ML19261D039: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML19261D039 | | number = ML19261D039 | ||
| issue date = 04/02/1979 | | issue date = 04/02/1979 | ||
| title = Responds to NRC | | title = Responds to NRC Re Violations Noted in IE Insp Repts 50-424/79-02 & 50-425/79-02.Corrective Actions:Proper Storage in Rebar Laydown Area Completed | ||
| author name = Staffa R | | author name = Staffa R | ||
| author affiliation = GEORGIA POWER CO. | | author affiliation = GEORGIA POWER CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 7904240094 | | document report number = NUDOCS 7904240094 | ||
| title reference date = 03-13-1979 | |||
| package number = ML19261D034 | | package number = ML19261D034 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 17: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:* | {{#Wiki_filter:* | ||
m . . r .. .. r . | s %., cm,, | ||
m.. r.... r. | |||
n, .. . ,. . .~ n . . s w A' a ' s ( . | - ~.,.1,* | ||
;m n,...,...~ n.. s w g | |||
A' a ' s (. | |||
* L | .y 14 | ||
April 2, 1979 United States Nuclear Regulatory Corrission Directorate of Inspection and Enforcement Region 11 | '4 T.. | ||
J ;4 f.? | |||
* k L | |||
go.., so,,,a.........oo s"'"S n /t P R 3 P3: I4 | |||
( 'o "e' P""" | |||
April 2, 1979 United States Nuclear Regulatory Corrission Directorate of Inspection and Enforcement Region 11 | |||
==REFERENCE:== | ==REFERENCE:== | ||
101 Marietta Street, N. W. | |||
101 Marietta Street, N. W. | IE: !!: WB5 Atlanta, GA 30303 50-424/79-02 50-425/79-02 Attn: | ||
Mr. C. E. Murphy File: | |||
X7BG10 Gentlemen: | |||
The Georgia Power Company wishes to submit the following information concerning the noncompliance discussed in your inspection report nurler 50-424/79-02 and 50-424/79-02. | The Georgia Power Company wishes to submit the following information concerning the noncompliance discussed in your inspection report nurler 50-424/79-02 and 50-424/79-02. | ||
The rebar laydown area has been inspected and proper storage has t'ect accomplished. | The rebar laydown area has been inspected and proper storage has t'ect accomplished. | ||
Procedure CD-A-01 specifies the required inspection frequency as being every three months, unless otherwise specified. Full compliance will tie achieved upon approval of Procedure CD-A-01 which will be achieved ty April 20, 1979. | The cut rebar identified in your report has been either scrapped or placed in a hold area. | ||
NCR CD-255 has been closed. | |||
Procc u e CD-A-01 has been reviewed and revised to eliminate future storage proble-; | |||
Procedure CD-A-01 specifies the required inspection frequency as being every three months, unless otherwise specified. | |||
Full compliance will tie achieved upon approval of Procedure CD-A-01 which will be achieved ty April 20, 1979. | |||
The inforration contained in the inspectior, report is not considered to be proprietary. | The inforration contained in the inspectior, report is not considered to be proprietary. | ||
Very truly yours, | Very truly yours, | ||
/[< | |||
/ | |||
F. W. Staffa CWH:aaw xc: | .4 F. W. Staffa CWH:aaw xc: | ||
NRC - Region 11 r | M. D. Hunt | ||
/ | |||
NRC - Region 11 r,304e4om d 79o0R7 OPMO'.4t0 POPY}} | |||
Latest revision as of 11:01, 3 January 2025
| ML19261D039 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 04/02/1979 |
| From: | Staffa R GEORGIA POWER CO. |
| To: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19261D034 | List: |
| References | |
| NUDOCS 7904240094 | |
| Download: ML19261D039 (1) | |
Text
s %., cm,,
m.. r.... r.
- ~.,.1,*
- m n,...,...~ n.. s w g
A' a ' s (.
.y 14
'4 T..
J ;4 f.?
- k L
go.., so,,,a.........oo s"'"S n /t P R 3 P3: I4
( 'o "e' P"""
April 2, 1979 United States Nuclear Regulatory Corrission Directorate of Inspection and Enforcement Region 11
REFERENCE:
101 Marietta Street, N. W.
IE: !!: WB5 Atlanta, GA 30303 50-424/79-02 50-425/79-02 Attn:
Mr. C. E. Murphy File:
X7BG10 Gentlemen:
The Georgia Power Company wishes to submit the following information concerning the noncompliance discussed in your inspection report nurler 50-424/79-02 and 50-424/79-02.
The rebar laydown area has been inspected and proper storage has t'ect accomplished.
The cut rebar identified in your report has been either scrapped or placed in a hold area.
NCR CD-255 has been closed.
Procc u e CD-A-01 has been reviewed and revised to eliminate future storage proble-;
Procedure CD-A-01 specifies the required inspection frequency as being every three months, unless otherwise specified.
Full compliance will tie achieved upon approval of Procedure CD-A-01 which will be achieved ty April 20, 1979.
The inforration contained in the inspectior, report is not considered to be proprietary.
Very truly yours,
/[<
/
.4 F. W. Staffa CWH:aaw xc:
M. D. Hunt
/
NRC - Region 11 r,304e4om d 79o0R7 OPMO'.4t0 POPY