| number = ML15245A307
| number = ML15245A307
| issue date = 08/31/2015
| issue date = 08/31/2015
| title = Catawba Initial Exam 2015-301 Final Sim In-Plant JPMs
| title = Initial Exam 2015-301 Final Sim In-Plant JPMs
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Catawba Nuclear Station JPM A May 2015 NRC Exam PAGE 1 OF 9  
{{#Wiki_filter:Catawba Nuclear Station JPM A May 2015 NRC Exam PAGE 1 OF 9 JPM A


JPM A    
Catawba Nuclear Station JPM A May 2015 NRC Exam PAGE 2 OF 9 EVALUATION SHEET Task:
Emergency Borate the Reactor Coolant System Alternate Path:
Yes Facility JPM #:
NV-017 Safety Function:
1


Catawba Nuclear Station JPM A May 2015 NRC Exam PAGE 2 OF 9 EVALUATION SHEET Task: Emergency Borate the Reactor Coolant System  Alternate Path: Yes  Facility JPM #: NV-017  Safety Function: 1 Title: Reactivity Control K/A 004 A2.14 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Emergency Boration Rating(s): 3.8 / 3.9 CFR: 41.5 / 43/5 / 45/3 / 45/5   Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate  
==Title:==
Reactivity Control K/A 004 A2.14 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Emergency Boration Rating(s):
3.8 / 3.9 CFR:
41.5 / 43/5 / 45/3 / 45/5 Preferred Evaluation Location:
Preferred Evaluation Method:
Simulator X
In-Plant Perform X
Simulate  


==References:==
==References:==
EP/1/A/5000/FR-S.1 (Nuclear Power Generation/ATWS) rev. 22   Task Standard: One NV pump running with its suction aligned to the FWST and isolated from the VCT. Validation Time: 5 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____     Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM A May 2015 NRC Exam PAGE 3 OF 9 SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #163 3. Enter the password. 4. Select "Yes" on the INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. ENSURE "Extra Operator" is present in the simulator. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event MAL-IPX003A(REACTOR TRIP BKR A FAILURE) ACTIVE     MAL-IPX003B (REACTOR TRIP BKR B FAILURE) ACTIVE     VLV-NV043F (NV236B BORIC ACID TO CHG PMP VLV FAIL TO POSITION) 0     MAL-MT-007 (LOSS OF TURBINE LUBE OIL PRESSURE) ACTIVE     Instructor will act as the OATC and be manually inserting control rods when the simulator is placed in RUN.
EP/1/A/5000/FR-S.1 (Nuclear Power Generation/ATWS) rev. 22 Task Standard:
REV. 0 PAGE 4 0F 9 Catawba Nuclear Station JPM A May 2015 NRC Exam PAGE 4 OF 9   READ TO APPLICANT DIRECTION TO APPLICANT:
One NV pump running with its suction aligned to the FWST and isolated from the VCT.
Validation Time:
5 minutes Time Critical:
Yes No X  
 
===========================================================================
Applicant:
Time Start: __________
NAME___________________________
Docket #_______________
Time Finish: __________
Performance Rating:
SAT ____ UNSAT ____
Performance Time _____
Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE  
 
===========================================================================
COMMENTS  
 
Catawba Nuclear Station JPM A May 2015 NRC Exam PAGE 3 OF 9 SIMULATOR OPERATOR INSTRUCTIONS:
: 1.
ENSURE NRC Examination Security has been established.
: 2.
Reset to IC #163
: 3.
Enter the password.
: 4.
Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5.
Ensure simulator setup per table below.
: 6.
Place simulator in RUN and acknowledge any alarms.
: 7.
ENSURE Extra Operator is present in the simulator.
: 8.
Place simulator in FREEZE until Examiner cue is given.
Instructor Action Final Delay Ramp Delete In Event MAL-IPX003A(REACTOR TRIP BKR A FAILURE)
ACTIVE MAL-IPX003B (REACTOR TRIP BKR B FAILURE)
ACTIVE VLV-NV043F (NV236B BORIC ACID TO CHG PMP VLV FAIL TO POSITION) 0 MAL-MT-007 (LOSS OF TURBINE LUBE OIL PRESSURE)
ACTIVE Instructor will act as the OATC and be manually inserting control rods when the simulator is placed in RUN.  
 
REV. 0 PAGE 4 0F 9 Catawba Nuclear Station JPM A May 2015 NRC Exam PAGE 4 OF 9 READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:   A valid reactor trip signal has been received. The reactor will NOT trip automatically or manually. A Red Path for Subcriticality is in effect. The OATC is inserting rods manually. INITIATING CUES:
INITIAL CONDITIONS:
The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR-S.1, (Nuclear Power Generation/ATWS), step 4. EXAMINER NOTE:   After reading cue, provide the applicant with a copy of EP/1/A/5000/FR-S.1 pages 3-5.
* A valid reactor trip signal has been received.
Catawba Nuclear Station JPM A May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 5 0F 9  START TIME: _______  STEP 1:  4. Initiate emergency boration of NC System as follows:  a. Ensure at least one NV pump - ON. STANDARD:  Applicant verifies red "ON" light lit for "NV PMP 1A" or "1B" (1MC-10). COMMENTS: 
* The reactor will NOT trip automatically or manually.
* A Red Path for Subcriticality is in effect.
* The OATC is inserting rods manually.
INITIATING CUES:
The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR-S.1, (Nuclear Power Generation/ATWS), step 4.
EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/FR-S.1 pages 3-5.  


Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 9 START TIME: _______
STEP 1: 4. Initiate emergency boration of NC System as follows:
: a. Ensure at least one NV pump - ON.
STANDARD:
Applicant verifies red ON light lit for NV PMP 1A or 1B (1MC-10).
COMMENTS:
___ SAT
___ SAT
___ UNSAT STEP 2   4. b. OPEN 1NV-236B (Boric Acid To NV Pumps Suct). STANDARD:   Applicant depresses the red "OPEN" pushbutton for 1NV-236B and verifies the red "OPEN" light remains dark and the green "CLSD" light remains lit on 1MC-10. 1NV-236B remains closed. COMMENTS:
___ UNSAT STEP 2 4. b. OPEN 1NV-236B (Boric Acid To NV Pumps Suct).
STANDARD:
Applicant depresses the red OPEN pushbutton for 1NV-236B and verifies the red OPEN light remains dark and the green CLSD light remains lit on 1MC-10. 1NV-236B remains closed.
COMMENTS:
___ SAT
___ SAT
___UNSAT STEP 3   4. c. Ensure both boric acid transfer pump switches - IN THE "ON" POSITION.
___UNSAT STEP 3 4. c. Ensure both boric acid transfer pump switches - IN THE "ON" POSITION.
STANDARD: Applicant rotates the switches for "B/A XFER PMP 1A" and "B/A XFER PMP 1B" to the "ON" position.
STANDARD:
COMMENTS:
Applicant rotates the switches for B/A XFER PMP 1A and B/A XFER PMP 1B to the ON position.
 
COMMENTS:
___ SAT   ___ UNSAT
___ SAT
 
___ UNSAT  
Catawba Nuclear Station JPM A May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 6 0F 9    STEP 4  4. d. Verify emergency boration flow - GREATER THAN OR EQUAL TO 30 GPM.
STANDARD:  Applicant verifies "EMER BORATE FLOW" (1NVP5440) indicates 0 gpm (1MC-5) and transitions to the RNO.
EXAMINER NOTE:  This begins the alternate path of this JPM. 


Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 9 STEP 4 4. d. Verify emergency boration flow - GREATER THAN OR EQUAL TO 30 GPM.
STANDARD:
Applicant verifies EMER BORATE FLOW (1NVP5440) indicates 0 gpm (1MC-5) and transitions to the RNO.
EXAMINER NOTE: This begins the alternate path of this JPM.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT STEP 5   4. d. RNO d. Align NV pump suction to FWST as follows: 1) OPEN the following valves:   1NV-252A (NV Pumps Suct From FWST)   1NV-253B (NV Pumps Suct From FWST).
___ SAT
STANDARD: Applicant depresses the red OPEN pushbuttons for 1NV-252A and 1NV-253B This step is critical to align borated water to the suction of the charging pumps. Only ONE of the valves opened meets the Critical Step criteria.
___ UNSAT STEP 5 4. d. RNO d. Align NV pump suction to FWST as follows:
: 1) OPEN the following valves:
* 1NV-252A (NV Pumps Suct From FWST)
* 1NV-253B (NV Pumps Suct From FWST).
STANDARD:
Applicant depresses the red OPEN pushbuttons for 1NV-252A and 1NV-253B This step is critical to align borated water to the suction of the charging pumps. Only ONE of the valves opened meets the Critical Step criteria.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT   ___ UNSAT
CRITICAL STEP
___ SAT
___ UNSAT  


Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 9   STEP 6   4. d. RNO d. 2) CLOSE the following valves:   1NV-188A (VCT Otlt Isol)   1NV-189B (VCT Otlt Isol). STANDARD: Applicant depresses the green CLSD pushbutton for 1NV-188A and 1NV-189B.
Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 9 STEP 6 4. d. RNO d. 2) CLOSE the following valves:
1NV-188A (VCT Otlt Isol) 1NV-189B (VCT Otlt Isol).
STANDARD:
Applicant depresses the green CLSD pushbutton for 1NV-188A and 1NV-189B.
This step is critical to prevent borated water from going to the VCT instead of the suction of the charging pumps. Closing only ONE of the valves meets the intent of the Critical Step criteria.
This step is critical to prevent borated water from going to the VCT instead of the suction of the charging pumps. Closing only ONE of the valves meets the intent of the Critical Step criteria.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT   ___ UNSAT STEP 7   4. e. Verify the following charging line isolation valves - OPEN:   1NV-312A (Chrg Line Cont Isol) follows:   1NV-314B (Chrg Line Cont Isol).
CRITICAL STEP
STANDARD: Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-312A and 1NV-314B.
___ SAT
___ UNSAT STEP 7 4. e. Verify the following charging line isolation valves - OPEN:
1NV-312A (Chrg Line Cont Isol) follows:
1NV-314B (Chrg Line Cont Isol).
STANDARD:
Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-312A and 1NV-314B.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT
___ SAT
___ UNSAT  


Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 9   STEP 8   4. f. Verify Pzr pressure - LESS THAN 2335 PSIG. STANDARD: Applicant verifies PZR pressure instruments (1NCP5161, 1NCP5150, 1NCP5170 and 1NCP5171) indicate less than 2335 psig (1MC-10) COMMENTS:
Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 9 STEP 8 4. f. Verify Pzr pressure - LESS THAN 2335 PSIG.
END OF TASK     ___ SAT   ___ UNSAT
STANDARD:
Applicant verifies PZR pressure instruments (1NCP5161, 1NCP5150, 1NCP5170 and 1NCP5171) indicate less than 2335 psig (1MC-10)
COMMENTS:
END OF TASK
___ SAT
___ UNSAT STOP TIME ________


STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) May 2015 NRC Initial License Exam JPM A        
May 2015 NRC Initial License Exam JPM A INITIAL CONDITIONS:
* A valid reactor trip signal has been received.
* The reactor will NOT trip automatically or manually.
* A Red Path for Subcriticality is in effect.
* The OATC is inserting rods manually.
INITIATING CUES:
The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR-S.1, (Nuclear Power Generation/ATWS), step 4.


INITIAL CONDITIONS:  A valid reactor trip signal has been received. The reactor will NOT trip automatically or manually. A Red Path for Subcriticality is in effect. The OATC is inserting rods manually. INITIATING CUES:
Catawba Nuclear Station JPM B May 2015 NRC Exam PAGE 1 OF 14 JPM B
The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR-S.1, (Nuclear Power Generation/ATWS),  step 4.
Catawba Nuclear Station JPM B May 2015 NRC Exam PAGE 1 OF 14  


JPM B
Catawba Nuclear Station JPM B May 2015 NRC Exam PAGE 2 OF 14 EVALUATION SHEET Task:
Transfer the Emergency Core Coolant System to the Cold Leg Recirculation Alternate Path:
Yes Facility JPM #:
NI-088 Safety Function:
2


Catawba Nuclear Station JPM B May 2015 NRC Exam PAGE 2 OF 14  EVALUATION SHEET Task: Transfer the Emergency Core Coolant System to the Cold Leg Recirculation  Alternate Path: Yes    Facility JPM #: NI-088  Safety Function: 2 Title: Emergency Core Cooling System (ECCS) K/A 006 A4.07 Ability to manually operate and/or monitor in the control room: ECCS pumps and valves. Rating(s): 4.4 / 4.4 CFR: 41.7 / 45.5 to 45.8   Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate  
==Title:==
Emergency Core Cooling System (ECCS)
K/A 006 A4.07 Ability to manually operate and/or monitor in the control room: ECCS pumps and valves.
Rating(s):
4.4 / 4.4 CFR:
41.7 / 45.5 to 45.8 Preferred Evaluation Location:
Preferred Evaluation Method:
Simulator X
In-Plant Perform X
Simulate  


==References:==
==References:==
EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) rev. 29   Task Standard: EP/1/A/5000/ES-1.3 Transfer to Cold Leg Recirculation) step 6 is performed and the 1A and 1B NV (Chemical Volume and Control System) and NI (Safety Injection System) pumps are secured. Validation Time: 15 minutes   Time Critical:   Yes No X =========================================================================== Applicant:    Time Start:    __________ NAME___________________________ Docket #_______________ Time Finish:  __________    Performance Rating:    SAT ____  UNSAT ____  Performance Time _____    Examiner: _____________________________ _____________________________/________  NAME  SIGNATURE DATE ===========================================================================  COMMENTS Catawba Nuclear Station JPM B May 2015 NRC Exam PAGE 3 OF 14  SIMULATOR OPERATOR INSTRUCTIONS:  1. ENSURE NRC Examination Security has been established. 2. Reset to IC #164 3. Enter the password. 4. Select "Yes" on the INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. ENSURE "Extra Operator" is present in the simulator. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event VLV-NI037F (NI184B CNMT SUMP LINE 1B ISOL (STEM) FAIL TO POSITION) 0    MAL-NC013A (NC COLD LEG A LEAK) 27.5    VLV-ND005F (ND28A ND HX A OUTLET TO CHARG AB FAIL TO POSITION. 0 PAGE  4  0F 14 Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam PAGE 4 OF 14  READ TO APPLICANT DIRECTION TO APPLICANT:  I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  A LOCA has occurred on Unit 1.
EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) rev. 29 Task Standard:
INITIATING CUES:  1AD-9, E/8 'FWST LO-LO LEVEL' annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6. EXAMINER NOTE:  After reading the cue, provide the applicant with a copy of EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) complete through step 8 with step 6 flagged. 
EP/1/A/5000/ES-1.3 Transfer to Cold Leg Recirculation) step 6 is performed and the 1A and 1B NV (Chemical Volume and Control System) and NI (Safety Injection System) pumps are secured.
Validation Time:
15 minutes Time Critical:
Yes No X  


Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 14   START TIME: _______   STEP 1:   6. WHEN FWST level decreases to 5% (1AD-9, E/8 "FWST LO-LO LEVEL"), THEN align NV and NI Systems for recirc as follows: a. Ensure Enclosure 1 (Foldout Page) is monitored. STANDARD: Applicant reads the step. Examiner Cue: "The OATC will monitor Enclosure 1COMMENTS:       ___ SAT
===========================================================================
___ UNSAT   NOTE CSF should not be implemented until directed by this procedure. STEP 2         b. Verify at least one of the following annunciators - LIT:   1AD-20, B/2 "CONT. SUMP LEVEL >2.5 ft"   OR   1AD-21, B/2 "CONT. SUMP LEVEL >2.5 ft". STANDARD:   Applicant determines that one or both annunciators are lit. COMMENTS:
Applicant:
___ SAT   ___UNSAT
Time Start: __________
NAME___________________________
Docket #_______________
Time Finish: __________
Performance Rating:
SAT ____ UNSAT ____
Performance Time _____
Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE
 
===========================================================================
COMMENTS
 
Catawba Nuclear Station JPM B May 2015 NRC Exam PAGE 3 OF 14 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC #164
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action Final Delay Ramp Delete In Event VLV-NI037F (NI184B CNMT SUMP LINE 1B ISOL (STEM) FAIL TO POSITION) 0 MAL-NC013A (NC COLD LEG A LEAK) 27.5 VLV-ND005F (ND28A ND HX A OUTLET TO CHARG AB FAIL TO POSITION.
0
 
PAGE 4 0F 14 Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam PAGE 4 OF 14 READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* A LOCA has occurred on Unit 1.
INITIATING CUES:
* 1AD-9, E/8 FWST LO-LO LEVEL annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.
EXAMINER NOTE: After reading the cue, provide the applicant with a copy of EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) complete through step 8 with step 6 flagged.
 
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 14 START TIME: _______
STEP 1: 6. WHEN FWST level decreases to 5% (1AD-9, E/8 "FWST LO-LO LEVEL"), THEN align NV and NI Systems for recirc as follows:
: a. Ensure Enclosure 1 (Foldout Page) is monitored.
STANDARD:
Applicant reads the step.
Examiner Cue: The OATC will monitor Enclosure 1 COMMENTS:
___ SAT
___ UNSAT NOTE CSF should not be implemented until directed by this procedure.
STEP 2 b. Verify at least one of the following annunciators - LIT:
* 1AD-20, B/2 "CONT. SUMP LEVEL >2.5 ft" OR
* 1AD-21, B/2 "CONT. SUMP LEVEL >2.5 ft".
STANDARD:
Applicant determines that one or both annunciators are lit.
COMMENTS:
___ SAT
___UNSAT  


Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 14   STEP 3         c. Verify both ND pumps - ON. STANDARD: Applicant determines that only 1 ND pump is running and transitions to the RNO COMMENTS:
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 14 STEP 3 c. Verify both ND pumps - ON.
___ SAT   ___ UNSAT STEP 4   6.c. RNO c. Perform the following: 1) IF 1NI-185A (ND Pump 1A Cont Sump Suct) is open, THEN start ND pump 1A. STANDARD: Applicant determines that ND PUMP 1A is on by verifying the red ON light is lit on 1MC-11.
STANDARD:
Applicant determines that only 1 ND pump is running and transitions to the RNO COMMENTS:
___ SAT
___ UNSAT STEP 4 6.c. RNO c. Perform the following:
: 1) IF 1NI-185A (ND Pump 1A Cont Sump Suct) is open, THEN start ND pump 1A.
STANDARD:
Applicant determines that ND PUMP 1A is on by verifying the red ON light is lit on 1MC-11.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT     STEP 5                       2) IF 1NI-184B (ND Pump 1B Cont Sump Suct) is open, THEN start ND pump 1B. STANDARD: Applicant determines that 1NI-184B is not open by verifying the green CLSD light is lit on 1MC-11 and determines that the step is not applicable.
___ SAT
___ UNSAT STEP 5 2) IF 1NI-184B (ND Pump 1B Cont Sump Suct) is open, THEN start ND pump 1B.
STANDARD:
Applicant determines that 1NI-184B is not open by verifying the green CLSD light is lit on 1MC-11 and determines that the step is not applicable.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 14   STEP 6                       3) IF any ND pump running with suction aligned to sump, THEN GO TO Step 6.d. STANDARD: Applicant determines that ND Pump 1A is running with suction aligned to the sump and proceeds to step 6.d.
___ SAT
COMMENTS:       ___ SAT   ___ UNSAT STEP 7   6. d. Ensure the following valves - CLOSED:   1ND-32A (ND Train 1A Hot Leg Inj Isol) 1ND-65B (ND Train 1B Hot Leg Inj Isol). STANDARD: Applicant depresses the green CLOSE pushbuttons for 1ND-32A and 1ND-65B on 1MC-11.
___ UNSAT  
 
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 14 STEP 6 3) IF any ND pump running with suction aligned to sump, THEN GO TO Step 6.d.
STANDARD:
Applicant determines that ND Pump 1A is running with suction aligned to the sump and proceeds to step 6.d.
COMMENTS:
___ SAT
___ UNSAT STEP 7 6. d. Ensure the following valves - CLOSED:
1ND-32A (ND Train 1A Hot Leg Inj Isol) 1ND-65B (ND Train 1B Hot Leg Inj Isol).
STANDARD:
Applicant depresses the green CLOSE pushbuttons for 1ND-32A and 1ND-65B on 1MC-11.
This step is critical to prevent pump run out should only one ND pump be running.
This step is critical to prevent pump run out should only one ND pump be running.
Examiner NOTE: Only one of the valves need to be closed to satisfy the critical step since the valves are in series. COMMENTS:     CRITICAL STEP   ___ SAT   ___ UNSAT
Examiner NOTE: Only one of the valves need to be closed to satisfy the critical step since the valves are in series.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT  


Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14   STEP 8   6. e. Isolate NI Pump Miniflow as follows: 1) Verify NC pressure - LESS THAN 1620 PSIG. STANDARD: Applicant determines that NC (Reactor Coolant System) pressure is less than 1620 psig. COMMENTS:
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14 STEP 8 6. e. Isolate NI Pump Miniflow as follows:
___ SAT   ___ UNSAT     STEP 9           2) Ensure the following valves - CLOSED:     1NI-115A (NI Pump 1A Miniflow Isol)     1NI-144A (NI Pump 1B Miniflow Isol). STANDARD: Applicant determines that the green CLSD lights are lit for 1NI-115A and 1NI-144A on 1MC-11. COMMENTS:
: 1) Verify NC pressure - LESS THAN 1620 PSIG.
___ SAT   ___ UNSAT     STEP 10         3) Ensure "PWR DISCON FOR 1NI-147B" switch in "ENABLE". STANDARD: Applicant determines that the "PWR DISCON FOR 1NI-147B" is in "ENABLE" on 1MC-11. COMMENTS:
STANDARD:
___ SAT   ___ UNSAT
Applicant determines that NC (Reactor Coolant System) pressure is less than 1620 psig.
COMMENTS:
___ SAT
___ UNSAT STEP 9 2) Ensure the following valves - CLOSED:
* 1NI-115A (NI Pump 1A Miniflow Isol)
* 1NI-144A (NI Pump 1B Miniflow Isol).
STANDARD:
Applicant determines that the green CLSD lights are lit for 1NI-115A and 1NI-144A on 1MC-11.
COMMENTS:
___ SAT
___ UNSAT STEP 10 3) Ensure "PWR DISCON FOR 1NI-147B" switch in "ENABLE".
STANDARD:
Applicant determines that the PWR DISCON FOR 1NI-147B is in ENABLE on 1MC-11.
COMMENTS:
___ SAT
___ UNSAT  


Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 14   STEP 11         4) Ensure 1NI-147B (NI Miniflow Hdr To FWST Isol) - CLOSED. STANDARD: Applicant determines that the green CLSD light is lit for 1NI-147B on 1MC-11. COMMENTS:        ___ SAT  ___ UNSAT STEP 12  6. f. Verify at least one of the following NV pumps miniflow valves - CLOSED:  1NV-203A (NV Pumps A&B Recirc Isol)  OR  1NV-202B (NV Pmps A&B Recirc Isol). STANDARD:  Applicant determines that the green CLSD lights are lit for 1NV-203A & 1NV-202B on 1MC-10.
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 14 STEP 11 4) Ensure 1NI-147B (NI Miniflow Hdr To FWST Isol) -
CLOSED.
STANDARD:
Applicant determines that the green CLSD light is lit for 1NI-147B on 1MC-11.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT     STEP 13     g. Ensure 1NI-334B (NI Pump Suct X-Over From ND) - OPEN. STANDARD: Applicant determines the red OPEN light is lit for 1NI-334B on 1MC-11. COMMENTS:       ___ SAT   ___ UNSAT
___ SAT
___ UNSAT STEP 12 6. f. Verify at least one of the following NV pumps miniflow valves - CLOSED:
1NV-203A (NV Pumps A&B Recirc Isol)
OR 1NV-202B (NV Pmps A&B Recirc Isol).
STANDARD:
Applicant determines that the green CLSD lights are lit for 1NV-203A &
1NV-202B on 1MC-10.
COMMENTS:
___ SAT
___ UNSAT STEP 13 g. Ensure 1NI-334B (NI Pump Suct X-Over From ND) - OPEN.
STANDARD:
Applicant determines the red OPEN light is lit for 1NI-334B on 1MC-11.
COMMENTS:
___ SAT
___ UNSAT  


Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14   STEP 14     h. OPEN the following valves:   1NI-332A (NI Pump Suct X-Over From ND) 1NI-333B (NI Pump Suct From ND). STANDARD: Applicant depresses the red OPEN pushbuttons for 1NI-332A and 1NI-333B on 1MC-11. COMMENTS:
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14 STEP 14 h. OPEN the following valves:
___ SAT   ___ UNSAT     STEP 15     i. Align ND discharge to suction of NI and NV pumps as follows: 1) OPEN 1ND-28A (ND Supply To NV & 1A NI Pmps). STANDARD: Applicant depresses the red OPEN pushbutton for 1ND-28A on 1MC-11 and determines that the valve will not open and continues.
1NI-332A (NI Pump Suct X-Over From ND) 1NI-333B (NI Pump Suct From ND).
STANDARD:
Applicant depresses the red OPEN pushbuttons for 1NI-332A and 1NI-333B on 1MC-11.
COMMENTS:
___ SAT
___ UNSAT STEP 15 i. Align ND discharge to suction of NI and NV pumps as follows:
: 1) OPEN 1ND-28A (ND Supply To NV & 1A NI Pmps).
STANDARD:
Applicant depresses the red OPEN pushbutton for 1ND-28A on 1MC-11 and determines that the valve will not open and continues.
COMMENTS:
___ SAT
___ UNSAT
 
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 14 STEP 16 2) OPEN 1NI-136B (ND Supply To NI Pump 1B).
STANDARD:
Applicant depresses the red OPEN pushbutton for 1NI-136B on 1MC-11, determines that the valve will not open and proceeds to the next step.
Examiner NOTE: 1NI-136B will not open due to an interlock with 1NI-184B COMMENTS:
___ SAT
___ UNSAT STEP 17 j. Verify at least one ND train aligned to provide suction to NV and NI as follows:
A Train:
1A ND pump running 1ND-28A (ND Supply To NV & 1A NI Pmps) -
OPEN.
STANDARD:
Applicant determines no train can be aligned to provide suction to NV and NI and proceeds to the RNO.
EXAMINER NOTE: This begins the alternate path of this JPM.
COMMENTS:
___ SAT
___ UNSAT
 
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 14 STEP 18 6.j. RNO j. Perform the following:
: 1) IF either valve is in intermediate position, THEN allow 20 seconds for valve to open.
STANDARD:
Applicant determines that this step does not apply.
COMMENTS:
___ SAT
___ UNSAT STEP 19 2) IF either valve is open AND its associated ND pump on, THEN GO TO Step 6.k.
STANDARD:
Applicant determines that this step does not apply.
COMMENTS:
___ SAT
___ UNSAT
 
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 14 STEP 20 3) IF both A train and B train unavailable, THEN trip all NV and NI pumps.
STANDARD:
Applicant determines both A train and B train are unavailable and depresses the green OFF pushbuttons for NV PMP 1A, NV PUMP 1B, NI PMP 1A and NI PUMP 1B.
This step is critical to protect the NV and NI pumps from damage from loss of suction and allow them to be available later when the FWST has been refilled.
EXAMINER CUE: Another operator will complete ES-1.3. This JPM is complete.
COMMENTS:
END OF TASK CRITICAL STEP
___ SAT
___ UNSAT STOP TIME ________


COMMENTS:       ___ SAT  ___ UNSAT 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 2015 NRC Initial License Exam JPM B INITIAL CONDITIONS:
* A LOCA has occurred on Unit 1.
INITIATING CUES:
* 1AD-9, E/8 FWST LO-LO LEVEL annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.


Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT  PAGE 11 0F 14  STEP 16        2) OPEN 1NI-136B (ND Supply To NI Pump 1B). STANDARD:  Applicant depresses the red OPEN pushbutton for 1NI-136B on 1MC-11, determines that the valve will not open and proceeds to the next step. Examiner NOTE:  1NI-136B will not open due to an interlock with 1NI-184B  COMMENTS:
Catawba Nuclear Station JPM C May 2015 NRC Exam PAGE 1 OF 10 JPM C
___ SAT  ___ UNSAT    STEP 17      j. Verify at least one ND train aligned to provide suction to NV and NI as follows:  A Train:    1A ND pump running  1ND-28A (ND Supply To NV & 1A NI Pmps) - OPEN. STANDARD:  Applicant determines no train can be aligned to provide suction to NV and NI and proceeds to the RNO. EXAMINER NOTE:  This begins the alternate path of this JPM. COMMENTS:        ___ SAT  ___ UNSAT 


Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT  PAGE 12 0F 14  STEP 18    6.j. RNO j. Perform the following: 1) IF either valve is in intermediate position, THEN allow 20 seconds for valve to open. STANDARD: Applicant determines that this step does not apply.
Catawba Nuclear Station JPM C May 2015 NRC Exam PAGE 2 OF 10 EVALUATION SHEET Task:
COMMENTS:       ___ SAT  ___ UNSAT STEP 19                      2)  IF either valve is open AND its  associated ND pump on, THEN GO TO Step 6.k. STANDARD: Applicant determines that this step does not apply.
Isolate Cold Leg Accumulators Following a Shutdown LOCA Alternate Path:
COMMENTS:        ___ SAT  ___ UNSAT 
Yes Facility JPM #:
N/A Safety Function:
3


Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam  STEP/STANDARD SAT/UNSAT  PAGE 13 0F 14  STEP 20                      3)  IF both A train and B train unavailable, THEN trip all NV and NI pumps. STANDARD:  Applicant determines both A train and B train are unavailable and depresses the green OFF pushbuttons for NV PMP 1A, NV PUMP 1B, NI PMP 1A and NI PUMP 1B. This step is critical to protect the NV and NI pumps from damage from loss of suction and allow them to be available later when the FWST has been refilled. EXAMINER CUE: "Another operator will complete ES-1.3. This JPM is complete."  COMMENTS:   END OF TASK  CRITICAL STEP    ___ SAT  ___ UNSAT 
==Title:==
Emergency Core Cooling System (ECCS)
K/A 006 A1.13 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the ECCS controls including: Accumulator pressure (level, boron concentration)
Rating(s):
3.5 / 3.7 CFR:
41.5 / 45.5 Preferred Evaluation Location:
Preferred Evaluation Method:
Simulator X
In-Plant Perform X
Simulate


STOP TIME ________
==References:==
APPLICANT CUE SHEET  (RETURN TO EXAMINER UPON COMPLETION OF TASK) May 2015 NRC Initial License Exam JPM B   
AP/1/A/5500/027 (Shutdown LOCA) rev. 38, Enclosure 14 (Isolating Cold Leg Accumulators)
Task Standard:
AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators) is performed and 1A & 1D Cold Leg Accumulators are isolated and 1B & 1C Cold Leg Accumulators are vented to containment.
Validation Time:
15 minutes Time Critical:
Yes No X


INITIAL CONDITIONS:   A LOCA has occurred on Unit 1.
===========================================================================
INITIATING CUES:   1AD-9, E/8 'FWST LO-LO LEVEL' annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.
Applicant:
Catawba Nuclear Station JPM C May 2015 NRC Exam PAGE 1 OF 10 
Time Start: __________
NAME___________________________
Docket #_______________
Time Finish: __________
Performance Rating:
SAT ____ UNSAT ____
Performance Time _____
Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE


JPM C 
===========================================================================
COMMENTS


Catawba Nuclear Station JPM C May 2015 NRC Exam PAGE 2 OF 10 EVALUATION SHEET Task: Isolate Cold Leg Accumulators Following a Shutdown LOCA Alternate Path: Yes   Facility JPM #: N/A  Safety Function: 3 Title: Emergency Core Cooling System (ECCS)  K/A 006 A1.13 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the ECCS controls including: Accumulator pressure (level, boron concentration)  Rating(s): 3.5  / 3.7 CFR: 41.5 / 45.5   Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate  
Catawba Nuclear Station JPM C May 2015 NRC Exam PAGE 3 OF 10 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC # 165
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action Final Delay Ramp Delete In Event
 
PAGE 4 0F 10 Catawba Nuclear Station JPM C May 2015 NRC Exam PAGE 4 OF 10 READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* Unit 1 is in Mode 4.
* Unit 1 shutdown was in progress for a refueling outage, when pressurizer pressure and level began to decrease uncontrollably.
* The CRS has entered AP/1/A/5500/027 (Shutdown LOCA) to address the reactor coolant system leak.
INITIATING CUES:
* The CRS has directed you to isolate the Unit 1 Cold Leg Accumulators by performing AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators).
* Power to all CLA discharge isolation valves has been restored per EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves).
EXAMINER NOTE: After reading the cue, provide the applicant with a copy of AP/1/A/5500/027 Enclosure 14.
 
Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 10 START TIME: _______
STEP 1: 1. Dispatch operator to restore power to all CLA discharge isolation valves. REFER TO EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves)
STANDARD:
Per initiating cue, the applicant should realize that this step is complete.
Also valve indication for each of the CLA discharge isolation valves is available, due to power already being aligned by the AO.
COMMENTS:
___ SAT
___ UNSAT STEP 2: 2. Ensure S/I - RESET
: a. ECCS
: b. D/G load sequencers
: c. IF AT ANY TIME a B/O occurs, THEN restart S/I equipment previously on.
STANDARD:
Applicant verifies that the yellow ECCS and D/G load sequencer RESET lights are lit. Applicant acknowledges the If at any time statement.
COMMENTS:
___ SAT
___UNSAT
 
Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10 STEP 3: 3. WHEN power is aligned, THEN perform the following:
: a. CLOSE the following valves:
* 1NI-54A (C-Leg Accum A Disch Isol)
* 1NI-65B (C-Leg Accum B Disch Isol)
* 1NI-76A (C-Leg Accum C Disch Isol)
* 1NI-88B (C-Leg Accum D Disch Isol)
STANDARD:
Applicant depresses the green CLOSE pushbutton for the valves listed, and verifies the green CLSD light lit and red OPEN light dark for valves 1NI-54A & 1NI-88B. Applicant also verifies the red OPEN light lit and green CLSD light dark for valves 1NI-65B & 1NI-76A and transitions to the RNO.
The critical part of this step is to close isolation valves 1NI-54A & 1NI-88B. The other 2 Cold Leg Accumulators will be vented to containment in subsequent steps in the RNO.
EXAMINER NOTE: This begins the alternate path of this JPM.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 4: 3.RNOa. Perform the following:
: 1) Ensure containment isolation signals - RESET:
* Phase A
* Phase B STANDARD:
Applicant verifies that the yellow RESET lights are lit for both trains Phase A and Phase B isolations.
COMMENTS:
___ SAT
___ UNSAT
 
Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 10 STEP 5: 2) Ensure 1VI-77B (VI Cont Isol) - OPEN STANDARD:
Applicant determines that the red OPEN light lit and green CLSD light dark for 1VI-77B.
COMMENTS:
___ SAT
___ UNSAT STEP 6: 3) IF VI pressure is less than 85 PSIG, THEN dispatch operator to ensure proper VI compressor operation.
STANDARD:
Applicant determines that VI pressure is ~ 90 PSIG. This step is N/A.
COMMENTS:
___ SAT
___ UNSAT STEP 7: 4) Vent any CLA which cannot be isolated as follows:
a) OPEN 1NI-47A (C-Leg Accum N2 Sup Cont Isol)
STANDARD:
Applicant depresses the red OPEN pushbutton for 1NI-47A and verifies the red OPEN light lit and green CLSD light dark.
COMMENTS:
___ SAT
___ UNSAT
 
Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 10 STEP 8: b) Place breaker 1CB-1 (behind 1MC-6)(Key
#11) to - ON STANDARD:
Applicant lifts breaker 1CB-1 fully up to the ON position.
This step is critical to place power on Cold Leg Accumulator Nitrogen supply isolation valves for 1B and 1C CLAs which will be opened in the next step to allow venting the accumulators to containment.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 9: c) OPEN valve for CLA(s) to be vented:
* 1NI-50 (C-Leg Accum A N2 Supply Isol)
* 1NI-61 (C-Leg Accum B N2 Supply Isol)
* 1NI-72 (C-Leg Accum C N2 Supply Isol)
* 1NI-84 (C-Leg Accum D N2 Supply Isol)
STANDARD:
Applicant depresses the red OPEN pushbutton and verifies the red OPEN light lit and green CLSD light dark for 1NI-61 and 1NI-72.
This step is critical due to not being able to isolate these CLAs. If these CLAs are not vented to reduce the N2 overpressure, it could cause a hard bubble to form in the reactor coolant system as reactor coolant pressure continues to decrease.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT
 
Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 10 STEP 10: d) CLOSE 1NI-47A.
STANDARD:
Applicant depresses the green CLOSE pushbutton and verifies the green CLSD light lit and red OPEN light dark for 1NI-47A.
This step is critical to allow venting the 1B and 1C CLAs.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 11: e) OPEN 1NI-83 (C-Leg Accums N2 Vent Ctrl) to depressurize affected CLA(s).
STANDARD:
Applicant rotates potentiometer for 1NI-83 clockwise to begin venting the 1B and 1C CLAs.
This step is critical to vent the 1B and 1C CLAs.
NOTE TO EVALUATOR: The time to fully vent the 1B & 1C CLAs would be approximately 30 minutes. The critical steps for this JPM have been met at this point and the JPM may be terminated at your discretion.
EVALUATOR CUE: Another operator will continue to vent the 1B and 1C Cold Leg Accumulators. This JPM is complete.
COMMENTS:
END OF TASK CRITICAL STEP
___ SAT
___ UNSAT STOP TIME ________
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 2015 NRC Initial License Exam JPM C INITIAL CONDITIONS:
* Unit 1 is in Mode 4.
* Unit 1 shutdown was in progress for a refueling outage, when pressurizer pressure and level began to decrease uncontrollably.
* The CRS has entered AP/1/A/5500/027 (Shutdown LOCA) to address the reactor coolant system leak.
INITIATING CUES:
* The CRS has directed you to isolate the Unit 1 Cold Leg Accumulators by performing AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators).
* An AO has been dispatched to restore power to all CLA discharge isolation valves per EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves).
 
Catawba Nuclear Station JPM D May 2015 NRC Exam PAGE 1 OF 14 JPM D
 
Catawba Nuclear Station JPM D May 2015 NRC Exam PAGE 2 OF 14 EVALUATION SHEET Task:
Establish NC system Bleed and Feed per EP/1/A/5000/FR-H.1 Alternate Path:
Yes Facility JPM #:
NC-046 Safety Function:
4P
 
==Title:==
Reactor Coolant System K/A 002 A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the RCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of heat sinks Rating(s):
4.3 / 4.6 CFR:
41.5 / 43.5 / 45.3 / 45.5 Preferred Evaluation Location:
Preferred Evaluation Method:
Simulator X
In-Plant Perform X
Simulate  


==References:==
==References:==
AP/1/A/5500/027 (Shutdown LOCA) rev. 38, Enclosure 14 (Isolating Cold Leg Accumulators)  Task Standard: AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators) is performed and 1A & 1D Cold Leg Accumulators are isolated and 1B & 1C Cold Leg Accumulators are vented to containment. Validation Time: 15 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____     Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM C May 2015 NRC Exam PAGE 3 OF 10  SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC # 165 3. Enter the password. 4. Select "Yes" on the INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. ENSURE "Extra Operator" is present in the simulator. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event PAGE 4 0F 10 Catawba Nuclear Station JPM C May 2015 NRC Exam PAGE 4 OF 10  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   Unit 1 is in Mode 4. Unit 1 shutdown was in progress for a refueling outage, when pressurizer pressure and level began to decrease uncontrollably. The CRS has entered AP/1/A/5500/027 (Shutdown LOCA) to address the reactor coolant system leak.
EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) rev. 42 Task Standard:
INITIATING CUES:  The CRS has directed you to isolate the Unit 1 Cold Leg Accumulators by performing AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators). Power to all CLA discharge isolation valves has been restored per EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves). EXAMINER NOTE:   After reading the cue, provide the applicant with a copy of AP/1/A/5500/027 Enclosure 14.
Aligns S/I feed path using NI and NV pumps and opens 1NC-32B and 1NC-34A PZR PORVs to establish NC system bleed path Validation Time:
10 minutes Time Critical:
Yes No X  
 
===========================================================================
Applicant:
Time Start: __________
NAME___________________________
Docket #_______________
Time Finish: __________
Performance Rating:
SAT ____ UNSAT ____
Performance Time _____
Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE  
 
===========================================================================
COMMENTS  
 
Catawba Nuclear Station JPM D May 2015 NRC Exam PAGE 3 OF 14 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC #166.
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action Final Delay Ramp Delete In Event MAL-CA003A CAPT SA2 FAILS TO START Active MAL-CA003B CAPT SA5 FAILS TO START Active MAL-CA004A FAILURE OF CA PUMP A TO START Both MAL-CA004B FAILURE OF CA PUMP B TO START Both MAL-NI001B NI PUMP B FAILURE Auto OVR-ISE043 SAFETY INJECTION INITIATE PB TRN B Off MAL-ISE002B (AUTO SI TRN B FAILS TO ACTUATE)
Active VLV-NI001F (NI9A B.I.T. DISCHARGE ISOL VLV FAIL TO POSITION) 0
 
REV. 0 PAGE 4 0F 14 Catawba Nuclear Station JPM D May 2015 NRC Exam PAGE 4 OF 14 READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* A reactor trip has occurred on Unit 1 due to a loss of both Main Feedwater pumps.
* The CA system will not function.
* Attempts to restart the Main CF pumps have been unsuccessful.
* EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a RED PATH for the Heat Sink critical safety function while performing EP/1/A/5000/ES-0.1 (Reactor Trip Response).
* Bleed and Feed initiation criteria have been met.
INITIATING CUES:
* The CRS instructs you to initiate NC system bleed and feed by performing steps 19-24 of EP/1/A/5000/FR-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.
EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/FR-H.1 pages 28-36.
 
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 14 START TIME: _______
STEP 1: 19. Perform Steps 20 through 24 quickly to establish NC heat removal by NC bleed and feed.
STANDARD:
Applicant acknowledges this step.
COMMENTS:
___ SAT
___ UNSAT STEP 2 20. Ensure all NC pumps - OFF.
STANDARD:
Applicant ensures the NC pumps are off.
COMMENTS:
___ SAT
___UNSAT


Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 10  START TIME: _______  STEP 1:   1. Dispatch operator to restore power to all CLA discharge isolation valves. REFER TO EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves) STANDARD: Per initiating cue, the applicant should realize that this step is complete. Also valve indication for each of the CLA discharge isolation valves is available, due to power already being aligned by the AO. COMMENTS:
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 14 STEP 3 21. Initiate S/I.
STANDARD:
Applicant depresses the red train A and B SAFETY INJECTION INITIATE pushbuttons and verifies the red SAFETY INJECTION ACTUATED status light is lit on 1SI-13 or ECCS TRN A yellow reset light is dark on 1MC-11.
This step is critical to start the NI pump and align the valves required for initiating an NC system feed path.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 4 22. Verify NC System feed path as follows:
: a. Verify the following pumps - ON:
* At least one NV pump
* At least one NI pump.
STANDARD:
Applicant determines that at least one NV pump and one NI pump are running.
EXAMINER NOTE: Applicant may start 1B NI pump and 1B NV pump at this time due to it being a failed auto action. If not, the procedure will direct starting these pumps in the upcoming steps.
COMMENTS:
___ SAT
___ UNSAT
 
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 14 STEP 5 22 b. Verify "NV S/I FLOW" - INDICATING FLOW.
STANDARD:
Applicant determines that 1NVP6080 (NV S/I FLOW) on 1MC-3 indicates 0 GPM and transitions to the RNO.
EXAMINER NOTE: This begins the alternate path of this JPM.
COMMENTS:
___ SAT
___ UNSAT STEP 6 22 b. RNO Perform the following:
: 1) Ensure the following pumps - ON:
* NV Pumps
* NI Pumps.
STANDARD:
Applicant ensures that all NV pumps and NI pumps are running by depressing the red ON pushbuttons for any non-running pump, and verifying the red ON lights are lit and green OFF lights are dark for all pumps.
COMMENTS:
___ SAT
___ UNSAT
 
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14 STEP 7 22 b. RNO 2) IF at least one NV pump in service, THEN perform the following:
a) Ensure the following valves - OPEN:
* 1NV-252A (NV Pumps Suct From FWST)
* 1NV-253B (NV Pumps Suct From FWST).
STANDARD:
Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-252A and 1NV-253B.
COMMENTS:
___ SAT
___ UNSAT STEP 8 22 b. RNO 2) b) Ensure the following valves - CLOSED:
* 1NV-188A (VCT Otlt Isol)
* 1NV-189B (VCT Otlt Isol).
STANDARD:
Applicant determines that the green CLSD light is lit and red OPEN light is dark on 1NV-188A. Applicant determines that the green CLSD light is dark for 1NV-189B, and depresses the green CLOSE pushbutton and verifies the green CLSD light is lit and the red OPEN light is dark.
COMMENTS:
___ SAT
___ UNSAT
 
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 14 STEP 9 22 b. RNO 2) c) Ensure the following valves - OPEN:
* 1NI-9A (NV Pmp C/L Inj Isol)
* 1NI-10B (NV Pmp C/L Inj Isol).
STANDARD:
Applicant determines the red OPEN light is dark and green CLSD light is lit on 1NI-9A and 1NI-10B. Applicant depresses the red OPEN pushbutton for 1NI-9A but the valve will not open. Applicant depresses the red OPEN pushbutton for 1NI-10B and verifies the red OPEN light is lit and the green CLSD light is dark.
This step is critical to align an NC (Reactor Coolant) system Feed path.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 10 22 b. RNO 3) IF NI Pump 1A is in service, THEN ensure the following valves - OPEN:
1NI-103A (NI Pump 1A Suct) 1NI-118A (NI Pump 1A C-Leg Inj Isol) 1NI-162A (NI To C-Legs Inj Hdr Isol) 1NI-100B (NI Pmps Suct From FWST).
STANDARD:
Applicant determines that the red OPEN light is lit and green CLSD light is dark on valves 1NI-103A, 1NI-118A, 1NI-162A, and 1NI-100B.
COMMENTS:
___ SAT
___ UNSAT
 
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14 STEP 11 22 b. RNO 4) IF NI Pump 1B is in service, THEN ensure the following valves - OPEN:
* 1NI-135B (NI Pump 1B Suct)
* 1NI-150B (NI Pump 1B C-Leg Inj Isol)
* 1NI-162A (NI To C-Legs Inj Hdr Isol)
* 1NI-100B (NI Pmps Suct From FWST).
STANDARD:
Applicant verifies that the red OPEN light is lit and green CLSD light is dark on valves 1NI-135B, 1NI-150B, 1NI-162A, and 1NI-100B.
COMMENTS:
___ SAT
___ UNSAT STEP 12 22 b. RNO 5) IF no feed path can be aligned, THEN perform the following:
STANDARD:
Applicant determines that a feed path does exist and this step is N/A.
COMMENTS:
___ SAT
___ UNSAT
 
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 14 STEP 13 23. Establish NC System bleed path as follows:
: a. Ensure all Pzr PORV isolation valves - OPEN.
STANDARD:
Applicant determines the RED lights are lit and GREEN lights are dark on valves 1NC-31B, 1NC-35B, and 1NC-33A.
COMMENTS:
___ SAT
___ UNSAT STEP 14 23 b. Select "OPEN" on the following PZR PORVs:
* 1NC-34A (PZR PORV)
* 1NC-32B (PZR PORV).
STANDARD:
Applicant rotates switches for 1NC-34A and 1NC-32B, clockwise to the OPEN position and verifies RED lights are lit and GREEN lights are dark on both valves.
This step is critical because it establishes an NC (Reactor Coolant) system Bleed path.
COMMENTS:
CRITICAL STEP
___ SAT
___ SAT
___ UNSAT     STEP 2:  2. Ensure S/I - RESET  a. ECCS b. D/G load sequencers c. IF AT ANY TIME a B/O occurs, THEN restart S/I equipment previously on. STANDARD:  Applicant verifies that the yellow ECCS and D/G load sequencer RESET lights are lit. Applicant acknowledges the If at any time statement. COMMENTS:
___ UNSAT  
___ SAT    ___UNSAT 


Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10  STEP 3:  3. WHEN power is aligned, THEN perform the following:  a. CLOSE the following valves: 1NI-54A (C-Leg Accum A Disch Isol) 1NI-65B (C-Leg Accum B Disch Isol)  1NI-76A (C-Leg Accum C Disch Isol) 1NI-88B (C-Leg Accum D Disch Isol)  STANDARD: Applicant depresses the green CLOSE pushbutton for the valves listed, and verifies the green CLSD light lit and red OPEN light dark for valves 1NI-54A & 1NI-88B. Applicant also verifies the red OPEN light lit and green CLSD light dark for valves 1NI-65B & 1NI-76A and transitions to the RNO. The critical part of this step is to close isolation valves 1NI-54A & 1NI-88B. The other 2 Cold Leg Accumulators will be vented to containment in subsequent steps in the RNO.
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 14 STEP 15 23 c. Align N2 to Pzr PORVs by opening the following valves:
EXAMINER NOTE:  This begins the alternate path of this JPM. COMMENTS:
* 1NI-438A (Emer N2 From CLA A To 1NC-34A)
CRITICAL STEP  ___ SAT  ___ UNSAT STEP 4:  3.RNOa. Perform the following:  1)  Ensure containment isolation signals - RESET:  Phase A  Phase B  STANDARD:  Applicant verifies that the yellow RESET lights are lit for both trains Phase A and Phase B isolations.
* 1NI-439B (Emer N2 From CLA B To 1NC-32B).
STANDARD:
Applicant depresses the red OPEN pushbutton and verifies red OPEN light lit and green CLSD light dark on valves 1NI-438A and 1NI-439B.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM C May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 7 0F 10    STEP 5:                      2)  Ensure 1VI-77B (VI Cont Isol) - OPEN  STANDARD: Applicant determines that the red OPEN light lit and green CLSD light dark for 1VI-77B.
___ SAT
___ UNSAT STEP 16 23 d. Verify power to all Pzr PORV isolation valves -
AVAILABLE.
STANDARD:
Applicant verifies indicating lights lit on 1NC-31B, 1NC-35B, and 1NC-33A.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT     STEP 6:                      3) IF VI pressure is less than 85 PSIG, THEN dispatch operator to ensure proper VI compressor operation.
___ SAT
STANDARD:  Applicant determines that VI pressure is ~ 90 PSIG. This step is N/A.
___ UNSAT  
COMMENTS:        ___ SAT  ___ UNSAT STEP 7:                       4) Vent any CLA which cannot be isolated as follows:    a) OPEN 1NI-47A (C-Leg Accum N2 Sup Cont Isol) STANDARD: Applicant depresses the red OPEN pushbutton for 1NI-47A and verifies the red OPEN light lit and green CLSD light dark.
 
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 14 STEP 17 24. Verify the following valves - OPEN:
1NC-31B (PZR PORV Isol) 1NC-32B (PZR PORV) 1NC-33A (PZR PORV Isol) 1NC-34A (PZR PORV).
STANDARD:
Applicant verifies lights on 1NC-31B, 1NC-32B, 1NC-33A and 1NC-34A indicate OPEN.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT
END OF TASK
___ SAT
___ UNSAT STOP TIME ________


Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 8 0F 10  STEP 8:                           b)  Place breaker 1CB-1 (behind 1MC-6)(Key #11) to - ON      STANDARD:  Applicant lifts breaker 1CB-1 fully up to the ON position. This step is critical to place power on Cold Leg Accumulator Nitrogen supply isolation valves for 1B and 1C CLAs which will be opened in the next step to allow venting the accumulators to containment. COMMENTS:
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 9:                            c)  OPEN valve for CLA(s) to be vented:  1NI-50 (C-Leg Accum A N2 Supply Isol)  1NI-61 (C-Leg Accum B N2 Supply Isol) 1NI-72 (C-Leg Accum C N2 Supply Isol)  1NI-84 (C-Leg Accum D N2 Supply Isol)  STANDARD:  Applicant depresses the red OPEN pushbutton and verifies the red OPEN light lit and green CLSD light dark for 1NI-61 and 1NI-72.
May 2015 NRC Initial License Exam JPM D INITIAL CONDITIONS:
This step is critical due to not being able to isolate these CLAs. If these CLAs are not vented to reduce the N2 overpressure, it could cause a hard bubble to form in the reactor coolant system as reactor coolant pressure continues to decrease. COMMENTS:
* A reactor trip has occurred on Unit 1 due to a loss of both Main Feedwater pumps.
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM C May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 9 0F 10  STEP 10:                            d)  CLOSE 1NI-47A. STANDARD:  Applicant depresses the green CLOSE pushbutton and verifies the green CLSD light lit and red OPEN light dark for 1NI-47A. This step is critical to allow venting the 1B and 1C CLAs. COMMENTS:     CRITICAL STEP
* The CA system will not function.
___ SAT  ___ UNSAT STEP 11:                            e)  OPEN 1NI-83 (C-Leg Accums N2 Vent Ctrl) to depressurize affected CLA(s). STANDARD:  Applicant rotates potentiometer for 1NI-83 clockwise to begin venting the 1B and 1C CLAs. This step is critical to vent the 1B and 1C CLAs.
* Attempts to restart the Main CF pumps have been unsuccessful.
NOTE TO EVALUATOR:  The time to fully vent the 1B & 1C CLAs would be approximately 30 minutes. The critical steps for this JPM have been met at this point and the JPM may be terminated at your discretion. EVALUATOR CUE:  "Another operator will continue to vent the 1B and 1C Cold Leg Accumulators. This JPM is complete."  COMMENTS:  END OF TASK  CRITICAL STEP    ___ SAT  ___ UNSAT STOP TIME ________
* EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a RED PATH for the Heat Sink critical safety function while performing EP/1/A/5000/ES-0.1 (Reactor Trip Response).
APPLICANT CUE SHEET  (RETURN TO EXAMINER UPON COMPLETION OF TASK) May 2015 NRC Initial License Exam JPM C   
* Bleed and Feed initiation criteria have been met.
INITIATING CUES:
* The CRS instructs you to initiate NC system bleed and feed by performing steps 19-24 of EP/1/A/5000/FR-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.  


INITIAL CONDITIONS:  Unit 1 is in Mode 4. Unit 1 shutdown was in progress for a refueling outage, when pressurizer pressure and level began to decrease uncontrollably. The CRS has entered AP/1/A/5500/027 (Shutdown LOCA) to address the reactor coolant system leak.
Catawba Nuclear Station JPM E May 2015 NRC Exam PAGE 1 OF 8 JPM E
INITIATING CUES:  The CRS has directed you to isolate the Unit 1 Cold Leg Accumulators by performing AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators). An AO has been dispatched to restore power to all CLA discharge isolation valves per EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves).
Catawba Nuclear Station JPM D May 2015 NRC Exam PAGE 1 OF 14 


JPM
Catawba Nuclear Station JPM E May 2015 NRC Exam PAGE 2 OF 8 EVALUATION SHEET Task:
Respond to Loss of Normal Steam Release Capabilities Alternate Path:
No Facility JPM #:
CSF-006 Modified Safety Function:
4S


Catawba Nuclear Station JPM D May 2015 NRC Exam PAGE 2 OF 14  EVALUATION SHEET Task: Establish NC system Bleed and Feed per EP/1/A/5000/FR-H.1  Alternate Path: Yes  Facility JPM #: NC-046  Safety Function: 4P Title: Reactor Coolant System K/A 002 A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the RCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:  Loss of heat sinks  Rating(s): 4.3 / 4.6 CFR: 41.5 / 43.5 / 45.3 / 45.Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate  
==Title:==
Main and Reheat Steam System K/A E13 EA1.1 Ability to operate and/or monitor the following as they apply to the (Steam Generator Overpressure): Components and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Rating(s):
3.1 / 3.3 CFR:
41.7 / 45.5 / 45.6 Preferred Evaluation Location:
Preferred Evaluation Method:
Simulator X
In-Plant Perform X
Simulate  


==References:==
==References:==
EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) rev. 42  Task Standard: Aligns S/I feed path using NI and NV pumps and opens 1NC-32B and 1NC-34A PZR PORVs to establish NC system bleed path  Validation Time: 10 minutes   Time Critical:   Yes No X =========================================================================== Applicant:    Time Start:    __________ NAME___________________________ Docket #_______________ Time Finish:  __________    Performance Rating:    SAT ____  UNSAT ____  Performance Time _____    Examiner: _____________________________ _____________________________/________  NAME  SIGNATURE DATE ===========================================================================  COMMENTS Catawba Nuclear Station JPM D May 2015 NRC Exam PAGE 3 OF 14  SIMULATOR OPERATOR INSTRUCTIONS:  1. ENSURE NRC Examination Security has been established. 2. Reset to IC #166. 3. Enter the password. 4. Select "Yes" on the INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. ENSURE "Extra Operator" is present in the simulator. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event MAL-CA003A CAPT SA2 FAILS TO START Active    MAL-CA003B CAPT SA5 FAILS TO START Active    MAL-CA004A FAILURE OF CA PUMP A TO START Both    MAL-CA004B FAILURE OF CA PUMP B TO START Both    MAL-NI001B NI PUMP B FAILURE Auto    OVR-ISE043 SAFETY INJECTION INITIATE PB TRN B Off    MAL-ISE002B (AUTO SI TRN B FAILS TO ACTUATE) Active    VLV-NI001F (NI9A B.I.T. DISCHARGE ISOL VLV FAIL TO POSITION) 0 REV. 0 PAGE  4  0F 14 Catawba Nuclear Station JPM D May 2015 NRC Exam PAGE 4 OF 14  READ TO APPLICANT DIRECTION TO APPLICANT:  I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  A reactor trip has occurred on Unit 1 due to a loss of both Main Feedwater pumps. The CA system will not function. Attempts to restart the Main CF pumps have been unsuccessful. EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a "RED PATH" for the Heat Sink critical safety function while performing EP/1/A/5000/ES-0.1 (Reactor Trip Response). Bleed and Feed initiation criteria have been met. INITIATING CUES:  The CRS instructs you to initiate NC system bleed and feed by performing steps 19-24 of EP/1/A/5000/FR-H.1. Inform the CRS when the bleed and feed path has been initiated and verified. EXAMINER NOTE:  After reading cue, provide the applicant with a copy of EP/1/A/5000/FR-H.1 pages 28-36. 
EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities)
Task Standard:
Steam Generator PORVs operated in manual to decrease steam pressure to <
1175 PSIG.
Validation Time:
5 minutes Time Critical:
Yes No X  


Catawba Nuclear Station JPM D May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 5 0F 14  START TIME: _______  STEP 1:   19. Perform Steps 20 through 24 quickly to establish NC heat removal by NC bleed and feed. STANDARD: Applicant acknowledges this step. COMMENTS:       ___ SAT
===========================================================================
___ UNSAT      STEP 2  20. Ensure all NC pumps - OFF.
Applicant:
STANDARD:  Applicant ensures the NC pumps are off. COMMENTS:
Time Start: __________
___ SAT    ___UNSAT 
NAME___________________________
Docket #_______________
Time Finish: __________
Performance Rating:
SAT ____ UNSAT ____
Performance Time _____
Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE


Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 6 0F 14  STEP 3   21. Initiate S/I. STANDARD: Applicant depresses the red train 'A' and 'B' "SAFETY INJECTION INITIATE" pushbuttons and verifies the red "SAFETY INJECTION ACTUATED" status light is lit on 1SI-13 or "ECCS TRN A" yellow reset light is dark on 1MC-11. This step is critical to start the NI pump and align the valves required for initiating an NC system feed path. COMMENTS:
===========================================================================
CRITICAL STEP  ___ SAT  ___ UNSAT STEP 4  22. Verify NC System feed path as follows: a. Verify the following pumps - ON:  At least one NV pump  At least one NI pump. STANDARD:  Applicant determines that at least one NV pump and one NI pump are running. EXAMINER NOTE:   Applicant may start 1B NI pump and 1B NV pump at this time due to it being a failed auto action. If not, the procedure will direct starting these pumps in the upcoming steps. COMMENTS:
COMMENTS
___ SAT  ___ UNSAT Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 14  STEP 5    22 b. Verify "NV S/I FLOW" - INDICATING FLOW.
 
STANDARD: Applicant determines that 1NVP6080 (NV S/I FLOW) on 1MC-3 indicates 0 GPM and transitions to the RNO. EXAMINER NOTE: This begins the alternate path of this JPM. COMMENTS:
Catawba Nuclear Station JPM E May 2015 NRC Exam PAGE 3 OF 8 SIMULATOR OPERATOR INSTRUCTIONS:
___ SAT   ___ UNSAT     STEP 6  22 b. RNO  Perform the following: 1) Ensure the following pumps - ON:  NV Pumps  NI Pumps. STANDARD: Applicant ensures that all NV pumps and NI pumps are running by depressing the red ON pushbuttons for any non-running pump, and verifying the red ON lights are lit and green OFF lights are dark for all pumps.
: 1. ENSURE NRC Examination Security has been established.
COMMENTS:       ___ SAT   ___ UNSAT 
: 2. Reset to IC # 158
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action Final Delay Ramp Delete In Event MAL-SM005A (S/G SAFETY VALVE SV20 FAILURE) 0 MAL-SM005B (S/G SAFETY VALVE SV14 FAILURE) 0 MAL-SM005C (S/G SAFETY VALVE SV8 FAILURE) 0 MAL-SM005D (S/G SAFETY VALVE SV2 FAILURE) 0 MAL-SM002A (S/G PORV SV19 FAILURE) 0 MAL-SM002B (S/G PORV SV13 FAILURE) 0 MAL-SM002C (S/G PORV SV7 FAILURE) 0 MAL-SM002D (S/G PORV SV1 FAILURE) 0 OVR-IDE025A (SBM-Steam Dump INTLK Byp Trn A - OFF RST POS)
ON MAL-SM002A (S/G PORV SV19 FAILURE) 0
:01 1
MAL-SM002B (S/G PORV SV13 FAILURE) 0
:01 2
MAL-SM002C (S/G PORV SV7 FAILURE) 0
:01 3
MAL-SM002D (S/G PORV SV1 FAILURE) 0
:01 4
Ensure Event 1 = x02i088m Ensure Event 2 = x02i091m Ensure Event 3 = x02i096m Ensure Event 4 = x02i099m
 
PAGE 4 0F 8 Catawba Nuclear Station JPM E May 2015 NRC Exam PAGE 4 OF 8 READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* An inadvertent Main Steam Isolation Signal has caused a reactor trip on Unit 1.
* Steam system failures have caused steam generator pressure to exceed 1175 PSIG.
INITIATING CUES:
* The CRS has directed you to perform EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities) to restore steam generator pressure to < 1175 PSIG.
EXAMINER NOTE: After reading the cue, provide the applicant with a copy of EP/1/A/5000/FR-H.4.  
 
Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 8 START TIME: _______
NOTE Throughout this procedure, affected refers to any S/G in which pressure is greater than 1175 PSIG.
STEP 1: 1. IF AT ANY TIME affected S/G(s) N/R level increases to greater than 92% (80% ACC), THEN steam should not be released from affected S/G(s).
STANDARD:
Applicant acknowledges the continuous action statement and continues to step 2.
COMMENTS:
___ SAT
___ UNSAT STEP 2: 2. Restore normal steam release capability of affected S/G(s) using S/G PORV as follows:
: a. Verify affected S/G(s) PORV isolation valve - OPEN.
STANDARD:
Applicant determines all S/G PORV isolation valves red OPEN lights are lit and green CLSD lights are dark.
COMMENTS:
___ SAT
___UNSAT


Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14  STEP 7  22 b. RNO 2) IF at least one NV pump in service, THEN perform the following: a) Ensure the following valves - OPEN:  1NV-252A (NV Pumps Suct From FWST)  1NV-253B (NV Pumps Suct From FWST). STANDARD:  Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-252A and 1NV-253B.
Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 8 STEP 3: 2.b. Throttle open affected S/G(s) PORV.
COMMENTS:        ___ SAT  ___ UNSAT STEP 8  22 b. RNO 2) b) Ensure the following valves - CLOSED:  1NV-188A (VCT Otlt Isol)  1NV-189B (VCT Otlt Isol). STANDARD:  Applicant determines that the green CLSD light is lit and red OPEN light is dark on 1NV-188A. Applicant determines that the green CLSD light is dark for 1NV-189B, and depresses the green CLOSE pushbutton and verifies the green CLSD light is lit and the red OPEN light is dark. COMMENTS:
STANDARD:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM D May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 9 0F 14  STEP 9  22 b. RNO 2) c) Ensure the following valves - OPEN:  1NI-9A (NV Pmp C/L Inj Isol)  1NI-10B (NV Pmp C/L Inj Isol). STANDARD: Applicant determines the red OPEN light is dark and green CLSD light is lit on 1NI-9A and 1NI-10B. Applicant depresses the red OPEN pushbutton for 1NI-9A but the valve will not open. Applicant depresses the red OPEN pushbutton for 1NI-10B and verifies the red OPEN light is lit and the green CLSD light is dark. This step is critical to align an NC (Reactor Coolant) system Feed path. COMMENTS:
Applicant must depress the manual pushbutton for each S/G PORV.
CRITICAL STEP   ___ SAT   ___ UNSAT     STEP 10  22 b. RNO 3)  IF NI Pump 1A is in service, THEN ensure the following valves - OPEN:  1NI-103A (NI Pump 1A Suct)  1NI-118A (NI Pump 1A C-Leg Inj Isol)  1NI-162A (NI To C-Legs Inj Hdr Isol)  1NI-100B (NI Pmps Suct From FWST). STANDARD: Applicant determines that the red OPEN light is lit and green CLSD light is dark on valves 1NI-103A, 1NI-118A, 1NI-162A, and 1NI-100B.
This step is critical to gain control of all steam generator PORVs to be able to decrease steam generator pressures to < 1175 psig.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 4: 2.b. Throttle open affected S/G(s) PORV.
STANDARD:
The applicant must rotate each S/G PORV potentiometer clockwise to open the applicable S/G PORV.
This step is critical to be able to decrease steam generator pressures to < 1175 psig.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT
CRITICAL STEP
___ SAT
___ UNSAT  


Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14  STEP 11  22 b. RNO 4)  IF NI Pump 1B is in service, THEN ensure the following valves - OPEN:  1NI-135B (NI Pump 1B Suct)  1NI-150B (NI Pump 1B C-Leg Inj Isol)  1NI-162A (NI To C-Legs Inj Hdr Isol)  1NI-100B (NI Pmps Suct From FWST). STANDARD: Applicant verifies that the red OPEN light is lit and green CLSD light is dark on valves 1NI-135B, 1NI-150B, 1NI-162A, and 1NI-100B.
Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 8 STEP 5: 2.c. GO TO Step 4.
COMMENTS:        ___ SAT  ___ UNSAT STEP 12  22 b. RNO 5)  IF no feed path can be aligned, THEN perform the following:  STANDARD:  Applicant determines that a feed path does exist and this step is N/A.
STANDARD:
Applicant goes to step 4.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM D May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 11 0F 14  STEP 13  23. Establish NC System bleed path as follows: a. Ensure all Pzr PORV isolation valves - OPEN. STANDARD: Applicant determines the RED lights are lit and GREEN lights are dark on valves 1NC-31B, 1NC-35B, and 1NC-33A.
___ SAT
COMMENTS:       ___ SAT  ___ UNSAT STEP 14  23  b. Select "OPEN" on the following PZR PORVs:  1NC-34A (PZR PORV)    1NC-32B (PZR PORV). STANDARD:  Applicant rotates switches for 1NC-34A and 1NC-32B, clockwise to the OPEN position and verifies RED lights are lit and GREEN lights are dark on both valves. This step is critical because it establishes an NC (Reactor Coolant) system Bleed path. COMMENTS:
___ UNSAT STEP 6: 4. Verify S/G pressures - LESS THAN 1175 PSIG.
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM D May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 12 0F 14  STEP 15  23  c. Align N2 to Pzr PORVs by opening the following valves:  1NI-438A (Emer N2 From CLA A To 1NC-34A)  1NI-439B (Emer N2 From CLA B To 1NC-32B). STANDARD:  Applicant depresses the red OPEN pushbutton and verifies red OPEN light lit and green CLSD light dark on valves 1NI-438A and 1NI-439B. COMMENTS:        ___ SAT  ___ UNSAT STEP 16  23  d. Verify power to all Pzr PORV isolation valves - AVAILABLE. STANDARD:  Applicant verifies indicating lights lit on 1NC-31B, 1NC-35B, and 1NC-33A.
STANDARD:
Applicant either determines that S/G pressures are currently < 1175 PSIG or will loop back to step 1.
EXAMINER CUE: If the applicant does not terminate the JPM when S/G pressures are reduced to < 1175 PSIG, then provide the following cue - The CRS is ready to return to the procedure and step in effect. This JPM is complete.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM D May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 13 0F 14  STEP 17  24. Verify the following valves - OPEN:    1NC-31B (PZR PORV Isol)    1NC-32B (PZR PORV)  1NC-33A (PZR PORV Isol)  1NC-34A (PZR PORV). STANDARD:  Applicant verifies lights on 1NC-31B, 1NC-32B, 1NC-33A and 1NC-34A indicate OPEN. COMMENTS:  END OF TASK    ___ SAT  ___ UNSAT 
___ SAT
___ UNSAT STOP TIME ________


STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) May 2015 NRC Initial License Exam JPM D   
May 2015 NRC Initial License Exam JPM E INITIAL CONDITIONS:
* An inadvertent Main Steam Isolation Signal has caused a reactor trip on Unit 1.
* Steam system failures have caused steam generator pressure to exceed 1175 PSIG.
INITIATING CUES:
* The CRS has directed you to perform EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities) to restore steam generator pressure to < 1175 PSIG.


INITIAL CONDITIONS:  A reactor trip has occurred on Unit 1 due to a loss of both Main Feedwater pumps. The CA system will not function. Attempts to restart the Main CF pumps have been unsuccessful. EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a "RED PATH" for the Heat Sink critical safety function while performing EP/1/A/5000/ES-0.1 (Reactor Trip Response). Bleed and Feed initiation criteria have been met. INITIATING CUES:  The CRS instructs you to initiate NC system bleed and feed by performing steps 19-24 of EP/1/A/5000/FR-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.
Catawba Nuclear Station JPM F May 2015 NRC Exam PAGE 1 OF 9 JPM F
Catawba Nuclear Station JPM E May 2015 NRC Exam PAGE 1 OF


JPM
Catawba Nuclear Station JPM F May 2015 NRC Exam PAGE 2 OF 9 EVALUATION SHEET Task:
Shift Upper Containment Ventilation Units Alternate Path:
No Facility JPM #:
NEW Safety Function:
5


Catawba Nuclear Station JPM E May 2015 NRC Exam PAGE 2 OF 8  EVALUATION SHEET Task: Respond to Loss of Normal Steam Release Capabilities  Alternate Path: No    Facility JPM #: CSF-006 Modified  Safety Function: 4S Title: Main and Reheat Steam System K/A E13 EA1.1 Ability to operate and/or monitor the following as they apply to the (Steam Generator Overpressure): Components and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features. Rating(s): 3./ 3.3 CFR: 41.7 / 45.5 / 45.Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate  
==Title:==
Containment Cooling System K/A 022 A4.01 Ability to manually operate and/or monitor in the control room: CCS fans Rating(s):
3.6 / 3.6 CFR:
41.7 / 45.5 to 45.8 Preferred Evaluation Location:
Preferred Evaluation Method:
Simulator X
In-Plant Perform X
Simulate  


==References:==
==References:==
EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities)   Task Standard: Steam Generator PORVs operated in manual to decrease steam pressure to < 1175 PSIG. Validation Time: 5 minutes  Time Critical:  Yes  No X =========================================================================== Applicant:    Time Start:    __________ NAME___________________________ Docket #_______________ Time Finish:  __________    Performance Rating:    SAT ____  UNSAT ____  Performance Time _____    Examiner: _____________________________ _____________________________/________  NAME  SIGNATURE DATE ===========================================================================  COMMENTS Catawba Nuclear Station JPM E May 2015 NRC Exam PAGE 3 OF 8  SIMULATOR OPERATOR INSTRUCTIONS:  1. ENSURE NRC Examination Security has been established. 2. Reset to IC # 158 3. Enter the password. 4. Select "Yes" on the INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. ENSURE "Extra Operator" is present in the simulator. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event MAL-SM005A (S/G SAFETY VALVE SV20 FAILURE) 0    MAL-SM005B (S/G SAFETY VALVE SV14 FAILURE) 0    MAL-SM005C (S/G SAFETY VALVE SV8 FAILURE) 0    MAL-SM005D (S/G SAFETY VALVE SV2 FAILURE) 0    MAL-SM002A (S/G PORV SV19 FAILURE) 0    MAL-SM002B (S/G PORV SV13 FAILURE) 0    MAL-SM002C (S/G PORV SV7 FAILURE) 0    MAL-SM002D (S/G PORV SV1 FAILURE) 0    OVR-IDE025A (SBM-Steam Dump INTLK Byp Trn A - OFF RST POS) ON    MAL-SM002A (S/G PORV SV19 FAILURE) 0  :01 1 MAL-SM002B (S/G PORV SV13 FAILURE) 0  :01 2 MAL-SM002C (S/G PORV SV7 FAILURE) 0  :01 3 MAL-SM002D (S/G PORV SV1 FAILURE) 0  :01 4 Ensure Event 1 = x02i088m Ensure Event 2 = x02i091m Ensure Event 3 = x02i096m Ensure Event 4 = x02i099m PAGE  4  0F 8 Catawba Nuclear Station JPM E May 2015 NRC Exam PAGE 4 OF 8  READ TO APPLICANT DIRECTION TO APPLICANT:  I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   An inadvertent Main Steam Isolation Signal has caused a reactor trip on Unit 1. Steam system failures have caused steam generator pressure to exceed 1175 PSIG.
OP/1/A/6450/001 (Containment Ventilation (VV) Systems) rev. 42, Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units)
INITIATING CUES:   The CRS has directed you to perform EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities) to restore steam generator pressure to < 1175 PSIG. EXAMINER NOTE:  After reading the cue, provide the applicant with a copy of EP/1/A/5000/FR-H.4. 
Task Standard:
OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units) performed to start 1D UCVU and shutdown 1C UCVU.
Validation Time:
5 minutes Time Critical:
Yes No X


Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F START TIME: _______ NOTE  Throughout this procedure, "affected" refers to any S/G in which pressure is greater than 1175 PSIG. STEP 1:   1. IF AT ANY TIME affected S/G(s) N/R level increases to greater than 92% (80% ACC), THEN steam should not be released from affected S/G(s). STANDARD: Applicant acknowledges the continuous action statement and continues to step 2. COMMENTS:       ___ SAT
===========================================================================
___ UNSAT     STEP 2:  2. Restore normal steam release capability of affected S/G(s) using S/G PORV as follows:  a. Verify affected S/G(s) PORV isolation valve - OPEN. STANDARD:   Applicant determines all S/G PORV isolation valves red OPEN lights are lit and green CLSD lights are dark.
Applicant:
Time Start: __________
NAME___________________________
Docket #_______________
Time Finish: __________
Performance Rating:
SAT ____ UNSAT ____
Performance Time _____
Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE
 
===========================================================================
COMMENTS
 
Catawba Nuclear Station JPM F May 2015 NRC Exam PAGE 3 OF 9 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC # 167 (This JPM written to be done with JPM E and will have the same simulator setup as JPM E).
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table in JPM E.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
EXAMINER NOTE: This JPM can be performed in conjunction with JPM E.
 
PAGE 4 0F 9 Catawba Nuclear Station JPM F May 2015 NRC Exam PAGE 4 OF 9 READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* Unit 1 is at 48% power.
INITIATING CUES:
* The CRS has directed you to shift operating Upper Containment Ventilation Units by starting 1D UCVU and stopping 1C UCVU per OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units).
EXAMINER NOTE: After reading the cue, provide the applicant with a copy of OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units).
 
Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 9 START TIME: _______
STEP 1 3.1 IF only one UCVU is running, perform the following:
3.1.1 IF the running UCVU is operating in the NORM mode, start the UCVU to be placed in service by placing its control switch in the NORM position:
* VV UCVU 1A
* VV UCVU 1B
* VV UCVU 1C
* VV UCVU 1D STANDARD:
Applicant places the control switch for VV UCVU 1D to the NORM position.
This step is critical to meet the task of shifting operating UCVUs per the JPM standard.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 2 3.1.2 IF the running UCVU is operating in the MAX mode, start the UCVU to be placed in service by placing its control switch in the MAX position.
STANDARD:
Applicant determines this step is N/A.
COMMENTS:
COMMENTS:
___ SAT   ___UNSAT
___ SAT
___UNSAT  


Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F STEP 3:  2.b. Throttle open affected S/G(s) PORV.
Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 9 STEP 3 3.1.3 Verify the red indicating lights illuminate for the UCVU placed in service.
STANDARD: Applicant must depress the manual pushbutton for each S/G PORV. This step is critical to gain control of all steam generator PORVs to be able to decrease steam generator pressures to < 1175 psig. COMMENTS:
STANDARD:
CRITICAL STEP  ___ SAT   ___ UNSAT STEP 4:  2.b. Throttle open affected S/G(s) PORV.
Applicant determines the red indicating light lit for the 1D UCVU.
STANDARD: The applicant must rotate each S/G PORV potentiometer clockwise to open the applicable S/G PORV. This step is critical to be able to decrease steam generator pressures to < 1175 psig. COMMENTS:
COMMENTS:
CRITICAL STEP  ___ SAT   ___ UNSAT
___ SAT
___ UNSAT STEP 4 3.1.4 Verify the red indicating lights illuminate for the return fan placed in service.
STANDARD:
Applicant determines the red indicating light lit for return fan 1D.
COMMENTS:
___ SAT
___ UNSAT  


Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 8    STEP 5:  2.c. GO TO Step 4. STANDARD: Applicant goes to step 4. COMMENTS:
Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 9 STEP 5 3.1.5 Place the control switch for the UCVU to be stopped in the OFF position:
___ SAT   ___ UNSAT     STEP 6:  4. Verify S/G pressures - LESS THAN 1175 PSIG. STANDARD: Applicant either determines that S/G pressures are currently < 1175 PSIG or will loop back to step 1. EXAMINER CUE: If the applicant does not terminate the JPM when S/G pressures are reduced to < 1175 PSIG, then provide the following cue - "The CRS is ready to return to the procedure and step in effect. This JPM is complete.COMMENTS:
* VV UCVU 1A
___ SAT   ___ UNSAT     STOP TIME ________
* VV UCVU 1B
APPLICANT CUE SHEET  (RETURN TO EXAMINER UPON COMPLETION OF TASK) May 2015 NRC Initial License Exam JPM E   
* VV UCVU 1C
* VV UCVU 1D STANDARD:
Applicant places the control switch for the 1C UCVU to the OFF position.
This step is critical to meet the task of shifting operating UCVUs per the JPM standard.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 6 3.1.6 Verify the green indicating light illuminates for the UCVU fan stopped.
STANDARD:
Applicant determines the green indicating light lit for the 1C UCVU.
COMMENTS:
___ SAT
___ UNSAT
 
Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 9 STEP 7 3.1.7 Verify the green indicating light illuminates for the return fan stopped.
STANDARD:
Applicant determines the green indicating light lit for the 1C return fan.
COMMENTS:
___ SAT
___ UNSAT STEP 8 3.2 IF two or three UCVUs are running, perform the following:
STANDARD:
Applicant determines this step is N/A.
COMMENTS:
___ SAT
___ UNSAT STEP 9 3.3 Indicate below the operating UCVUs:
* VV UCVU 1A
* VV UCVU 1B
* VV UCVU 1C
* VV UCVU 1D STANDARD:
Applicant indicates that 1D UCVU is running.
COMMENTS:
END OF TASK
___ SAT
___ UNSAT STOP TIME ________  


INITIAL CONDITIONS:   An inadvertent Main Steam Isolation Signal has caused a reactor trip on Unit 1. Steam system failures have caused steam generator pressure to exceed 1175 PSIG.
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
INITIATING CUES:   The CRS has directed you to perform EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities) to restore steam generator pressure to < 1175 PSIG.
May 2015 NRC Initial License Exam JPM F INITIAL CONDITIONS:
Catawba Nuclear Station JPM F May 2015 NRC Exam PAGE 1 OF 9 
* Unit 1 is at 48% power.
INITIATING CUES:
* The CRS has directed you to shift operating Upper Containment Ventilation Units by starting 1D UCVU and stopping 1C UCVU per OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units).  


JPM
Catawba Nuclear Station JPM G May 2015 NRC Exam PAGE 1 OF 10 JPM G


Catawba Nuclear Station JPM F May 2015 NRC Exam PAGE 2 OF EVALUATION SHEET Task: Shift Upper Containment Ventilation Units  Alternate Path: No   Facility JPM #: NEW  Safety Function: 5 Title: Containment Cooling System K/A 022 A4.01 Ability to manually operate and/or monitor in the control room: CCS fans  Rating(s): 3./ 3.6 CFR: 41.7 / 45.5 to 45.8   Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate  
Catawba Nuclear Station JPM G May 2015 NRC Exam PAGE 2 OF 10 EVALUATION SHEET Task:
Reset Radiation Monitor Trip Setpoints Alternate Path:
No Facility JPM #:
WE-EMF-001 Safety Function:
7
 
==Title:==
Process Radiation Monitoring System K/A 073 A4.02 Ability to manually operate and/or monitor in the control room: Radiation monitoring system control panel Rating(s):
3.7 / 3.7 CFR:
41.7 / 45.5 to 45.8 Preferred Evaluation Location:
Preferred Evaluation Method:
Simulator X
In-Plant Perform X
Simulate  


==References:==
==References:==
OP/1/A/6450/001 (Containment Ventilation (VV) Systems) rev. 42, Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units)   Task Standard: OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units) performed to start 1D UCVU and shutdown 1C UCVU. Validation Time: 5 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____     Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM F May 2015 NRC Exam PAGE 3 OF SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC # 167 (This JPM written to be done with JPM E and will have the same simulator setup as JPM E). 3. Enter the password. 4. Select "Yes" on the INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table in JPM E. 6. Place simulator in RUN and acknowledge any alarms. 7. ENSURE "Extra Operator" is present in the simulator. 8. Place simulator in FREEZE until Examiner cue is given. EXAMINER NOTE:  This JPM can be performed in conjunction with JPM E.
OP/0/A/6500/080 (EMF RP86A Output Modules) rev. 17, Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment)
PAGE  4  0F 9 Catawba Nuclear Station JPM F May 2015 NRC Exam PAGE 4 OF READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   Unit 1 is at 48% power.
Task Standard:
INITIATING CUES:   The CRS has directed you to shift operating Upper Containment Ventilation Units by starting 1D UCVU and stopping 1C UCVU per OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units). EXAMINER NOTE:   After reading the cue, provide the applicant with a copy of OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units).
EMF50L TRIP 1 setpoint set to 6.3 E3 CPM and the TRIP 2 setpoint set to 9.0 E3 CPM per OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment).
Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F START TIME: _______   STEP 1   3.1  IF only one UCVU is running, perform the following:
Validation Time:
3.1.1  IF the running UCVU is operating in the "NORM" mode, start the UCVU to be placed in service by placing its control switch in the "NORM" position:  "VV UCVU 1A"  "VV UCVU 1B"  "VV UCVU 1C"  "VV UCVU 1D" STANDARD:  Applicant places the control switch for "VV UCVU 1D" to the "NORM" position. This step is critical to meet the task of shifting operating UCVUs per the JPM standard. COMMENTS:
10 minutes Time Critical:
CRITICAL STEP   ___ SAT
Yes No X  
___ UNSAT    STEP 2  3.1.2  IF the running UCVU is operating in the "MAX" mode, start the UCVU to be placed in service by placing its control switch in the "MAX" position. STANDARD:   Applicant determines this step is N/A.
 
===========================================================================
Applicant:
Time Start: __________
NAME___________________________
Docket #_______________
Time Finish: __________
Performance Rating:
SAT ____ UNSAT ____
Performance Time _____
Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE  
 
===========================================================================
COMMENTS  
 
Catawba Nuclear Station JPM G May 2015 NRC Exam PAGE 3 OF 10 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC # 168
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Ensure copy of EMF-50 setpoint log page has been replaced.
: 9. Place simulator in FREEZE until Examiner cue is given.
Instructor Action Final Delay Ramp Delete In Event
 
Catawba Nuclear Station JPM G May 2015 NRC Exam PAGE 4 OF 10 READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* Unit 1 is at 100% power.
INITIATING CUES:
Following a discussion with Glenn from RP concerning a premature gaseous release termination, the Control Room Supervisor directs you to set EMF 50L setpoints using OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment) to the following values:
* Trip 1 = 6300 CPM
* Trip 2 = 9000 CPM OAC Program EMFLIB is currently not available.
EXAMINER NOTE: After reading the cue, provide the applicant with a copy of OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment).  
 
Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 10 START TIME: _______
NOTE: 1. If desired, EMF setpoints adjustments may be performed from the EMF SETPOINT screen of OAC EMF Library (EMFLIB) Application. EMFLIB is user friendly, no procedure instructions are provided for this application.
: 2. The Trip Lamps can only be cleared if the activity level has decreased below the Trip Setpoint.
: 3. If any trip setpoint is >1000 cpm, the entered setpoint should be rounded down to the nearest 100 prior to entering to ensure the entered setpoint remains conservative.
STEP 1 3.1 IF necessary, press the clear key [CLR] to reset trip lamps STANDARD:
Applicant verifies trip lamps dark or depresses the [CLR] key to clear alarms.
COMMENTS:
COMMENTS:
___ SAT   ___UNSAT
___ SAT
___ UNSAT STEP 2 3.2 Press the function key [FUN] to bring up the SELECT FUNCTION screen.
STANDARD:
Applicant depresses the [FUN] key to bring up the SELECT FUNCTION screen.
This step is critical, due to being the only way to get to the select function screen, which is required to input new Trip 1 and Trip 2 values.
COMMENTS:
CRITICAL STEP
___ SAT
___UNSAT  


Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F STEP 3   3.1.3 Verify the red indicating lights illuminate for the UCVU placed in service. STANDARD: Applicant determines the red indicating light lit for the 1D UCVU.
Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10 STEP 3 3.3 Adjust Trip 1 Setpoint as follows:
3.3.1 Press [1] for Trip 1 setting display screen.
STANDARD:
Applicant depresses the [1] to bring up the Trip 1 setting display screen.
This step is critical to bring up the screen that the new Trip 1 setting will be input into.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT STEP 4   3.1.4  Verify the red indicating lights illuminate for the return fan placed in service. STANDARD: Applicant determines the red indicating light lit for return fan 1D.
CRITICAL STEP
___ SAT
___ UNSAT STEP 4 3.3.2 Key in the desired Trip 1 setpoint.
STANDARD:
Applicant keys in 6300 CPM using the numeric keypad.
This step is critical to input the new Trip 1 setpoint required to meet the task standard. This new setpoint is checked in the next step. The critical requirement is for the new trip setpoint of 6300 CPM to be entered by the end of this JPM.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT


Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 10 STEP 5 3.3.3 Ensure the setpoint is correctly displayed in the ENTER block on the setpoint display screen.
STANDARD:
Applicant ensures 6300 CPM is displayed in the ENTER block.
This step is only critical if setpoint was entered wrong in the previous step.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT NOTE: Once the enter key [ENT] is pressed, the change in Trip 1 alarm setpoint is active.
STEP 6 3.3.4 Press the enter key [ENT]. This value is now displayed under Trip 1 and the ENTER block is cleared.
STANDARD:
Applicant presses the [ENT] key and verifies the correct value under the Trip 1 on the display.
This step is critical to input the new Trip 1 setpoint. Again the critical requirement is to have the Trip 1 setpoint set to 6300 CPM by the end of the JPM.
COMMENTS:
COMMENTS:
___ SAT    ___ UNSAT Catawba Nuclear Station JPM F May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 7 0F 9  STEP 5  3.1.5  Place the control switch for the UCVU to be stopped in the "OFF" position:  "VV UCVU 1A"  "VV UCVU 1B"  "VV UCVU 1C"  "VV UCVU 1D"  STANDARD:  Applicant places the control switch for the 1C UCVU to the "OFF" position. This step is critical to meet the task of shifting operating UCVUs per the JPM standard. COMMENTS:
CRITICAL STEP
CRITICAL STEP    ___ SAT   ___ UNSAT    STEP 6  3.1.6  Verify the green indicating light illuminates for the UCVU fan stopped. STANDARD:  Applicant determines the green indicating light lit for the 1C UCVU.
___ SAT
COMMENTS:        ___ SAT    ___ UNSAT
___ UNSAT  


Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F STEP 7 3.1.7  Verify the green indicating light illuminates for the return fan stopped. STANDARD: Applicant determines the green indicating light lit for the 1C return fan. COMMENTS:
Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 10 STEP 7 3.3.5 Press the clear key [CLR] to return to the SELECT FUNCTION screen.
___ SAT    ___ UNSAT STEP 8  3.2  IF two or three UCVUs are running, perform the following:    STANDARD:  Applicant determines this step is N/A.
STANDARD:
Applicant presses the [CLR] key to return to the SELECT FUNCTION screen.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT   STEP 3.3   Indicate below the operating UCVUs:  "VV UCVU 1A"  "VV UCVU 1B"  "VV UCVU 1C"  "VV UCVU 1D"  STANDARD: Applicant indicates that 1D UCVU is running.
___ SAT
___ UNSAT STEP 8 3.4 Adjust Trip 2 Setpoint as follows:
3.4.1 Press [2] for Trip 2 setting display screen.
STANDARD:
Applicant presses [2] to bring up the Trip 2 setting display screen.
This step is critical to get to the required screen to input the new Trip 2 setpoint.
COMMENTS:
COMMENTS:
END OF TASK    ___ SAT   ___ UNSAT   STOP TIME ________
CRITICAL STEP
APPLICANT CUE SHEET  (RETURN TO EXAMINER UPON COMPLETION OF TASK) May 2015 NRC Initial License Exam JPM F   
___ SAT
___ UNSAT STEP 9 3.4.2 Key in the desired Trip 2 setpoint.
STANDARD:
Applicant enters 9000 CPM using the numeric keypad.
This step is critical to input the new Trip 2 setpoint required to meet the task standard. This new setpoint is checked in the next step. The critical requirement is for the new trip setpoint of 9000 CPM to be entered by the end of this JPM.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT


INITIAL CONDITIONS:   Unit 1 is at 48% power.
Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 10 STEP 10 3.4.3 Ensure the setpoint is correctly displayed in the ENTER block on the setpoint display screen.
INITIATING CUES:   The CRS has directed you to shift operating Upper Containment Ventilation Units by starting 1D UCVU and stopping 1C UCVU per OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units).
STANDARD:
Catawba Nuclear Station JPM G May 2015 NRC Exam PAGE 1 OF 10  
Applicant ensures 9000 CPM is displayed in the ENTER block.
This step is only critical if setpoint was entered wrong in the previous step.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT NOTE: Once the enter key [ENT] is pressed, the change in Trip 2 alarm setpoint is active.
STEP 11 3.4.4 Press the enter key [ENT]. This value is now displayed under Trip 2 and the ENTER block is cleared.
STANDARD:
Applicant presses the [ENT] key and verifies the correct value under the Trip 2 on the display.
This step is critical to input the new Trip 2 setpoint. Again the critical requirement is to have the Trip 2 setpoint set to 9000 CPM by the end of the JPM.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 12 3.5 Press the clear key [CLR] twice to return to the normal display screen.
STANDARD:
Applicant presses the [CLR] key twice to return to the normal display screen.
EXAMINER CUE: Another operator will complete the procedure.
This JPM is complete.
COMMENTS:
END OF TASK
___ SAT
___ UNSAT STOP TIME ________
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 2015 NRC Initial License Exam JPM G INITIAL CONDITIONS:
* Unit 1 is at 100% power.
INITIATING CUES:
Following a discussion with Glenn from RP concerning a premature gaseous release termination, the Control Room Supervisor directs you to set EMF 50L setpoints using OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment) to the following values:
* Trip 1 = 6300 CPM
* Trip 2 = 9000 CPM OAC Program EMFLIB is currently not available.  
 
Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 1 OF 10 JPM H


JPM
Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 2 OF 10 EVALUATION SHEET Task:
Loss of KC AP-21 step 8 (Reactor Trip Sequence)
Alternate Path:
Yes Facility JPM #:
PSS-KC-083 Safety Function:
8


Catawba Nuclear Station JPM G May 2015 NRC Exam PAGE 2 OF 10  EVALUATION SHEET Task: Reset Radiation Monitor Trip Setpoints  Alternate Path: No    Facility JPM #: WE-EMF-001  Safety Function: 7 Title: Process Radiation Monitoring System K/A 073 A4.02 Ability to manually operate and/or monitor in the control room: Radiation monitoring system control panel  Rating(s): 3./ 3.7 CFR: 41.7 / 45.5 to 45.Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate  
==Title:==
Component Cooling Water System K/A 008 A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the CCWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of CCW pump Rating(s):
3.3 / 3.6 CFR:
41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location:
Preferred Evaluation Method:
Simulator X
In-Plant Perform X
Simulate  


==References:==
==References:==
OP/0/A/6500/080 (EMF RP86A Output Modules) rev. 17, Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment)  Task Standard: EMF50L TRIP 1 setpoint set to 6.3 E3 CPM and the TRIP 2 setpoint set to 9.0 E3 CPM per OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment). Validation Time: 10 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____     Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM G May 2015 NRC Exam PAGE 3 OF 10 SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC # 168 3. Enter the password. 4. Select "Yes" on the INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. ENSURE "Extra Operator" is present in the simulator. 8. Ensure copy of EMF-50 setpoint log page has been replaced. 9. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event Catawba Nuclear Station JPM G May 2015 NRC Exam PAGE 4 OF 10   READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   Unit 1 is at 100% power.
AP/1/A/5500/021 (Loss of Component Cooling) rev. 42 Task Standard:
INITIATING CUES: Following a discussion with Glenn from RP concerning a premature gaseous release termination, the Control Room Supervisor directs you to set EMF 50L setpoints using OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment) to the following values:  Trip 1 = 6300 CPM  Trip 2 = 9000 CPM  OAC Program EMFLIB is currently not available.
Aligns steam dumps to pressure mode, trips the reactor and when reactor power is < 5%, trips all NC pumps per AP/1/A/5500/021 (Loss of Component Cooling) step 8.
EXAMINER NOTE:   After reading the cue, provide the applicant with a copy of OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment).
Validation Time:
Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 10   START TIME: _______   NOTE: 1. If desired, EMF setpoints adjustments may be performed from the "EMF SETPOINT" screen of OAC EMF Library (EMFLIB) Application. EMFLIB is user friendly, no procedure instructions are provided for this application. 2. The Trip Lamps can only be cleared if the activity level has decreased below the Trip Setpoint. 3. If any trip setpoint is >1000 cpm, the entered setpoint should be rounded down to the nearest 100 prior to entering to ensure the entered setpoint remains conservative. STEP 1  3.1 IF necessary, press the clear key [CLR] to reset trip lamps  STANDARD: Applicant verifies trip lamps dark or depresses the [CLR] key to clear alarms. COMMENTS:       ___ SAT
5 minutes Time Critical:
___ UNSAT     STEP 3.2  Press the function key [FUN] to bring up the "SELECT FUNCTION" screen. STANDARD:   Applicant depresses the [FUN] key to bring up the "SELECT FUNCTION" screen. This step is critical, due to being the only way to get to the select function screen, which is required to input new Trip 1 and Trip 2 values. COMMENTS:
Yes No X  
CRITICAL STEP   ___ SAT   ___UNSAT 
 
===========================================================================
Applicant:
Time Start: __________
NAME___________________________
Docket #_______________
Time Finish: __________
Performance Rating:
SAT ____ UNSAT ____
Performance Time _____
Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE  
 
===========================================================================
COMMENTS  
 
Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 3 OF 10 SIMULATOR OPERATOR INSTRUCTIONS:
: 1.
ENSURE NRC Examination Security has been established.
: 2.
Reset to IC # 169.
: 3.
Enter the password.
: 4.
Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5.
Ensure simulator setup per table below.
: 6.
Place simulator in RUN and acknowledge any alarms.
: 7.
ENSURE Extra Operator is present in the simulator.
: 8.
Place simulator in FREEZE until Examiner cue is given.
Instructor Action Final Delay Ramp Delete In Event VLV-KC024F (KC425A Rtn Hdr Cont Isol Outside VLV Fail To Position) 0 Perform actions of AP-21 up to step 8.
 
Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 4 OF 10 READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* Unit 1 is at 100% power.
* AP/1/A/5500/021 (Loss of Component Cooling) has been entered.
INITIATING CUES:
* The CRS instructs you to perform step 8 of AP/1/A/5500/021.
EXAMINER NOTE: After reading cue, provide the applicant with a copy of AP/1/A/5500/021 (Loss of Component Cooling) completed through step 7.  
 
Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 10 START TIME: _______
CAUTION A loss of KC cooling to the NC pumps results in a gradual approach to an overheated condition in approximately 10 minutes which will result in shaft seizure.
STEP 1 8. Verify KC flow to NC pumps as follows:
1AD-20, A/1 KC SUPPLY HDR FLOW TO NCP BRGS LOW - DARK 1AD-21, A/1 KC SUPPLY HDR FLOW TO NCP BRGS LOW - DARK STANDARD:
Applicant determines that the listed alarms are lit and transitions to the RNO.
COMMENTS:
___ SAT
___ UNSAT STEP 2 8.RNO.a. Ensure the following valves - OPEN:
* 1KC-425A (NC Pumps Ret Hdr Cont Isol)
* 1KC-338B (NC Pumps Sup Hdr Cont Isol)
* 1KC-424B (NC Pumps Ret Hdr Cont Isol)
STANDARD:
Applicant determines the red OPEN lights lit and green CLSD lights dark for 1KC-338B & 1KC-424B. Applicant determines that the green CLSD light is lit for 1KC-425A and depresses the red OPEN pushbutton. Applicant determines that 1KC-425A will not open.
EXAMINER NOTE: This begins the alternate path of this JPM.
COMMENTS:
___ SAT
___UNSAT
 
Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10 STEP 3 8.RNO.b. IF AT ANY TIME any of the following conditions are met:
* Time since loss of KC - GREATER THAN 10 MINUTES OR
* Any NC pump trip criteria from Enclosure 1 (Foldout Page) is met THEN perform the following:
EXAMINER CUE: Loss of KC occurred greater than 10 minutes ago.
STANDARD:
Applicant determines that it has been > 10 minutes since loss of KC per examiner cue and continues with step b.1) of the RNO.
COMMENTS:
___ SAT
___ UNSAT STEP 4 8.RNO.b.1) IF letdown is isolated, THEN perform the following:
STANDARD:
Applicant determines that letdown is in service and that this step is N/A.
COMMENTS:
___ SAT
___ UNSAT
 
Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 10 STEP 5 8.RNO.b.2) Ensure steam dumps - IN PRESSURE MODE.
STANDARD:
Applicant places steam dump select switch to PRESS.
This step is critical to ensure proper temperature control following trip of the NC pumps in subsequent steps.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 6 8.RNO.b.3) Ensure the Reactor - TRIPPED.
STANDARD:
Applicant rotates the reactor trip breaker pistol grips counter-clockwise to the trip position.
EXAMINER CUE: If the applicant starts to perform actions to verify reactor trip, give the following cue - Another operator will perform the immediate actions of E-0.
This step is critical to ensure reactor power is < 5% prior to tripping the NC pumps in subsequent steps.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT


Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10   STEP 3  3.3  Adjust Trip 1 Setpoint as follows:  3.3.1  Press [1] for Trip 1 setting display screen.
Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 10 STEP 7 8.RNO.b.4) WHEN reactor power less than 5%, THEN perform the following:
STANDARD: Applicant depresses the [1] to bring up the Trip 1 setting display screen. This step is critical to bring up the screen that the new Trip 1 setting will be input into. COMMENTS:
a) Trip all NC pumps.
CRITICAL STEP   ___ SAT   ___ UNSAT STEP 4  3.3.2  Key in the desired Trip 1 setpoint. STANDARD: Applicant keys in 6300 CPM using the numeric keypad. This step is critical to input the new Trip 1 setpoint required to meet the task standard. This new setpoint is checked in the next step. The critical requirement is for the new trip setpoint of 6300 CPM to be entered by the end of this JPM. COMMENTS:
b) Ensure normal spray valve associated with tripped NC pump(s) - IN MANUAL AND CLOSED STANDARD:
CRITICAL STEP    ___ SAT   ___ UNSAT Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 10   STEP 5  3.3.3  Ensure the setpoint is correctly displayed in the "ENTER" block on the setpoint display screen. STANDARD:  Applicant ensures 6300 CPM is displayed in the ENTER block. This step is only critical if setpoint was entered wrong in the previous step. COMMENTS:
Applicant depresses the green OFF pushbutton for NC pumps 1A, 1B, 1C, and 1D and verifies the green OFF light lit and red ON light dark for each NC pump. Applicant will depress the [M] button on 1NC-27 &
CRITICAL STEP    ___ SAT    ___ UNSAT  NOTE:  Once the enter key [ENT] is pressed, the change in Trip 1 alarm setpoint is active. STEP 6  3.3.4  Press the enter key [ENT]. This value is now displayed under "Trip 1" and the "ENTER" block is cleared. STANDARD: Applicant presses the [ENT] key and verifies the correct value under the "Trip 1" on the display. This step is critical to input the new Trip 1 setpoint. Again the critical requirement is to have the Trip 1 setpoint set to 6300 CPM by the end of the JPM. COMMENTS:     CRITICAL STEP    ___ SAT   ___ UNSAT
1NC-29 controllers and depress the [] demand pushbutton on each valve until the demand is reading 0%.
Tripping the NC pumps is critical to protect the NC pumps from failure due to a loss of cooling water supply. Closing the spray valves is not critical.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 8 8.RNO.b.5) Secure any dilutions in progress.
STANDARD:
Applicant determines that no dilutions are in progress and continues to the next step.
COMMENTS:
___ SAT
___ UNSAT  
 
Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 10 STEP 9 8.RNO.b.6) IF reactor trip breakers were closed, THEN perform one of the following while continuing with this procedure as time and conditions allow:
* IF above P-11, THEN GO TO EP/1/A/5000/E-0 (Reactor Trip or Safety Injection)
OR
* IF below P-11, THEN GO TO AP/1/A/5500/005 (Reactor Trip or Inadvertent S/I Below P-11)
STANDARD:
Applicant determines the need to go to E-0.
EXAMINER CUE: The CRS has pulled E-0 and another RO will perform the immediate actions of E-0. This JPM is complete.
COMMENTS:
END OF TASK
___ SAT
___ UNSAT STOP TIME ________


Catawba Nuclear Station JPM G May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 8 0F 10  STEP 7  3.3.5  Press the clear key [CLR] to return to the "SELECT FUNCTION" screen. STANDARD:  Applicant presses the [CLR] key to return to the "SELECT FUNCTION" screen. COMMENTS:
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
___ SAT    ___ UNSAT STEP 8  3.4  Adjust Trip 2 Setpoint as follows:  3.4.1  Press [2] for Trip 2 setting display screen. STANDARD:  Applicant presses [2] to bring up the Trip 2 setting display screen. This step is critical to get to the required screen to input the new Trip 2 setpoint. COMMENTS:    CRITICAL STEP
May 2015 NRC Initial License Exam JPM H INITIAL CONDITIONS:
___ SAT  ___ UNSAT  STEP 9  3.4.2  Key in the desired Trip 2 setpoint. STANDARD:  Applicant enters 9000 CPM using the numeric keypad. This step is critical to input the new Trip 2 setpoint required to meet the task standard. This new setpoint is checked in the next step. The critical requirement is for the new trip setpoint of 9000 CPM to be entered by the end of this JPM. COMMENTS:
* Unit 1 is at 100% power.
CRITICAL STEP  ___ SAT  ___ UNSAT Catawba Nuclear Station JPM G May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 9 0F 10  STEP 10  3.4.3  Ensure the setpoint is correctly displayed in the "ENTER" block on the setpoint display screen. STANDARD:  Applicant ensures 9000 CPM is displayed in the ENTER block. This step is only critical if setpoint was entered wrong in the previous step. COMMENTS:  CRITICAL STEP  ___ SAT  ___ UNSAT  NOTE:  Once the enter key [ENT] is pressed, the change in Trip 2 alarm setpoint is active. STEP 11  3.4.4  Press the enter key [ENT]. This value is now displayed under "Trip 2" and the "ENTER" block is cleared. STANDARD:  Applicant presses the [ENT] key and verifies the correct value under the "Trip 2" on the display. This step is critical to input the new Trip 2 setpoint. Again the critical requirement is to have the Trip 2 setpoint set to 9000 CPM by the end of the JPM. COMMENTS:  CRITICAL STEP  ___ SAT  ___ UNSAT  STEP 12  3.5  Press the clear key [CLR] twice to return to the normal display screen. STANDARD:  Applicant presses the [CLR] key twice to return to the normal display screen. EXAMINER CUE:  "Another operator will complete the procedure. This JPM is complete."
* AP/1/A/5500/021 (Loss of Component Cooling) has been entered.
COMMENTS: END OF TASK    ___ SAT  ___ UNSAT  STOP TIME ________
INITIATING CUES:
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) May 2015 NRC Initial License Exam JPM G   
* The CRS instructs you to perform step 8 of AP/1/A/5500/021.


INITIAL CONDITIONS:  Unit 1 is at 100% power.
Catawba Nuclear Station JPM I May 2015 NRC Exam PAGE 1 OF 13 JPM I
INITIATING CUES:  Following a discussion with Glenn from RP concerning a premature gaseous release termination, the Control Room Supervisor directs you to set EMF 50L setpoints using OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment) to the following values:  Trip 1 = 6300 CPM  Trip 2 = 9000 CPM  OAC Program EMFLIB is currently not available.
Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 1 OF 10   


JPM H   
Catawba Nuclear Station JPM I May 2015 NRC Exam PAGE 2 OF 13 EVALUATION SHEET Task:
Place 1B Hydrogen Recombiner in Service Alternate Path:
No Facility JPM #:
VX-025 Safety Function:
5


Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 2 OF 10 EVALUATION SHEET Task: Loss of KC AP-21 step 8 (Reactor Trip Sequence)  Alternate Path: Yes  Facility JPM #: PSS-KC-083  Safety Function: 8 Title: Component Cooling Water System K/A 008 A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the CCWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of CCW pump  Rating(s): 3.3 / 3.6 CFR: 41.5 / 43.5 / 45.3 / 45.13   Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate 
==Title:==
Hydrogen Recombiner and Purge Control System K/A 028 A2.01 Malfunctions or operations on the HRPS; and (b) based on those predictions, use procedures to correct, control or mitigate the consequences of those malfunctions or operations: Hydrogen Recombiner power setting, determined by using plant data book Rating(s):
3.4 / 3.6 CFR:
41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location:
Preferred Evaluation Method:
Simulator In-Plant X
Perform Simulate X  


==References:==
==References:==
AP/1/A/5500/021 (Loss of Component Cooling) rev. 42  Task Standard: Aligns steam dumps to pressure mode, trips the reactor and when reactor power is < 5%, trips all NC pumps per AP/1/A/5500/021 (Loss of Component Cooling) step 8. Validation Time: 5 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____     Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 3 OF 10  SIMULATOR OPERATOR INSTRUCTIONS:  1. ENSURE NRC Examination Security has been established. 2. Reset to IC # 169. 3. Enter the password. 4. Select "Yes" on the INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. ENSURE "Extra Operator" is present in the simulator. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event VLV-KC024F (KC425A Rtn Hdr Cont Isol Outside VLV Fail To Position) 0    Perform actions of AP-21 up to step 8.
OP/1/A/6450/010 (Containment Hydrogen Control Systems) rev. 43, Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA)
Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 4 OF 10  READ TO APPLICANT DIRECTION TO APPLICANT:
Unit 1 Revised Data Book, Figure 10 Task Standard:
Hydrogen Recombiner 1B in service with Power Adjust POT set to approximately 58 KW per Figure 10 of the Unit 1 Revised Data Book.
Validation Time:
15 minutes Time Critical:
Yes No X  
 
===========================================================================
Applicant:
Time Start: __________
NAME___________________________
Docket #_______________
Time Finish: __________
Performance Rating:
SAT ____ UNSAT ____
Performance Time _____
Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE  
 
===========================================================================
COMMENTS  
 
Catawba Nuclear Station JPM I May 2015 NRC Exam PAGE 3 OF 13 READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:   Unit 1 is at 100% power. AP/1/A/5500/021 (Loss of Component Cooling) has been entered.
INITIAL CONDITIONS:
INITIATING CUES:   The CRS instructs you to perform step 8 of AP/1/A/5500/021. EXAMINER NOTE: After reading cue, provide the applicant with a copy of AP/1/A/5500/021 (Loss of Component Cooling) completed through step 7.
* A LOCA has occurred on Unit 1.
Catawba Nuclear Station JPM H May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 5 0F 10  START TIME: _______  CAUTION  A loss of KC cooling to the NC pumps results in a gradual approach to an overheated condition in approximately 10 minutes which will result in shaft seizure. STEP 1  8. Verify KC flow to NC pumps as follows:  1AD-20, A/1 "KC SUPPLY HDR FLOW TO NCP BRGS LOW" - DARK  1AD-21, A/1 "KC SUPPLY HDR FLOW TO NCP BRGS LOW" - DARK  STANDARD:  Applicant determines that the listed alarms are lit and transitions to the RNO. COMMENTS: 
INITIATING CUES:
* The CRS instructs you to place Hydrogen Recombiner 1B in service at the required power per OP/1/A/6450/010 (Containment Hydrogen Control Systems), Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA), steps 3.1 through 3.3.14.
* All initial conditions are complete.
* Containment pressure is 4.3 psig.
* Containment hydrogen concentration is 5% as indicated on 1MC-7.
* Hydrogen Recombiner 1A is tagged for maintenance.
EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6450/010 rev. 43, Enclosure 4.10 signed off through step 2.2 and a copy of Unit 1 Revised Data Book Figure 10.  


Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 4 0F 13 START TIME: _______
STEP 1 3.1 Ensure the H2 Skimmer Fans running per Enclosure 4.13 (Emergency Manual Operation of the H2 Skimmer Fans)
EXAMINER CUE: Hydrogen Skimmer Fans 1A & 1B are running per.13.
STANDARD:
Applicant acknowledges cue and signs off the step.
COMMENTS:
___ SAT
___ SAT
___ UNSAT STEP 2   8.RNO.a. Ensure the following valves - OPEN:  1KC-425A (NC Pumps Ret Hdr Cont Isol) 1KC-338B (NC Pumps Sup Hdr Cont Isol)  1KC-424B (NC Pumps Ret Hdr Cont Isol)
___ UNSAT CAUTION: Hydrogen Recombiners are NOT operated with hydrogen concentration > 6%
STANDARD:   Applicant determines the red OPEN lights lit and green CLSD lights dark for 1KC-338B & 1KC-424B. Applicant determines that the green CLSD light is lit for 1KC-425A and depresses the red OPEN pushbutton. Applicant determines that 1KC-425A will not open. EXAMINER NOTE:  This begins the alternate path of this JPM.
without TSC approval.
COMMENTS:
NOTE: 1. If desired to place both Hydrogen Recombiners in service, Steps 3.2 and 3.3 may be performed in conjunction.
: 2. If desired to place both Hydrogen Recombiners in service, use additional.11 (Hydrogen Recombiner Heater Temperature Log).
: 3. Placing Hydrogen Recombiner 1A in service is preferred for ALARA consideration.
STEP 2 3.2 IF placing Hydrogen Recombiner 1A in service, perform the following at 1ELCP0139 (1A Hydrogen Recombiner Control Panel) (AB-577, DD-52, Rm 494):
STANDARD:
Applicant determines that per the cue sheet, Hydrogen Recombiner 1A is tagged out for maintenance, and that this step is N/A.
COMMENTS:
___ SAT
___UNSAT


___ SAT   ___UNSAT 
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 13 STEP 3 3.3 IF placing Hydrogen Recombiner 1B in service, perform the following at 1ELCP0140 (1B Hydrogen Recombiner Control Panel) (AB-560, DD-52, Rm 370):
3.3.1 Ensure the POWER OUT SWITCH is in the OFF position.
STANDARD:
Applicant locates the Power Out Switch and ensures it is in the OFF position.
EXAMINER CUE: The POWER OUT SWITCH is in the OFF position.
COMMENTS:
___ SAT
___ UNSAT STEP 4 3.3.2 Ensure the POWER ADJUST potentiometer is set to zero (000).
STANDARD:
Applicant verifies the POWER ADJUST potentiometer is set to 000.
EXAMINER CUE: The POWER ADJUST pot is set to zero (000).
COMMENTS:
___ SAT
___ UNSAT


Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10    STEP 3   8.RNO.b. IF AT ANY TIME any of the following conditions are met:  Time since loss of KC - GREATER THAN 10 MINUTES OR  Any NC pump trip criteria from Enclosure 1 (Foldout Page) is met THEN perform the following:  EXAMINER CUE: "Loss of KC occurred greater than 10 minutes ago."
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 13 STEP 5 3.3.3 IF the POWER IN AVAILABLE light is DARK, ensure 1EMXL-F07C (1B Electric Hydrogen Recombiner Power Supply Panel) (AB-560, BB-47) is in the ON position.
STANDARD: Applicant determines that it has been > 10 minutes since loss of KC per examiner cue and continues with step b.1) of the RNO.
EXAMINER CUE: The POWER IN AVAILABLE light is lit.
COMMENTS:
STANDARD:
Applicant determines that with the POWER IN AVAILABLE light being lit, this step is N/A.
COMMENTS:
___ SAT
___ UNSAT STEP 6 3.3.4 Place the POWER OUT SWITCH in the ON position.
EXAMINER CUE: After applicant describes placing the POWER OUT SWITCH up to the ON position, The POWER OUT SWITCH is in the ON position.
STANDARD:
Applicant places the POWER OUT SWITCH up to the ON position.
This step is critical to place the hydrogen recombiner in service.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT


___ SAT   ___ UNSAT
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 13 STEP 7 3.3.5 Verify that the red indicating light is lit.
EXAMINER CUE: After finding the indicating light on the switch plate inform the applicant - The RED light on the switch plate is lit.
STANDARD:
Applicant finds the red indicating light on the switch plate and verifies that it is lit.
COMMENTS:
___ SAT
___ UNSAT STEP 8 3.3.6 Slowly turn the POWER ADJUST potentiometer clockwise until 5 KW is indicated on the POWER OUT meter.
EXAMINER CUE: After explaining operation of the potentiometer in the clockwise direction, inform applicant - The POWER OUT meter rises to 5 KW.
STANDARD:
Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 5 KW.
COMMENTS:
___ SAT
___ UNSAT  


STEP 8.RNO.b.1)  IF letdown is isolated, THEN perform the following:  STANDARD: Applicant determines that letdown is in service and that this step is N/A.
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 13 STEP 9 3.3.7 Maintain a 5 KW output for 10 minutes.
EXAMINER CUE: Using time compression, 10 minutes has elapsed.
STANDARD:
Applicant describes maintaining this power output for 10 minutes.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT
___ SAT
___ UNSAT STEP 10 3.3.8 Slowly advance the POWER ADJUST setting until an output of 10 KW is obtained on the POWER OUT meter.
EXAMINER CUE: After explaining the operation of the potentiometer in the clockwise direction inform applicant - The POWER OUT meter rises to 10 KW.
STANDARD:
Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 10 KW.
COMMENTS:
___ SAT
___ UNSAT STEP 11 3.3.9 Maintain a 10 KW output for 10 minutes.
EXAMINER CUE: Using time compression, 10 minutes has elapsed.
STANDARD:
Applicant describes maintaining this power output for 10 minutes.
COMMENTS:
___ SAT
___ UNSAT  


Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 10  STEP 5    8.RNO.b.2)  Ensure steam dumps - IN PRESSURE MODE.
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 13 STEP 12 3.3.10 Advance the POWER ADJUST setting until an output of 20 KW is obtained on the POWER OUT meter.
STANDARD: Applicant places steam dump select switch to "PRESS".
EXAMINER CUE: After explaining the operation of the potentiometer in the clockwise direction inform applicant - The POWER OUT meter rises to 20 KW.
This step is critical to ensure proper temperature control following trip of the NC pumps in subsequent steps.
STANDARD:
Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 20 KW.
COMMENTS:
___ SAT
___ UNSAT STEP 13 3.3.11 Maintain a 20 KW output for 5 minutes.
EXAMINER CUE: Using time compression, 5 minutes has elapsed.
STANDARD:
Applicant describes maintaining this power output for 5 minutes.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT   ___ UNSAT STEP 6  8.RNO.b.3)  Ensure the Reactor - TRIPPED. 
___ SAT
___ UNSAT  


STANDARD: Applicant rotates the reactor trip breaker pistol grips counter-clockwise to the trip position.
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 13 STEP 14 3.3.12 Determine Hydrogen Recombiner 1B power setting as follows:
EXAMINER CUE: If the applicant starts to perform actions to verify reactor trip, give the following cue - "Another operator will perform the immediate actions of E-0."
3.3.12.1 Determine KW value from Figure 10 of the Unit 1 Revised Data Book.
This step is critical to ensure reactor power is < 5% prior to tripping the NC pumps in subsequent  steps.
EXAMINER NOTE: The applicant will use the copy of Unit 1 Revised Data Book Figure 10 provided with the initiating cue.
STANDARD:
Applicant determines that the KW value from Figure 10 is 54 KW.
This step is critical in determining the proper power setting for the given containment conditions.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 15 3.3.12.2 H2 concentration (1MC-7) ________ %
STANDARD:
Applicant determines from cue sheet that hydrogen concentration is 5%.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT   ___ UNSAT
___ SAT
___ UNSAT  


Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 10  STEP 7  8.RNO.b.4)  WHEN reactor power less than 5%, THEN perform the following:  a)  Trip all NC pumps. b)  Ensure normal spray valve associated with tripped NC pump(s) - IN MANUAL AND CLOSED STANDARD: Applicant depresses the green OFF pushbutton for NC pumps 1A, 1B, 1C, and 1D and verifies the green OFF light lit and red ON light dark for each NC pump. Applicant will depress the [M] button on 1NC-27 & 1NC-valve until the demand is reading 0%. Tripping the NC pumps is critical to protect the NC pumps from failure due to a loss of cooling water supply. Closing the spray valves is not critical.
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 13 STEP 16 3.3.12.3 IF H2 concentration is > 3.5%, add 4 KW to calculation.
STANDARD:
Applicant determines that H2 concentration is > 3.5% and adds 4 KW to the calculation.
This step is critical in determining the proper power setting for the given containment conditions.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT   ___ UNSAT STEP 8  8.RNO.b.5)  Secure any dilutions in progress. STANDARD: Applicant determines that no dilutions are in progress and continues to the next step.
CRITICAL STEP
___ SAT
___ UNSAT STEP 17 3.3.12.4 Calculate KW as follows:
54 + 4 = 58 KW Step 3.3.12.1 Step 3.3.12.3 or N/A STANDARD:
Applicant calculates the required power setting to be 58 KW.
This step is critical in determining the proper power setting for the given containment conditions.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT
CRITICAL STEP
___ SAT
___ UNSAT  


Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 10  STEP 9  8.RNO.b.6)  IF reactor trip breakers were closed, THEN perform one of the following while continuing with this procedure as time and conditions allow:  IF above P-11, THEN GO TO EP/1/A/5000/E-0 (Reactor Trip or Safety Injection) OR  IF below P-11, THEN GO TO AP/1/A/5500/005 (Reactor Trip or Inadvertent S/I Below P-11)
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 13 STEP 18 3.3.13 Advance the POWER ADJUST setting until the POWER OUT meter indicates the value calculated in 3.3.12.4. Adjust POWER ADJUST as necessary to maintain this output.
STANDARD: Applicant determines the need to go to E-0. EXAMINER CUE: "The CRS has pulled E-0 and another RO will perform the immediate actions of E-0. This JPM is complete."
EXAMINER CUE: After explaining the operation of the potentiometer in the clockwise direction inform applicant - The POWER OUT meter rises to 58 KW.
STANDARD:
Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 58 KW.
This step is critical to set the necessary power output setting for the given containment conditions.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 19 3.3.14 Notify the NCO that Hydrogen Recombiner 1B is now in service.
Person notified _______________________
STANDARD:
Applicant calls the control room and notifies them that 1B Hydrogen Recombiner is in service.
EXAMINER CUE: Unit 1 Control Room, this is Greg. Repeat any additional information given.
COMMENTS:
COMMENTS:
END OF TASK     ___ SAT   ___ UNSAT
END OF TASK
___ SAT
___ UNSAT STOP TIME ________


STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) May 2015 NRC Initial License Exam JPM H   
May 2015 NRC Initial License Exam JPM I INITIAL CONDITIONS:
* A LOCA has occurred on Unit 1.
INITIATING CUES:
* The CRS instructs you to place Hydrogen Recombiner 1B in service at the required power per OP/1/A/6450/010 (Containment Hydrogen Control Systems), Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA), steps 3.1 through 3.3.14.
* All initial conditions are complete.
* Containment pressure is 4.3 psig.
* Containment hydrogen concentration is 5% as indicated on 1MC-7.
* Hydrogen Recombiner 1A is tagged for maintenance.


INITIAL CONDITIONS:  Unit 1 is at 100% power. AP/1/A/5500/021 (Loss of Component Cooling) has been entered.
Catawba Nuclear Station JPM J May 2015 NRC Exam PAGE 1 OF 11 JPM J
INITIATING CUES:  The CRS instructs you to perform step 8 of AP/1/A/5500/021.
Catawba Nuclear Station JPM I May 2015 NRC Exam PAGE 1 OF 13 


JPM
Catawba Nuclear Station JPM J May 2015 NRC Exam PAGE 2 OF 11 EVALUATION SHEET Task:
Locally Start 2B Diesel Generator Alternate Path:
Yes Facility JPM #:
DG3-008 Safety Function:
6


Catawba Nuclear Station JPM I May 2015 NRC Exam PAGE 2 OF 13  EVALUATION SHEET Task: Place 1B Hydrogen Recombiner in Service  Alternate Path: No  Facility JPM #: VX-025  Safety Function: 5 Title: Hydrogen Recombiner and Purge Control System  K/A 028 A2.01 Malfunctions or operations on the HRPS; and (b) based on those predictions, use procedures to correct, control or mitigate the consequences of those malfunctions or operations: Hydrogen Recombiner power setting, determined by using plant data book  Rating(s): 3.4 / 3.6 CFR: 41.5 / 43.5 / 45.3 / 45.13   Preferred Evaluation Location: Preferred Evaluation Method: Simulator In-Plant   X Perform Simulate     X
==Title:==
Emergency Diesel Generators K/A 064 A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the ED/G system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Failure modes of water, oil, and air valves Rating(s):
3.1 / 3.3 CFR:
41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location:
Preferred Evaluation Method:
Simulator In-Plant X
Perform Simulate X  


==References:==
==References:==
OP/1/A/6450/010 (Containment Hydrogen Control Systems) rev. 43, Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA) Unit 1 Revised Data Book, Figure 10  Task Standard: Hydrogen Recombiner 1B in service with Power Adjust "POT" set to approximately 58 KW per Figure 10 of the Unit 1 Revised Data Book. Validation Time: 15 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____     Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE ===========================================================================  COMMENTS Catawba Nuclear Station JPM I May 2015 NRC Exam PAGE 3 OF 13    READ TO APPLICANT DIRECTION TO APPLICANT:  I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  A LOCA has occurred on Unit 1.
AP/2/A/5500/007 (Loss of Normal Power) rev. 72, Enclosure 11 (Energizing 2ETB From 2B D/G)
INITIATING CUES:  The CRS instructs you to place Hydrogen Recombiner 1B in service at the required power per OP/1/A/6450/010 (Containment Hydrogen Control Systems), Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA), steps 3.1 through 3.3.14. All initial conditions are complete. Containment pressure is 4.3 psig. Containment hydrogen concentration is 5% as indicated on 1MC-7. Hydrogen Recombiner 1A is tagged for maintenance. EXAMINER NOTE:  After reading cue, provide the applicant with a copy of OP/1/A/6450/010 rev. 43, Enclosure 4.10 signed off through step 2.2 and a copy of Unit 1 Revised Data Book Figure 10. 
Task Standard:
2B D/G is started locally; then secured due to inability to align cooling water supply.
Validation Time:
17 minutes Time Critical:
Yes No X  
 
===========================================================================
Applicant:
Time Start: __________
NAME___________________________
Docket #_______________
Time Finish: __________
Performance Rating:
SAT ____ UNSAT ____
Performance Time _____
Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE  


Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 4 0F 13  START TIME: _______   STEP 1   3.1  Ensure the H2 Skimmer Fans running per Enclosure 4.13 (Emergency Manual Operation of the H2 Skimmer Fans) EXAMINER CUE:  "Hydrogen Skimmer Fans 1A & 1B are running per Enclosure 4.13.STANDARD: Applicant acknowledges cue and signs off the step. COMMENTS:
===========================================================================
COMMENTS
 
Catawba Nuclear Station JPM J May 2015 NRC Exam PAGE 3 OF 11 READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* Unit 2 has experienced a loss of all AC power to 2ETB.
* The reason for the loss of AC power has been corrected.
* The 2ETB load shed is complete.
INITIATING CUES:
* The CRS instructs you to energize 2ETB from 2B D/G by performing AP/2/A/5500/007 (Loss of Normal Power) Enclosure 11 (Energizing 2ETB From D/G).
* Key #757 and flashlight have been obtained.
EXAMINER NOTE: After reading cue, provide the applicant with a copy of AP/2/A/5500/007 rev. 72, Enclosure 11.
 
Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 4 0F 11 START TIME: _______
STEP 1 1. Obtain the following:
* Key #757 (2A/2B D/G Test Start Switch) from WCC Key locker
* Flashlight.
STANDARD:
Applicant determines from initiating cue that key #757 and flashlight have been obtained.
COMMENTS:
___ SAT
___ SAT
___ UNSAT   CAUTION:  Hydrogen Recombiners are NOT operated with hydrogen concentration > 6% without TSC approval. NOTE:  1. If desired to place both Hydrogen Recombiners in service, Steps 3.2 and 3.3 may be performed in conjunction. 2. If desired to place both Hydrogen Recombiners in service, use additional Enclosure 4.11 (Hydrogen Recombiner Heater Temperature Log). 3. Placing Hydrogen Recombiner 1A in service is preferred for ALARA consideration. STEP 2  3.2  IF placing Hydrogen Recombiner 1A in service, perform the following at 1ELCP0139 (1A Hydrogen Recombiner Control Panel) (AB-577, DD-52, Rm 494):
___ UNSAT STEP 2 2. Do not continue in this enclosure until notified that load shed of 2ETB is complete.
STANDARD:   Applicant determines that per the cue sheet, Hydrogen Recombiner 1A is tagged out for maintenance, and that this step is N/A.
STANDARD:
Applicant determines from initial conditions that 2ETB load shed is complete and continues with the procedure.
COMMENTS:
COMMENTS:
___ SAT   ___UNSAT
___ SAT
___UNSAT  


Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 13  STEP 3   3.3  IF placing Hydrogen Recombiner 1B in service, perform the following at 1ELCP0140 (1B Hydrogen Recombiner Control Panel) (AB-560, DD-52, Rm 370):  3.3.1  Ensure the "POWER OUT SWITCH" is in the "OFF" position. STANDARD: Applicant locates the Power Out Switch and ensures it is in the OFF position. EXAMINER CUE: "The "POWER OUT SWITCH" is in the "OFF" position." COMMENTS:
Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 11 STEP 3 3. Start D/G 2B as follows:
___ SAT  ___ UNSAT STEP 4  3.3.2  Ensure the "POWER ADJUST" potentiometer is set to zero (000).
: a. Notify Control Room Operator to place D/G 2B CTRL LOCATION switch on 2MC-11 in LOCAL position.
STANDARD:  Applicant verifies the "POWER ADJUST" potentiometer is set to 000. EXAMINER CUE:  "The "POWER ADJUST" pot is set to zero (000)."
STANDARD:
Applicant calls the control room operator and directs placing the D/G 2B CONTROL LOCATION switch to the LOCAL position.
EXAMINER CUE: D/G 2B CTRL LOCATION SWITCH is in the LOCAL position.
This step is critical to be able to start 2B D/G locally and gain control of the D/G output breaker to tie 2B D/G to 2ETB.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM I May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 6 0F 13  STEP 5    3.3.IF the "POWER IN AVAILABLE" light is DARK, ensure 1EMXL-F07C (1B Electric Hydrogen Recombiner Power Supply Panel) (AB-560, BB-47) is in the "ON" position. EXAMINER CUE:  "The "POWER IN AVAILABLE" light is lit.STANDARD: Applicant determines that with the POWER IN AVAILABLE light being lit, this step is N/A.
CRITICAL STEP
___ SAT
___ UNSAT STEP 4 3.b. IF unable to transfer diesel to Local Control, THEN actuate CONTROL ROOM OVERRIDE at breakglass station on 2DGCPB.
STANDARD:
Applicant determines that per previous examiner cue that this step is N/A.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT     STEP 6  3.3.4  Place the "POWER OUT SWITCH" in the "ON" position. EXAMINER CUE:  After applicant describes placing the POWER OUT SWITCH up to the ON position, "The POWER OUT SWITCH is in the "ON" position." STANDARD:  Applicant places the POWER OUT SWITCH up to the ON position. This step is critical to place the hydrogen recombiner in service. COMMENTS:    CRITICAL STEP    ___ SAT  ___ UNSAT 
___ SAT
___ UNSAT  


Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 13  STEP 3.3.5  Verify that the red indicating light is lit. EXAMINER CUE: After finding the indicating light on the switch plate inform the applicant - "The RED light on the switch plate is lit.STANDARD: Applicant finds the red indicating light on the switch plate and verifies that it is lit.
Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 11 STEP 5 3.c. Place key in MANUAL TEST START keyswitch and turn to START position.
COMMENTS:        ___ SAT  ___ UNSAT STEP 8  3.3.6  Slowly turn the "POWER ADJUST" potentiometer clockwise until 5 KW is indicated on the "POWER OUT" meter.
EXAMINER CUE: After describing inserting the key and rotating switch to the START position, notify applicant -
EXAMINER CUE:  After explaining operation of the potentiometer in the clockwise direction, inform applicant - "The POWER OUT meter rises to 5 KW". STANDARD:  Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 5 KW. COMMENTS:
The 2B D/G has started and is coming up to operating speed.
___ SAT  ___ UNSAT Catawba Nuclear Station JPM I May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 8 0F 13  STEP 9  3.3.7  Maintain a 5 KW output for 10 minutes. EXAMINER CUE:  "Using time compression, 10 minutes has elapsed."  STANDARD:  Applicant describes maintaining this power output for 10 minutes.
STANDARD:
Applicant describes inserting key #757 into the MANUAL TEST START keyswitch and rotating it clockwise to the START position.
This step is critical to start the D/G to meet the task given for this JPM.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT     STEP 10  3.3.8 Slowly advance the "POWER ADJUST" setting until an output of 10 KW is obtained on the "POWER OUT" meter.
CRITICAL STEP
EXAMINER CUE: After explaining the operation of the potentiometer in the clockwise direction inform applicant - "The POWER OUT meter rises to 10 KW.STANDARD: Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 10 KW.
___ SAT
___ UNSAT STEP 6 3.d. Ensure SPEED CONTROL is adjusted to obtain frequency of between 58.8 and 61.2 Hz.
EXAMINER CUE: When frequency meter is found, inform applicant -
Frequency is 60 Hz.
STANDARD:
Applicant finds the frequency meter and verifies that frequency is in the required band.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT     STEP 11   3.3.9  Maintain a 10 KW output for 10 minutes. EXAMINER CUE: "Using time compression, 10 minutes has elapsed.STANDARD: Applicant describes maintaining this power output for 10 minutes.
___ SAT
___ UNSAT  
 
Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 11 STEP 7 3.e. Ensure VOLTAGE CONTROL is adjusted to obtain D/G VOLTAGE between 4160 and 4600 Volts.
EXAMINER CUE: When voltage meter is found, inform applicant -
Voltage is 4100 Volts.
STANDARD:
Applicant finds the D/G voltage meter and when discovering that voltage is low, will describe depressing the VOLTAGE RAISE pushbutton to increase D/G voltage.
EXAMINER CUE: After applicant describes depressing the VOLTAGE RAISE pushbutton, inform them - D/G Voltage now reads 4200 Volts.
This step is critical to ensure the D/G is operating at the proper voltage prior to tying it to 2ETB in the following step.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM I May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 9 0F 13    STEP 12  3.3.10  Advance the "POWER ADJUST" setting until an output of 20 KW is obtained on the "POWER OUT" meter. EXAMINER CUE: After explaining the operation of the potentiometer in the clockwise direction inform applicant - "The POWER OUT meter rises to 20 KW.STANDARD: Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 20 KW.
CRITICAL STEP
___ SAT
___ UNSAT STEP 8 4. WHEN D/G is running, THEN close Diesel Generator 2B breaker.
EXAMINER CUE: After explaining depressing the RED CLOSE pushbutton on D/G 2B breaker, inform applicant -
D/G 2B breaker RED CLSD light is lit.
STANDARD:
Applicant describes depressing the RED CLOSE pushbutton and verifying the RED CLSD indicating light being lit.
This step is critical to meeting the task given in this JPM.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT     STEP 13  3.3.11 Maintain a 20 KW output for 5 minutes. EXAMINER CUE: "Using time compression, 5 minutes has elapsed."  STANDARD: Applicant describes maintaining this power output for 5 minutes.
CRITICAL STEP
___ SAT
___ UNSAT  
 
Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 11 STEP 9 5. IF D/G breaker will not close, THEN:
STANDARD:
Applicant determines from the previous cue that this step is N/A.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM I May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 10 0F 13  STEP 14  3.3.12  Determine Hydrogen Recombiner 1B power setting as follows: 3.3.12.1  Determine KW value from Figure 10 of the Unit 1 Revised Data Book. EXAMINER NOTE: The applicant will use the copy of Unit 1 Revised Data Book Figure 10 provided with the initiating cue. STANDARD: Applicant determines that the KW value from Figure 10 is 54 KW. This step is critical in determining the proper power setting for the given containment conditions. COMMENTS:
___ SAT
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 15  3.3.12.2  H2 concentration (1MC-7) ________ %  STANDARD:  Applicant determines from cue sheet that hydrogen concentration is 5%.
___ UNSAT STEP 10 6. Close the following essential load center normal incoming breakers:
* 2ELXB-4B (Normal Incoming Breaker Fed From Xfmr 2ETXB) (AB-560, AA-67, Rm 362)
* 2ELXD-4B (Normal Incoming Breaker Fed From Xfmr 2ETXD) (AB-560, AA-68, Rm 362)
EXAMINER CUE: After explaining the operation of the Load Center pistol grip clockwise to the CLOSE position, inform applicant - Breaker is closed.
STANDARD:
Applicant describes rotating each breaker pistol grip clockwise to the CLOSE position and verifying the RED indicating light lit for each breaker.
This step is critical to provide power to the D/G cooling water valve, allowing it to open automatically and provide cooling to the D/G.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM I May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 11 0F 13  STEP 16  3.3.12.3  IF H2 concentration is > 3.5%, add 4 KW to calculation. STANDARD:  Applicant determines that H2 concentration is > 3.5% and adds 4 KW to the calculation. This step is critical in determining the proper power setting for the given containment conditions. COMMENTS:
CRITICAL STEP
CRITICAL STEP   ___ SAT  ___ UNSAT    STEP 17  3.3.12.4  Calculate KW as follows:          54      +            4          =          58        KW Step 3.3.12.1    Step 3.3.12.3 or N/A  STANDARD:  Applicant calculates the required power setting to be 58 KW.
___ SAT
This step is critical in determining the proper power setting for the given containment conditions. COMMENTS:
___ UNSAT  
CRITICAL STEP    ___ SAT   ___ UNSAT Catawba Nuclear Station JPM I May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 12 0F 13  STEP 18  3.3.13  Advance the "POWER ADJUST" setting until the "POWER OUT" meter indicates the value calculated in 3.3.12.4. Adjust "POWER ADJUST" as necessary to maintain this output. EXAMINER CUE:  After explaining the operation of the potentiometer in the clockwise direction inform applicant -  "The POWER OUT meter rises to 58 KW."  STANDARD:  Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 58 KW. This step is critical to set the necessary power output setting for the given containment conditions. COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 19  3.3.14  Notify the NCO that Hydrogen Recombiner 1B is now in service. Person notified _______________________  STANDARD:  Applicant calls the control room and notifies them that 1B Hydrogen Recombiner is in service. EXAMINER CUE:  "Unit 1 Control Room, this is Greg." Repeat any additional information given. COMMENTS:
END OF TASK    ___ SAT  ___ UNSAT  


STOP TIME ________
Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 11 STEP 11 7. Ensure RN flow through KD Hx as follows:
APPLICANT CUE SHEET  (RETURN TO EXAMINER UPON COMPLETION OF TASK)  May 2015 NRC Initial License Exam JPM I   
: a. Verify 2RN-292B (2B D/G Hx Inlet Isol) (D2B-567, AA-76)
- OPEN EXAMINER CUE: When applicant finds 2RN-292B and describes verifying the valve indicator needle pointing to the OPEN position, inform them - Valve indicates CLOSED.
STANDARD:
Applicant describes verifying the valve position indicator pointing to the OPEN position.
COMMENTS:
___ SAT
___ UNSAT STEP 12 7.b. IF 2RN 292B (2B D/G Hx Inlet Isol) does not open, THEN perform the following:
: 1) Open 2EMXF-F01A (2B Diesel Generator Hx Inlet Isol Motor (2RN-292B)) (D2B-556, CC-75)
EXAMINER CUE: When applicant describes the opening of 2EMXF-F01A, inform them - Breaker is OFF.
STANDARD:
Applicant describes inserting the locking tab on 2EMXF-F01A and rotating the breaker counter-clockwise to the OFF position and pulling the locking tab back out.
COMMENTS:
___ SAT
___ UNSAT
 
Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 11 STEP 13 7.b.2) OPEN 2RN-292B (2B D/G Hx Inlet Isol).
EXAMINER CUE: After applicant describes manually opening 2RN-292B, inform them - Valve does not move and the position indicator still shows CLOSED.
STANDARD:
Applicant describes pulling the declutching lever and rotating the valve handwheel in the counter-clockwise direction.
EXAMINER NOTE: This begins the alternate path of this JPM.
COMMENTS:
___ SAT
___ UNSAT STEP 14 8. IF RN flow cannot be established, THEN:
: a. Stop D/G 2B by depressing STOP on 2DECPB.
: b. Notify Control Room Supervisor of status.
: c. Return this enclosure to Control Room Supervisor.
EXAMINER CUE: After applicant describes depressing the STOP pushbutton on 2DECPB, inform them - Diesel Generator is coasting down. Also repeat back any information given to the Control Room Supervisor.
STANDARD:
Applicant depresses the STOP pushbutton on 2DECPB and verifies the Diesel Generator is stopped.
The only part of this step that is critical is to stop the 2B D/G. This step is critical to prevent damage to the 2B D/G due to no cooling water being available.
COMMENTS:
END OF TASK CRITICAL STEP
___ SAT
___ UNSAT STOP TIME ________


INITIAL CONDITIONS:   A LOCA has occurred on Unit 1.
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
INITIATING CUES:   The CRS instructs you to place Hydrogen Recombiner 1B in service at the required power per OP/1/A/6450/010 (Containment Hydrogen Control Systems), Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA), steps 3.1 through 3.3.14. All initial conditions are complete. Containment pressure is 4.3 psig. Containment hydrogen concentration is 5% as indicated on 1MC-7. Hydrogen Recombiner 1A is tagged for maintenance.
May 2015 NRC Initial License Exam JPM J INITIAL CONDITIONS:
Catawba Nuclear Station JPM J May 2015 NRC Exam PAGE 1 OF 11 
* Unit 2 has experienced a loss of all AC power to 2ETB.
* The reason for the loss of AC power has been corrected.
* The 2ETB load shed is complete.
INITIATING CUES:
* The CRS instructs you to energize 2ETB from 2B D/G by performing AP/2/A/5500/007 (Loss of Normal Power) Enclosure 11 (Energizing 2ETB From D/G).
* Key #757 and flashlight have been obtained.  


JPM
Catawba Nuclear Station JPM K May 2015 NRC Exam PAGE 1 OF 24 JPM K


Catawba Nuclear Station JPM J May 2015 NRC Exam PAGE 2 OF 11  EVALUATION SHEET Task: Locally Start 2B Diesel Generator  Alternate Path: Yes  Facility JPM #: DG3-008  Safety Function: 6 Title: Emergency Diesel Generators  K/A 064 A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the ED/G system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Failure modes of water, oil, and air valves  Rating(s): 3.1 / 3.3 CFR: 41.5 / 43.5 / 45.3 / 45.13  Preferred Evaluation Location: Preferred Evaluation Method: Simulator In-Plant   X Perform Simulate     X
Catawba Nuclear Station JPM K May 2015 NRC Exam PAGE 2 OF 24 EVALUATION SHEET Task:
Startup Backup Temporary VI Compressor Alternate Path:
No Facility JPM #:
VI-003 Safety Function:
8
 
==Title:==
Instrument Air System K/A APE065 AA1.04 Ability to operate and / or monitor the following as they apply to the Loss of Instrument Air: Emergency air compressor Rating(s):
3.4 / 3.6 CFR:
41.7 / 45.5 / 45.6 Preferred Evaluation Location:
Preferred Evaluation Method:
Simulator In-Plant X
Perform Simulate X  


==References:==
==References:==
AP/2/A/5500/007 (Loss of Normal Power) rev. 72, Enclosure 11 (Energizing 2ETB From 2B D/G)   Task Standard: 2B D/G is started locally; then secured due to inability to align cooling water supply. Validation Time: 17 minutes   Time Critical:   Yes No X =========================================================================== Applicant:    Time Start:    __________ NAME___________________________ Docket #_______________ Time Finish:  __________    Performance Rating:    SAT ____  UNSAT ____  Performance Time _____    Examiner: _____________________________ _____________________________/________  NAME  SIGNATURE DATE ===========================================================================  COMMENTS Catawba Nuclear Station JPM J May 2015 NRC Exam PAGE 3 OF 11    READ TO APPLICANT DIRECTION TO APPLICANT:  I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  Unit 2 has experienced a loss of all AC power to 2ETB. The reason for the loss of AC power has been corrected. The 2ETB load shed is complete.
AP/0/A/5500/022 (Loss of Instrument Air) rev. 35 EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) rev. 09, Enclosure 23 (Backup VI Compressor(s))
INITIATING CUES:  The CRS instructs you to energize 2ETB from 2B D/G by performing AP/2/A/5500/007 (Loss of Normal Power) Enclosure 11 (Energizing 2ETB From D/G). Key #757 and flashlight have been obtained. EXAMINER NOTE:  After reading cue, provide the applicant with a copy of AP/2/A/5500/007 rev. 72, Enclosure 11. 
Task Standard:
Temporary VI compressor started and aligned to the Instrument Air header through 1VI-417.
Validation Time:
20 minutes Time Critical:
Yes No X  


Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 4 0F 11  START TIME: _______   STEP 1   1. Obtain the following:   Key #757 (2A/2B D/G Test Start Switch) from WCC Key locker  Flashlight.
===========================================================================
STANDARD: Applicant determines from initiating cue that key #757 and flashlight have been obtained. COMMENTS:
Applicant:
Time Start: __________
NAME___________________________
Docket #_______________
Time Finish: __________
Performance Rating:
SAT ____ UNSAT ____
Performance Time _____
Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE
 
===========================================================================
COMMENTS
 
Catawba Nuclear Station JPM K May 2015 NRC Exam PAGE 3 OF 24 READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* Unit 1 and 2 are at 100% power.
* VI Lo Pressure annunciator is lit.
* VI pressure is 75 psig and slowly decreasing.
* AP/0/A/5500/022 (Loss of Instrument Air) has been implemented.
INITIATING CUES:
* The CRS instructs you to startup and align the Backup Temporary VI compressor #2 to the Instrument Air Header per the local copy of EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) Enclosure 23 (Backup VI Compressor(s)) step 3.
EXAMINER NOTE: After applicant locates the local copy, hand them a copy of EP/1/A/5000/G-1 Enclosure 23.
 
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 4 0F 24 START TIME: _______
EXAMINER NOTE: Two Backup VI compressors should be available at any given time. A third backup compressor is stationed at the Catawba garage.
Applicant should select Backup VI Compressor 2 for startup per the initiating cue.
IF Backup Compressor 2 is not available then direct the operator to startup compressor 3 and start the JPM at step 5 (page 14 of this JPM).
STEP 1 3. To Start Backup VI Compressor 2 perform the following:
: a. Verify engine oil (inside engine side panel) - GREATER THAN ADD ON DIPSTICK.
EXAMINER CUE: When dipstick is located, inform applicant - Oil level is greater than ADD.
STANDARD:
Applicant locates the dipstick and checks the oil level.
COMMENTS:
___ SAT
___ SAT
___ UNSAT     STEP 2   2. Do not continue in this enclosure until notified that load shed of 2ETB is complete.
___ UNSAT STEP 2 3.b. Verify compressor oil level (inside compressor front panel) -
STANDARD:   Applicant determines from initial conditions that 2ETB load shed is complete and continues with the procedure.
VISIBLE IN SIGHTGLASS.
EXAMINER CUE: When sightglass is located, inform applicant - Oil level is visible in the sight glass (near full).
STANDARD:
Applicant locates sightglass and checks oil level.
COMMENTS:
COMMENTS:
___ SAT   ___UNSAT
___ SAT
___UNSAT  


Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 11  STEP 3   3. Start D/G 2B as follows:  a. Notify Control Room Operator to place "D/G 2B CTRL LOCATION" switch on 2MC-11 in "LOCAL" position. STANDARD: Applicant calls the control room operator and directs placing the D/G 2B CONTROL LOCATION switch to the LOCAL position. EXAMINER CUE: "D/G 2B CTRL LOCATION SWITCH is in the LOCAL position."  This step is critical to be able to start 2B D/G locally and gain control of the D/G output breaker to tie 2B D/G to 2ETB. COMMENTS:
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 24 STEP 3 3.c. IF oil levels inadequate, THEN inform Control Room.
CRITICAL STEP  ___ SAT   ___ UNSAT
STANDARD:
Applicant determines per given cues that this step is N/A.
COMMENTS:
___ SAT
___ UNSAT STEP 4 3.d. Ensure all compressor panel doors - CLOSED EXAMINER CUE: If asked, inform applicant - All doors are closed.
STANDARD:
Applicant ensures that all compressor panel doors are closed.
COMMENTS:
___ SAT
___ UNSAT STEP 5 3.e. Unplug battery charger power supply cord from the outlet (outside wall at TB 594, 2D-34).
EXAMINER CUE: When plug is located, inform applicant - Battery charger is unplugged.
STANDARD:
Applicant locates and describes unplugging the battery charger power supply cord.
COMMENTS:
___ SAT
___ UNSAT  


STEP 3.b. IF unable to transfer diesel to Local Control, THEN actuate "CONTROL ROOM OVERRIDE" at breakglass station on 2DGCPB.
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 24 STEP 6 3.f. Ensure 1VI-428 (VI Comp B/U2 Disch) - OPEN EXAMINER CUE: When valve is located and applicant correctly describes opening the valve, inform applicant -
STANDARD: Applicant determines that per previous examiner cue that this step is N/A.
1VI-428 is Open.
STANDARD:
Applicant locates and describes the verification of or opening 1VI-428.
This step is critical to ensure a flow path from the compressor discharge to the VI header.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT NOTE The following steps are performed at control panel on front of Backup VI compressor 2.
STEP 7 3.g. Rotate OFF/ON/START switch to - ON.
EXAMINER CUE: When switch is located, and operation described, inform applicant - OFF/ON/START switch is in ON.
STANDARD:
Applicant locates and describes operation of the OFF/ON/START switch to the ON position.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM J May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 6 0F 11  STEP 5    3.c. Place key in "MANUAL TEST START" keyswitch and turn to "START" position. EXAMINER CUE:  After describing inserting the key and rotating switch to the START position, notify applicant -  "The 2B D/G has started and is coming up to operating speed."  STANDARD:  Applicant describes inserting key #757 into the MANUAL TEST START keyswitch and rotating it clockwise to the START position. This step is critical to start the D/G to meet the task given for this JPM. COMMENTS:
___ SAT
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 6  3.d. Ensure "SPEED CONTROL" is adjusted to obtain frequency of between 58.8 and 61.2 Hz.
___ UNSAT  
EXAMINER CUE:  When frequency meter is found, inform applicant - "Frequency is 60 Hz."
STANDARD:  Applicant finds the frequency meter and verifies that frequency is in the required band.
COMMENTS:        ___ SAT  ___ UNSAT


Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 11  STEP 3.e. Ensure "VOLTAGE CONTROL" is adjusted to obtain "D/G VOLTAGE" between 4160 and 4600 Volts. EXAMINER CUE:  When voltage meter is found, inform applicant - "Voltage is 4100 Volts."  STANDARD:  Applicant finds the D/G voltage meter and when discovering that voltage is low, will describe depressing the VOLTAGE RAISE pushbutton to increase D/G voltage. EXAMINER CUE:  After applicant describes depressing the VOLTAGE RAISE pushbutton, inform them - "D/G Voltage now reads 4200 Volts."
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 24 STEP 8 3.h. IF outside temperature less than or equal to 45&deg;F, THEN place HEATERS toggle switch - ON.
This step is critical to ensure the D/G is operating at the proper voltage prior to tying it to 2ETB in the following step. COMMENTS:    CRITICAL STEP    ___ SAT  ___ UNSAT STEP 8  4. WHEN D/G is running, THEN close "Diesel Generator 2B" breaker.
EXAMINER CUE: If asked, inform applicant - Outside air temp is currently 87&deg;F.
EXAMINER CUE: After explaining depressing the RED CLOSE pushbutton on D/G 2B breaker, inform applicant - "D/G 2B breaker RED CLSD light is lit." STANDARD:  Applicant describes depressing the RED CLOSE pushbutton and verifying the RED CLSD indicating light being lit.
STANDARD:
This step is critical to meeting the task given in this JPM. COMMENTS:
Applicant determines from the examiner cue that this step is N/A.
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM J May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 8 0F 11  STEP 9  5. IF D/G breaker will not close, THEN:  STANDARD:  Applicant determines from the previous cue that this step is N/A.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT     STEP 10  6. Close the following essential load center normal incoming breakers:  2ELXB-4B (Normal Incoming Breaker Fed From Xfmr 2ETXB) (AB-560, AA-67, Rm 362)  2ELXD-4B (Normal Incoming Breaker Fed From Xfmr 2ETXD) (AB-560, AA-68, Rm 362)
___ SAT
EXAMINER CUE: After explaining the operation of the Load Center pistol grip clockwise to the CLOSE position, inform applicant - "Breaker is closed."  STANDARD:  Applicant describes rotating each breaker pistol grip clockwise to the CLOSE position and verifying the RED indicating light lit for each breaker. This step is critical to provide power to the D/G cooling water valve, allowing it to open automatically and provide cooling to the D/G. COMMENTS:
___ UNSAT NOTE Fuel level of 1/2 will provide approximately 3 hours of run time at full load.
CRITICAL STEP   ___ SAT  ___ UNSAT Catawba Nuclear Station JPM J May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 9 0F 11  STEP 11  7. Ensure RN flow through KD Hx as follows:  a. Verify 2RN-292B (2B D/G Hx Inlet Isol) (D2B-567, AA-76) - OPEN  EXAMINER CUE: When applicant finds 2RN-292B and describes verifying the valve indicator needle pointing to the OPEN position, inform them - "Valve indicates CLOSED.STANDARD: Applicant describes verifying the valve position indicator pointing to the OPEN position.
STEP 9 3.i. Verify fuel level - ON SCALE.
EXAMINER CUE: When fuel level gage is located, inform applicant -
Fuel oil level is at 3/4 mark.
STANDARD:
Applicant locates fuel level gage and verifies level is on scale per cue given.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT     STEP 12  7.b. IF 2RN 292B (2B D/G Hx Inlet Isol) does not open, THEN perform the following: 1) Open 2EMXF-F01A (2B Diesel Generator Hx Inlet Isol Motor (2RN-292B)) (D2B-556, CC-75)
___ SAT
EXAMINER CUE: When applicant describes the opening of 2EMXF-F01A, inform them - "Breaker is OFF.STANDARD: Applicant describes inserting the locking tab on 2EMXF-F01A and rotating the breaker counter-clockwise to the OFF position and pulling the locking tab back out.
___ UNSAT NOTE OFF/ON/START switch spring returns to ON when released.
OFF/ON/START switch should not be held in the START position for greater than 10 seconds, to prevent starter overheating.
 
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 24 STEP 10 3.j. Start Backup VI Compressor 2 as follows:
: 1) Rotate and hold OFF/ON/START switch to - START.
EXAMINER CUE: After explaining the operation of the OFF/ON/START switch, inform applicant - OFF/ON/START switch is in START.
STANDARD:
Applicant describes turning OFF/ON/START switch to the START position.
This step is critical to start the backup VI compressor prior to aligning to supply the instrument air header.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM J May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 10 0F 11  STEP 13  7.b.2)  OPEN 2RN-292B (2B D/G Hx Inlet Isol). EXAMINER CUE:  After applicant describes manually opening 2RN-292B, inform them - "Valve does not move and the position indicator still shows CLOSED."  STANDARD:  Applicant describes pulling the declutching lever and rotating the valve handwheel in the counter-clockwise direction. EXAMINER NOTE:  This begins the alternate path of this JPM. COMMENTS:
CRITICAL STEP
___ SAT   ___ UNSAT    STEP 14  8. IF RN flow cannot be established, THEN:  a. Stop D/G 2B by depressing "STOP" on 2DECPB. b. Notify Control Room Supervisor of status. c. Return this enclosure to Control Room Supervisor.
___ SAT
EXAMINER CUE:  After applicant describes depressing the STOP pushbutton on 2DECPB, inform them - "Diesel Generator is coasting down."  Also repeat back any information given to the Control Room Supervisor. STANDARD:  Applicant depresses the STOP pushbutton on 2DECPB and verifies the Diesel Generator is stopped.
___ UNSAT  
The only part of this step that is critical is to stop the 2B D/G. This step is critical to prevent damage to the 2B D/G due to no cooling water being available. COMMENTS:  END OF TASK  CRITICAL STEP    ___ SAT  ___ UNSAT  


STOP TIME ________
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 24 STEP 11 3.j.2) Release OFF/ON/START switch when one of the following occurs:
APPLICANT CUE SHEET  (RETURN TO EXAMINER UPON COMPLETION OF TASK) May 2015 NRC Initial License Exam JPM J   
* Engine starts OR
* 10 seconds has elapsed.
EXAMINER CUE: Inform applicant - The engine is running.
EXAMINER CUE: Once applicant describes releasing the OFF/ON/START switch, inform applicant -
OFF/ON/START switch has been released.
STANDARD:
Applicant describes releasing the OFF/ON/START switch following cue given by examiner.
This step is critical to prevent overheating the engine starter.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 12 3.j.3) IF engine failed to start, THEN start compressor as follows:
STANDARD:
Applicant determines from examiner cue in previous step, that this step is N/A.
COMMENTS:
___ SAT
___ UNSAT


INITIAL CONDITIONS:   Unit 2 has experienced a loss of all AC power to 2ETB. The reason for the loss of AC power has been corrected. The 2ETB load shed is complete.
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 24 STEP 13 3.k. WHEN compressor has been running for 60 seconds, THEN depress PRESSURE CONTROL switch.
INITIATING CUES:   The CRS instructs you to energize 2ETB from 2B D/G by performing AP/2/A/5500/007 (Loss of Normal Power) Enclosure 11 (Energizing 2ETB From D/G). Key #757 and flashlight have been obtained.
EXAMINER CUE: Inform applicant - 60 seconds have elapsed.
Catawba Nuclear Station JPM K May 2015 NRC Exam PAGE 1 OF 24 
When located and operation described, inform applicant - PRESSURE CONTROL button has been depressed. If asked, Diesel is heard to speed up and discharge pressure increases to ~
110 psig.
STANDARD:
Applicant describes depressing the PRESSURE CONTROL button.
This step is critical to ensure compressor discharge pressure is sufficient to supply the Instrument Air header.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 14 3.l. IF outside air temperature greater than 32&deg;F, THEN ensure HEATERS toggle switch - OFF.
EXAMINER CUE: When located, inform applicant - HEATER toggle switch is in the OFF position.
STANDARD:
Applicant determines that per previous given cue, that this step is applicable and verifies the HEATERS toggle switch is OFF.
COMMENTS:
___ SAT
___ UNSAT


JPM K
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 24 STEP 15 3.m. OPEN 1VI 425 (VI Comp B/U2 Manifold Inlet).
EXAMINER CUE: When valve is located and proper operation described, inform applicant - 1VI-425 is Open.
STANDARD:
Applicant describes opening 1VI-425.
This step is critical to align proper flow path from the compressor to the Instrument Air header.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT STEP 16 3.n. Ensure the following valves OPEN:
1VI-511 (B/U VI Compressor Air Dryer Bypass) (TB2-598, 2C-34).
1VI-417 (B/U VI Compressor Header Isol) (TB2-598, 2C-34).
EXAMINER CUE: When valves are located and proper operation to open is described, inform applicant - 1VI-511 is open. 1VI-417 is open.
STANDARD:
Applicant describes opening 1VI-511 and 1VI-417.
This step is critical to align a flow path from the backup VI Compressor to the Instrument Air header.
COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT


Catawba Nuclear Station JPM K May 2015 NRC Exam PAGE 2 OF 24 EVALUATION SHEET Task: Startup Backup Temporary VI Compressor Alternate Path: No  Facility JPM #: VI-003  Safety Function: 8 Title: Instrument Air System  K/A  APE065 AA1.04 Ability to operate and / or monitor the following as they apply to the Loss of Instrument Air:  Emergency air compressor  Rating(s): 3.4 / 3.6 CFR: 41.7 / 45.5 / 45.6  Preferred Evaluation Location:  Preferred Evaluation  Method:  Simulator  In-Plant    X  Perform  Simulate      X 
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 24 STEP 17 3.o. Record the following:
* Compressor start time ___________
* HOURMETER __________
* COMP DISH PRESS __________
EXAMINER CUE: If asked, inform applicant - Use current run hours, time and discharge pressure is 110 psig.
STANDARD:
Applicant records the values for current time, engine run hours, and discharge pressure given in the cue.
COMMENTS:
___ SAT
___ UNSAT


==References:==
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 24 STEP 18 3.p. Notify the control room of the following:
AP/0/A/5500/022 (Loss of Instrument Air) rev. 35 EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) rev. 09, Enclosure 23 (Backup VI Compressor(s))  Task Standard: Temporary VI compressor started and aligned to the Instrument Air header through 1VI-417. Validation Time: 20 minutes  Time Critical:  Yes  No X =========================================================================== Applicant:    Time Start:    __________ NAME___________________________ Docket #_______________ Time Finish:  __________    Performance Rating:    SAT ____  UNSAT ____  Performance Time _____    Examiner: _____________________________ _____________________________/________  NAME  SIGNATURE DATE ===========================================================================  COMMENTS Catawba Nuclear Station JPM K May 2015 NRC Exam PAGE 3 OF 24    READ TO APPLICANT DIRECTION TO APPLICANT:  I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   Unit 1 and 2 are at 100% power. VI Lo Pressure annunciator is lit. VI pressure is 75 psig and slowly decreasing. AP/0/A/5500/022 (Loss of Instrument Air) has been implemented.
* Status of backup compressor 2
INITIATING CUES:   The CRS instructs you to startup and align the Backup Temporary VI compressor #2 to the Instrument Air Header per the local copy of EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) Enclosure 23 (Backup VI Compressor(s)) step 3. EXAMINER NOTE: After applicant locates the local copy, hand them a copy of EP/1/A/5000/G-1 Enclosure 23.
* IF idle compressor available, THEN request Control Room Supervisor to evaluate VI header pressure to determine whether additional backup compressor required
* IF Control Room determines additional backup VI compressor required, THEN start idle Backup VI compressor.
EXAMINER CUE: Repeat back the information given, then inform applicant - The CRS has evaluated VI header pressure and an additional backup VI compressor is not needed at this time. The CRS will have the turbine building AO complete the steps. This JPM is complete.
EXAMINER NOTE: If backup compressor 2 was not available, the following steps will be to align backup compressor 3.
STANDARD:
Applicant informs the Control Room of the status of backup compressor
: 2.
COMMENTS:
___ SAT
___ UNSAT


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 4 0F 24   START TIME: _______  EXAMINER NOTE:  Two Backup VI compressors should be available at any given time. A third backup compressor is stationed at the Catawba garage. Applicant should select Backup VI Compressor 2 for startup per the initiating cue. IF Backup Compressor 2 is not available then direct the operator to startup compressor 3 and start the JPM at step 5 (page 14 of this JPM). STEP 1   3. To Start Backup VI Compressor 2 perform the following: a. Verify engine oil (inside engine side panel) - GREATER THAN "ADD" ON DIPSTICK. EXAMINER CUE: When dipstick is located, inform applicant - "Oil level is greater than "ADD".STANDARD: Applicant locates the dipstick and checks the oil level. COMMENTS:
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 14 0F 24 STEP 1 5. To Start Backup VI Compressor 3 perform the following:
: a. Verify engine oil (inside engine side panel) - GREATER THAN ADD ON DIPSTICK.
EXAMINER CUE: When dipstick is located, inform applicant - Oil level is greater than ADD.
STANDARD:
Applicant locates the dipstick and checks the oil level.
COMMENTS:
___ SAT
___ UNSAT STEP 2 5.b. Verify compressor oil level (inside compressor front panel) -
VISIBLE IN SIGHTGLASS.
EXAMINER CUE: When sightglass is located, inform applicant - Oil level is visible in the sight glass (near full).
STANDARD:
Applicant locates sightglass and checks oil level.
COMMENTS:
___ SAT
___ SAT
___ UNSAT    STEP 3.b. Verify compressor oil level (inside compressor front panel) - VISIBLE IN SIGHTGLASS. EXAMINER CUE:  When sightglass is located, inform applicant - "Oil level is visible in the sight glass (near full)."
___UNSAT STEP 3 5.c. IF oil levels inadequate, THEN inform Control Room.
STANDARD:   Applicant locates sightglass and checks oil level.
STANDARD:
Applicant determines per given cues that this step is N/A.
COMMENTS:
COMMENTS:
___ SAT   ___UNSAT 
___ SAT
___ UNSAT


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 24   STEP 3  3.c. IF oil levels inadequate, THEN inform Control Room. STANDARD:  Applicant determines per given cues that this step is N/A. COMMENTS:
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 15 0F 24 STEP 4 5.d. Ensure all compressor panel doors - CLOSED EXAMINER CUE: If asked, inform applicant - All doors are closed.
___ SAT  ___ UNSAT STEP 4   3.d. Ensure all compressor panel doors - CLOSED EXAMINER CUE: If asked, inform applicant - "All doors are closed."
STANDARD:
STANDARD: Applicant ensures that all compressor panel doors are closed.
Applicant ensures that all compressor panel doors are closed.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT     STEP 5   3.e. Unplug battery charger power supply cord from the outlet (outside wall at TB 594, 2D-34). EXAMINER CUE: When plug is located, inform applicant - "Battery charger is unplugged.STANDARD: Applicant locates and describes unplugging the battery charger power supply cord.
___ SAT
___ UNSAT STEP 5 5.e. Unplug battery charger power supply cord from the outlet (outside wall at TB 594, 2D-34).
EXAMINER CUE: When plug is located, inform applicant - Battery charger is unplugged.
STANDARD:
Applicant locates and describes unplugging the battery charger power supply cord.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 6 0F 24  STEP 6  3.f. Ensure 1VI-428 (VI Comp B/U2 Disch) - OPEN  EXAMINER CUE:  When valve is located and applicant correctly describes opening the valve, inform applicant - "1VI-428 is Open."  STANDARD:  Applicant locates and describes the verification of or opening 1VI-428. This step is critical to ensure a flow path from the compressor discharge to the VI header. COMMENTS:    CRITICAL STEP    ___ SAT  ___ UNSAT NOTE  The following steps are performed at control panel on front of Backup VI compressor 2. STEP 7  3.g. Rotate OFF/ON/START switch to - ON.
___ SAT
EXAMINER CUE:  When switch is located, and operation described, inform applicant - "OFF/ON/START switch is in ON."  STANDARD:  Applicant locates and describes operation of the OFF/ON/START switch to the ON position.
___ UNSAT  
COMMENTS:        ___ SAT  ___ UNSAT


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 24   STEP 8  3.h. IF outside temperature less than or equal to 45&deg;F, THEN place "HEATERS" toggle switch - "ON". EXAMINER CUE:  If asked, inform applicant - "Outside air temp is currently 87&deg;F." STANDARD:  Applicant determines from the examiner cue that this step is N/A. COMMENTS:
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 16 0F 24 STEP 6 5.f. Ensure 1VI-430 (VI Comp B/U3 Disch) - OPEN EXAMINER CUE: When valve is located and applicant correctly describes opening the valve, inform applicant -
___ SAT  ___ UNSAT    NOTE  Fuel level of 1/2 will provide approximately 3 hours of run time at full load. STEP 9  3.i. Verify fuel level - ON SCALE.
1VI-430 is Open.
EXAMINER CUE: When fuel level gage is located, inform applicant - "Fuel oil level is at 3/4 mark.STANDARD: Applicant locates fuel level gage and verifies level is on scale per cue given.
STANDARD:
Applicant locates and describes the verification of or opening 1VI-430.
This step is critical to ensure a flow path from the compressor discharge to the VI header.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT   NOTE OFF/ON/START switch spring returns to ON when released. OFF/ON/START switch should not be held in the START position for greater than 10 seconds, to prevent starter overheating.
CRITICAL STEP
Catawba Nuclear Station JPM K May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 8 0F 24  STEP 10  3.j. Start Backup VI Compressor 2 as follows:  1)  Rotate and hold OFF/ON/START switch to - START. EXAMINER CUE: After explaining the operation of the OFF/ON/START switch, inform applicant - "OFF/ON/START switch is in START."  STANDARD:  Applicant describes turning OFF/ON/START switch to the START position. This step is critical to start the backup VI compressor prior to aligning to supply the instrument air header. COMMENTS:
___ SAT
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 9 0F 24  STEP 11  3.j.2)  Release OFF/ON/START switch when one of the following occurs:   Engine starts OR  10 seconds has elapsed. EXAMINER CUE:  Inform applicant - "The engine is running." EXAMINER CUE:  Once applicant describes releasing the OFF/ON/START switch, inform applicant - "OFF/ON/START switch has been released."  STANDARD:  Applicant describes releasing the OFF/ON/START switch following cue given by examiner. This step is critical to prevent overheating the engine starter. COMMENTS:
___ UNSAT NOTE The following steps are performed at control panel on front of Backup VI compressor 3.
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 12  3.j.3)  IF engine failed to start, THEN start compressor as follows:  STANDARD:  Applicant determines from examiner cue in previous step, that this step is N/A.
STEP 7 5.g. Rotate OFF/ON/START switch to - ON.
EXAMINER CUE: When switch is located, and operation described, inform applicant - OFF/ON/START switch is in ON.
STANDARD:
Applicant locates and describes operation of the OFF/ON/START switch to the ON position.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 10 0F 24  STEP 13  3.k. WHEN compressor has been running for 60 seconds, THEN depress "PRESSURE CONTROL" switch. EXAMINER CUE:  Inform applicant - "60 seconds have elapsed."  When located and operation described, inform applicant - "PRESSURE CONTROL button has been depressed. If asked, "Diesel is heard to speed up and discharge pressure increases to ~ 110 psig."  STANDARD:  Applicant describes depressing the PRESSURE CONTROL button. This step is critical to ensure compressor discharge pressure is sufficient to supply the Instrument Air header. COMMENTS:
___ SAT
CRITICAL STEP    ___ SAT  ___ UNSAT     STEP 14  3.l. IF outside air temperature greater than 32&deg;F, THEN ensure "HEATERS" toggle switch - "OFF". EXAMINER CUE:  When located, inform applicant - "HEATER toggle switch is in the OFF position."  STANDARD:  Applicant determines that per previous given cue, that this step is applicable and verifies the HEATERS toggle switch is OFF. 
___ UNSAT  


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 17 0F 24 STEP 8 5.h. IF outside temperature less than or equal to 45&deg;F, THEN place HEATERS toggle switch - ON.
EXAMINER CUE: If asked, inform applicant - Outside air temp is currently 87&deg;F.
STANDARD:
Applicant determines from the examiner cue that this step is N/A.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 11 0F 24  STEP 15  3.m. OPEN 1VI 425 (VI Comp B/U2 Manifold Inlet). EXAMINER CUE:  When valve is located and proper operation described, inform applicant - "1VI-425 is Open."  STANDARD:  Applicant describes opening 1VI-425. This step is critical to align proper flow path from the compressor to the Instrument Air header. COMMENTS:
___ SAT
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 16  3.n. Ensure the following valves OPEN:  1VI-511 (B/U VI Compressor Air Dryer Bypass) (TB2-598, 2C-34). 1VI-417 (B/U VI Compressor Header Isol) (TB2-598, 2C-34).
___ UNSAT NOTE Fuel level of 1/2 will provide approximately 3 hours of run time at full load.
EXAMINER CUE: When valves are located and proper operation to open is described, inform applicant - "1VI-511 is open. 1VI-417 is open."  STANDARD: Applicant describes opening 1VI-511 and 1VI-417. This step is critical to align a flow path from the backup VI Compressor to the Instrument Air header. COMMENTS:
STEP 9 5.i. Verify fuel level - ON SCALE.
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 12 0F 24  STEP 17  3.o. Record the following:  Compressor start time ___________  HOURMETER __________  COMP DISH PRESS __________  EXAMINER CUE:  If asked, inform applicant - "Use current run hours, time and discharge pressure is 110 psig." STANDARD:  Applicant records the values for current time, engine run hours, and discharge pressure given in the cue. COMMENTS:
EXAMINER CUE: When fuel level gage is located, inform applicant -
___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 13 0F 24  STEP 18  3.p. Notify the control room of the following:  Status of backup compressor 2  IF idle compressor available, THEN request Control Room Supervisor to evaluate VI header pressure to determine whether additional backup compressor required  IF Control Room determines additional backup VI compressor required, THEN start idle Backup VI compressor. EXAMINER CUE:  Repeat back the information given, then inform applicant - "The CRS has evaluated VI header pressure and an additional backup VI compressor is not needed at this time. The CRS will have the turbine building AO complete the steps. This JPM is complete."
Fuel oil level is at 3/4 mark.
EXAMINER NOTE:  If backup compressor 2 was not available, the following steps will be to align backup compressor 3. STANDARD:  Applicant informs the Control Room of the status of backup compressor 2.
STANDARD:
Applicant locates fuel level gage and verifies level is on scale per cue given.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 14 0F 24  STEP 1    5. To Start Backup VI Compressor 3 perform the following:  a. Verify engine oil (inside engine side panel) - GREATER THAN "ADD" ON DIPSTICK. EXAMINER CUE:  When dipstick is located, inform applicant - "Oil level is greater than "ADD"."  STANDARD:  Applicant locates the dipstick and checks the oil level. COMMENTS:
___ SAT
___ SAT
___ UNSAT     STEP 5.b. Verify compressor oil level (inside compressor front panel) - VISIBLE IN SIGHTGLASS. EXAMINER CUE: When sightglass is located, inform applicant - "Oil level is visible in the sight glass (near full)."
___ UNSAT NOTE OFF/ON/START switch spring returns to ON when released.
STANDARD:   Applicant locates sightglass and checks oil level.
OFF/ON/START switch should not be held in the START position for greater than 10 seconds, to prevent starter overheating.
 
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 18 0F 24 STEP 10 5.j. Start Backup VI Compressor 3 as follows:
: 1) Rotate and hold OFF/ON/START switch to - START.
EXAMINER CUE: After explaining the operation of the OFF/ON/START switch, inform applicant - OFF/ON/START switch is in START.
STANDARD:
Applicant describes turning OFF/ON/START switch to the START position.
This step is critical to start the backup VI compressor prior to aligning to supply the instrument air header.
COMMENTS:
COMMENTS:
___ SAT    ___UNSAT STEP 3  5.c. IF oil levels inadequate, THEN inform Control Room. STANDARD:  Applicant determines per given cues that this step is N/A. COMMENTS:
CRITICAL STEP
___ SAT   ___ UNSAT
___ SAT
___ UNSAT  


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 15 0F 24     STEP 5.d. Ensure all compressor panel doors - CLOSED  EXAMINER CUE: If asked, inform applicant - "All doors are closed."
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 19 0F 24 STEP 11 5.j.2) Release OFF/ON/START switch when one of the following occurs:
STANDARD: Applicant ensures that all compressor panel doors are closed.
* Engine starts OR
* 10 seconds has elapsed.
EXAMINER CUE: Inform applicant - The engine is running.
EXAMINER CUE: Once applicant describes releasing the OFF/ON/START switch, inform applicant -
OFF/ON/START switch has been released.
STANDARD:
Applicant describes releasing the OFF/ON/START switch following cue given by examiner.
This step is critical to prevent overheating the engine starter.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT     STEP 5    5.e. Unplug battery charger power supply cord from the outlet (outside wall at TB 594, 2D-34). EXAMINER CUE: When plug is located, inform applicant - "Battery charger is unplugged."  STANDARD: Applicant locates and describes unplugging the battery charger power supply cord.
CRITICAL STEP
___ SAT
___ UNSAT STEP 12 5.j.3) IF engine failed to start, THEN start compressor as follows:
STANDARD:
Applicant determines from examiner cue in previous step, that this step is N/A.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 16 0F 24  STEP 6  5.f. Ensure 1VI-430 (VI Comp B/U3 Disch) - OPEN  EXAMINER CUE:  When valve is located and applicant correctly describes opening the valve, inform applicant - "1VI-430 is Open."  STANDARD:  Applicant locates and describes the verification of or opening 1VI-430. This step is critical to ensure a flow path from the compressor discharge to the VI header. COMMENTS:    CRITICAL STEP    ___ SAT  ___ UNSAT NOTE  The following steps are performed at control panel on front of Backup VI compressor 3. STEP 7  5.g. Rotate OFF/ON/START switch to - ON.
___ SAT
EXAMINER CUE:  When switch is located, and operation described, inform applicant - "OFF/ON/START switch is in ON."  STANDARD:  Applicant locates and describes operation of the OFF/ON/START switch to the ON position.
___ UNSAT  
COMMENTS:        ___ SAT  ___ UNSAT


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 17 0F 24   STEP 5.h. IF outside temperature less than or equal to 45&deg;F, THEN place "HEATERS" toggle switch - "ON". EXAMINER CUE: If asked, inform applicant - "Outside air temp is currently 87&deg;F." STANDARD:  Applicant determines from the examiner cue that this step is N/A. COMMENTS:
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 20 0F 24 STEP 13 5.k. WHEN compressor has been running for 60 seconds, THEN depress PRESSURE CONTROL switch.
___ SAT  ___ UNSAT    NOTE  Fuel level of 1/2 will provide approximately 3 hours of run time at full load. STEP 9  5.i. Verify fuel level - ON SCALE.
EXAMINER CUE: Inform applicant - 60 seconds have elapsed.
EXAMINER CUE:  When fuel level gage is located, inform applicant - "Fuel oil level is at 3/4 mark.STANDARD: Applicant locates fuel level gage and verifies level is on scale per cue given.
When located and operation described, inform applicant - PRESSURE CONTROL button has been depressed.
STANDARD:
Applicant describes depressing the PRESSURE CONTROL button.
This step is critical to ensure compressor discharge pressure is sufficient to supply the Instrument Air header.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT   NOTE  OFF/ON/START switch spring returns to ON when released. OFF/ON/START switch should not be held in the START position for greater than 10 seconds, to prevent starter overheating.
CRITICAL STEP
Catawba Nuclear Station JPM K May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 18 0F 24  STEP 10  5.j. Start Backup VI Compressor 3 as follows:  1)  Rotate and hold OFF/ON/START switch to - START. EXAMINER CUE: After explaining the operation of the OFF/ON/START switch, inform applicant - "OFF/ON/START switch is in START."  STANDARD:  Applicant describes turning OFF/ON/START switch to the START position. This step is critical to start the backup VI compressor prior to aligning to supply the instrument air header. COMMENTS:
___ SAT
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 19 0F 24  STEP 11  5.j.2)  Release OFF/ON/START switch when one of the following occurs:  Engine starts OR  10 seconds has elapsed. EXAMINER CUE:  Inform applicant - "The engine is running." EXAMINER CUE:  Once applicant describes releasing the OFF/ON/START switch, inform applicant - "OFF/ON/START switch has been released."  STANDARD:  Applicant describes releasing the OFF/ON/START switch following cue given by examiner. This step is critical to prevent overheating the engine starter. COMMENTS:
___ UNSAT STEP 14 5.l. IF outside air temperature greater than 32&deg;F, THEN ensure HEATERS toggle switch - OFF.
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 12  5.j.3)  IF engine failed to start, THEN start compressor as follows:  STANDARD:  Applicant determines from examiner cue in previous step, that this step is N/A.
EXAMINER CUE: When located, inform applicant - HEATER toggle switch is in the OFF position.
STANDARD:
Applicant determines that per previous given cue, that this step is applicable and verifies the HEATERS toggle switch is OFF.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 20 0F 24  STEP 13  5.k. WHEN compressor has been running for 60 seconds, THEN depress "PRESSURE CONTROL" switch. EXAMINER CUE:  Inform applicant - "60 seconds have elapsed."  When located and operation described, inform applicant - "PRESSURE CONTROL button has been depressed."  STANDARD:  Applicant describes depressing the PRESSURE CONTROL button. This step is critical to ensure compressor discharge pressure is sufficient to supply the Instrument Air header. COMMENTS:
___ SAT
CRITICAL STEP    ___ SAT  ___ UNSAT     STEP 14  5.l. IF outside air temperature greater than 32&deg;F, THEN ensure "HEATERS" toggle switch - "OFF". EXAMINER CUE:  When located, inform applicant - "HEATER toggle switch is in the OFF position."  STANDARD:  Applicant determines that per previous given cue, that this step is applicable and verifies the HEATERS toggle switch is OFF. 
___ UNSAT  


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 21 0F 24 STEP 15 5.m. OPEN 1VI 426 (VI Comp B/U3 Manifold Inlet).
EXAMINER CUE: When valve is located and proper operation described, inform applicant - 1VI-426 is Open.
STANDARD:
Applicant describes opening 1VI-426.
This step is critical to align proper flow path from the compressor to the Instrument Air header.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 21 0F 24  STEP 15  5.m. OPEN 1VI 426 (VI Comp B/U3 Manifold Inlet). EXAMINER CUE:  When valve is located and proper operation described, inform applicant - "1VI-426 is Open."  STANDARD:  Applicant describes opening 1VI-426. This step is critical to align proper flow path from the compressor to the Instrument Air header. COMMENTS:
CRITICAL STEP
CRITICAL STEP    ___ SAT   ___ UNSAT     STEP 16   5.n. Ensure the following valves OPEN:   1VI-511 (B/U VI Compressor Air Dryer Bypass) (TB2-598, 2C-34). 1VI-417 (B/U VI Compressor Header Isol) (TB2-598, 2C-34).
___ SAT
EXAMINER CUE: When valves are located and proper operation to open is described, inform applicant - "1VI-511 is open. 1VI-417 is open.STANDARD: Applicant describes opening 1VI-511 and 1VI-417. This step is critical to align a flow path from the backup VI Compressor to the Instrument Air header. COMMENTS:
___ UNSAT STEP 16 5.n. Ensure the following valves OPEN:
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 22 0F 24  STEP 17  5.o. Record the following:  Compressor start time ___________  HOURMETER __________  COMP DISH PRESS __________  EXAMINER CUE:  If asked, inform applicant - "Use current run hours, time and discharge pressure is 110 psig." STANDARD:  Applicant records the values for current time, engine run hours, and discharge pressure given in the cue.
1VI-511 (B/U VI Compressor Air Dryer Bypass) (TB2-598, 2C-34).
1VI-417 (B/U VI Compressor Header Isol) (TB2-598, 2C-34).
EXAMINER CUE: When valves are located and proper operation to open is described, inform applicant - 1VI-511 is open. 1VI-417 is open.
STANDARD:
Applicant describes opening 1VI-511 and 1VI-417.
This step is critical to align a flow path from the backup VI Compressor to the Instrument Air header.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 23 0F 24   STEP 18  5.p. Notify the control room of the following:   Status of backup compressor 3  IF idle compressor available, THEN request Control Room Supervisor to evaluate VI header pressure to determine whether additional backup compressor required  IF Control Room determines additional backup VI compressor required, THEN start idle Backup VI compressor. EXAMINER CUE: Repeat back the information given, then inform applicant - "The CRS has evaluated VI header pressure and an additional backup VI compressor is not needed at this time. The CRS will have the turbine building AO complete the steps. This JPM is complete."  STANDARD: Applicant informs the Control Room of the status of backup compressor 3.
CRITICAL STEP
___ SAT
___ UNSAT  
 
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 22 0F 24 STEP 17 5.o. Record the following:
* Compressor start time ___________
* HOURMETER __________
* COMP DISH PRESS __________
EXAMINER CUE: If asked, inform applicant - Use current run hours, time and discharge pressure is 110 psig.
STANDARD:
Applicant records the values for current time, engine run hours, and discharge pressure given in the cue.
COMMENTS:
COMMENTS:
END OF TASK    ___ SAT   ___ UNSAT  
___ SAT
___ UNSAT  


STOP TIME ________
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 23 0F 24 STEP 18 5.p. Notify the control room of the following:
APPLICANT CUE SHEET  (RETURN TO EXAMINER UPON COMPLETION OF TASK)  May 2015 NRC Initial License Exam JPM K   
* Status of backup compressor 3
* IF idle compressor available, THEN request Control Room Supervisor to evaluate VI header pressure to determine whether additional backup compressor required
* IF Control Room determines additional backup VI compressor required, THEN start idle Backup VI compressor.
EXAMINER CUE: Repeat back the information given, then inform applicant - The CRS has evaluated VI header pressure and an additional backup VI compressor is not needed at this time. The CRS will have the turbine building AO complete the steps. This JPM is complete.
STANDARD:
Applicant informs the Control Room of the status of backup compressor
: 3.
COMMENTS:
END OF TASK
___ SAT
___ UNSAT STOP TIME ________


INITIAL CONDITIONS:   Unit 1 and 2 are at 100% power. VI Lo Pressure annunciator is lit. VI pressure is 75 psig and slowly decreasing. AP/0/A/5500/022 (Loss of Instrument Air) has been implemented.
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
INITIATING CUES:   The CRS instructs you to startup and align the Backup Temporary VI compressor #2 to the Instrument Air Header per the local copy of EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) Enclosure 23 (Backup VI Compressor(s)) step 3.}}
May 2015 NRC Initial License Exam JPM K INITIAL CONDITIONS:
* Unit 1 and 2 are at 100% power.
* VI Lo Pressure annunciator is lit.
* VI pressure is 75 psig and slowly decreasing.
* AP/0/A/5500/022 (Loss of Instrument Air) has been implemented.
INITIATING CUES:
* The CRS instructs you to startup and align the Backup Temporary VI compressor #2 to the Instrument Air Header per the local copy of EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) Enclosure 23 (Backup VI Compressor(s)) step 3.}}

Latest revision as of 08:47, 10 January 2025

Initial Exam 2015-301 Final Sim In-Plant JPMs
ML15245A307
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/31/2015
From:
NRC/RGN-II
To:
Duke Energy Carolinas
References
50-413/15-301, 50-414/15-301
Download: ML15245A307 (132)


Text

Catawba Nuclear Station JPM A May 2015 NRC Exam PAGE 1 OF 9 JPM A

Catawba Nuclear Station JPM A May 2015 NRC Exam PAGE 2 OF 9 EVALUATION SHEET Task:

Emergency Borate the Reactor Coolant System Alternate Path:

Yes Facility JPM #:

NV-017 Safety Function:

1

Title:

Reactivity Control K/A 004 A2.14 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Emergency Boration Rating(s):

3.8 / 3.9 CFR:

41.5 / 43/5 / 45/3 / 45/5 Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator X

In-Plant Perform X

Simulate

References:

EP/1/A/5000/FR-S.1 (Nuclear Power Generation/ATWS) rev. 22 Task Standard:

One NV pump running with its suction aligned to the FWST and isolated from the VCT.

Validation Time:

5 minutes Time Critical:

Yes No X

===============================================================

Applicant:

Time Start: __________

NAME___________________________

Docket #_______________

Time Finish: __________

Performance Rating:

SAT ____ UNSAT ____

Performance Time _____

Examiner: _____________________________

_____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

Catawba Nuclear Station JPM A May 2015 NRC Exam PAGE 3 OF 9 SIMULATOR OPERATOR INSTRUCTIONS:

1.

ENSURE NRC Examination Security has been established.

2.

Reset to IC #163

3.

Enter the password.

4.

Select Yes on the INITIAL CONDITION RESET pop-up window.

5.

Ensure simulator setup per table below.

6.

Place simulator in RUN and acknowledge any alarms.

7.

ENSURE Extra Operator is present in the simulator.

8.

Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event MAL-IPX003A(REACTOR TRIP BKR A FAILURE)

ACTIVE MAL-IPX003B (REACTOR TRIP BKR B FAILURE)

ACTIVE VLV-NV043F (NV236B BORIC ACID TO CHG PMP VLV FAIL TO POSITION) 0 MAL-MT-007 (LOSS OF TURBINE LUBE OIL PRESSURE)

ACTIVE Instructor will act as the OATC and be manually inserting control rods when the simulator is placed in RUN.

REV. 0 PAGE 4 0F 9 Catawba Nuclear Station JPM A May 2015 NRC Exam PAGE 4 OF 9 READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The reactor will NOT trip automatically or manually.
  • A Red Path for Subcriticality is in effect.
  • The OATC is inserting rods manually.

INITIATING CUES:

The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR-S.1, (Nuclear Power Generation/ATWS), step 4.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/FR-S.1 pages 3-5.

Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 9 START TIME: _______

STEP 1: 4. Initiate emergency boration of NC System as follows:

a. Ensure at least one NV pump - ON.

STANDARD:

Applicant verifies red ON light lit for NV PMP 1A or 1B (1MC-10).

COMMENTS:

___ SAT

___ UNSAT STEP 2 4. b. OPEN 1NV-236B (Boric Acid To NV Pumps Suct).

STANDARD:

Applicant depresses the red OPEN pushbutton for 1NV-236B and verifies the red OPEN light remains dark and the green CLSD light remains lit on 1MC-10. 1NV-236B remains closed.

COMMENTS:

___ SAT

___UNSAT STEP 3 4. c. Ensure both boric acid transfer pump switches - IN THE "ON" POSITION.

STANDARD:

Applicant rotates the switches for B/A XFER PMP 1A and B/A XFER PMP 1B to the ON position.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 9 STEP 4 4. d. Verify emergency boration flow - GREATER THAN OR EQUAL TO 30 GPM.

STANDARD:

Applicant verifies EMER BORATE FLOW (1NVP5440) indicates 0 gpm (1MC-5) and transitions to the RNO.

EXAMINER NOTE: This begins the alternate path of this JPM.

COMMENTS:

___ SAT

___ UNSAT STEP 5 4. d. RNO d. Align NV pump suction to FWST as follows:

1) OPEN the following valves:

STANDARD:

Applicant depresses the red OPEN pushbuttons for 1NV-252A and 1NV-253B This step is critical to align borated water to the suction of the charging pumps. Only ONE of the valves opened meets the Critical Step criteria.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 9 STEP 6 4. d. RNO d. 2) CLOSE the following valves:

1NV-188A (VCT Otlt Isol) 1NV-189B (VCT Otlt Isol).

STANDARD:

Applicant depresses the green CLSD pushbutton for 1NV-188A and 1NV-189B.

This step is critical to prevent borated water from going to the VCT instead of the suction of the charging pumps. Closing only ONE of the valves meets the intent of the Critical Step criteria.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 7 4. e. Verify the following charging line isolation valves - OPEN:

1NV-312A (Chrg Line Cont Isol) follows:

1NV-314B (Chrg Line Cont Isol).

STANDARD:

Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-312A and 1NV-314B.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 9 STEP 8 4. f. Verify Pzr pressure - LESS THAN 2335 PSIG.

STANDARD:

Applicant verifies PZR pressure instruments (1NCP5161, 1NCP5150, 1NCP5170 and 1NCP5171) indicate less than 2335 psig (1MC-10)

COMMENTS:

END OF TASK

___ SAT

___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM A INITIAL CONDITIONS:

  • The reactor will NOT trip automatically or manually.
  • A Red Path for Subcriticality is in effect.
  • The OATC is inserting rods manually.

INITIATING CUES:

The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR-S.1, (Nuclear Power Generation/ATWS), step 4.

Catawba Nuclear Station JPM B May 2015 NRC Exam PAGE 1 OF 14 JPM B

Catawba Nuclear Station JPM B May 2015 NRC Exam PAGE 2 OF 14 EVALUATION SHEET Task:

Transfer the Emergency Core Coolant System to the Cold Leg Recirculation Alternate Path:

Yes Facility JPM #:

NI-088 Safety Function:

2

Title:

Emergency Core Cooling System (ECCS)

K/A 006 A4.07 Ability to manually operate and/or monitor in the control room: ECCS pumps and valves.

Rating(s):

4.4 / 4.4 CFR:

41.7 / 45.5 to 45.8 Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator X

In-Plant Perform X

Simulate

References:

EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) rev. 29 Task Standard:

EP/1/A/5000/ES-1.3 Transfer to Cold Leg Recirculation) step 6 is performed and the 1A and 1B NV (Chemical Volume and Control System) and NI (Safety Injection System) pumps are secured.

Validation Time:

15 minutes Time Critical:

Yes No X

===============================================================

Applicant:

Time Start: __________

NAME___________________________

Docket #_______________

Time Finish: __________

Performance Rating:

SAT ____ UNSAT ____

Performance Time _____

Examiner: _____________________________

_____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

Catawba Nuclear Station JPM B May 2015 NRC Exam PAGE 3 OF 14 SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #164
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event VLV-NI037F (NI184B CNMT SUMP LINE 1B ISOL (STEM) FAIL TO POSITION) 0 MAL-NC013A (NC COLD LEG A LEAK) 27.5 VLV-ND005F (ND28A ND HX A OUTLET TO CHARG AB FAIL TO POSITION.

0

PAGE 4 0F 14 Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam PAGE 4 OF 14 READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A LOCA has occurred on Unit 1.

INITIATING CUES:

  • 1AD-9, E/8 FWST LO-LO LEVEL annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.

EXAMINER NOTE: After reading the cue, provide the applicant with a copy of EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) complete through step 8 with step 6 flagged.

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 14 START TIME: _______

STEP 1: 6. WHEN FWST level decreases to 5% (1AD-9, E/8 "FWST LO-LO LEVEL"), THEN align NV and NI Systems for recirc as follows:

a. Ensure Enclosure 1 (Foldout Page) is monitored.

STANDARD:

Applicant reads the step.

Examiner Cue: The OATC will monitor Enclosure 1 COMMENTS:

___ SAT

___ UNSAT NOTE CSF should not be implemented until directed by this procedure.

STEP 2 b. Verify at least one of the following annunciators - LIT:

STANDARD:

Applicant determines that one or both annunciators are lit.

COMMENTS:

___ SAT

___UNSAT

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 14 STEP 3 c. Verify both ND pumps - ON.

STANDARD:

Applicant determines that only 1 ND pump is running and transitions to the RNO COMMENTS:

___ SAT

___ UNSAT STEP 4 6.c. RNO c. Perform the following:

1) IF 1NI-185A (ND Pump 1A Cont Sump Suct) is open, THEN start ND pump 1A.

STANDARD:

Applicant determines that ND PUMP 1A is on by verifying the red ON light is lit on 1MC-11.

COMMENTS:

___ SAT

___ UNSAT STEP 5 2) IF 1NI-184B (ND Pump 1B Cont Sump Suct) is open, THEN start ND pump 1B.

STANDARD:

Applicant determines that 1NI-184B is not open by verifying the green CLSD light is lit on 1MC-11 and determines that the step is not applicable.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 14 STEP 6 3) IF any ND pump running with suction aligned to sump, THEN GO TO Step 6.d.

STANDARD:

Applicant determines that ND Pump 1A is running with suction aligned to the sump and proceeds to step 6.d.

COMMENTS:

___ SAT

___ UNSAT STEP 7 6. d. Ensure the following valves - CLOSED:

1ND-32A (ND Train 1A Hot Leg Inj Isol) 1ND-65B (ND Train 1B Hot Leg Inj Isol).

STANDARD:

Applicant depresses the green CLOSE pushbuttons for 1ND-32A and 1ND-65B on 1MC-11.

This step is critical to prevent pump run out should only one ND pump be running.

Examiner NOTE: Only one of the valves need to be closed to satisfy the critical step since the valves are in series.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14 STEP 8 6. e. Isolate NI Pump Miniflow as follows:

1) Verify NC pressure - LESS THAN 1620 PSIG.

STANDARD:

Applicant determines that NC (Reactor Coolant System) pressure is less than 1620 psig.

COMMENTS:

___ SAT

___ UNSAT STEP 9 2) Ensure the following valves - CLOSED:

STANDARD:

Applicant determines that the green CLSD lights are lit for 1NI-115A and 1NI-144A on 1MC-11.

COMMENTS:

___ SAT

___ UNSAT STEP 10 3) Ensure "PWR DISCON FOR 1NI-147B" switch in "ENABLE".

STANDARD:

Applicant determines that the PWR DISCON FOR 1NI-147B is in ENABLE on 1MC-11.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 14 STEP 11 4) Ensure 1NI-147B (NI Miniflow Hdr To FWST Isol) -

CLOSED.

STANDARD:

Applicant determines that the green CLSD light is lit for 1NI-147B on 1MC-11.

COMMENTS:

___ SAT

___ UNSAT STEP 12 6. f. Verify at least one of the following NV pumps miniflow valves - CLOSED:

1NV-203A (NV Pumps A&B Recirc Isol)

OR 1NV-202B (NV Pmps A&B Recirc Isol).

STANDARD:

Applicant determines that the green CLSD lights are lit for 1NV-203A &

1NV-202B on 1MC-10.

COMMENTS:

___ SAT

___ UNSAT STEP 13 g. Ensure 1NI-334B (NI Pump Suct X-Over From ND) - OPEN.

STANDARD:

Applicant determines the red OPEN light is lit for 1NI-334B on 1MC-11.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14 STEP 14 h. OPEN the following valves:

1NI-332A (NI Pump Suct X-Over From ND) 1NI-333B (NI Pump Suct From ND).

STANDARD:

Applicant depresses the red OPEN pushbuttons for 1NI-332A and 1NI-333B on 1MC-11.

COMMENTS:

___ SAT

___ UNSAT STEP 15 i. Align ND discharge to suction of NI and NV pumps as follows:

1) OPEN 1ND-28A (ND Supply To NV & 1A NI Pmps).

STANDARD:

Applicant depresses the red OPEN pushbutton for 1ND-28A on 1MC-11 and determines that the valve will not open and continues.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 14 STEP 16 2) OPEN 1NI-136B (ND Supply To NI Pump 1B).

STANDARD:

Applicant depresses the red OPEN pushbutton for 1NI-136B on 1MC-11, determines that the valve will not open and proceeds to the next step.

Examiner NOTE: 1NI-136B will not open due to an interlock with 1NI-184B COMMENTS:

___ SAT

___ UNSAT STEP 17 j. Verify at least one ND train aligned to provide suction to NV and NI as follows:

A Train:

1A ND pump running 1ND-28A (ND Supply To NV & 1A NI Pmps) -

OPEN.

STANDARD:

Applicant determines no train can be aligned to provide suction to NV and NI and proceeds to the RNO.

EXAMINER NOTE: This begins the alternate path of this JPM.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 14 STEP 18 6.j. RNO j. Perform the following:

1) IF either valve is in intermediate position, THEN allow 20 seconds for valve to open.

STANDARD:

Applicant determines that this step does not apply.

COMMENTS:

___ SAT

___ UNSAT STEP 19 2) IF either valve is open AND its associated ND pump on, THEN GO TO Step 6.k.

STANDARD:

Applicant determines that this step does not apply.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 14 STEP 20 3) IF both A train and B train unavailable, THEN trip all NV and NI pumps.

STANDARD:

Applicant determines both A train and B train are unavailable and depresses the green OFF pushbuttons for NV PMP 1A, NV PUMP 1B, NI PMP 1A and NI PUMP 1B.

This step is critical to protect the NV and NI pumps from damage from loss of suction and allow them to be available later when the FWST has been refilled.

EXAMINER CUE: Another operator will complete ES-1.3. This JPM is complete.

COMMENTS:

END OF TASK CRITICAL STEP

___ SAT

___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM B INITIAL CONDITIONS:

  • A LOCA has occurred on Unit 1.

INITIATING CUES:

  • 1AD-9, E/8 FWST LO-LO LEVEL annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.

Catawba Nuclear Station JPM C May 2015 NRC Exam PAGE 1 OF 10 JPM C

Catawba Nuclear Station JPM C May 2015 NRC Exam PAGE 2 OF 10 EVALUATION SHEET Task:

Isolate Cold Leg Accumulators Following a Shutdown LOCA Alternate Path:

Yes Facility JPM #:

N/A Safety Function:

3

Title:

Emergency Core Cooling System (ECCS)

K/A 006 A1.13 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the ECCS controls including: Accumulator pressure (level, boron concentration)

Rating(s):

3.5 / 3.7 CFR:

41.5 / 45.5 Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator X

In-Plant Perform X

Simulate

References:

AP/1/A/5500/027 (Shutdown LOCA) rev. 38, Enclosure 14 (Isolating Cold Leg Accumulators)

Task Standard:

AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators) is performed and 1A & 1D Cold Leg Accumulators are isolated and 1B & 1C Cold Leg Accumulators are vented to containment.

Validation Time:

15 minutes Time Critical:

Yes No X

===============================================================

Applicant:

Time Start: __________

NAME___________________________

Docket #_______________

Time Finish: __________

Performance Rating:

SAT ____ UNSAT ____

Performance Time _____

Examiner: _____________________________

_____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

Catawba Nuclear Station JPM C May 2015 NRC Exam PAGE 3 OF 10 SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC # 165
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event

PAGE 4 0F 10 Catawba Nuclear Station JPM C May 2015 NRC Exam PAGE 4 OF 10 READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is in Mode 4.
  • Unit 1 shutdown was in progress for a refueling outage, when pressurizer pressure and level began to decrease uncontrollably.

INITIATING CUES:

  • The CRS has directed you to isolate the Unit 1 Cold Leg Accumulators by performing AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators).
  • Power to all CLA discharge isolation valves has been restored per EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves).

EXAMINER NOTE: After reading the cue, provide the applicant with a copy of AP/1/A/5500/027 Enclosure 14.

Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 10 START TIME: _______

STEP 1: 1. Dispatch operator to restore power to all CLA discharge isolation valves. REFER TO EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves)

STANDARD:

Per initiating cue, the applicant should realize that this step is complete.

Also valve indication for each of the CLA discharge isolation valves is available, due to power already being aligned by the AO.

COMMENTS:

___ SAT

___ UNSAT STEP 2: 2. Ensure S/I - RESET

a. ECCS
b. D/G load sequencers
c. IF AT ANY TIME a B/O occurs, THEN restart S/I equipment previously on.

STANDARD:

Applicant verifies that the yellow ECCS and D/G load sequencer RESET lights are lit. Applicant acknowledges the If at any time statement.

COMMENTS:

___ SAT

___UNSAT

Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10 STEP 3: 3. WHEN power is aligned, THEN perform the following:

a. CLOSE the following valves:

STANDARD:

Applicant depresses the green CLOSE pushbutton for the valves listed, and verifies the green CLSD light lit and red OPEN light dark for valves 1NI-54A & 1NI-88B. Applicant also verifies the red OPEN light lit and green CLSD light dark for valves 1NI-65B & 1NI-76A and transitions to the RNO.

The critical part of this step is to close isolation valves 1NI-54A & 1NI-88B. The other 2 Cold Leg Accumulators will be vented to containment in subsequent steps in the RNO.

EXAMINER NOTE: This begins the alternate path of this JPM.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 4: 3.RNOa. Perform the following:

1) Ensure containment isolation signals - RESET:
  • Phase A
  • Phase B STANDARD:

Applicant verifies that the yellow RESET lights are lit for both trains Phase A and Phase B isolations.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 10 STEP 5: 2) Ensure 1VI-77B (VI Cont Isol) - OPEN STANDARD:

Applicant determines that the red OPEN light lit and green CLSD light dark for 1VI-77B.

COMMENTS:

___ SAT

___ UNSAT STEP 6: 3) IF VI pressure is less than 85 PSIG, THEN dispatch operator to ensure proper VI compressor operation.

STANDARD:

Applicant determines that VI pressure is ~ 90 PSIG. This step is N/A.

COMMENTS:

___ SAT

___ UNSAT STEP 7: 4) Vent any CLA which cannot be isolated as follows:

a) OPEN 1NI-47A (C-Leg Accum N2 Sup Cont Isol)

STANDARD:

Applicant depresses the red OPEN pushbutton for 1NI-47A and verifies the red OPEN light lit and green CLSD light dark.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 10 STEP 8: b) Place breaker 1CB-1 (behind 1MC-6)(Key

  1. 11) to - ON STANDARD:

Applicant lifts breaker 1CB-1 fully up to the ON position.

This step is critical to place power on Cold Leg Accumulator Nitrogen supply isolation valves for 1B and 1C CLAs which will be opened in the next step to allow venting the accumulators to containment.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 9: c) OPEN valve for CLA(s) to be vented:

  • 1NI-50 (C-Leg Accum A N2 Supply Isol)
  • 1NI-61 (C-Leg Accum B N2 Supply Isol)
  • 1NI-72 (C-Leg Accum C N2 Supply Isol)
  • 1NI-84 (C-Leg Accum D N2 Supply Isol)

STANDARD:

Applicant depresses the red OPEN pushbutton and verifies the red OPEN light lit and green CLSD light dark for 1NI-61 and 1NI-72.

This step is critical due to not being able to isolate these CLAs. If these CLAs are not vented to reduce the N2 overpressure, it could cause a hard bubble to form in the reactor coolant system as reactor coolant pressure continues to decrease.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 10 STEP 10: d) CLOSE 1NI-47A.

STANDARD:

Applicant depresses the green CLOSE pushbutton and verifies the green CLSD light lit and red OPEN light dark for 1NI-47A.

This step is critical to allow venting the 1B and 1C CLAs.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 11: e) OPEN 1NI-83 (C-Leg Accums N2 Vent Ctrl) to depressurize affected CLA(s).

STANDARD:

Applicant rotates potentiometer for 1NI-83 clockwise to begin venting the 1B and 1C CLAs.

This step is critical to vent the 1B and 1C CLAs.

NOTE TO EVALUATOR: The time to fully vent the 1B & 1C CLAs would be approximately 30 minutes. The critical steps for this JPM have been met at this point and the JPM may be terminated at your discretion.

EVALUATOR CUE: Another operator will continue to vent the 1B and 1C Cold Leg Accumulators. This JPM is complete.

COMMENTS:

END OF TASK CRITICAL STEP

___ SAT

___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM C INITIAL CONDITIONS:

  • Unit 1 is in Mode 4.
  • Unit 1 shutdown was in progress for a refueling outage, when pressurizer pressure and level began to decrease uncontrollably.

INITIATING CUES:

  • The CRS has directed you to isolate the Unit 1 Cold Leg Accumulators by performing AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators).
  • An AO has been dispatched to restore power to all CLA discharge isolation valves per EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves).

Catawba Nuclear Station JPM D May 2015 NRC Exam PAGE 1 OF 14 JPM D

Catawba Nuclear Station JPM D May 2015 NRC Exam PAGE 2 OF 14 EVALUATION SHEET Task:

Establish NC system Bleed and Feed per EP/1/A/5000/FR-H.1 Alternate Path:

Yes Facility JPM #:

NC-046 Safety Function:

4P

Title:

Reactor Coolant System K/A 002 A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the RCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of heat sinks Rating(s):

4.3 / 4.6 CFR:

41.5 / 43.5 / 45.3 / 45.5 Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator X

In-Plant Perform X

Simulate

References:

EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) rev. 42 Task Standard:

Aligns S/I feed path using NI and NV pumps and opens 1NC-32B and 1NC-34A PZR PORVs to establish NC system bleed path Validation Time:

10 minutes Time Critical:

Yes No X

===============================================================

Applicant:

Time Start: __________

NAME___________________________

Docket #_______________

Time Finish: __________

Performance Rating:

SAT ____ UNSAT ____

Performance Time _____

Examiner: _____________________________

_____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

Catawba Nuclear Station JPM D May 2015 NRC Exam PAGE 3 OF 14 SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #166.
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event MAL-CA003A CAPT SA2 FAILS TO START Active MAL-CA003B CAPT SA5 FAILS TO START Active MAL-CA004A FAILURE OF CA PUMP A TO START Both MAL-CA004B FAILURE OF CA PUMP B TO START Both MAL-NI001B NI PUMP B FAILURE Auto OVR-ISE043 SAFETY INJECTION INITIATE PB TRN B Off MAL-ISE002B (AUTO SI TRN B FAILS TO ACTUATE)

Active VLV-NI001F (NI9A B.I.T. DISCHARGE ISOL VLV FAIL TO POSITION) 0

REV. 0 PAGE 4 0F 14 Catawba Nuclear Station JPM D May 2015 NRC Exam PAGE 4 OF 14 READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The CA system will not function.
  • Attempts to restart the Main CF pumps have been unsuccessful.
  • EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a RED PATH for the Heat Sink critical safety function while performing EP/1/A/5000/ES-0.1 (Reactor Trip Response).
  • Bleed and Feed initiation criteria have been met.

INITIATING CUES:

  • The CRS instructs you to initiate NC system bleed and feed by performing steps 19-24 of EP/1/A/5000/FR-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/FR-H.1 pages 28-36.

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 14 START TIME: _______

STEP 1: 19. Perform Steps 20 through 24 quickly to establish NC heat removal by NC bleed and feed.

STANDARD:

Applicant acknowledges this step.

COMMENTS:

___ SAT

___ UNSAT STEP 2 20. Ensure all NC pumps - OFF.

STANDARD:

Applicant ensures the NC pumps are off.

COMMENTS:

___ SAT

___UNSAT

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 14 STEP 3 21. Initiate S/I.

STANDARD:

Applicant depresses the red train A and B SAFETY INJECTION INITIATE pushbuttons and verifies the red SAFETY INJECTION ACTUATED status light is lit on 1SI-13 or ECCS TRN A yellow reset light is dark on 1MC-11.

This step is critical to start the NI pump and align the valves required for initiating an NC system feed path.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 4 22. Verify NC System feed path as follows:

a. Verify the following pumps - ON:
  • At least one NV pump
  • At least one NI pump.

STANDARD:

Applicant determines that at least one NV pump and one NI pump are running.

EXAMINER NOTE: Applicant may start 1B NI pump and 1B NV pump at this time due to it being a failed auto action. If not, the procedure will direct starting these pumps in the upcoming steps.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 14 STEP 5 22 b. Verify "NV S/I FLOW" - INDICATING FLOW.

STANDARD:

Applicant determines that 1NVP6080 (NV S/I FLOW) on 1MC-3 indicates 0 GPM and transitions to the RNO.

EXAMINER NOTE: This begins the alternate path of this JPM.

COMMENTS:

___ SAT

___ UNSAT STEP 6 22 b. RNO Perform the following:

1) Ensure the following pumps - ON:
  • NV Pumps
  • NI Pumps.

STANDARD:

Applicant ensures that all NV pumps and NI pumps are running by depressing the red ON pushbuttons for any non-running pump, and verifying the red ON lights are lit and green OFF lights are dark for all pumps.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14 STEP 7 22 b. RNO 2) IF at least one NV pump in service, THEN perform the following:

a) Ensure the following valves - OPEN:

STANDARD:

Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-252A and 1NV-253B.

COMMENTS:

___ SAT

___ UNSAT STEP 8 22 b. RNO 2) b) Ensure the following valves - CLOSED:

STANDARD:

Applicant determines that the green CLSD light is lit and red OPEN light is dark on 1NV-188A. Applicant determines that the green CLSD light is dark for 1NV-189B, and depresses the green CLOSE pushbutton and verifies the green CLSD light is lit and the red OPEN light is dark.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 14 STEP 9 22 b. RNO 2) c) Ensure the following valves - OPEN:

STANDARD:

Applicant determines the red OPEN light is dark and green CLSD light is lit on 1NI-9A and 1NI-10B. Applicant depresses the red OPEN pushbutton for 1NI-9A but the valve will not open. Applicant depresses the red OPEN pushbutton for 1NI-10B and verifies the red OPEN light is lit and the green CLSD light is dark.

This step is critical to align an NC (Reactor Coolant) system Feed path.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 10 22 b. RNO 3) IF NI Pump 1A is in service, THEN ensure the following valves - OPEN:

1NI-103A (NI Pump 1A Suct) 1NI-118A (NI Pump 1A C-Leg Inj Isol) 1NI-162A (NI To C-Legs Inj Hdr Isol) 1NI-100B (NI Pmps Suct From FWST).

STANDARD:

Applicant determines that the red OPEN light is lit and green CLSD light is dark on valves 1NI-103A, 1NI-118A, 1NI-162A, and 1NI-100B.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14 STEP 11 22 b. RNO 4) IF NI Pump 1B is in service, THEN ensure the following valves - OPEN:

STANDARD:

Applicant verifies that the red OPEN light is lit and green CLSD light is dark on valves 1NI-135B, 1NI-150B, 1NI-162A, and 1NI-100B.

COMMENTS:

___ SAT

___ UNSAT STEP 12 22 b. RNO 5) IF no feed path can be aligned, THEN perform the following:

STANDARD:

Applicant determines that a feed path does exist and this step is N/A.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 14 STEP 13 23. Establish NC System bleed path as follows:

a. Ensure all Pzr PORV isolation valves - OPEN.

STANDARD:

Applicant determines the RED lights are lit and GREEN lights are dark on valves 1NC-31B, 1NC-35B, and 1NC-33A.

COMMENTS:

___ SAT

___ UNSAT STEP 14 23 b. Select "OPEN" on the following PZR PORVs:

STANDARD:

Applicant rotates switches for 1NC-34A and 1NC-32B, clockwise to the OPEN position and verifies RED lights are lit and GREEN lights are dark on both valves.

This step is critical because it establishes an NC (Reactor Coolant) system Bleed path.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 14 STEP 15 23 c. Align N2 to Pzr PORVs by opening the following valves:

STANDARD:

Applicant depresses the red OPEN pushbutton and verifies red OPEN light lit and green CLSD light dark on valves 1NI-438A and 1NI-439B.

COMMENTS:

___ SAT

___ UNSAT STEP 16 23 d. Verify power to all Pzr PORV isolation valves -

AVAILABLE.

STANDARD:

Applicant verifies indicating lights lit on 1NC-31B, 1NC-35B, and 1NC-33A.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 14 STEP 17 24. Verify the following valves - OPEN:

1NC-31B (PZR PORV Isol) 1NC-32B (PZR PORV) 1NC-33A (PZR PORV Isol) 1NC-34A (PZR PORV).

STANDARD:

Applicant verifies lights on 1NC-31B, 1NC-32B, 1NC-33A and 1NC-34A indicate OPEN.

COMMENTS:

END OF TASK

___ SAT

___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM D INITIAL CONDITIONS:

  • The CA system will not function.
  • Attempts to restart the Main CF pumps have been unsuccessful.
  • EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a RED PATH for the Heat Sink critical safety function while performing EP/1/A/5000/ES-0.1 (Reactor Trip Response).
  • Bleed and Feed initiation criteria have been met.

INITIATING CUES:

  • The CRS instructs you to initiate NC system bleed and feed by performing steps 19-24 of EP/1/A/5000/FR-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.

Catawba Nuclear Station JPM E May 2015 NRC Exam PAGE 1 OF 8 JPM E

Catawba Nuclear Station JPM E May 2015 NRC Exam PAGE 2 OF 8 EVALUATION SHEET Task:

Respond to Loss of Normal Steam Release Capabilities Alternate Path:

No Facility JPM #:

CSF-006 Modified Safety Function:

4S

Title:

Main and Reheat Steam System K/A E13 EA1.1 Ability to operate and/or monitor the following as they apply to the (Steam Generator Overpressure): Components and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Rating(s):

3.1 / 3.3 CFR:

41.7 / 45.5 / 45.6 Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator X

In-Plant Perform X

Simulate

References:

EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities)

Task Standard:

Steam Generator PORVs operated in manual to decrease steam pressure to <

1175 PSIG.

Validation Time:

5 minutes Time Critical:

Yes No X

===============================================================

Applicant:

Time Start: __________

NAME___________________________

Docket #_______________

Time Finish: __________

Performance Rating:

SAT ____ UNSAT ____

Performance Time _____

Examiner: _____________________________

_____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

Catawba Nuclear Station JPM E May 2015 NRC Exam PAGE 3 OF 8 SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC # 158
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event MAL-SM005A (S/G SAFETY VALVE SV20 FAILURE) 0 MAL-SM005B (S/G SAFETY VALVE SV14 FAILURE) 0 MAL-SM005C (S/G SAFETY VALVE SV8 FAILURE) 0 MAL-SM005D (S/G SAFETY VALVE SV2 FAILURE) 0 MAL-SM002A (S/G PORV SV19 FAILURE) 0 MAL-SM002B (S/G PORV SV13 FAILURE) 0 MAL-SM002C (S/G PORV SV7 FAILURE) 0 MAL-SM002D (S/G PORV SV1 FAILURE) 0 OVR-IDE025A (SBM-Steam Dump INTLK Byp Trn A - OFF RST POS)

ON MAL-SM002A (S/G PORV SV19 FAILURE) 0

01 1

MAL-SM002B (S/G PORV SV13 FAILURE) 0

01 2

MAL-SM002C (S/G PORV SV7 FAILURE) 0

01 3

MAL-SM002D (S/G PORV SV1 FAILURE) 0

01 4

Ensure Event 1 = x02i088m Ensure Event 2 = x02i091m Ensure Event 3 = x02i096m Ensure Event 4 = x02i099m

PAGE 4 0F 8 Catawba Nuclear Station JPM E May 2015 NRC Exam PAGE 4 OF 8 READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

INITIATING CUES:

  • The CRS has directed you to perform EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities) to restore steam generator pressure to < 1175 PSIG.

EXAMINER NOTE: After reading the cue, provide the applicant with a copy of EP/1/A/5000/FR-H.4.

Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 8 START TIME: _______

NOTE Throughout this procedure, affected refers to any S/G in which pressure is greater than 1175 PSIG.

STEP 1: 1. IF AT ANY TIME affected S/G(s) N/R level increases to greater than 92% (80% ACC), THEN steam should not be released from affected S/G(s).

STANDARD:

Applicant acknowledges the continuous action statement and continues to step 2.

COMMENTS:

___ SAT

___ UNSAT STEP 2: 2. Restore normal steam release capability of affected S/G(s) using S/G PORV as follows:

a. Verify affected S/G(s) PORV isolation valve - OPEN.

STANDARD:

Applicant determines all S/G PORV isolation valves red OPEN lights are lit and green CLSD lights are dark.

COMMENTS:

___ SAT

___UNSAT

Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 8 STEP 3: 2.b. Throttle open affected S/G(s) PORV.

STANDARD:

Applicant must depress the manual pushbutton for each S/G PORV.

This step is critical to gain control of all steam generator PORVs to be able to decrease steam generator pressures to < 1175 psig.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 4: 2.b. Throttle open affected S/G(s) PORV.

STANDARD:

The applicant must rotate each S/G PORV potentiometer clockwise to open the applicable S/G PORV.

This step is critical to be able to decrease steam generator pressures to < 1175 psig.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 8 STEP 5: 2.c. GO TO Step 4.

STANDARD:

Applicant goes to step 4.

COMMENTS:

___ SAT

___ UNSAT STEP 6: 4. Verify S/G pressures - LESS THAN 1175 PSIG.

STANDARD:

Applicant either determines that S/G pressures are currently < 1175 PSIG or will loop back to step 1.

EXAMINER CUE: If the applicant does not terminate the JPM when S/G pressures are reduced to < 1175 PSIG, then provide the following cue - The CRS is ready to return to the procedure and step in effect. This JPM is complete.

COMMENTS:

___ SAT

___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM E INITIAL CONDITIONS:

INITIATING CUES:

  • The CRS has directed you to perform EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities) to restore steam generator pressure to < 1175 PSIG.

Catawba Nuclear Station JPM F May 2015 NRC Exam PAGE 1 OF 9 JPM F

Catawba Nuclear Station JPM F May 2015 NRC Exam PAGE 2 OF 9 EVALUATION SHEET Task:

Shift Upper Containment Ventilation Units Alternate Path:

No Facility JPM #:

NEW Safety Function:

5

Title:

Containment Cooling System K/A 022 A4.01 Ability to manually operate and/or monitor in the control room: CCS fans Rating(s):

3.6 / 3.6 CFR:

41.7 / 45.5 to 45.8 Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator X

In-Plant Perform X

Simulate

References:

OP/1/A/6450/001 (Containment Ventilation (VV) Systems) rev. 42, Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units)

Task Standard:

OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units) performed to start 1D UCVU and shutdown 1C UCVU.

Validation Time:

5 minutes Time Critical:

Yes No X

===============================================================

Applicant:

Time Start: __________

NAME___________________________

Docket #_______________

Time Finish: __________

Performance Rating:

SAT ____ UNSAT ____

Performance Time _____

Examiner: _____________________________

_____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

Catawba Nuclear Station JPM F May 2015 NRC Exam PAGE 3 OF 9 SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC # 167 (This JPM written to be done with JPM E and will have the same simulator setup as JPM E).
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table in JPM E.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

EXAMINER NOTE: This JPM can be performed in conjunction with JPM E.

PAGE 4 0F 9 Catawba Nuclear Station JPM F May 2015 NRC Exam PAGE 4 OF 9 READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is at 48% power.

INITIATING CUES:

  • The CRS has directed you to shift operating Upper Containment Ventilation Units by starting 1D UCVU and stopping 1C UCVU per OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units).

EXAMINER NOTE: After reading the cue, provide the applicant with a copy of OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units).

Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 9 START TIME: _______

STEP 1 3.1 IF only one UCVU is running, perform the following:

3.1.1 IF the running UCVU is operating in the NORM mode, start the UCVU to be placed in service by placing its control switch in the NORM position:

  • VV UCVU 1A
  • VV UCVU 1B
  • VV UCVU 1C
  • VV UCVU 1D STANDARD:

Applicant places the control switch for VV UCVU 1D to the NORM position.

This step is critical to meet the task of shifting operating UCVUs per the JPM standard.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 2 3.1.2 IF the running UCVU is operating in the MAX mode, start the UCVU to be placed in service by placing its control switch in the MAX position.

STANDARD:

Applicant determines this step is N/A.

COMMENTS:

___ SAT

___UNSAT

Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 9 STEP 3 3.1.3 Verify the red indicating lights illuminate for the UCVU placed in service.

STANDARD:

Applicant determines the red indicating light lit for the 1D UCVU.

COMMENTS:

___ SAT

___ UNSAT STEP 4 3.1.4 Verify the red indicating lights illuminate for the return fan placed in service.

STANDARD:

Applicant determines the red indicating light lit for return fan 1D.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 9 STEP 5 3.1.5 Place the control switch for the UCVU to be stopped in the OFF position:

  • VV UCVU 1A
  • VV UCVU 1B
  • VV UCVU 1C
  • VV UCVU 1D STANDARD:

Applicant places the control switch for the 1C UCVU to the OFF position.

This step is critical to meet the task of shifting operating UCVUs per the JPM standard.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 6 3.1.6 Verify the green indicating light illuminates for the UCVU fan stopped.

STANDARD:

Applicant determines the green indicating light lit for the 1C UCVU.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 9 STEP 7 3.1.7 Verify the green indicating light illuminates for the return fan stopped.

STANDARD:

Applicant determines the green indicating light lit for the 1C return fan.

COMMENTS:

___ SAT

___ UNSAT STEP 8 3.2 IF two or three UCVUs are running, perform the following:

STANDARD:

Applicant determines this step is N/A.

COMMENTS:

___ SAT

___ UNSAT STEP 9 3.3 Indicate below the operating UCVUs:

  • VV UCVU 1A
  • VV UCVU 1B
  • VV UCVU 1C
  • VV UCVU 1D STANDARD:

Applicant indicates that 1D UCVU is running.

COMMENTS:

END OF TASK

___ SAT

___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM F INITIAL CONDITIONS:

  • Unit 1 is at 48% power.

INITIATING CUES:

  • The CRS has directed you to shift operating Upper Containment Ventilation Units by starting 1D UCVU and stopping 1C UCVU per OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units).

Catawba Nuclear Station JPM G May 2015 NRC Exam PAGE 1 OF 10 JPM G

Catawba Nuclear Station JPM G May 2015 NRC Exam PAGE 2 OF 10 EVALUATION SHEET Task:

Reset Radiation Monitor Trip Setpoints Alternate Path:

No Facility JPM #:

WE-EMF-001 Safety Function:

7

Title:

Process Radiation Monitoring System K/A 073 A4.02 Ability to manually operate and/or monitor in the control room: Radiation monitoring system control panel Rating(s):

3.7 / 3.7 CFR:

41.7 / 45.5 to 45.8 Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator X

In-Plant Perform X

Simulate

References:

OP/0/A/6500/080 (EMF RP86A Output Modules) rev. 17, Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment)

Task Standard:

EMF50L TRIP 1 setpoint set to 6.3 E3 CPM and the TRIP 2 setpoint set to 9.0 E3 CPM per OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment).

Validation Time:

10 minutes Time Critical:

Yes No X

===============================================================

Applicant:

Time Start: __________

NAME___________________________

Docket #_______________

Time Finish: __________

Performance Rating:

SAT ____ UNSAT ____

Performance Time _____

Examiner: _____________________________

_____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

Catawba Nuclear Station JPM G May 2015 NRC Exam PAGE 3 OF 10 SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC # 168
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Ensure copy of EMF-50 setpoint log page has been replaced.
9. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event

Catawba Nuclear Station JPM G May 2015 NRC Exam PAGE 4 OF 10 READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.

INITIATING CUES:

Following a discussion with Glenn from RP concerning a premature gaseous release termination, the Control Room Supervisor directs you to set EMF 50L setpoints using OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment) to the following values:

  • Trip 1 = 6300 CPM
  • Trip 2 = 9000 CPM OAC Program EMFLIB is currently not available.

EXAMINER NOTE: After reading the cue, provide the applicant with a copy of OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment).

Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 10 START TIME: _______

NOTE: 1. If desired, EMF setpoints adjustments may be performed from the EMF SETPOINT screen of OAC EMF Library (EMFLIB) Application. EMFLIB is user friendly, no procedure instructions are provided for this application.

2. The Trip Lamps can only be cleared if the activity level has decreased below the Trip Setpoint.
3. If any trip setpoint is >1000 cpm, the entered setpoint should be rounded down to the nearest 100 prior to entering to ensure the entered setpoint remains conservative.

STEP 1 3.1 IF necessary, press the clear key [CLR] to reset trip lamps STANDARD:

Applicant verifies trip lamps dark or depresses the [CLR] key to clear alarms.

COMMENTS:

___ SAT

___ UNSAT STEP 2 3.2 Press the function key [FUN] to bring up the SELECT FUNCTION screen.

STANDARD:

Applicant depresses the [FUN] key to bring up the SELECT FUNCTION screen.

This step is critical, due to being the only way to get to the select function screen, which is required to input new Trip 1 and Trip 2 values.

COMMENTS:

CRITICAL STEP

___ SAT

___UNSAT

Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10 STEP 3 3.3 Adjust Trip 1 Setpoint as follows:

3.3.1 Press [1] for Trip 1 setting display screen.

STANDARD:

Applicant depresses the [1] to bring up the Trip 1 setting display screen.

This step is critical to bring up the screen that the new Trip 1 setting will be input into.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 4 3.3.2 Key in the desired Trip 1 setpoint.

STANDARD:

Applicant keys in 6300 CPM using the numeric keypad.

This step is critical to input the new Trip 1 setpoint required to meet the task standard. This new setpoint is checked in the next step. The critical requirement is for the new trip setpoint of 6300 CPM to be entered by the end of this JPM.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 10 STEP 5 3.3.3 Ensure the setpoint is correctly displayed in the ENTER block on the setpoint display screen.

STANDARD:

Applicant ensures 6300 CPM is displayed in the ENTER block.

This step is only critical if setpoint was entered wrong in the previous step.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT NOTE: Once the enter key [ENT] is pressed, the change in Trip 1 alarm setpoint is active.

STEP 6 3.3.4 Press the enter key [ENT]. This value is now displayed under Trip 1 and the ENTER block is cleared.

STANDARD:

Applicant presses the [ENT] key and verifies the correct value under the Trip 1 on the display.

This step is critical to input the new Trip 1 setpoint. Again the critical requirement is to have the Trip 1 setpoint set to 6300 CPM by the end of the JPM.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 10 STEP 7 3.3.5 Press the clear key [CLR] to return to the SELECT FUNCTION screen.

STANDARD:

Applicant presses the [CLR] key to return to the SELECT FUNCTION screen.

COMMENTS:

___ SAT

___ UNSAT STEP 8 3.4 Adjust Trip 2 Setpoint as follows:

3.4.1 Press [2] for Trip 2 setting display screen.

STANDARD:

Applicant presses [2] to bring up the Trip 2 setting display screen.

This step is critical to get to the required screen to input the new Trip 2 setpoint.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 9 3.4.2 Key in the desired Trip 2 setpoint.

STANDARD:

Applicant enters 9000 CPM using the numeric keypad.

This step is critical to input the new Trip 2 setpoint required to meet the task standard. This new setpoint is checked in the next step. The critical requirement is for the new trip setpoint of 9000 CPM to be entered by the end of this JPM.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 10 STEP 10 3.4.3 Ensure the setpoint is correctly displayed in the ENTER block on the setpoint display screen.

STANDARD:

Applicant ensures 9000 CPM is displayed in the ENTER block.

This step is only critical if setpoint was entered wrong in the previous step.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT NOTE: Once the enter key [ENT] is pressed, the change in Trip 2 alarm setpoint is active.

STEP 11 3.4.4 Press the enter key [ENT]. This value is now displayed under Trip 2 and the ENTER block is cleared.

STANDARD:

Applicant presses the [ENT] key and verifies the correct value under the Trip 2 on the display.

This step is critical to input the new Trip 2 setpoint. Again the critical requirement is to have the Trip 2 setpoint set to 9000 CPM by the end of the JPM.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 12 3.5 Press the clear key [CLR] twice to return to the normal display screen.

STANDARD:

Applicant presses the [CLR] key twice to return to the normal display screen.

EXAMINER CUE: Another operator will complete the procedure.

This JPM is complete.

COMMENTS:

END OF TASK

___ SAT

___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM G INITIAL CONDITIONS:

  • Unit 1 is at 100% power.

INITIATING CUES:

Following a discussion with Glenn from RP concerning a premature gaseous release termination, the Control Room Supervisor directs you to set EMF 50L setpoints using OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment) to the following values:

  • Trip 1 = 6300 CPM
  • Trip 2 = 9000 CPM OAC Program EMFLIB is currently not available.

Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 1 OF 10 JPM H

Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 2 OF 10 EVALUATION SHEET Task:

Loss of KC AP-21 step 8 (Reactor Trip Sequence)

Alternate Path:

Yes Facility JPM #:

PSS-KC-083 Safety Function:

8

Title:

Component Cooling Water System K/A 008 A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the CCWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of CCW pump Rating(s):

3.3 / 3.6 CFR:

41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator X

In-Plant Perform X

Simulate

References:

AP/1/A/5500/021 (Loss of Component Cooling) rev. 42 Task Standard:

Aligns steam dumps to pressure mode, trips the reactor and when reactor power is < 5%, trips all NC pumps per AP/1/A/5500/021 (Loss of Component Cooling) step 8.

Validation Time:

5 minutes Time Critical:

Yes No X

===============================================================

Applicant:

Time Start: __________

NAME___________________________

Docket #_______________

Time Finish: __________

Performance Rating:

SAT ____ UNSAT ____

Performance Time _____

Examiner: _____________________________

_____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 3 OF 10 SIMULATOR OPERATOR INSTRUCTIONS:

1.

ENSURE NRC Examination Security has been established.

2.

Reset to IC # 169.

3.

Enter the password.

4.

Select Yes on the INITIAL CONDITION RESET pop-up window.

5.

Ensure simulator setup per table below.

6.

Place simulator in RUN and acknowledge any alarms.

7.

ENSURE Extra Operator is present in the simulator.

8.

Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event VLV-KC024F (KC425A Rtn Hdr Cont Isol Outside VLV Fail To Position) 0 Perform actions of AP-21 up to step 8.

Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 4 OF 10 READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.
  • AP/1/A/5500/021 (Loss of Component Cooling) has been entered.

INITIATING CUES:

  • The CRS instructs you to perform step 8 of AP/1/A/5500/021.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of AP/1/A/5500/021 (Loss of Component Cooling) completed through step 7.

Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 10 START TIME: _______

CAUTION A loss of KC cooling to the NC pumps results in a gradual approach to an overheated condition in approximately 10 minutes which will result in shaft seizure.

STEP 1 8. Verify KC flow to NC pumps as follows:

1AD-20, A/1 KC SUPPLY HDR FLOW TO NCP BRGS LOW - DARK 1AD-21, A/1 KC SUPPLY HDR FLOW TO NCP BRGS LOW - DARK STANDARD:

Applicant determines that the listed alarms are lit and transitions to the RNO.

COMMENTS:

___ SAT

___ UNSAT STEP 2 8.RNO.a. Ensure the following valves - OPEN:

STANDARD:

Applicant determines the red OPEN lights lit and green CLSD lights dark for 1KC-338B & 1KC-424B. Applicant determines that the green CLSD light is lit for 1KC-425A and depresses the red OPEN pushbutton. Applicant determines that 1KC-425A will not open.

EXAMINER NOTE: This begins the alternate path of this JPM.

COMMENTS:

___ SAT

___UNSAT

Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10 STEP 3 8.RNO.b. IF AT ANY TIME any of the following conditions are met:

  • Time since loss of KC - GREATER THAN 10 MINUTES OR
  • Any NC pump trip criteria from Enclosure 1 (Foldout Page) is met THEN perform the following:

EXAMINER CUE: Loss of KC occurred greater than 10 minutes ago.

STANDARD:

Applicant determines that it has been > 10 minutes since loss of KC per examiner cue and continues with step b.1) of the RNO.

COMMENTS:

___ SAT

___ UNSAT STEP 4 8.RNO.b.1) IF letdown is isolated, THEN perform the following:

STANDARD:

Applicant determines that letdown is in service and that this step is N/A.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 10 STEP 5 8.RNO.b.2) Ensure steam dumps - IN PRESSURE MODE.

STANDARD:

Applicant places steam dump select switch to PRESS.

This step is critical to ensure proper temperature control following trip of the NC pumps in subsequent steps.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 6 8.RNO.b.3) Ensure the Reactor - TRIPPED.

STANDARD:

Applicant rotates the reactor trip breaker pistol grips counter-clockwise to the trip position.

EXAMINER CUE: If the applicant starts to perform actions to verify reactor trip, give the following cue - Another operator will perform the immediate actions of E-0.

This step is critical to ensure reactor power is < 5% prior to tripping the NC pumps in subsequent steps.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 10 STEP 7 8.RNO.b.4) WHEN reactor power less than 5%, THEN perform the following:

a) Trip all NC pumps.

b) Ensure normal spray valve associated with tripped NC pump(s) - IN MANUAL AND CLOSED STANDARD:

Applicant depresses the green OFF pushbutton for NC pumps 1A, 1B, 1C, and 1D and verifies the green OFF light lit and red ON light dark for each NC pump. Applicant will depress the [M] button on 1NC-27 &

1NC-29 controllers and depress the [] demand pushbutton on each valve until the demand is reading 0%.

Tripping the NC pumps is critical to protect the NC pumps from failure due to a loss of cooling water supply. Closing the spray valves is not critical.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 8 8.RNO.b.5) Secure any dilutions in progress.

STANDARD:

Applicant determines that no dilutions are in progress and continues to the next step.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 10 STEP 9 8.RNO.b.6) IF reactor trip breakers were closed, THEN perform one of the following while continuing with this procedure as time and conditions allow:

  • IF above P-11, THEN GO TO EP/1/A/5000/E-0 (Reactor Trip or Safety Injection)

OR

  • IF below P-11, THEN GO TO AP/1/A/5500/005 (Reactor Trip or Inadvertent S/I Below P-11)

STANDARD:

Applicant determines the need to go to E-0.

EXAMINER CUE: The CRS has pulled E-0 and another RO will perform the immediate actions of E-0. This JPM is complete.

COMMENTS:

END OF TASK

___ SAT

___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM H INITIAL CONDITIONS:

  • Unit 1 is at 100% power.
  • AP/1/A/5500/021 (Loss of Component Cooling) has been entered.

INITIATING CUES:

  • The CRS instructs you to perform step 8 of AP/1/A/5500/021.

Catawba Nuclear Station JPM I May 2015 NRC Exam PAGE 1 OF 13 JPM I

Catawba Nuclear Station JPM I May 2015 NRC Exam PAGE 2 OF 13 EVALUATION SHEET Task:

Place 1B Hydrogen Recombiner in Service Alternate Path:

No Facility JPM #:

VX-025 Safety Function:

5

Title:

Hydrogen Recombiner and Purge Control System K/A 028 A2.01 Malfunctions or operations on the HRPS; and (b) based on those predictions, use procedures to correct, control or mitigate the consequences of those malfunctions or operations: Hydrogen Recombiner power setting, determined by using plant data book Rating(s):

3.4 / 3.6 CFR:

41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator In-Plant X

Perform Simulate X

References:

OP/1/A/6450/010 (Containment Hydrogen Control Systems) rev. 43, Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA)

Unit 1 Revised Data Book, Figure 10 Task Standard:

Hydrogen Recombiner 1B in service with Power Adjust POT set to approximately 58 KW per Figure 10 of the Unit 1 Revised Data Book.

Validation Time:

15 minutes Time Critical:

Yes No X

===============================================================

Applicant:

Time Start: __________

NAME___________________________

Docket #_______________

Time Finish: __________

Performance Rating:

SAT ____ UNSAT ____

Performance Time _____

Examiner: _____________________________

_____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

Catawba Nuclear Station JPM I May 2015 NRC Exam PAGE 3 OF 13 READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A LOCA has occurred on Unit 1.

INITIATING CUES:

  • The CRS instructs you to place Hydrogen Recombiner 1B in service at the required power per OP/1/A/6450/010 (Containment Hydrogen Control Systems), Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA), steps 3.1 through 3.3.14.
  • All initial conditions are complete.
  • Containment pressure is 4.3 psig.
  • Hydrogen Recombiner 1A is tagged for maintenance.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6450/010 rev. 43, Enclosure 4.10 signed off through step 2.2 and a copy of Unit 1 Revised Data Book Figure 10.

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 4 0F 13 START TIME: _______

STEP 1 3.1 Ensure the H2 Skimmer Fans running per Enclosure 4.13 (Emergency Manual Operation of the H2 Skimmer Fans)

EXAMINER CUE: Hydrogen Skimmer Fans 1A & 1B are running per.13.

STANDARD:

Applicant acknowledges cue and signs off the step.

COMMENTS:

___ SAT

___ UNSAT CAUTION: Hydrogen Recombiners are NOT operated with hydrogen concentration > 6%

without TSC approval.

NOTE: 1. If desired to place both Hydrogen Recombiners in service, Steps 3.2 and 3.3 may be performed in conjunction.

2. If desired to place both Hydrogen Recombiners in service, use additional.11 (Hydrogen Recombiner Heater Temperature Log).
3. Placing Hydrogen Recombiner 1A in service is preferred for ALARA consideration.

STEP 2 3.2 IF placing Hydrogen Recombiner 1A in service, perform the following at 1ELCP0139 (1A Hydrogen Recombiner Control Panel) (AB-577, DD-52, Rm 494):

STANDARD:

Applicant determines that per the cue sheet, Hydrogen Recombiner 1A is tagged out for maintenance, and that this step is N/A.

COMMENTS:

___ SAT

___UNSAT

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 13 STEP 3 3.3 IF placing Hydrogen Recombiner 1B in service, perform the following at 1ELCP0140 (1B Hydrogen Recombiner Control Panel) (AB-560, DD-52, Rm 370):

3.3.1 Ensure the POWER OUT SWITCH is in the OFF position.

STANDARD:

Applicant locates the Power Out Switch and ensures it is in the OFF position.

EXAMINER CUE: The POWER OUT SWITCH is in the OFF position.

COMMENTS:

___ SAT

___ UNSAT STEP 4 3.3.2 Ensure the POWER ADJUST potentiometer is set to zero (000).

STANDARD:

Applicant verifies the POWER ADJUST potentiometer is set to 000.

EXAMINER CUE: The POWER ADJUST pot is set to zero (000).

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 13 STEP 5 3.3.3 IF the POWER IN AVAILABLE light is DARK, ensure 1EMXL-F07C (1B Electric Hydrogen Recombiner Power Supply Panel) (AB-560, BB-47) is in the ON position.

EXAMINER CUE: The POWER IN AVAILABLE light is lit.

STANDARD:

Applicant determines that with the POWER IN AVAILABLE light being lit, this step is N/A.

COMMENTS:

___ SAT

___ UNSAT STEP 6 3.3.4 Place the POWER OUT SWITCH in the ON position.

EXAMINER CUE: After applicant describes placing the POWER OUT SWITCH up to the ON position, The POWER OUT SWITCH is in the ON position.

STANDARD:

Applicant places the POWER OUT SWITCH up to the ON position.

This step is critical to place the hydrogen recombiner in service.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 13 STEP 7 3.3.5 Verify that the red indicating light is lit.

EXAMINER CUE: After finding the indicating light on the switch plate inform the applicant - The RED light on the switch plate is lit.

STANDARD:

Applicant finds the red indicating light on the switch plate and verifies that it is lit.

COMMENTS:

___ SAT

___ UNSAT STEP 8 3.3.6 Slowly turn the POWER ADJUST potentiometer clockwise until 5 KW is indicated on the POWER OUT meter.

EXAMINER CUE: After explaining operation of the potentiometer in the clockwise direction, inform applicant - The POWER OUT meter rises to 5 KW.

STANDARD:

Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 5 KW.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 13 STEP 9 3.3.7 Maintain a 5 KW output for 10 minutes.

EXAMINER CUE: Using time compression, 10 minutes has elapsed.

STANDARD:

Applicant describes maintaining this power output for 10 minutes.

COMMENTS:

___ SAT

___ UNSAT STEP 10 3.3.8 Slowly advance the POWER ADJUST setting until an output of 10 KW is obtained on the POWER OUT meter.

EXAMINER CUE: After explaining the operation of the potentiometer in the clockwise direction inform applicant - The POWER OUT meter rises to 10 KW.

STANDARD:

Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 10 KW.

COMMENTS:

___ SAT

___ UNSAT STEP 11 3.3.9 Maintain a 10 KW output for 10 minutes.

EXAMINER CUE: Using time compression, 10 minutes has elapsed.

STANDARD:

Applicant describes maintaining this power output for 10 minutes.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 13 STEP 12 3.3.10 Advance the POWER ADJUST setting until an output of 20 KW is obtained on the POWER OUT meter.

EXAMINER CUE: After explaining the operation of the potentiometer in the clockwise direction inform applicant - The POWER OUT meter rises to 20 KW.

STANDARD:

Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 20 KW.

COMMENTS:

___ SAT

___ UNSAT STEP 13 3.3.11 Maintain a 20 KW output for 5 minutes.

EXAMINER CUE: Using time compression, 5 minutes has elapsed.

STANDARD:

Applicant describes maintaining this power output for 5 minutes.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 13 STEP 14 3.3.12 Determine Hydrogen Recombiner 1B power setting as follows:

3.3.12.1 Determine KW value from Figure 10 of the Unit 1 Revised Data Book.

EXAMINER NOTE: The applicant will use the copy of Unit 1 Revised Data Book Figure 10 provided with the initiating cue.

STANDARD:

Applicant determines that the KW value from Figure 10 is 54 KW.

This step is critical in determining the proper power setting for the given containment conditions.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 15 3.3.12.2 H2 concentration (1MC-7) ________ %

STANDARD:

Applicant determines from cue sheet that hydrogen concentration is 5%.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 13 STEP 16 3.3.12.3 IF H2 concentration is > 3.5%, add 4 KW to calculation.

STANDARD:

Applicant determines that H2 concentration is > 3.5% and adds 4 KW to the calculation.

This step is critical in determining the proper power setting for the given containment conditions.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 17 3.3.12.4 Calculate KW as follows:

54 + 4 = 58 KW Step 3.3.12.1 Step 3.3.12.3 or N/A STANDARD:

Applicant calculates the required power setting to be 58 KW.

This step is critical in determining the proper power setting for the given containment conditions.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 13 STEP 18 3.3.13 Advance the POWER ADJUST setting until the POWER OUT meter indicates the value calculated in 3.3.12.4. Adjust POWER ADJUST as necessary to maintain this output.

EXAMINER CUE: After explaining the operation of the potentiometer in the clockwise direction inform applicant - The POWER OUT meter rises to 58 KW.

STANDARD:

Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 58 KW.

This step is critical to set the necessary power output setting for the given containment conditions.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 19 3.3.14 Notify the NCO that Hydrogen Recombiner 1B is now in service.

Person notified _______________________

STANDARD:

Applicant calls the control room and notifies them that 1B Hydrogen Recombiner is in service.

EXAMINER CUE: Unit 1 Control Room, this is Greg. Repeat any additional information given.

COMMENTS:

END OF TASK

___ SAT

___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM I INITIAL CONDITIONS:

  • A LOCA has occurred on Unit 1.

INITIATING CUES:

  • The CRS instructs you to place Hydrogen Recombiner 1B in service at the required power per OP/1/A/6450/010 (Containment Hydrogen Control Systems), Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA), steps 3.1 through 3.3.14.
  • All initial conditions are complete.
  • Containment pressure is 4.3 psig.
  • Hydrogen Recombiner 1A is tagged for maintenance.

Catawba Nuclear Station JPM J May 2015 NRC Exam PAGE 1 OF 11 JPM J

Catawba Nuclear Station JPM J May 2015 NRC Exam PAGE 2 OF 11 EVALUATION SHEET Task:

Locally Start 2B Diesel Generator Alternate Path:

Yes Facility JPM #:

DG3-008 Safety Function:

6

Title:

Emergency Diesel Generators K/A 064 A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the ED/G system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Failure modes of water, oil, and air valves Rating(s):

3.1 / 3.3 CFR:

41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator In-Plant X

Perform Simulate X

References:

AP/2/A/5500/007 (Loss of Normal Power) rev. 72, Enclosure 11 (Energizing 2ETB From 2B D/G)

Task Standard:

2B D/G is started locally; then secured due to inability to align cooling water supply.

Validation Time:

17 minutes Time Critical:

Yes No X

===============================================================

Applicant:

Time Start: __________

NAME___________________________

Docket #_______________

Time Finish: __________

Performance Rating:

SAT ____ UNSAT ____

Performance Time _____

Examiner: _____________________________

_____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

Catawba Nuclear Station JPM J May 2015 NRC Exam PAGE 3 OF 11 READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 2 has experienced a loss of all AC power to 2ETB.
  • The reason for the loss of AC power has been corrected.
  • The 2ETB load shed is complete.

INITIATING CUES:

  • The CRS instructs you to energize 2ETB from 2B D/G by performing AP/2/A/5500/007 (Loss of Normal Power) Enclosure 11 (Energizing 2ETB From D/G).
  • Key #757 and flashlight have been obtained.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of AP/2/A/5500/007 rev. 72, Enclosure 11.

Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 4 0F 11 START TIME: _______

STEP 1 1. Obtain the following:

  • Key #757 (2A/2B D/G Test Start Switch) from WCC Key locker
  • Flashlight.

STANDARD:

Applicant determines from initiating cue that key #757 and flashlight have been obtained.

COMMENTS:

___ SAT

___ UNSAT STEP 2 2. Do not continue in this enclosure until notified that load shed of 2ETB is complete.

STANDARD:

Applicant determines from initial conditions that 2ETB load shed is complete and continues with the procedure.

COMMENTS:

___ SAT

___UNSAT

Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 11 STEP 3 3. Start D/G 2B as follows:

a. Notify Control Room Operator to place D/G 2B CTRL LOCATION switch on 2MC-11 in LOCAL position.

STANDARD:

Applicant calls the control room operator and directs placing the D/G 2B CONTROL LOCATION switch to the LOCAL position.

EXAMINER CUE: D/G 2B CTRL LOCATION SWITCH is in the LOCAL position.

This step is critical to be able to start 2B D/G locally and gain control of the D/G output breaker to tie 2B D/G to 2ETB.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 4 3.b. IF unable to transfer diesel to Local Control, THEN actuate CONTROL ROOM OVERRIDE at breakglass station on 2DGCPB.

STANDARD:

Applicant determines that per previous examiner cue that this step is N/A.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 11 STEP 5 3.c. Place key in MANUAL TEST START keyswitch and turn to START position.

EXAMINER CUE: After describing inserting the key and rotating switch to the START position, notify applicant -

The 2B D/G has started and is coming up to operating speed.

STANDARD:

Applicant describes inserting key #757 into the MANUAL TEST START keyswitch and rotating it clockwise to the START position.

This step is critical to start the D/G to meet the task given for this JPM.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 6 3.d. Ensure SPEED CONTROL is adjusted to obtain frequency of between 58.8 and 61.2 Hz.

EXAMINER CUE: When frequency meter is found, inform applicant -

Frequency is 60 Hz.

STANDARD:

Applicant finds the frequency meter and verifies that frequency is in the required band.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 11 STEP 7 3.e. Ensure VOLTAGE CONTROL is adjusted to obtain D/G VOLTAGE between 4160 and 4600 Volts.

EXAMINER CUE: When voltage meter is found, inform applicant -

Voltage is 4100 Volts.

STANDARD:

Applicant finds the D/G voltage meter and when discovering that voltage is low, will describe depressing the VOLTAGE RAISE pushbutton to increase D/G voltage.

EXAMINER CUE: After applicant describes depressing the VOLTAGE RAISE pushbutton, inform them - D/G Voltage now reads 4200 Volts.

This step is critical to ensure the D/G is operating at the proper voltage prior to tying it to 2ETB in the following step.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 8 4. WHEN D/G is running, THEN close Diesel Generator 2B breaker.

EXAMINER CUE: After explaining depressing the RED CLOSE pushbutton on D/G 2B breaker, inform applicant -

D/G 2B breaker RED CLSD light is lit.

STANDARD:

Applicant describes depressing the RED CLOSE pushbutton and verifying the RED CLSD indicating light being lit.

This step is critical to meeting the task given in this JPM.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 11 STEP 9 5. IF D/G breaker will not close, THEN:

STANDARD:

Applicant determines from the previous cue that this step is N/A.

COMMENTS:

___ SAT

___ UNSAT STEP 10 6. Close the following essential load center normal incoming breakers:

  • 2ELXB-4B (Normal Incoming Breaker Fed From Xfmr 2ETXB) (AB-560, AA-67, Rm 362)
  • 2ELXD-4B (Normal Incoming Breaker Fed From Xfmr 2ETXD) (AB-560, AA-68, Rm 362)

EXAMINER CUE: After explaining the operation of the Load Center pistol grip clockwise to the CLOSE position, inform applicant - Breaker is closed.

STANDARD:

Applicant describes rotating each breaker pistol grip clockwise to the CLOSE position and verifying the RED indicating light lit for each breaker.

This step is critical to provide power to the D/G cooling water valve, allowing it to open automatically and provide cooling to the D/G.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 11 STEP 11 7. Ensure RN flow through KD Hx as follows:

a. Verify 2RN-292B (2B D/G Hx Inlet Isol) (D2B-567, AA-76)

- OPEN EXAMINER CUE: When applicant finds 2RN-292B and describes verifying the valve indicator needle pointing to the OPEN position, inform them - Valve indicates CLOSED.

STANDARD:

Applicant describes verifying the valve position indicator pointing to the OPEN position.

COMMENTS:

___ SAT

___ UNSAT STEP 12 7.b. IF 2RN 292B (2B D/G Hx Inlet Isol) does not open, THEN perform the following:

1) Open 2EMXF-F01A (2B Diesel Generator Hx Inlet Isol Motor (2RN-292B)) (D2B-556, CC-75)

EXAMINER CUE: When applicant describes the opening of 2EMXF-F01A, inform them - Breaker is OFF.

STANDARD:

Applicant describes inserting the locking tab on 2EMXF-F01A and rotating the breaker counter-clockwise to the OFF position and pulling the locking tab back out.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 11 STEP 13 7.b.2) OPEN 2RN-292B (2B D/G Hx Inlet Isol).

EXAMINER CUE: After applicant describes manually opening 2RN-292B, inform them - Valve does not move and the position indicator still shows CLOSED.

STANDARD:

Applicant describes pulling the declutching lever and rotating the valve handwheel in the counter-clockwise direction.

EXAMINER NOTE: This begins the alternate path of this JPM.

COMMENTS:

___ SAT

___ UNSAT STEP 14 8. IF RN flow cannot be established, THEN:

a. Stop D/G 2B by depressing STOP on 2DECPB.
b. Notify Control Room Supervisor of status.
c. Return this enclosure to Control Room Supervisor.

EXAMINER CUE: After applicant describes depressing the STOP pushbutton on 2DECPB, inform them - Diesel Generator is coasting down. Also repeat back any information given to the Control Room Supervisor.

STANDARD:

Applicant depresses the STOP pushbutton on 2DECPB and verifies the Diesel Generator is stopped.

The only part of this step that is critical is to stop the 2B D/G. This step is critical to prevent damage to the 2B D/G due to no cooling water being available.

COMMENTS:

END OF TASK CRITICAL STEP

___ SAT

___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM J INITIAL CONDITIONS:

  • Unit 2 has experienced a loss of all AC power to 2ETB.
  • The reason for the loss of AC power has been corrected.
  • The 2ETB load shed is complete.

INITIATING CUES:

  • The CRS instructs you to energize 2ETB from 2B D/G by performing AP/2/A/5500/007 (Loss of Normal Power) Enclosure 11 (Energizing 2ETB From D/G).
  • Key #757 and flashlight have been obtained.

Catawba Nuclear Station JPM K May 2015 NRC Exam PAGE 1 OF 24 JPM K

Catawba Nuclear Station JPM K May 2015 NRC Exam PAGE 2 OF 24 EVALUATION SHEET Task:

Startup Backup Temporary VI Compressor Alternate Path:

No Facility JPM #:

VI-003 Safety Function:

8

Title:

Instrument Air System K/A APE065 AA1.04 Ability to operate and / or monitor the following as they apply to the Loss of Instrument Air: Emergency air compressor Rating(s):

3.4 / 3.6 CFR:

41.7 / 45.5 / 45.6 Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator In-Plant X

Perform Simulate X

References:

AP/0/A/5500/022 (Loss of Instrument Air) rev. 35 EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) rev. 09, Enclosure 23 (Backup VI Compressor(s))

Task Standard:

Temporary VI compressor started and aligned to the Instrument Air header through 1VI-417.

Validation Time:

20 minutes Time Critical:

Yes No X

===============================================================

Applicant:

Time Start: __________

NAME___________________________

Docket #_______________

Time Finish: __________

Performance Rating:

SAT ____ UNSAT ____

Performance Time _____

Examiner: _____________________________

_____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

Catawba Nuclear Station JPM K May 2015 NRC Exam PAGE 3 OF 24 READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 and 2 are at 100% power.
  • VI pressure is 75 psig and slowly decreasing.
  • AP/0/A/5500/022 (Loss of Instrument Air) has been implemented.

INITIATING CUES:

  • The CRS instructs you to startup and align the Backup Temporary VI compressor #2 to the Instrument Air Header per the local copy of EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) Enclosure 23 (Backup VI Compressor(s)) step 3.

EXAMINER NOTE: After applicant locates the local copy, hand them a copy of EP/1/A/5000/G-1 Enclosure 23.

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 4 0F 24 START TIME: _______

EXAMINER NOTE: Two Backup VI compressors should be available at any given time. A third backup compressor is stationed at the Catawba garage.

Applicant should select Backup VI Compressor 2 for startup per the initiating cue.

IF Backup Compressor 2 is not available then direct the operator to startup compressor 3 and start the JPM at step 5 (page 14 of this JPM).

STEP 1 3. To Start Backup VI Compressor 2 perform the following:

a. Verify engine oil (inside engine side panel) - GREATER THAN ADD ON DIPSTICK.

EXAMINER CUE: When dipstick is located, inform applicant - Oil level is greater than ADD.

STANDARD:

Applicant locates the dipstick and checks the oil level.

COMMENTS:

___ SAT

___ UNSAT STEP 2 3.b. Verify compressor oil level (inside compressor front panel) -

VISIBLE IN SIGHTGLASS.

EXAMINER CUE: When sightglass is located, inform applicant - Oil level is visible in the sight glass (near full).

STANDARD:

Applicant locates sightglass and checks oil level.

COMMENTS:

___ SAT

___UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 24 STEP 3 3.c. IF oil levels inadequate, THEN inform Control Room.

STANDARD:

Applicant determines per given cues that this step is N/A.

COMMENTS:

___ SAT

___ UNSAT STEP 4 3.d. Ensure all compressor panel doors - CLOSED EXAMINER CUE: If asked, inform applicant - All doors are closed.

STANDARD:

Applicant ensures that all compressor panel doors are closed.

COMMENTS:

___ SAT

___ UNSAT STEP 5 3.e. Unplug battery charger power supply cord from the outlet (outside wall at TB 594, 2D-34).

EXAMINER CUE: When plug is located, inform applicant - Battery charger is unplugged.

STANDARD:

Applicant locates and describes unplugging the battery charger power supply cord.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 24 STEP 6 3.f. Ensure 1VI-428 (VI Comp B/U2 Disch) - OPEN EXAMINER CUE: When valve is located and applicant correctly describes opening the valve, inform applicant -

1VI-428 is Open.

STANDARD:

Applicant locates and describes the verification of or opening 1VI-428.

This step is critical to ensure a flow path from the compressor discharge to the VI header.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT NOTE The following steps are performed at control panel on front of Backup VI compressor 2.

STEP 7 3.g. Rotate OFF/ON/START switch to - ON.

EXAMINER CUE: When switch is located, and operation described, inform applicant - OFF/ON/START switch is in ON.

STANDARD:

Applicant locates and describes operation of the OFF/ON/START switch to the ON position.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 24 STEP 8 3.h. IF outside temperature less than or equal to 45°F, THEN place HEATERS toggle switch - ON.

EXAMINER CUE: If asked, inform applicant - Outside air temp is currently 87°F.

STANDARD:

Applicant determines from the examiner cue that this step is N/A.

COMMENTS:

___ SAT

___ UNSAT NOTE Fuel level of 1/2 will provide approximately 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> of run time at full load.

STEP 9 3.i. Verify fuel level - ON SCALE.

EXAMINER CUE: When fuel level gage is located, inform applicant -

Fuel oil level is at 3/4 mark.

STANDARD:

Applicant locates fuel level gage and verifies level is on scale per cue given.

COMMENTS:

___ SAT

___ UNSAT NOTE OFF/ON/START switch spring returns to ON when released.

OFF/ON/START switch should not be held in the START position for greater than 10 seconds, to prevent starter overheating.

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 24 STEP 10 3.j. Start Backup VI Compressor 2 as follows:

1) Rotate and hold OFF/ON/START switch to - START.

EXAMINER CUE: After explaining the operation of the OFF/ON/START switch, inform applicant - OFF/ON/START switch is in START.

STANDARD:

Applicant describes turning OFF/ON/START switch to the START position.

This step is critical to start the backup VI compressor prior to aligning to supply the instrument air header.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 24 STEP 11 3.j.2) Release OFF/ON/START switch when one of the following occurs:

  • Engine starts OR
  • 10 seconds has elapsed.

EXAMINER CUE: Inform applicant - The engine is running.

EXAMINER CUE: Once applicant describes releasing the OFF/ON/START switch, inform applicant -

OFF/ON/START switch has been released.

STANDARD:

Applicant describes releasing the OFF/ON/START switch following cue given by examiner.

This step is critical to prevent overheating the engine starter.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 12 3.j.3) IF engine failed to start, THEN start compressor as follows:

STANDARD:

Applicant determines from examiner cue in previous step, that this step is N/A.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 24 STEP 13 3.k. WHEN compressor has been running for 60 seconds, THEN depress PRESSURE CONTROL switch.

EXAMINER CUE: Inform applicant - 60 seconds have elapsed.

When located and operation described, inform applicant - PRESSURE CONTROL button has been depressed. If asked, Diesel is heard to speed up and discharge pressure increases to ~

110 psig.

STANDARD:

Applicant describes depressing the PRESSURE CONTROL button.

This step is critical to ensure compressor discharge pressure is sufficient to supply the Instrument Air header.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 14 3.l. IF outside air temperature greater than 32°F, THEN ensure HEATERS toggle switch - OFF.

EXAMINER CUE: When located, inform applicant - HEATER toggle switch is in the OFF position.

STANDARD:

Applicant determines that per previous given cue, that this step is applicable and verifies the HEATERS toggle switch is OFF.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 24 STEP 15 3.m. OPEN 1VI 425 (VI Comp B/U2 Manifold Inlet).

EXAMINER CUE: When valve is located and proper operation described, inform applicant - 1VI-425 is Open.

STANDARD:

Applicant describes opening 1VI-425.

This step is critical to align proper flow path from the compressor to the Instrument Air header.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 16 3.n. Ensure the following valves OPEN:

1VI-511 (B/U VI Compressor Air Dryer Bypass) (TB2-598, 2C-34).

1VI-417 (B/U VI Compressor Header Isol) (TB2-598, 2C-34).

EXAMINER CUE: When valves are located and proper operation to open is described, inform applicant - 1VI-511 is open. 1VI-417 is open.

STANDARD:

Applicant describes opening 1VI-511 and 1VI-417.

This step is critical to align a flow path from the backup VI Compressor to the Instrument Air header.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 24 STEP 17 3.o. Record the following:

  • Compressor start time ___________
  • HOURMETER __________
  • COMP DISH PRESS __________

EXAMINER CUE: If asked, inform applicant - Use current run hours, time and discharge pressure is 110 psig.

STANDARD:

Applicant records the values for current time, engine run hours, and discharge pressure given in the cue.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 24 STEP 18 3.p. Notify the control room of the following:

  • Status of backup compressor 2
  • IF idle compressor available, THEN request Control Room Supervisor to evaluate VI header pressure to determine whether additional backup compressor required
  • IF Control Room determines additional backup VI compressor required, THEN start idle Backup VI compressor.

EXAMINER CUE: Repeat back the information given, then inform applicant - The CRS has evaluated VI header pressure and an additional backup VI compressor is not needed at this time. The CRS will have the turbine building AO complete the steps. This JPM is complete.

EXAMINER NOTE: If backup compressor 2 was not available, the following steps will be to align backup compressor 3.

STANDARD:

Applicant informs the Control Room of the status of backup compressor

2.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 14 0F 24 STEP 1 5. To Start Backup VI Compressor 3 perform the following:

a. Verify engine oil (inside engine side panel) - GREATER THAN ADD ON DIPSTICK.

EXAMINER CUE: When dipstick is located, inform applicant - Oil level is greater than ADD.

STANDARD:

Applicant locates the dipstick and checks the oil level.

COMMENTS:

___ SAT

___ UNSAT STEP 2 5.b. Verify compressor oil level (inside compressor front panel) -

VISIBLE IN SIGHTGLASS.

EXAMINER CUE: When sightglass is located, inform applicant - Oil level is visible in the sight glass (near full).

STANDARD:

Applicant locates sightglass and checks oil level.

COMMENTS:

___ SAT

___UNSAT STEP 3 5.c. IF oil levels inadequate, THEN inform Control Room.

STANDARD:

Applicant determines per given cues that this step is N/A.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 15 0F 24 STEP 4 5.d. Ensure all compressor panel doors - CLOSED EXAMINER CUE: If asked, inform applicant - All doors are closed.

STANDARD:

Applicant ensures that all compressor panel doors are closed.

COMMENTS:

___ SAT

___ UNSAT STEP 5 5.e. Unplug battery charger power supply cord from the outlet (outside wall at TB 594, 2D-34).

EXAMINER CUE: When plug is located, inform applicant - Battery charger is unplugged.

STANDARD:

Applicant locates and describes unplugging the battery charger power supply cord.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 16 0F 24 STEP 6 5.f. Ensure 1VI-430 (VI Comp B/U3 Disch) - OPEN EXAMINER CUE: When valve is located and applicant correctly describes opening the valve, inform applicant -

1VI-430 is Open.

STANDARD:

Applicant locates and describes the verification of or opening 1VI-430.

This step is critical to ensure a flow path from the compressor discharge to the VI header.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT NOTE The following steps are performed at control panel on front of Backup VI compressor 3.

STEP 7 5.g. Rotate OFF/ON/START switch to - ON.

EXAMINER CUE: When switch is located, and operation described, inform applicant - OFF/ON/START switch is in ON.

STANDARD:

Applicant locates and describes operation of the OFF/ON/START switch to the ON position.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 17 0F 24 STEP 8 5.h. IF outside temperature less than or equal to 45°F, THEN place HEATERS toggle switch - ON.

EXAMINER CUE: If asked, inform applicant - Outside air temp is currently 87°F.

STANDARD:

Applicant determines from the examiner cue that this step is N/A.

COMMENTS:

___ SAT

___ UNSAT NOTE Fuel level of 1/2 will provide approximately 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> of run time at full load.

STEP 9 5.i. Verify fuel level - ON SCALE.

EXAMINER CUE: When fuel level gage is located, inform applicant -

Fuel oil level is at 3/4 mark.

STANDARD:

Applicant locates fuel level gage and verifies level is on scale per cue given.

COMMENTS:

___ SAT

___ UNSAT NOTE OFF/ON/START switch spring returns to ON when released.

OFF/ON/START switch should not be held in the START position for greater than 10 seconds, to prevent starter overheating.

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 18 0F 24 STEP 10 5.j. Start Backup VI Compressor 3 as follows:

1) Rotate and hold OFF/ON/START switch to - START.

EXAMINER CUE: After explaining the operation of the OFF/ON/START switch, inform applicant - OFF/ON/START switch is in START.

STANDARD:

Applicant describes turning OFF/ON/START switch to the START position.

This step is critical to start the backup VI compressor prior to aligning to supply the instrument air header.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 19 0F 24 STEP 11 5.j.2) Release OFF/ON/START switch when one of the following occurs:

  • Engine starts OR
  • 10 seconds has elapsed.

EXAMINER CUE: Inform applicant - The engine is running.

EXAMINER CUE: Once applicant describes releasing the OFF/ON/START switch, inform applicant -

OFF/ON/START switch has been released.

STANDARD:

Applicant describes releasing the OFF/ON/START switch following cue given by examiner.

This step is critical to prevent overheating the engine starter.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 12 5.j.3) IF engine failed to start, THEN start compressor as follows:

STANDARD:

Applicant determines from examiner cue in previous step, that this step is N/A.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 20 0F 24 STEP 13 5.k. WHEN compressor has been running for 60 seconds, THEN depress PRESSURE CONTROL switch.

EXAMINER CUE: Inform applicant - 60 seconds have elapsed.

When located and operation described, inform applicant - PRESSURE CONTROL button has been depressed.

STANDARD:

Applicant describes depressing the PRESSURE CONTROL button.

This step is critical to ensure compressor discharge pressure is sufficient to supply the Instrument Air header.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 14 5.l. IF outside air temperature greater than 32°F, THEN ensure HEATERS toggle switch - OFF.

EXAMINER CUE: When located, inform applicant - HEATER toggle switch is in the OFF position.

STANDARD:

Applicant determines that per previous given cue, that this step is applicable and verifies the HEATERS toggle switch is OFF.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 21 0F 24 STEP 15 5.m. OPEN 1VI 426 (VI Comp B/U3 Manifold Inlet).

EXAMINER CUE: When valve is located and proper operation described, inform applicant - 1VI-426 is Open.

STANDARD:

Applicant describes opening 1VI-426.

This step is critical to align proper flow path from the compressor to the Instrument Air header.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 16 5.n. Ensure the following valves OPEN:

1VI-511 (B/U VI Compressor Air Dryer Bypass) (TB2-598, 2C-34).

1VI-417 (B/U VI Compressor Header Isol) (TB2-598, 2C-34).

EXAMINER CUE: When valves are located and proper operation to open is described, inform applicant - 1VI-511 is open. 1VI-417 is open.

STANDARD:

Applicant describes opening 1VI-511 and 1VI-417.

This step is critical to align a flow path from the backup VI Compressor to the Instrument Air header.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 22 0F 24 STEP 17 5.o. Record the following:

  • Compressor start time ___________
  • HOURMETER __________
  • COMP DISH PRESS __________

EXAMINER CUE: If asked, inform applicant - Use current run hours, time and discharge pressure is 110 psig.

STANDARD:

Applicant records the values for current time, engine run hours, and discharge pressure given in the cue.

COMMENTS:

___ SAT

___ UNSAT

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 23 0F 24 STEP 18 5.p. Notify the control room of the following:

  • Status of backup compressor 3
  • IF idle compressor available, THEN request Control Room Supervisor to evaluate VI header pressure to determine whether additional backup compressor required
  • IF Control Room determines additional backup VI compressor required, THEN start idle Backup VI compressor.

EXAMINER CUE: Repeat back the information given, then inform applicant - The CRS has evaluated VI header pressure and an additional backup VI compressor is not needed at this time. The CRS will have the turbine building AO complete the steps. This JPM is complete.

STANDARD:

Applicant informs the Control Room of the status of backup compressor

3.

COMMENTS:

END OF TASK

___ SAT

___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM K INITIAL CONDITIONS:

  • Unit 1 and 2 are at 100% power.
  • VI pressure is 75 psig and slowly decreasing.
  • AP/0/A/5500/022 (Loss of Instrument Air) has been implemented.

INITIATING CUES:

  • The CRS instructs you to startup and align the Backup Temporary VI compressor #2 to the Instrument Air Header per the local copy of EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) Enclosure 23 (Backup VI Compressor(s)) step 3.