ML19294B401: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML19294B401 | | number = ML19294B401 | ||
| issue date = 01/21/1980 | | issue date = 01/21/1980 | ||
| title = Responds to NRC | | title = Responds to NRC Re Violations Noted in IE Insp Repts 50-277/79-28 & 50-278/79-31.Corrective Actions:Review of Abnormal & Emergency Procedures Will Be Initiated in Jan 1980 | ||
| author name = Daltroff S | | author name = Daltroff S | ||
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC | | author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8002280300 | | document report number = NUDOCS 8002280300 | ||
| title reference date = 01-02-1980 | |||
| package number = ML19294B390 | | package number = ML19294B390 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 18: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:, | {{#Wiki_filter:, | ||
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 | PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 | ||
$HIELOS L DALTROFF ELtcf m c Pn o c som January 21, 1980 Re: Docket Nos.: 50-277 50-278 Inspection No.: 50-277/79-23 50-278/79-31 Mr. Eldon J. | |||
Brunner, Chief Reactor Operations & Nuclear Support Branch US Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 | |||
==Dear Mr. Brunner:== | ==Dear Mr. Brunner:== | ||
Your letter of January 2, | |||
1980, f orwarded combined Inspection Rep orts 50-277/79-29 and 50-278/79-31. | |||
Appendix A to y ou r letter addresses an item which did not appear t o be in full comp liance with Nuclear Regulat ory Commission requirements. | |||
This item is categorized as a deficiency and is restated below with ou r respons e. | |||
10 CFR Part 55, Appendix A, Requalification Programs for Licens ed Operat ors of Production and Utilization Facilities, states, in part, "1. | |||
Schedule. | |||
The requalification program shall be conducted f or a continuous period not to exceed two years..." | |||
: and, "3.d. | |||
Each licensed operator and senior op e ra t or reviews the contents of all abnormal and emergency procedures on a re gu la rly scheduled basis." | |||
800228o 3 0 0 | |||
e Mr. | |||
E. | |||
J. | |||
Brunner, Chief Page 2 | |||
===Response=== | ===Response=== | ||
During the past few years, review of abnormal and emergency procedures were scheduled whenever significant revisions to these procedures were made. | During the past few years, review of abnormal and emergency procedures were scheduled whenever significant revisions to these procedures were made. | ||
Some procedures were reviewed as part of the requalification lecture for operator training. | |||
Our records shou for the period January 1978 t o December 1979, that 43 of the 103 abnormal and emergency procedures were reviewed by the licensed operators. | |||
The f ollowing corrective action has been initiated: | The f ollowing corrective action has been initiated: | ||
1. | |||
Required review of abnormal and emergency procedures will be initiated in January 1980, by inclusion in the monthly requalification reading assignments. | |||
The 60 procedures not reviewed for the period January 19 7 8 t o December 1979 will be scheduled for review on a priority basis during 1980 monthly reading assignments. | |||
2. | |||
Very t ru ly yours, l | All abnormal and eme rgency procedures (including OT, E, | ||
EP, and SE procedures) shall be reviewed by each licensed operator (LO) and senior licensed operator (SLO) every two years. | |||
3. | |||
Documentation of required p rocedure review shall be recorded by the training coordinator. | |||
Very t ru ly yours, l | |||
v-o.aaf | |||
/ | |||
t | |||
,}} | |||
Latest revision as of 08:25, 2 January 2025
| ML19294B401 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 01/21/1980 |
| From: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML19294B390 | List: |
| References | |
| NUDOCS 8002280300 | |
| Download: ML19294B401 (2) | |
Text
,
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101
$HIELOS L DALTROFF ELtcf m c Pn o c som January 21, 1980 Re: Docket Nos.: 50-277 50-278 Inspection No.: 50-277/79-23 50-278/79-31 Mr. Eldon J.
Brunner, Chief Reactor Operations & Nuclear Support Branch US Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406
Dear Mr. Brunner:
Your letter of January 2,
1980, f orwarded combined Inspection Rep orts 50-277/79-29 and 50-278/79-31.
Appendix A to y ou r letter addresses an item which did not appear t o be in full comp liance with Nuclear Regulat ory Commission requirements.
This item is categorized as a deficiency and is restated below with ou r respons e.
10 CFR Part 55, Appendix A, Requalification Programs for Licens ed Operat ors of Production and Utilization Facilities, states, in part, "1.
Schedule.
The requalification program shall be conducted f or a continuous period not to exceed two years..."
- and, "3.d.
Each licensed operator and senior op e ra t or reviews the contents of all abnormal and emergency procedures on a re gu la rly scheduled basis."
800228o 3 0 0
e Mr.
E.
J.
Brunner, Chief Page 2
Response
During the past few years, review of abnormal and emergency procedures were scheduled whenever significant revisions to these procedures were made.
Some procedures were reviewed as part of the requalification lecture for operator training.
Our records shou for the period January 1978 t o December 1979, that 43 of the 103 abnormal and emergency procedures were reviewed by the licensed operators.
The f ollowing corrective action has been initiated:
1.
Required review of abnormal and emergency procedures will be initiated in January 1980, by inclusion in the monthly requalification reading assignments.
The 60 procedures not reviewed for the period January 19 7 8 t o December 1979 will be scheduled for review on a priority basis during 1980 monthly reading assignments.
2.
All abnormal and eme rgency procedures (including OT, E,
EP, and SE procedures) shall be reviewed by each licensed operator (LO) and senior licensed operator (SLO) every two years.
3.
Documentation of required p rocedure review shall be recorded by the training coordinator.
Very t ru ly yours, l
v-o.aaf
/
t
,