for January 1 to December 31, 2014, dated March 2015 | |||
* | |||
CORO Meeting Minutes from October 17, 2013, February 14, 2014, September 26, 2014, January 20, 2015, April 1, 2015 and May 20, 2015 | |||
* | |||
2013 and 2014 Audit of Radiation Safety Program Content and Implementation | |||
- 6 - | |||
b. | |||
Observations and Findings | |||
The CORO was short one member with the retirement of the Reactor Supervisor. | |||
The job has been posted and interviews were in progress. A quorum as defined in Technical Specifications Section 6.2.4 was present at each of the meeting minutes reviewed. Meetings were held at the required frequency as specified in Technical Specifications Section 6.2.3. | The job has been posted and interviews were in progress. A quorum as defined in Technical Specifications Section 6.2.4 was present at each of the meeting minutes reviewed. Meetings were held at the required frequency as specified in Technical Specifications Section 6.2.3. | ||
Line 163: | Line 380: | ||
Through review of CORO meeting minutes from the recent past, the inspectors verified that the committee was performing the review responsibilities defined in Technical Specifications Section 6.2.5. | Through review of CORO meeting minutes from the recent past, the inspectors verified that the committee was performing the review responsibilities defined in Technical Specifications Section 6.2.5. | ||
c. Conclusion The Committee on Reactor Operations provided the oversight required by the Technical Specifications. | c. | ||
Conclusion | |||
The Committee on Reactor Operations provided the oversight required by the Technical Specifications. | |||
7. | |||
Transportation | |||
a. | |||
Inspection Scope (IP 86740) | |||
The inspector interviewed personnel to verify compliance with regulatory and procedural requirements for transferring licensed material. | The inspector interviewed personnel to verify compliance with regulatory and procedural requirements for transferring licensed material. | ||
b. Observations and Findings None. | b. | ||
Observations and Findings | |||
None. | |||
c. | |||
Conclusion | |||
The licensee had not shipped any radioactive material since the last inspection. | |||
8. | |||
Exit Meeting Summary | |||
The inspector reviewed the inspection results with members or the licensee management at the conclusion of the inspection on June 11, 2015. The licensee acknowledged the findings presented and did not identify as proprietary any of the material provided to or reviewed by the inspector during the inspection. The licensee acknowledged the results of the inspection. | |||
PARTIAL LIST OF PERSONS CONTACTED | |||
Licensee Director of Radiation Laboratories E. C. Merritt | |||
Reactor Supervisor J. F.Schweitzer Director/Radiation Safety Officer Z. Tribbett | |||
Health Physics Staff | |||
INSPECTION PROCEDURES USED | |||
IP 69001 Class II Research and Test Reactors IP 92701 Follow-up | |||
ITEMS OPENED, CLOSED, AND DISCUSSED | |||
Opened | |||
None | |||
Closed | |||
None | |||
Discussed | |||
50-182/2010-201-01 URI | |||
Failure to have pen and ink temporary changes to | |||
procedures reviewed by the CORO. | |||
PARTIAL LIST OF ACRONYMS USED | |||
ADAMS Agencywide Document Access Management System 10 CFR Title 10 of the Code of Federal Regulations CORO Committee on Reactor Operations IP | |||
Inspection Procedure No. | |||
Number NRC | |||
U.S. Nuclear Regulatory Commission NRF | |||
Nuclear Reactor Facility PARS Publicly Available Records PUR | |||
Purdue University Reactor REM Radiological and Environmental Management Rev. | |||
Revision URI | |||
Unresolved Item | |||
}} | }} |
Latest revision as of 10:50, 10 January 2025
ML15170A191 | |
Person / Time | |
---|---|
Site: | Purdue University |
Issue date: | 06/25/2015 |
From: | Kevin Hsueh Research and Test Reactors Licensing Branch |
To: | Bean R Purdue University Research Reactor |
Morlang M, NRR/DPR, 415-4092 | |
References | |
IR 2015201 | |
Download: ML15170A191 (13) | |
Text
June 25, 2015
SUBJECT:
PURDUE UNIVERSITY - NRC ROUTINE INSPECTION REPORT NO.
50-182/2015-201
Dear Dr. Bean:
From June 8-11, 2015, the U.S. Nuclear Regulatory Commission (NRC) conducted an inspection at your Purdue University Reactor. The inspection included a review of activities authorized for your facility. The enclosed report presents the results of that inspection.
Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations of activities in progress. Based on the results of this inspection, no safety concerns or noncompliances with requirements were identified. No response to this letter is required.
In accordance with Title 10 of the Code of Federal Regulations Section 2.390, Public inspections, exemptions, and requests for withholding, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (Agencywide Document Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html. Should you have any questions concerning this inspection, please contact Gary Mike Morlang at 301-415-4092 or by electronic mail at Gary.Morlang@nrc.gov.
Sincerely,
/RA by MDeSouza for/
Kevin Hsueh, Chief
Research and Test Reactors Oversight Branch
Division of Policy and Rulemaking
Office of Nuclear Reactor Regulation
Docket No. 50-182 License No. R-87
Enclosure:
As stated
cc w/ encl: See next page
TEMPLATE #: NRC-002 OFFICE PROB:RI
PROB:BC NAME GMorlang
KHsueh DATE 6/25/2015
6/25/2015
Purdue University
Docket No. 50-182
cc:
Leah Jamieson, Dean College of Engineering Purdue University West Lafayette, IN 47907
Mayor City of West Lafayette 609 W. Navajo West Lafayette, IN 47906
Manager Epidemiology Res Center/Indoor & Radiological Health Indiana Department of Health 2525 N. Shadeland Ave., E3 Indianapolis, IN 46219
P.E., Director Consumer Protection Indiana State Department of Health 2 North Meridian Street, 5D Indianapolis, IN 46204
Mr. Ed Merritt Reactor Supervisor Department of Nuclear Engineering Purdue University West Lafayette, IN 47907
Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION
Docket No:
50-182
License No:
R-87
Report No:
50-182/2015-201
Licensee:
Purdue University
Facility:
Purdue University Reactor
Location:
West Lafayette, IN
Dates:
June 8 to 11, 2015
Inspectors:
Gary Mike Morlang
Approved by:
Kevin Hsueh, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
EXECUTIVE SUMMARY
Purdue University Purdue University Reactor NRC Inspection Report No. 50-182/2015-201
The primary focus of this routine, announced inspection was the onsite review of selected aspects of the Purdue Universitys (the licensees) Class II research reactor facility safety programs including operations logs and records; procedures; surveillance and limiting conditions for operation; health physics; effluents and environmental monitoring; committees, audits, and reviews; and transportation. The licensees programs were acceptably directed toward the protection of public health and safety and were in compliance with U.S. Nuclear Regulatory Commission requirements.
Operations Logs and Records
- Within the scope of this review, the licensees operations record keeping program conformed to Technical Specification requirements.
Procedures
- The inspector found that appropriate procedures were in effect and new procedures were being prepared as needed.
Surveillance and Limiting Conditions for Operation
- Surveillance testing was observed to be performed in accordance with requirements as stated in the Technical Specifications.
Health Physics
- The inspector verified that the licensees health physics program was effective in minimizing radiation doses to individuals through training, notices to workers, radiation monitoring and surveys, and calibrated equipment.
Effluent and Environmental Monitoring
- Effluent monitoring satisfied license and regulatory requirements and releases were within the specified regulatory limits.
Committees, Audits, and Reviews
- The Committee on Reactor Operations provided the oversight required by the Technical Specifications.
Transportation
- The licensee had not shipped any radioactive material since the last inspection.
REPORT DETAILS
Summary of Facility Status
The Purdue Universitys (the licensees) one kilowatt research reactor had not operated since April 2013 because of electronic equipment problems and lack of licensed staff personnel. The electronic equipment problems have been repaired and new licensed staff personnel were in place.
1.
Operations Logs and Records
a.
Inspection Scope (IP 69001)
The inspector reviewed selected parts of the following reactor operations records to verify that the requirements of Technical Specifications Section 6.5, Operating Records, were being met:
- Purdue University Reactor (PUR) Procedures Manual
PUR Procedure 91-1, Reactor Startup, Operation and Shutdown, dated June 1991
Reactor Logbook No. 57, September 4, 2014 to present
Reactor Logbook No. 53, June 26, 2012 to September 3, 2014
Annual Report for January 1 to December 31, 2013, dated May 2014
Annual Report for January 1 to December 31, 2014, dated March 2015
File of completed Pre-start Checklists, including those for 2012 to 2015
b.
Observations and Findings
The PUR procedures specified a records system that was commensurate with Technical Specification requirements. Procedures called for operational data to be recorded in the reactor logbooks, startup checklists, and shutdown checklists.
Data recorded indicated that the reactor was operated within reactor license and Technical Specification parameters prior to the shutdown in 2013. Records indicated the electronic repairs were completed and the reactor deemed operation on March 20, 2015.
c.
Conclusion
The licensees operations record keeping program conformed to Technical Specification requirements.
- 2 -
2.
Procedures
a.
Inspection Scope (IP 69001)
The inspector reviewed the following to ensure that the requirements of Technical Specifications Section 6.3, Operating Procedures, were being met:
- PUR Procedures Manual
PUR 91-1, Reactor Startup, Operation and Shutdown, dated June 1991
PUR 07-01, Partial or complete disassembly and reassembly of the PUR core, dated September 7, 2007
PUR-03-01-EP, Emergency Procedure, dated March 25, 2003
PUR-05-01, Sample Irradiation, dated June 14, 2005
PUR 07-05, Procedure for core loading, dated September 1, 2007
PUR M-1, Procedure for Checking Meter Contact Switches, dated June 16, 1995
PUR M-2, Procedure for checking the Source Missing Interlock, dated June 8, 1995
PUR M-3, Procedure for determining magnet current settings and checking the fast scrams, dated June 29, 1995
PUR M-4, Procedure for measuring Shim-safety rod drop times, dated July 28, 1995
PUR M-5A, Calibration of Radiation Area Monitors, dated April 25, 2011
PUR M-6, Determining Excess Reactivity, dated July 27, 1995
b.
Observations and Findings
The inspector reviewed the licensees written procedures and revisions to procedures. The procedures reviewed were thorough and of the appropriate level of detail. The Procedures Manual included lists of Approved Procedures, Maintenance Procedures, and Emergency Procedures, all of which were reviewed and approved by the Committee for Reactor Operations (CORO). The inspector noted that Technical Specifications Section 6.4.8 requires all temporary pen and ink procedure changes initiated by the reactor supervisor to be subsequently reviewed by the CORO. A number of temporary changes had been made to several maintenance procedures over many years. These maintenance procedures had been rewritten and were being reviewed by the CORO at the time of the inspection. The licensee was informed that failure to have the pen and ink procedure changes reviewed by the CORO was identified as an Unresolved Item1 (URI) pending corrective actions and implementation of controls to prevent recurrence. This issue was reviewed during the inspection and will remain open until the CORO has approved the new procedures (URI-50-182/2010-201-01).
_____________
1An Unresolved Item is a matter about which more information is required to determine whether the issue in question is an acceptable item, a deviation, a nonconformance, or a violation.
- 3 -
c.
Conclusion
The inspector found that appropriate procedures were in effect and new procedures were being prepared as needed. A URI was noted for failure to have temporary pen and ink changes to maintenance procedures reviewed by the CORO.
3.
Surveillance and Limiting Conditions for Operation
a.
Inspection Scope (IP 69001 and IP 92701)
The inspectors reviewed the following to determine if the periodic surveillance tests on safety systems were performed as stipulated in TECHNICAL SPECIFICATION Section 4.0, Surveillance Requirements:
- PUR-1 Maintenance Log
File of completed Pre-start Checklists including those for 2014 and 2015
Procedure 91-1, Reactor Startup, Operations and Shutdown, dated June 1991
Procedure 95-7-RR, Calibration of Regulating Rod, dated July 25, 1995
Procedure 95-7-SS, Calibration of Shim Safety Rod, dated July 28, 1995
PUR 07-01, Partial or complete disassembly and reassembly of the PUR core, dated September 7, 2007
PUR 07-05, Procedure for core loading, dated September 1, 2007
Reactor Logbook No. 57, September 4, 2014 to present
Reactor Logbook No. 56, June 26, 2012 to September 3, 2014
b.
Observations and Findings
Surveillance requirements were primarily done as part of the pre-start checkout; surveillance such as control rod drop time tests and water chemistry tests were documented with individual procedures or in the Console Log Books. Checks and calibrations were completed as required by Technical Specifications.
The licensee had developed a new tracking system to ensure the required annual, semiannual, quarterly, monthly and weekly administrative and technical specification surveillance items were completed in a timely manner. Technical Specification requirements were annotated in red.
c.
Conclusion
Surveillance test were observed to be performed in accordance with requirements as stated in the Technical Specifications.
- 4 -
4.
Health Physics
a.
Inspection Scope (IP 69001)
The inspector reviewed the following to verify compliance with Title 10 of the Code of Federal Regulations (10 CFR) Part 20 requirements:
- Radiation Safety Manual
Annual Report for January 1 to December 31, 2013, dated May 2014
Annual Report for January 1 to December 31, 2014, dated March 2015
Personnel dosimetry records
Radiation Monitor Calibration Logbook, March 2013 to present
2013 and 2014 Audit of Radiation Safety Program Content and Implementation
Reactor Air and Water Reports for 2013, 2014 and to date in 2015
b.
Observations and Findings
The inspector reviewed records of radiation surveys performed by a Radiological and Emergency Management (REM) health physics specialist, and found activity levels to be generally consistent with background radiation. A copy of the current NRC Form 3 notice to radiation workers required by 10 CFR Part 19 was posted at the entrance to the reactor bay.
Dosimetry results were reviewed by the inspectors and PUR-1 facilities associated exposures were in conformance with 10 CFR Part 20 and administrative limits. The maximum whole body exposure during 2014 was 28 millirem and the maximum exposure to extremities was 15 millirem. The maximum whole body exposure for year-to-date 2015 was 44 millirem and the maximum exposure to extremities was 29 millirem. All results were below 10 CFR Part 20 limits.
The calibration records of selected devices were reviewed. Calibration tags on devices found throughout the facility were verified to be current and in accordance with the calibration records that were reviewed. REM calibrated the PUR-1 facility portable radiological monitoring equipment onsite.
The inspector reviewed Radiation Safety Training records given every 2 years to permanent reactor staff and found them to be up-to-date.
c.
Conclusion
The inspector verified that the licensees health physics program was effective in minimizing radiation doses to individuals through training, notices to workers, radiation monitoring and surveys, and calibrated equipment.
- 5 -
5.
Effluent and Environmental Monitoring
a.
Inspection Scope (IP 69001)
The inspector reviewed the following to verify compliance with the requirements of 10 CFR Part 20:
- Annual Report for January 1 to December 31, 2013, dated May 2014
Annual Report for January 1 to December 31, 2014, dated March 2015
Reactor Air and Water Annual Report for 2013 and 2014
Reactor Continuous Air Monitor Filter Data Worksheets for 2013 and 2014
Reactor Water Data Worksheets for 2013 and 2014
b.
Observation and Findings
The inspectors reviewed air and water data collected by REM staff that would indicate if fuel integrity had been compromised or breached. There were no indications of nuclear fuel or its byproducts having been detected in the water or air samples. Licensee air samples showed that all samples were below minimum detectable activity.
The licensee also reported the results of several thermoluminescent dosimeters placed around the PUR-1 facility as environmental radiation monitors, including the Electrical Engineering classroom above the reactor bay. In all cases the TLDs indicated no significant difference from background radiation levels.
c.
Conclusion
Effluent monitoring satisfied license and regulatory requirements and releases were within the specified regulatory limits.
6.
Committees, Audits, and Reviews
a.
Inspection Scope (IP 69001 and IP 92701)
The inspectors reviewed the following to verify compliance with the requirements of TS Section 6.2, Review and Audit:
- Annual Report for January 1 to December 31, 2013, dated May 2014
Annual Report for January 1 to December 31, 2014, dated March 2015
CORO Meeting Minutes from October 17, 2013, February 14, 2014, September 26, 2014, January 20, 2015, April 1, 2015 and May 20, 2015
2013 and 2014 Audit of Radiation Safety Program Content and Implementation
- 6 -
b.
Observations and Findings
The CORO was short one member with the retirement of the Reactor Supervisor.
The job has been posted and interviews were in progress. A quorum as defined in Technical Specifications Section 6.2.4 was present at each of the meeting minutes reviewed. Meetings were held at the required frequency as specified in Technical Specifications Section 6.2.3.
Through review of CORO meeting minutes from the recent past, the inspectors verified that the committee was performing the review responsibilities defined in Technical Specifications Section 6.2.5.
c.
Conclusion
The Committee on Reactor Operations provided the oversight required by the Technical Specifications.
7.
Transportation
a.
Inspection Scope (IP 86740)
The inspector interviewed personnel to verify compliance with regulatory and procedural requirements for transferring licensed material.
b.
Observations and Findings
None.
c.
Conclusion
The licensee had not shipped any radioactive material since the last inspection.
8.
Exit Meeting Summary
The inspector reviewed the inspection results with members or the licensee management at the conclusion of the inspection on June 11, 2015. The licensee acknowledged the findings presented and did not identify as proprietary any of the material provided to or reviewed by the inspector during the inspection. The licensee acknowledged the results of the inspection.
PARTIAL LIST OF PERSONS CONTACTED
Licensee Director of Radiation Laboratories E. C. Merritt
Reactor Supervisor J. F.Schweitzer Director/Radiation Safety Officer Z. Tribbett
Health Physics Staff
INSPECTION PROCEDURES USED
IP 69001 Class II Research and Test Reactors IP 92701 Follow-up
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
None
Closed
None
Discussed
50-182/2010-201-01 URI
Failure to have pen and ink temporary changes to
procedures reviewed by the CORO.
PARTIAL LIST OF ACRONYMS USED
ADAMS Agencywide Document Access Management System 10 CFR Title 10 of the Code of Federal Regulations CORO Committee on Reactor Operations IP
Inspection Procedure No.
Number NRC
U.S. Nuclear Regulatory Commission NRF