{{#Wiki_filter: March 8, 2018 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852 SUBJECT: ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-568, "CLARIFY APPLICABILITY OF BWR/4 TS 3.6.2.5 AND TS 3.6.3.2" (EPID L-2017-PMP-0024)
[[Issue date::March 8, 2018]]
Dear Members of the Technical Specifications Task Force: By letter dated December 19, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17353A437), you submitted to the U.S. Nuclear Regulatory Commission (NRC) a request to incorporate Traveler TSTF-568, "Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2," into the standard technical specifications. Section 170.21 of Title 10 of the Code of Federal Regulations requires that Travelers are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours have been billed accordingly. The NRC staff estimates that the review will require approximately 530 staff hours including project management time.
 
Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852
 
SUBJECT: ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-568, "CLARIFY APPLICABILITY OF BWR/4 TS 3.6.2.5 AND TS 3.6.3.2" (EPID L-2017-PMP-0024)
 
==Dear Members of the Technical Specifications Task Force:==
By letter dated December 19, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17353A437), you submitted to the U.S. Nuclear Regulatory Commission (NRC) a request to incorporate Traveler TSTF-568, "Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2," into the standard technical specifications. Section 170.21 of Title 10 of the Code of Federal Regulations requires that Travelers are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours have been billed accordingly. The NRC staff estimates that the review will require approximately 530 staff hours including project management time.
 
The NRC staff has completed a preliminary review of your submission and determined it is sufficiently complete and appropriate to initiate a more comprehensive review. The review will generally follow the schedule below.
The NRC staff has completed a preliminary review of your submission and determined it is sufficiently complete and appropriate to initiate a more comprehensive review. The review will generally follow the schedule below.
MILESTONE SCHEDULE DATE Issue Request for Additional Information April 17, 2018 Issue Draft Safety Evaluation September 28, 2018 Issue Final Safety Evaluation December 19, 2018  The dates are provided for draft and final safety evaluations (SEs) have been expedited at your request. In order to meet these dates the TSTF will need to respond to RAIs in 30 days and provide comments to the draft SE in 15 days. If you have any questions, please contact me at (301) 415-1774 or via e-mail to Michelle.Honcharik@nrc.gov.        Sincerely,                    /RA/  Michelle C. Honcharik, Senior Project Manager      Technical Specifications Branch      Division of Safety Systems Office of Nuclear Reactor Regulation


MILESTONE SCHEDULE DATE Issue Request for Additional Information April 17, 2018 Issue Draft Safety Evaluation September 28, 2018 Issue Final Safety Evaluation December 19, 2018 The dates are provided for draft and final safety evaluations (SEs) have been expedited at your request. In order to meet these dates the TSTF will need to respond to RAIs in 30 days and provide comments to the draft SE in 15 days. If you have any questions, please contact me at (301) 415-1774 or via e-mail to Michelle.Honcharik@nrc.gov.
Project No. 753 SUBJECT: ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-568, "CLARIFY APPLICABILITY OF BWR/4 TS 3.6.2.5 AND TS 3.6.3.2" (EPID L-2017-PMP-0024)
 
Dated:   March 8, 2018   
Sincerely,/RA/ Michelle C. Honcharik, Senior Project Manager Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation
 
Project No. 753
 
SUBJECT: ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-568, "CLARIFY APPLICABILITY OF BWR/4 TS 3.6.2.5 AND TS 3.6.3.2" (EPID L-2017-PMP-0024)
Dated: March 8, 2018
 
DISTRIBUTION: PUBLIC RidsNrrOd RidsNrrDss RidsOgcMailCenter RidsOpaMail RidsACRS_MailCTR RidsNrrDssStsb RidsNrrDssSrxb RKuntz RidsNrrDssScpb CTilton ASallman JBettle ADAMS Accession No.: ML18057A163; *concurred via e-mail NRR-106 OFFICE DSS/STSB DSS/STSB* NAME MHoncharik VCusumano DATE 2/26/2018 3/8/2018  OFFICIAL RECORD COPY Technical Specifications Task Force Project No. 753 cc: Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.


DISTRIBUTION: PUBLIC  RidsNrrOd  RidsNrrDss  RidsOgcMailCenter RidsOpaMail  RidsACRS_MailCTR  RidsNrrDssStsb RidsNrrDssSrxb RKuntz  RidsNrrDssScpb  CTilton  ASallman JBettle  ADAMS Accession No.:  ML18057A163;    *concurred via e-mail NRR-106 OFFICE DSS/STSB DSS/STSB* NAME MHoncharik VCusumano DATE 2/26/2018 3/8/2018                  OFFICIAL RECORD COPY Technical Specifications Task Force  Project No. 753  cc:  Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention:  Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Email: jmiksa@entergy.com  
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Email: jmiksa@entergy.com  


Jordan L. Vaughan Duke Energy EC2ZF / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com  
Jordan L. Vaughan Duke Energy EC2ZF / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com  


Lisa L. Williams Energy Northwest Columbia Generating Station PO Box 968 Mail Drop PE20 Richland, WA 99352-0968 E-mail: llwilliams@energy-northwest.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 Email: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com}}
Lisa L. Williams Energy Northwest Columbia Generating Station PO Box 968 Mail Drop PE20 Richland, WA 99352-0968 E-mail: llwilliams@energy-northwest.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 Email: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com
 
}}

Revision as of 22:52, 20 March 2018

Acceptance for Review Regarding Traveler TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 (EPID L-2017-PMP-0024)
ML18057A163
Person / Time
Site: Technical Specifications Task Force
Issue date: 03/08/2018
From: Honcharik M C
NRC/NRR/DSS/STSB
To:
Technical Specifications Task Force
Honcharik M C
References
EPID L-2017-PMP-0024
Download: ML18057A163 (3)


Text

March 8, 2018 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852 SUBJECT: ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-568, "CLARIFY APPLICABILITY OF BWR/4 TS 3.6.2.5 AND TS 3.6.3.2" (EPID L-2017-PMP-0024)

Dear Members of the Technical Specifications Task Force: By letter dated December 19, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17353A437), you submitted to the U.S. Nuclear Regulatory Commission (NRC) a request to incorporate Traveler TSTF-568, "Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2," into the standard technical specifications. Section 170.21 of Title 10 of the Code of Federal Regulations requires that Travelers are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours have been billed accordingly. The NRC staff estimates that the review will require approximately 530 staff hours including project management time.

The NRC staff has completed a preliminary review of your submission and determined it is sufficiently complete and appropriate to initiate a more comprehensive review. The review will generally follow the schedule below.

MILESTONE SCHEDULE DATE Issue Request for Additional Information April 17, 2018 Issue Draft Safety Evaluation September 28, 2018 Issue Final Safety Evaluation December 19, 2018 The dates are provided for draft and final safety evaluations (SEs) have been expedited at your request. In order to meet these dates the TSTF will need to respond to RAIs in 30 days and provide comments to the draft SE in 15 days. If you have any questions, please contact me at (301) 415-1774 or via e-mail to Michelle.Honcharik@nrc.gov. Sincerely, /RA/ Michelle C. Honcharik, Senior Project Manager Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation

Project No. 753 SUBJECT: ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-568, "CLARIFY APPLICABILITY OF BWR/4 TS 3.6.2.5 AND TS 3.6.3.2" (EPID L-2017-PMP-0024)

Dated: March 8, 2018

DISTRIBUTION: PUBLIC RidsNrrOd RidsNrrDss RidsOgcMailCenter RidsOpaMail RidsACRS_MailCTR RidsNrrDssStsb RidsNrrDssSrxb RKuntz RidsNrrDssScpb CTilton ASallman JBettle ADAMS Accession No.: ML18057A163; *concurred via e-mail NRR-106 OFFICE DSS/STSB DSS/STSB* NAME MHoncharik VCusumano DATE 2/26/2018 3/8/2018 OFFICIAL RECORD COPY Technical Specifications Task Force Project No. 753 cc: Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Email: jmiksa@entergy.com

Jordan L. Vaughan Duke Energy EC2ZF / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com

Lisa L. Williams Energy Northwest Columbia Generating Station PO Box 968 Mail Drop PE20 Richland, WA 99352-0968 E-mail: llwilliams@energy-northwest.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 Email: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com