{{#Wiki_filter:October 22, 2019
{{#Wiki_filter:October 22, 2019  
Mr. Ken J. Peters, Senior Vice President
   and Chief Nuclear Officer
Attention: Regulatory Affairs
Mr. Ken J. Peters, Senior Vice President  
Vistra Operations Company LLC
   and Chief Nuclear Officer  
P.O. Box 1002
Attention: Regulatory Affairs  
Glen Rose, TX 76043
Vistra Operations Company LLC  
SUBJECT:           COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -
P.O. Box 1002  
                  NOTIFICATION OF CYBER SECURITY INSPECTION (NRC
Glen Rose, TX 76043  
                  INSPECTION REPORT 05000445/2020401 AND
                  05000446/2020401) AND REQUEST FOR INFORMATION
SUBJECT:  
Dear Mr. Peters:
COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -
On February 10, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin an
inspection in accordance with Inspection Procedure (IP) 71130.10P, Cyber Security,
NOTIFICATION OF CYBER SECURITY INSPECTION (NRC
Revision 0, at Comanche Peak Nuclear Power Plant, Units 1 and 2. This inspection evaluates
and verifies your ability to meet the full implementation requirements of the NRCs Cyber
INSPECTION REPORT 05000445/2020401 AND
Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54, Protection of
Digital Computer and Communication Systems and Networks. The onsite portion of the
05000446/2020401) AND REQUEST FOR INFORMATION  
inspection will take place during the weeks of February 10 and February 24, 2020.
Experience has shown that these inspections are extremely resource intensive, both for the
Dear Mr. Peters:  
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the
site and to ensure a productive inspection for both parties, we have enclosed a request for
On February 10, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin an  
documents needed for the inspection. The document request has been divided into four
inspection in accordance with Inspection Procedure (IP) 71130.10P, Cyber Security,  
groups.
Revision 0, at Comanche Peak Nuclear Power Plant, Units 1 and 2. This inspection evaluates  
The first group specifies information necessary to assist the team in choosing the focus areas
and verifies your ability to meet the full implementation requirements of the NRCs Cyber  
(i.e., sample set) to be inspected in accordance with the cyber security inspection procedure.
Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54, Protection of  
This information should be made available using either a secure document management
Digital Computer and Communication Systems and Networks. The onsite portion of the  
service or passive media (i.e. CD, DVD) and delivered to the regional office no later than
inspection will take place during the weeks of February 10 and February 24, 2020.  
December 2, 2019. The inspection team will review this information and by the end of the
planned information gathering visit on January 16, 2020, will request the specific items that
Experience has shown that these inspections are extremely resource intensive, both for the  
should be provided for review.
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the  
The second group of requested documents will assist the team in their evaluation of the critical
site and to ensure a productive inspection for both parties, we have enclosed a request for  
systems and critical digital assets, defensive architecture, and the areas of the cyber security
documents needed for the inspection. The document request has been divided into four  
plan selected for inspection. This information will be requested for our review in the regional
groups.  
office prior to the inspection, by January 27, 2020.
The third group of requested documents consists of those items that the team will review or
The first group specifies information necessary to assist the team in choosing the focus areas  
need access to, during the inspection. Please have this information available by the first day of
(i.e., sample set) to be inspected in accordance with the cyber security inspection procedure.  
the onsite inspection, February 10, 2020.
This information should be made available using either a secure document management  
service or passive media (i.e. CD, DVD) and delivered to the regional office no later than  
December 2, 2019. The inspection team will review this information and by the end of the  
planned information gathering visit on January 16, 2020, will request the specific items that  
should be provided for review.  
The second group of requested documents will assist the team in their evaluation of the critical  
systems and critical digital assets, defensive architecture, and the areas of the cyber security  
plan selected for inspection. This information will be requested for our review in the regional  
office prior to the inspection, by January 27, 2020.  
The third group of requested documents consists of those items that the team will review or  
need access to, during the inspection. Please have this information available by the first day of  
the onsite inspection, February 10, 2020.  


K. Peters                                         2
The fourth group of information is necessary to aid the team in tracking issues identified as a
K. Peters
result of the inspection. It is requested that this information be provided to the lead inspector as
2  
the information is generated during the inspection. It is important that all of these documents
are up to date and complete in order to minimize the number of additional documents requested
The fourth group of information is necessary to aid the team in tracking issues identified as a  
during the preparation and/or the onsite portions of the inspection.
result of the inspection. It is requested that this information be provided to the lead inspector as  
The lead inspector for this inspection is Sam Graves. We understand that our regulatory
the information is generated during the inspection. It is important that all of these documents  
contact for this inspection is Jim Barnette. If there are any questions about the inspection or the
are up to date and complete in order to minimize the number of additional documents requested  
material requested, please contact the lead inspector at 817-200-1102 or by e-mail
during the preparation and/or the onsite portions of the inspection.  
at Samuel.Graves@nrc.gov.
This letter does not contain new or amended information collections that are subject to the
The lead inspector for this inspection is Sam Graves. We understand that our regulatory  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and
contact for this inspection is Jim Barnette. If there are any questions about the inspection or the  
Budget (OMB) approved these information collections (approval number 3150-0011). The NRC
material requested, please contact the lead inspector at 817-200-1102 or by e-mail  
may not conduct nor sponsor, and a person is not required to respond to, a request for
at Samuel.Graves@nrc.gov.  
information or an information collection requirement unless the requesting document displays a
currently valid OMB control number.
This letter, its enclosure, and your response (if any) will be made available for public inspection
This letter does not contain new or amended information collections that are subject to the  
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and  
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
Budget (OMB) approved these information collections (approval number 3150-0011). The NRC  
Withholding.
may not conduct nor sponsor, and a person is not required to respond to, a request for  
                                                      Sincerely,
information or an information collection requirement unless the requesting document displays a  
                                                      /RA/
currently valid OMB control number.  
                                                      Nicholas H. Taylor, Chief
                                                      Engineering Branch 2
This letter, its enclosure, and your response (if any) will be made available for public inspection  
                                                      Division of Reactor Safety
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document  
Docket Nos. 05000445 and 05000446
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for  
License Nos. NPF-87 and NPF-89
Withholding.  
Enclosure:
Comanche Peak Nuclear Power Plant -
Sincerely,  
   Cyber Security Inspection Document Request
cc: Mr. Mike McNally
/RA/  
    Manager, Nuclear Security
    Comanche Peak Nuclear Power Plant
    Vistra Operations Company LLC
Nicholas H. Taylor, Chief  
    6322 N FM 56
Engineering Branch 2  
    P.O. Box 1002
Division of Reactor Safety  
    Glen Rose, TX 76043
Docket Nos. 05000445 and 05000446  
License Nos. NPF-87 and NPF-89  
Enclosure:  
Comanche Peak Nuclear Power Plant -
   Cyber Security Inspection Document Request  
cc: Mr. Mike McNally  
      Manager, Nuclear Security  
      Comanche Peak Nuclear Power Plant  
      Vistra Operations Company LLC  
      6322 N FM 56  
      P.O. Box 1002  
      Glen Rose, TX 76043




ML19295E162
  ML19295E162  
  SUNSI Review: ADAMS:         Non-Publicly Available Non-Sensitive Keyword:
  SUNSI Review:     ADAMS:               Non-Publicly Available         Non-Sensitive       Keyword:
By: STG         Yes  No    Publicly Available     Sensitive       NRC-002
By: STG                   Yes   No
OFFICE       SRI:EB2     C:EB2
  Publicly Available                 Sensitive                   NRC-002  
  NAME         SGraves     NTaylor
OFFICE  
  SIGNATURE         /RA/         /RA/
SRI:EB2  
  DATE           10/22/2019   10/22/2019
C:EB2  
                                   
   
  Comanche Peak Nuclear Power Plant - Cyber Security Inspection Document Request
Inspection Report:              05000445/2020401 and 05000446/2020401
Inspection Dates:              Weeks of February 10 and February 24, 2020
Inspection Procedure:          IP 71130.10P, Cyber Security, Revision 0
NAME  
Reference 1:                    ML17156A215 - Guidance Document for Development of the
SGraves  
                                Request for Information (RFI) and Notification Letter for
NTaylor  
                                Full-Implementation of the Cyber Security Inspection,
   
                                Revision 1, dated October 26, 2017
NRC Inspectors:                Sam Graves, Lead                        Steven Alferink
                                817-200-1102                            817-200-1548
                                Samuel.Graves@nrc.gov                    Steven.Alferink@nrc.gov
SIGNATURE  
                                David You, Observer
/RA/  
                                817-200-1233
/RA/  
                                David.You@nrc.gov
   
NRC Contractors:                Alan Konkal                              William Johns
                                561-989-0210                            301-287-3752
                                Alan.Konkal@nrc.gov                      William.Johns@nrc.gov
  I. Information Requested for In-Office Preparation
DATE  
    The initial request for information (i.e., first RFI) provides the team with the general
10/22/2019  
    information necessary to select appropriate components and cyber security plan
10/22/2019  
    elements to develop a site-specific inspection plan. The team will use the first set of
    information requested to identify the list of critical systems and critical digital assets
   
    plus operational and management security control portions of the cyber security plan
    to be chosen as the sample set required to be inspected during this inspection. The
    first information request is specified in Table RFI #1. Provide the first set of
    information to the team lead in the regional office, by December 2, 2019, or sooner,
    to facilitate the selection of the specific items that will be reviewed during the onsite
    inspection weeks.
    The required Table RFI #1 information shall be provided on a secure document
    management service or passive media (i.e. CD or DVD) to the lead inspector. Please
    provide five copies of each media submitted (i.e., one for each inspector/contractor). The
    preferred file format for all lists is a searchable Excel spreadsheet file on a CD or DVD.
    These files should be indexed and hyperlinked to facilitate efficient review. If you have
    any questions regarding this information, please contact the inspection team lead as
    soon as possible.
                                                                                            Enclosure


                                              Table RFI #1
  Section 3: Initial Documentation Requests (See                                      Items
   
  Reference 1) Paragraph Number/Title:
   
1      List all identified critical systems and critical digital assets              All
Enclosure
        List critical digital asset facility and site ethernet - transmission control
Comanche Peak Nuclear Power Plant - Cyber Security Inspection Document Request
2      protocol/internet protocol (TCP/IP) based local area networks (LANs)          All
        and identify those LANs that have non-critical digital assets on them
        List critical digital asset facility and site non-ethernet TCP/IP based
Inspection Report:
3      LANs including those industrial networks and identify LANs that have          All
05000445/2020401 and 05000446/2020401
        non-critical digital assets on them
        Network topology diagrams (be sure to include all network intrusion
Inspection Dates:
        detection systems and security information and event management
Weeks of February 10 and February 24, 2020
4                                                                                    All
        (SIEMs) for emergency preparedness (EP) networks and security
Inspection Procedure:
        level 3 and 4 networks)
IP 71130.10P, Cyber Security, Revision  0
        List all network security boundary devices for EP networks and all
8                                                                                    All
Reference 1:
        network security boundary devices for levels 3 and 4
ML17156A215 - Guidance Document for Development of  the
9      List critical digital asset wireless Industrial networks                      All
Request for Information (RFI) and Notification Letter for
        Network Intrusion detection system documentation for critical systems        11.a.1)
Full-Implementation of the Cyber Security Inspection,
11      that have critical digital assets associated with them                        11.a.2)
Revision 1, dated October 26, 2017
        SIEM documentation for critical systems that have critical digital assets    12.a.1)
12      associated with them                                                          12.a.2)
NRC Inspectors:
14      List EP and security onsite and offsite digital communication systems        All
Sam Graves, Lead
25      Cyber security assessment and cyber security incident response teams          All
Steven Alferink
        Copy of current cyber security plan and copy of any 50.54(p) analysis
817-200-1102
28                                                                                    All
817-200-1548
        to support changes to that plan
Samuel.Graves@nrc.gov
        Copy of any licensee identified violations and associated corrective
Steven.Alferink@nrc.gov
29                                                                                    All
        action program documentation to resolve issue(s)
In addition to the above information please provide the following:
David You, Observer
    (1) Electronic copy of the updated safety analysis report and technical specifications
    (2) Name(s) and phone number(s) for the regulatory and technical contacts
    (3)  Current management and engineering organizational charts related to cyber security
817-200-1233
    (4) Cyber security program procedures
Based on this information, the team will identify and select specific systems and
equipment (e.g., critical systems and critical digital assets) from the information
David.You@nrc.gov 
requested by Table RFI #1 and submit a list of specific systems and equipment to your
staff by the end of the information gathering visit on January 16, 2020, for the second
information request (i.e., Table RFI #2).
NRC Contractors:
                                                      2
Alan Konkal
William Johns
561-989-0210
301-287-3752
Alan.Konkal@nrc.gov
William.Johns@nrc.gov
I. Information Requested for In-Office  Preparation
   
The initial request for information (i.e., first RFI) provides the team with the general
information necessary to select appropriate components and cyber security plan
elements to develop a site-specific inspection plan. The team will use the first set of
information requested to identify the list of critical systems and critical digital assets  
plus operational and management security control portions of the cyber security plan
to be chosen as the sample set required to be inspected during this inspection.  The
first information request is specified in Table RFI #1.  Provide the first set of  
information to the team lead in the regional office, by December 2, 2019, or sooner,
to facilitate the selection of the specific items that will be reviewed during the onsite
inspection weeks.
The required Table RFI #1 information shall be provided on a secure document
management service or passive media (i.e. CD or DVD) to the lead inspector.  Please
provide five copies of each media submitted (i.e., one for each inspector/contractor). The
preferred file format for all lists is a searchable Excel spreadsheet file on a CD or DVD. 
These files should be indexed and hyperlinked to facilitate efficient review.  If you have
any questions regarding this information, please contact the inspection team lead as
soon as possible.


II. Additional Information Requested to be Available Prior to Inspection
    As stated in Section I, the team will examine the documents from the initial information
2
    request and submit the list of specific systems and equipment to your staff by the end of
    the information gathering visit on January 16, 2020. This second information request
    (i.e., Table RFI #2) obtains additional documents required to evaluate the critical systems
    and critical digital assets, defensive architecture, and the areas of the cyber security
Table RFI #1
    program selected for the cyber security inspection. The additional information requested
Section 3:  Initial Documentation Requests (See 
    for the specific systems and equipment is identified in Table RFI #2. All requested
Reference 1) Paragraph Number/Title:
    information shall follow the guidance document Reference 1.
Items
    The Table RFI #2 information shall be provided on a secure document management
1
    service or passive media to the lead inspector, by January 27, 2020, or sooner. Please
List all identified critical systems and critical digital assets  
    provide five copies of each CD/DVD submitted (i.e., one for each inspector/contractor).
All  
    The preferred file format for all lists is a searchable Excel spreadsheet file on a CD/DVD.
2  
    These files should be indexed and hyperlinked to facilitate efficient review. If you have
List critical digital asset facility and site ethernet - transmission control
    any questions regarding this information, please call the inspection team lead as soon as
protocol/internet protocol (TCP/IP) based local area networks (LANs)  
    possible.
and identify those LANs that have non-critical digital assets on them
                                              Table RFI #2
All
    Section 3: Initial Documentation Requests (See                                      Items
3
    Reference 1) Paragraph Number/Title:
List critical digital asset facility and site non-ethernet TCP/IP based
            Plant computer system block diagram (if plant computer system is
LANs including those industrial networks and identify LANs that have  
      5                                                                                All
non-critical digital assets on them
            selected for inspection)
All
            Plant security system block diagram (if security computer system is
4
      6                                                                                All
Network topology diagrams (be sure to include all network intrusion
            selected for inspection)
detection systems and security information and event management
            Block diagrams for distributed systems (for systems selected for
(SIEMs) for emergency preparedness (EP) networks and security
      7                                                                                All
level 3 and 4 networks)
            inspection)
All  
            Host-based intrusion detection system documentation for critical             10.a.1)
8
      10
List all network security boundary devices for EP networks and all
            digital assets (for systems selected for inspection)                         10.a.2)
network security boundary devices for levels 3 and 4
            List all maintenance and test equipment (M&TE) used on critical digital
All  
      13                                                                                All
9
            assets (for systems selected for inspection)
List critical digital asset wireless Industrial networks
      15  Configuration management                                                    All
All  
                                                                                        16.a
11
      16  Supply chain management                                                      16.b
Network Intrusion detection system documentation for critical systems
      17  Portable media and mobile device control                                    All
that have critical digital assets associated with them
      18  Software management                                                         All
11.a.1)  
      20  Vendor access and monitoring                                                All
11.a.2)
      21  Work control                                                                All
12
      22  Device access and key control                                                All
SIEM documentation for critical systems that have critical digital assets  
      23  Password/authenticator policy                                                All
associated with them
                                                    3
12.a.1)  
12.a.2)  
14
List EP and security onsite and offsite digital communication systems
All
25
Cyber security assessment and cyber security incident response teams
All
28
Copy of current cyber security plan and copy of any 50.54(p) analysis
to support changes to that plan
All  
29
Copy of any licensee identified violations and associated corrective
action program documentation to resolve issue(s)  
All  
In addition to the above information please provide the following:
(1) Electronic copy of the updated safety analysis report and technical specifications
(2) Name(s) and phone number(s) for the regulatory and technical contacts
(3) Current management and engineering organizational charts related to cyber security
(4) Cyber security program procedures
Based on this information, the team will identify and select specific systems and  
equipment (e.g., critical systems and critical digital assets) from the information
requested by Table RFI #1 and submit a list of specific systems and equipment to your
staff by the end of the information gathering visit on January 16, 2020, for the second
information request (i.e., Table RFI #2).


                                                Table RFI #2
      Section 3: Initial Documentation Requests (See                                      Items
3  
      Reference 1) Paragraph Number/Title:
      24    User account/credential policy                                                All
      26    Corrective actions since last NRC inspection                                  All
II. Additional Information Requested to be Available Prior to  Inspection
      27    Cyber security assessments for selected systems                              All
    In addition to the above information please provide the following:
As stated in Section I, the team will examine the documents from the initial information  
        (1) Names and positions of the CSAT and CSIRT members.
request and submit the list of specific systems and equipment to your staff by the end of
        (2) Copies of lessons plans and training presented to the CSAT and CSIRT members,
the information gathering visit on January 16, 2020. This second information request 
            continuing technical training for engineers, as well as any general awareness
(i.e., Table RFI #2) obtains additional documents required to evaluate the critical systems
            training.
and critical digital assets, defensive architecture, and the areas of the cyber security
        (3) List of dates of CSAT meetings that have occurred.
program selected for the cyber security inspection. The additional information requested
III. Information Requested to be Available on First Day of Inspection
for the specific systems and equipment is identified in Table RFI #2.  All requested
    For the specific systems and equipment identified in Section II, provide the following
information shall follow the guidance document Reference 1.  
    request for information (i.e., Table 1st Week Onsite) on a secure document management
    service or passive media, by February 10, 2020, the first day of the inspection. All
The Table RFI #2 information shall be provided on a secure document management  
    requested information shall follow the guidance in Reference 1.
service or passive media to the lead inspector, by January 27, 2020, or sooner. Please
    Please provide four copies of each CD submitted (i.e., one for each inspector/contactor).
provide five copies of each CD/DVD submitted (i.e., one for each inspector/contractor).  
    The preferred file format for all lists is a searchable Excel spreadsheet file on a CD/DVD.
The preferred file format for all lists is a searchable Excel spreadsheet file on a CD/DVD.  
    These files should be indexed and hyperlinked to facilitate ease of use. If you have any
These files should be indexed and hyperlinked to facilitate efficient review. If you have  
    questions regarding this information, please call the inspection team lead as soon as
any questions regarding this information, please call the inspection team lead as soon as  
    possible.
possible.  
                                          Table 1st Week Onsite
      Section 3: Initial Documentation Requests (See
Table RFI #2
      Reference 1) Paragraph Number/Title:                                               Items
Section 3: Initial Documentation Requests (See
                                                                                        10.a.3)
Reference 1) Paragraph Number/Title:  
      10     Host-based intrusion detection system documentation for critical           thru
Items  
            digital assets (for systems selected for inspection)                       10.a.12)
5
                                                                                        11.a.3)
Plant computer system block diagram (if plant computer system is
      11    Network Intrusion detection system documentation for critical              thru
selected for inspection)
            systems that have critical digital assets associated with them            11.a.15)
All
                                                                                        12.a.3)
6
      12    SIEM documentation for critical systems that have critical digital        thru
Plant security system block diagram (if security computer system is
            assets associated with them                                                12.a.14)
selected for inspection)
      16     Supply chain management                                                     16.c
All
      19    Cyber security event notifications                                          All
7
                                                    4
Block diagrams for distributed systems (for systems selected for
inspection)  
All
10  
Host-based intrusion detection system documentation for critical  
digital assets (for systems selected for inspection)  
10.a.1)  
10.a.2)  
13
List all maintenance and test equipment (M&TE) used on critical digital  
assets (for systems selected for inspection)  
All
15
Configuration management
All
16  
Supply chain management  
16.a
16.b
17
Portable media and mobile device control
All
18
Software management
All
20
Vendor access and monitoring
All
21
Work control
All
22
Device access and key control
All
23
Password/authenticator policy
All  


                                        Table 1st Week Onsite
      Section 3: Initial Documentation Requests (See
4
      Reference 1) Paragraph Number/Title:                                             Items
            Update to licensee identified violations and corrective action               All
      29
Table RFI #2
            program actions taken since the initial request was made
Section 3:  Initial Documentation Requests (See 
    In addition to the above information please provide the following:
Reference 1) Paragraph Number/Title:
        (1) Copies of the following documents do not need to be solely available to the
Items
            inspection team as long as the inspectors have easy and unrestrained access
24
            to them.
User account/credential policy
                a. Quality Assurance Plan;
All
                b. Technical Specifications, if not previously provided;
26
                c. Latest Individual Plant Examination/Probabilistic Risk Assessment
Corrective actions since last NRC inspection
                  Report; and,
All
        (2) Vendor Manuals, Assessments, and Corrective Actions:
27
                a. The most recent cyber security quality assurance audit
Cyber security assessments for selected systems
                  and/or self-assessment; and
All
                b. Corrective action documents (e.g., condition reports, including status of
                  corrective actions) generated as a result of the most recent cyber
In addition to the above information please provide the following:
                  security quality assurance audit and/or self-assessment.
IV: Information Requested To Be Provided Throughout the Inspection
(1) Names and positions of the CSAT and CSIRT members.
        (1) Copies of any corrective action documents generated as a result of the
            inspection teams questions or queries during the inspection.
(2) Copies of lessons plans and training presented to the CSAT and CSIRT members,
        (2) Copies of the list of questions submitted by the inspection team members and
continuing technical training for engineers, as well as any general awareness
            the status/resolution of the information requested (provided daily during the
training.
            inspection to each inspection team member).
(3) List of dates of CSAT meetings that have occurred.
III. Information Requested to be Available on First Day of  Inspection
For the specific systems and equipment identified in Section II, provide the following
request for information (i.e., Table 1st Week Onsite) on a secure document management
service or passive media, by February 10, 2020, the first day of the inspection.  All
requested information shall follow the guidance in Reference 1.
Please provide four copies of each CD submitted (i.e., one for each inspector/contactor).
The preferred file format for all lists is a searchable Excel spreadsheet file on a CD/DVD.
These files should be indexed and hyperlinked to facilitate ease of use.  If you have any
questions regarding this information, please call the inspection team lead as soon as
possible.
Table 1st Week Onsite
Section 3:  Initial Documentation Requests (See 
Reference 1) Paragraph Number/Title:
Items
10
Host-based intrusion detection system documentation for critical
digital assets (for systems selected for inspection)
10.a.3)
thru
10.a.12)
11
Network Intrusion detection system documentation for critical
systems that have critical digital assets associated with them
11.a.3)
thru
11.a.15)
12
SIEM documentation for critical systems that have critical digital
assets associated with them
12.a.3)
thru
12.a.14)
16
Supply chain management
16.c
19
Cyber security event notifications
All
 
5
Table 1st Week Onsite  
Section 3: Initial Documentation Requests (See
Reference 1) Paragraph Number/Title:  
Items  
29 Update to licensee identified violations and corrective action  
program actions taken since the initial request was made  
All
        In addition to the above information please provide the following:  
(1) Copies of the following documents do not need to be solely available to the  
inspection team as long as the inspectors have easy and unrestrained access  
to them.  
a. Quality Assurance Plan;  
b. Technical Specifications, if not previously provided;  
c. Latest Individual Plant Examination/Probabilistic Risk Assessment  
Report; and,  
(2) Vendor Manuals, Assessments, and Corrective Actions:  
a. The most recent cyber security quality assurance audit  
and/or self-assessment; and  
b. Corrective action documents (e.g., condition reports, including status of  
corrective actions) generated as a result of the most recent cyber  
security quality assurance audit and/or self-assessment.  
  IV: Information Requested To Be Provided Throughout the Inspection  
(1) Copies of any corrective action documents generated as a result of the  
inspection teams questions or queries during the inspection.  
(2) Copies of the list of questions submitted by the inspection team members and  
the status/resolution of the information requested (provided daily during the  
inspection to each inspection team member).  
If you have any questions regarding the information requested, please contact the team lead.
If you have any questions regarding the information requested, please contact the team lead.
                                                  5
}}
}}

Latest revision as of 08:03, 2 January 2025

Notification of Cyber Security Inspection (NRC Inspection Report 05000445/2020401 and 05000446/2020401) and Request for Information
ML19295E162
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/22/2019
From: Nick Taylor
Division of Reactor Safety IV
To: Peters K
Vistra Operations Company
Taylor N
References
IR 2020401
Download: ML19295E162 (8)


See also: IR 05000445/2020401

Text

October 22, 2019

Mr. Ken J. Peters, Senior Vice President

and Chief Nuclear Officer

Attention: Regulatory Affairs

Vistra Operations Company LLC

P.O. Box 1002

Glen Rose, TX 76043

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -

NOTIFICATION OF CYBER SECURITY INSPECTION (NRC

INSPECTION REPORT 05000445/2020401 AND

05000446/2020401) AND REQUEST FOR INFORMATION

Dear Mr. Peters:

On February 10, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin an

inspection in accordance with Inspection Procedure (IP) 71130.10P, Cyber Security,

Revision 0, at Comanche Peak Nuclear Power Plant, Units 1 and 2. This inspection evaluates

and verifies your ability to meet the full implementation requirements of the NRCs Cyber

Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54, Protection of

Digital Computer and Communication Systems and Networks. The onsite portion of the

inspection will take place during the weeks of February 10 and February 24, 2020.

Experience has shown that these inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the

site and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. The document request has been divided into four

groups.

The first group specifies information necessary to assist the team in choosing the focus areas

(i.e., sample set) to be inspected in accordance with the cyber security inspection procedure.

This information should be made available using either a secure document management

service or passive media (i.e. CD, DVD) and delivered to the regional office no later than

December 2, 2019. The inspection team will review this information and by the end of the

planned information gathering visit on January 16, 2020, will request the specific items that

should be provided for review.

The second group of requested documents will assist the team in their evaluation of the critical

systems and critical digital assets, defensive architecture, and the areas of the cyber security

plan selected for inspection. This information will be requested for our review in the regional

office prior to the inspection, by January 27, 2020.

The third group of requested documents consists of those items that the team will review or

need access to, during the inspection. Please have this information available by the first day of

the onsite inspection, February 10, 2020.

K. Peters

2

The fourth group of information is necessary to aid the team in tracking issues identified as a

result of the inspection. It is requested that this information be provided to the lead inspector as

the information is generated during the inspection. It is important that all of these documents

are up to date and complete in order to minimize the number of additional documents requested

during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Sam Graves. We understand that our regulatory

contact for this inspection is Jim Barnette. If there are any questions about the inspection or the

material requested, please contact the lead inspector at 817-200-1102 or by e-mail

at Samuel.Graves@nrc.gov.

This letter does not contain new or amended information collections that are subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and

Budget (OMB) approved these information collections (approval number 3150-0011). The NRC

may not conduct nor sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid OMB control number.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Nicholas H. Taylor, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 05000445 and 05000446

License Nos. NPF-87 and NPF-89

Enclosure:

Comanche Peak Nuclear Power Plant -

Cyber Security Inspection Document Request

cc: Mr. Mike McNally

Manager, Nuclear Security

Comanche Peak Nuclear Power Plant

Vistra Operations Company LLC

6322 N FM 56

P.O. Box 1002

Glen Rose, TX 76043

ML19295E162

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: STG Yes No

Publicly Available Sensitive NRC-002

OFFICE

SRI:EB2

C:EB2

NAME

SGraves

NTaylor

SIGNATURE

/RA/

/RA/

DATE

10/22/2019

10/22/2019

Enclosure

Comanche Peak Nuclear Power Plant - Cyber Security Inspection Document Request

Inspection Report: 05000445/2020401 and 05000446/2020401

Inspection Dates:

Weeks of February 10 and February 24, 2020

Inspection Procedure:

IP 71130.10P, Cyber Security, Revision 0

Reference 1:

ML17156A215 - Guidance Document for Development of the

Request for Information (RFI) and Notification Letter for

Full-Implementation of the Cyber Security Inspection,

Revision 1, dated October 26, 2017

NRC Inspectors:

Sam Graves, Lead

Steven Alferink

817-200-1102

817-200-1548

Samuel.Graves@nrc.gov

Steven.Alferink@nrc.gov

David You, Observer

817-200-1233

David.You@nrc.gov

NRC Contractors:

Alan Konkal

William Johns

561-989-0210

301-287-3752

Alan.Konkal@nrc.gov

William.Johns@nrc.gov

I. Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) provides the team with the general

information necessary to select appropriate components and cyber security plan

elements to develop a site-specific inspection plan. The team will use the first set of

information requested to identify the list of critical systems and critical digital assets

plus operational and management security control portions of the cyber security plan

to be chosen as the sample set required to be inspected during this inspection. The

first information request is specified in Table RFI #1. Provide the first set of

information to the team lead in the regional office, by December 2, 2019, or sooner,

to facilitate the selection of the specific items that will be reviewed during the onsite

inspection weeks.

The required Table RFI #1 information shall be provided on a secure document

management service or passive media (i.e. CD or DVD) to the lead inspector. Please

provide five copies of each media submitted (i.e., one for each inspector/contractor). The

preferred file format for all lists is a searchable Excel spreadsheet file on a CD or DVD.

These files should be indexed and hyperlinked to facilitate efficient review. If you have

any questions regarding this information, please contact the inspection team lead as

soon as possible.

2

Table RFI #1

Section 3: Initial Documentation Requests (See

Reference 1) Paragraph Number/Title:

Items

1

List all identified critical systems and critical digital assets

All

2

List critical digital asset facility and site ethernet - transmission control

protocol/internet protocol (TCP/IP) based local area networks (LANs)

and identify those LANs that have non-critical digital assets on them

All

3

List critical digital asset facility and site non-ethernet TCP/IP based

LANs including those industrial networks and identify LANs that have

non-critical digital assets on them

All

4

Network topology diagrams (be sure to include all network intrusion

detection systems and security information and event management

(SIEMs) for emergency preparedness (EP) networks and security

level 3 and 4 networks)

All

8

List all network security boundary devices for EP networks and all

network security boundary devices for levels 3 and 4

All

9

List critical digital asset wireless Industrial networks

All

11

Network Intrusion detection system documentation for critical systems

that have critical digital assets associated with them

11.a.1)

11.a.2)

12

SIEM documentation for critical systems that have critical digital assets

associated with them

12.a.1)

12.a.2)

14

List EP and security onsite and offsite digital communication systems

All

25

Cyber security assessment and cyber security incident response teams

All

28

Copy of current cyber security plan and copy of any 50.54(p) analysis

to support changes to that plan

All

29

Copy of any licensee identified violations and associated corrective

action program documentation to resolve issue(s)

All

In addition to the above information please provide the following:

(1) Electronic copy of the updated safety analysis report and technical specifications

(2) Name(s) and phone number(s) for the regulatory and technical contacts

(3) Current management and engineering organizational charts related to cyber security

(4) Cyber security program procedures

Based on this information, the team will identify and select specific systems and

equipment (e.g., critical systems and critical digital assets) from the information

requested by Table RFI #1 and submit a list of specific systems and equipment to your

staff by the end of the information gathering visit on January 16, 2020, for the second

information request (i.e., Table RFI #2).

3

II. Additional Information Requested to be Available Prior to Inspection

As stated in Section I, the team will examine the documents from the initial information

request and submit the list of specific systems and equipment to your staff by the end of

the information gathering visit on January 16, 2020. This second information request

(i.e., Table RFI #2) obtains additional documents required to evaluate the critical systems

and critical digital assets, defensive architecture, and the areas of the cyber security

program selected for the cyber security inspection. The additional information requested

for the specific systems and equipment is identified in Table RFI #2. All requested

information shall follow the guidance document Reference 1.

The Table RFI #2 information shall be provided on a secure document management

service or passive media to the lead inspector, by January 27, 2020, or sooner. Please

provide five copies of each CD/DVD submitted (i.e., one for each inspector/contractor).

The preferred file format for all lists is a searchable Excel spreadsheet file on a CD/DVD.

These files should be indexed and hyperlinked to facilitate efficient review. If you have

any questions regarding this information, please call the inspection team lead as soon as

possible.

Table RFI #2

Section 3: Initial Documentation Requests (See

Reference 1) Paragraph Number/Title:

Items

5

Plant computer system block diagram (if plant computer system is

selected for inspection)

All

6

Plant security system block diagram (if security computer system is

selected for inspection)

All

7

Block diagrams for distributed systems (for systems selected for

inspection)

All

10

Host-based intrusion detection system documentation for critical

digital assets (for systems selected for inspection)

10.a.1)

10.a.2)

13

List all maintenance and test equipment (M&TE) used on critical digital

assets (for systems selected for inspection)

All

15

Configuration management

All

16

Supply chain management

16.a

16.b

17

Portable media and mobile device control

All

18

Software management

All

20

Vendor access and monitoring

All

21

Work control

All

22

Device access and key control

All

23

Password/authenticator policy

All

4

Table RFI #2

Section 3: Initial Documentation Requests (See

Reference 1) Paragraph Number/Title:

Items

24

User account/credential policy

All

26

Corrective actions since last NRC inspection

All

27

Cyber security assessments for selected systems

All

In addition to the above information please provide the following:

(1) Names and positions of the CSAT and CSIRT members.

(2) Copies of lessons plans and training presented to the CSAT and CSIRT members,

continuing technical training for engineers, as well as any general awareness

training.

(3) List of dates of CSAT meetings that have occurred.

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II, provide the following

request for information (i.e., Table 1st Week Onsite) on a secure document management

service or passive media, by February 10, 2020, the first day of the inspection. All

requested information shall follow the guidance in Reference 1.

Please provide four copies of each CD submitted (i.e., one for each inspector/contactor).

The preferred file format for all lists is a searchable Excel spreadsheet file on a CD/DVD.

These files should be indexed and hyperlinked to facilitate ease of use. If you have any

questions regarding this information, please call the inspection team lead as soon as

possible.

Table 1st Week Onsite

Section 3: Initial Documentation Requests (See

Reference 1) Paragraph Number/Title:

Items

10

Host-based intrusion detection system documentation for critical

digital assets (for systems selected for inspection)

10.a.3)

thru

10.a.12)

11

Network Intrusion detection system documentation for critical

systems that have critical digital assets associated with them

11.a.3)

thru

11.a.15)

12

SIEM documentation for critical systems that have critical digital

assets associated with them

12.a.3)

thru

12.a.14)

16

Supply chain management

16.c

19

Cyber security event notifications

All

5

Table 1st Week Onsite

Section 3: Initial Documentation Requests (See

Reference 1) Paragraph Number/Title:

Items

29 Update to licensee identified violations and corrective action

program actions taken since the initial request was made

All

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access

to them.

a. Quality Assurance Plan;

b. Technical Specifications, if not previously provided;

c. Latest Individual Plant Examination/Probabilistic Risk Assessment

Report; and,

(2) Vendor Manuals, Assessments, and Corrective Actions:

a. The most recent cyber security quality assurance audit

and/or self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generated as a result of the most recent cyber

security quality assurance audit and/or self-assessment.

IV: Information Requested To Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the team lead.