ML19317E488: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.-      .  .      .        -          -          --      -.        - - .      .              _. - _ -
{{#Wiki_filter:.-
..
L. I Oconae Unit 1 DATE 7/9/75 1
            .                                                                          L. I Oconae Unit 1 1
DOCKET NO. 50-269 PREPARED BY M. S. 'Iuckman OPERATING STATUS l
* DATE 7/9/75
1.
-                                                                              DOCKET NO. 50-269
REPORTING PERIOD: June 1, 1975 THROUGH June 30, 1975 f
        *
GROSS HOURS IN REPORTING PERIOD:
* PREPARED BY       M. S. 'Iuckman OPERATING STATUS l           1. REPORTING PERIOD: June 1, 1975                   THROUGH       June 30, 1975 GROSS HOURS IN REPORTING PERIOD:                       720.00 f
720.00 2.
!          2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY I                 (MWe-Net):                                             871                                                             ,
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY I
None                                      !
(MWe-Net):
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) j           4. REASONS FOR RESTRICTION (IF ANY)
871 3.
!          5. NUMBER OF HOURS THE REACTOR WAS hiis Month      Year to Date              Cumulative                j i                 CRITICAL                                       713.5               2742.3                   12542.9                   l i
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
'
None j
                                                                                                                                          ,
4.
: 6. REACTOR RESERVE SHUTDOWN HOURS                 -                  -                          -
REASONS FOR RESTRICTION (IF ANY) hiis Month Year to Date Cumulative j
                                                                                                                                          '
5.
: 7. HOURS GENERATOR ON-LINE                         693.6             2536.8                     10791.2
NUMBER OF HOURS THE REACTOR WAS i
: 8. UNIT RESERVE SHUTDOWN HOURS                     -                  -                          -
CRITICAL 713.5 2742.3 12542.9 l
: 9. GROSS THERMAL ENERGY GENERATED (MWH)1736812                       5801035                   24038545 l
i 6.
: 10. GROSS ELECTRICAL ENERGY GENERATED
REACTOR RESERVE SHUTDOWN HOURS 7.
;
HOURS GENERATOR ON-LINE 693.6 2536.8 10791.2 8.
  .
UNIT RESERVE SHUTDOWN HOURS 9.
(MWH)                                           606280             2041200                   8359900
GROSS THERMAL ENERGY GENERATED (MWH)1736812 5801035 24038545 l
'
10.
: 11. NET ELECTRICAL ENERGY GENERATED
GROSS ELECTRICAL ENERGY GENERATED (MWH) 606280 2041200 8359900 11.
'
NET ELECTRICAL ENERGY GENERATED (MWH) 578396 1922597 7875616 I
(MWH)                                           578396             1922597                   7875616 I         12. REACTOR SERVICE FACTOR                         99.1               63.1                       73.1
12.
: 13. REACTOR AVAIIABILITY FACTOR                     98.6             59.3                       64.2
REACTOR SERVICE FACTOR 99.1 63.1 73.1 13.
  .        14. UNIT SERVICE FACTOR                             96.3             58.4                     _
REACTOR AVAIIABILITY FACTOR 98.6 59.3 64.2 14.
62.9
UNIT SERVICE FACTOR 96.3 58.4 62.9 15.
: 15. UNIT AVILABILITY FACTOR                         96.3             58.4                       63.1
UNIT AVILABILITY FACTOR 96.3 58.4 63.1 16.
: 16. UNIT CAPACITY FACTOR (Using Net                 92.2               50.8                     52.7 i               Capability)
UNIT CAPACITY FACTOR (Using Net 92.2 50.8 52.7 i
: 17. UNIT CAPACITY FACTOR (Using Design Mwe)                               90.6               49.9                     51.7
Capability) 17.
,          18. UNIT FORCED OUTAGE RATE                         3.7               41.1                       21.3
UNIT CAPACITY FACTOR (Using Design Mwe) 90.6 49.9 51.7 18.
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
UNIT FORCED OUTAGE RATE 3.7 41.1 21.3 19.
  !
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
<
20.
: 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP'
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP' REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRITICAI X 100 llOURS IN REPORTING PERIOD REACTOR AVAILABILITY FACTOR = Hot?HS RTACTOR UAS AVAIIALLP TO Oi'ERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE FACTOR
,
= HOPPS CTEERATOR ON 1.lNE HOURS IN REPORTING PERIOD UNIT AVAIIABILITY FACTOR = liOURS UNIT WAS AVATIABLE TO GENERATE X 100 HOURS IN FEPORTING PERIOD UNIT CAPACITY FACTOR
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRITICAI X 100 llOURS IN REPORTING PERIOD REACTOR AVAILABILITY FACTOR = Hot?HS RTACTOR UAS AVAIIALLP TO Oi'ERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE FACTOR     = HOPPS CTEERATOR ON 1.lNE HOURS IN REPORTING PERIOD
= NET ELECTRICAL P0tlER CENERATED (Nat C.ipability or Design (Mag-Net)1 X 110UltS IN Rf','OhdNh.
                '
f PERIOD'
UNIT AVAIIABILITY FACTOR = liOURS UNIT WAS AVATIABLE TO GENERATE X 100 HOURS IN FEPORTING PERIOD UNIT CAPACITY FACTOR     = NET ELECTRICAL P0tlER CENERATED                                                   ,
,5 h}$}gQ p
(Nat C.ipability or Design (Mag-Net)1 X 110UltS IN Rf','OhdNh. f PERIOD'                               ,5 h}$}gQ                 p UNIT FORCED OUTACE RATE = FORCEILOUTAGE_JJ0JJRS                               -
UNIT FORCED OUTACE RATE = FORCEILOUTAGE_JJ0JJRS X 100 HOURS GENEILATOR ON 1.INE + FORCED OUTAGE HOURS
X 100 HOURS GENEILATOR ON 1.INE + FORCED OUTAGE HOURS
                                                                                                                                          '
    -      -
                    -
                          -        .                        ----                          - ,    , ,              ,-  - ., - -


                                                                                                                                        .
DdCKET NO.
DdCKET NO. 50-269         -
50-269 Oconee Unit 1 UNIT SHUTDOWNS UNIT NAME DATli 7/9/75 REPORT MONTil __ June, 1975 TYPE METHOD 0; F FORCED DURATION SHUTTING DOWfl I
                                                                                                                                      ,
NO.
Oconee Unit 1 UNIT SHUTDOWNS                                       UNIT NAME
DATE S SCHEDULED (HOURS)
_
RE ASON (1)
DATli 7/9/75 REPORT MONTil __ June, 1975 TYPE                                   METHOD 0;                                                           -
THE REACTOR (2)
                                                                                                                                            ,
CORRECTIVE ACTIONS / COMMENTS 9
F FORCED     DURATION                   SHUTTING DOWfl                                                                   .
750608 F
NO. DATE   S SCHEDULED                                                                                                               I (HOURS) RE ASON (1)       THE REACTOR (2)         CORRECTIVE ACTIONS / COMMENTS 9 750608       F           16.5       A                 3         Turbine tripped due to low turbine control oil pressure 10 750609       F           9.9       G                 3         Unit tripped during restart due to high .
16.5 A
RC pressure while in manual control
3 Turbine tripped due to low turbine control oil pressure 10 750609 F
                                                                                                                                  .
9.9 G
(1) REASON                                 (2) METilOD A -EQUIPMENT F AlLUME (EXPLAIN)           1-MANUAL B- M AINT. OR TEST.                       2-MANUAL C- MLl L'ELING                                SCR AM      _)
3 Unit tripped during restart due to high.
D-REGULATO!tY RESTRICTION                 3- AUTOM ATIC E-OPERATOR 1 RAINING AND                     SCRAM LICENSE EXAMINATION F- A DMINIST R ATIVE G- OPl.R A1:ON AL LRROR (LXPLAIN)
RC pressure while in manual control (1) REASON (2) METilOD A -EQUIPMENT F AlLUME (EXPLAIN) 1-MANUAL B-M AINT. OR TEST.
2-MANUAL D-REGULATO!tY RESTRICTION 3-AUTOM ATIC
_ )
C-MLl L'ELING SCR AM E-OPERATOR 1 RAINING AND SCRAM LICENSE EXAMINATION F-A DMINIST R ATIVE G-OPl.R A1:ON AL LRROR (LXPLAIN)
Il-OlllLR (EXP1 AIN) s
Il-OlllLR (EXP1 AIN) s
                                                                                            .
,


==SUMMARY==
==SUMMARY==
Unit operated base loaded during the month.
Unit operated base loaded during the month.
_ . _ _ _ _ _ _ _


n
n l
                            ,
l
                                ;                                      !
\\
  .
DOCKET NO. 50-269 oconee Unit 1 UNIT DATE 7/9/75 AVERAGE DAILY UNIT POWER LEVEL June 1975 MONTH AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
l l                                                                                                          \
DAY (MWe-net) 850 862 17 1
DOCKET NO. 50-269 UNIT oconee Unit 1 DATE 7/9/75 AVERAGE DAILY UNIT POWER LEVEL MONTH        June 1975 AVERAGE DAILY POWER LEVEL                           AVERAGE DAILY POWER LEVEL DAY                   (MWe-net)                     DAY               (MWe-net)             .
861 18 849 2
        .
849 864 jg 3
862 850 1
848 4
17 861                         18                 849             ,
864 20 851 5
2 864                         jg                 849 3
864 21 6
864                          20                  848 4
865 22 852 7
864                         21                  851 5
866 23 852 8
865                         22                 852 6
146 24 820 g
866                         23                 852 7
297 25 854 755 2d; 854 10 762 27 853 11 8 17 28 849 12 848 852 29 13 851 30 851 14 847 31 15 849 16 DAILY UNTT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
146                         24                 820 8
g                    297                         25                 854
                        '
755                           2d;               854 10 762                           27                 853 11 8 17                         28                 849 12 852                           29                 848 13 851                           30                 851 14 15                    847                           31 16                     849 DAILY UNTT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
These figures will be used to plot .i graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 1007o line (or the restricted power lesel line). In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.}}
These figures will be used to plot.i graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 1007o line (or the restricted power lesel line). In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.}}

Latest revision as of 21:56, 1 January 2025

Monthly Operating Rept for June 1975
ML19317E488
Person / Time
Site: Oconee 
Issue date: 07/09/1975
From: Tuckman M
DUKE POWER CO.
To:
Shared Package
ML19317E484 List:
References
NUDOCS 7912180730
Download: ML19317E488 (3)


Text

.-

L. I Oconae Unit 1 DATE 7/9/75 1

DOCKET NO. 50-269 PREPARED BY M. S. 'Iuckman OPERATING STATUS l

1.

REPORTING PERIOD: June 1, 1975 THROUGH June 30, 1975 f

GROSS HOURS IN REPORTING PERIOD:

720.00 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY I

(MWe-Net):

871 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)

None j

4.

REASONS FOR RESTRICTION (IF ANY) hiis Month Year to Date Cumulative j

5.

NUMBER OF HOURS THE REACTOR WAS i

CRITICAL 713.5 2742.3 12542.9 l

i 6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON-LINE 693.6 2536.8 10791.2 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH)1736812 5801035 24038545 l

10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 606280 2041200 8359900 11.

NET ELECTRICAL ENERGY GENERATED (MWH) 578396 1922597 7875616 I

12.

REACTOR SERVICE FACTOR 99.1 63.1 73.1 13.

REACTOR AVAIIABILITY FACTOR 98.6 59.3 64.2 14.

UNIT SERVICE FACTOR 96.3 58.4 62.9 15.

UNIT AVILABILITY FACTOR 96.3 58.4 63.1 16.

UNIT CAPACITY FACTOR (Using Net 92.2 50.8 52.7 i

Capability) 17.

UNIT CAPACITY FACTOR (Using Design Mwe) 90.6 49.9 51.7 18.

UNIT FORCED OUTAGE RATE 3.7 41.1 21.3 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP' REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRITICAI X 100 llOURS IN REPORTING PERIOD REACTOR AVAILABILITY FACTOR = Hot?HS RTACTOR UAS AVAIIALLP TO Oi'ERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE FACTOR

= HOPPS CTEERATOR ON 1.lNE HOURS IN REPORTING PERIOD UNIT AVAIIABILITY FACTOR = liOURS UNIT WAS AVATIABLE TO GENERATE X 100 HOURS IN FEPORTING PERIOD UNIT CAPACITY FACTOR

= NET ELECTRICAL P0tlER CENERATED (Nat C.ipability or Design (Mag-Net)1 X 110UltS IN Rf','OhdNh.

f PERIOD'

,5 h}$}gQ p

UNIT FORCED OUTACE RATE = FORCEILOUTAGE_JJ0JJRS X 100 HOURS GENEILATOR ON 1.INE + FORCED OUTAGE HOURS

DdCKET NO.

50-269 Oconee Unit 1 UNIT SHUTDOWNS UNIT NAME DATli 7/9/75 REPORT MONTil __ June, 1975 TYPE METHOD 0; F FORCED DURATION SHUTTING DOWfl I

NO.

DATE S SCHEDULED (HOURS)

RE ASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS 9

750608 F

16.5 A

3 Turbine tripped due to low turbine control oil pressure 10 750609 F

9.9 G

3 Unit tripped during restart due to high.

RC pressure while in manual control (1) REASON (2) METilOD A -EQUIPMENT F AlLUME (EXPLAIN) 1-MANUAL B-M AINT. OR TEST.

2-MANUAL D-REGULATO!tY RESTRICTION 3-AUTOM ATIC

_ )

C-MLl L'ELING SCR AM E-OPERATOR 1 RAINING AND SCRAM LICENSE EXAMINATION F-A DMINIST R ATIVE G-OPl.R A1:ON AL LRROR (LXPLAIN)

Il-OlllLR (EXP1 AIN) s

SUMMARY

Unit operated base loaded during the month.

n l

l

\\

DOCKET NO. 50-269 oconee Unit 1 UNIT DATE 7/9/75 AVERAGE DAILY UNIT POWER LEVEL June 1975 MONTH AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 850 862 17 1

861 18 849 2

849 864 jg 3

848 4

864 20 851 5

864 21 6

865 22 852 7

866 23 852 8

146 24 820 g

297 25 854 755 2d; 854 10 762 27 853 11 8 17 28 849 12 848 852 29 13 851 30 851 14 847 31 15 849 16 DAILY UNTT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot.i graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 1007o line (or the restricted power lesel line). In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.