ML18047A404: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 14: | Line 14: | ||
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS | | document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS | ||
| page count = 1 | | page count = 1 | ||
| project = | |||
| stage = Other | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:,...., 4.6 SAFETY INJECTION AND CONTAINMENT SPRAY SYSTEMS TESTS (Contd) I 4.6.5 Containment Air Cooling System a. Emergency mode automatic valve and fan operation will be checked for operability during each refueling shutdown. | {{#Wiki_filter:,...., | ||
: b. Each fan and valve required to function during accident conditions will be exercised at three-month intervals. | ~*- | ||
4.6 SAFETY INJECTION AND CONTAINMENT SPRAY SYSTEMS TESTS (Contd) | |||
I 4.6.5 Containment Air Cooling System | |||
: a. | |||
Emergency mode automatic valve and fan operation will be checked for operability during each refueling shutdown. | |||
: b. | |||
Each fan and valve required to function during accident conditions will be exercised at three-month intervals. | |||
Basis The safety injection system and the containment spray system are principal Plant safety features that are normally inoperative during reactor operation. | Basis The safety injection system and the containment spray system are principal Plant safety features that are normally inoperative during reactor operation. | ||
Complete systems tests cannot be performed when the reactor is ing because a safety injection signal causes containment isolation and a containment spray system test requires the system to be temporarily disabled. | Complete systems tests cannot be performed when the reactor is operat-ing because a safety injection signal causes containment isolation and a containment spray system test requires the system to be temporarily disabled. | ||
The method of assuring operability* | The method of assuring operability* of these systems. is, therefore, to combine systems tests to be performed during annual Plant shutdowns, with more frequent component tests, which can be performed during reactor operation. | ||
of these systems. is, therefore, to combine systems tests to be performed during annual Plant shutdowns, with more frequent component tests, which can be performed during reactor operation. | The annual systems tests demonstrate proper automatic operation of the safety injection and containment spray systems. | ||
The annual systems tests demonstrate proper automatic operation of the safety injection and containment spray systems. A test signal is applied to initiate automatic action and verification made that the components receive the safety injection in the proper sequence. | A test signal is applied to initiate automatic action and verification made that the components receive the safety injection in the proper sequence. | ||
The test demonstrates the operation of the valves, pump circuit breakers, d | The test demonstrates the operation of the valves, pump circuit breakers, d | ||
' | (1, 2) an automatic circuitry. | ||
p ADOCK 0500025S I | /~----- | ||
' ~g~7020244~) | |||
p ADOCK 0500025S I | |||
PDR._! | |||
j nu0582-0477a-43-48 4-40 Proposed}} | |||
Latest revision as of 10:04, 6 January 2025
| ML18047A404 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 06/29/1982 |
| From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML18047A402 | List: |
| References | |
| NUDOCS 8207020244 | |
| Download: ML18047A404 (1) | |
Text
,....,
~*-
4.6 SAFETY INJECTION AND CONTAINMENT SPRAY SYSTEMS TESTS (Contd)
I 4.6.5 Containment Air Cooling System
- a.
Emergency mode automatic valve and fan operation will be checked for operability during each refueling shutdown.
- b.
Each fan and valve required to function during accident conditions will be exercised at three-month intervals.
Basis The safety injection system and the containment spray system are principal Plant safety features that are normally inoperative during reactor operation.
Complete systems tests cannot be performed when the reactor is operat-ing because a safety injection signal causes containment isolation and a containment spray system test requires the system to be temporarily disabled.
The method of assuring operability* of these systems. is, therefore, to combine systems tests to be performed during annual Plant shutdowns, with more frequent component tests, which can be performed during reactor operation.
The annual systems tests demonstrate proper automatic operation of the safety injection and containment spray systems.
A test signal is applied to initiate automatic action and verification made that the components receive the safety injection in the proper sequence.
The test demonstrates the operation of the valves, pump circuit breakers, d
(1, 2) an automatic circuitry.
/~-----
' ~g~7020244~)
p ADOCK 0500025S I
PDR._!
j nu0582-0477a-43-48 4-40 Proposed