ML19351E902: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
O VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH November YEAR 193p)_
O VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH November YEAR 193p)_
l l
l l
l l
l l
l l                                     APPROVED:
l l
f'         I"
APPROVED:
                                                          '
f' I"
STATION MANAGER   V
STATION MANAGER V
.
80121906/S iu u
80121906/S
I M
          ._  _                                            iu u


  * '
OPERATING DATA REPORT DOCKET NO. _50-338 DATE 12-9-80 COMPLETED BY M. E. Fel1ows TELEPHONE T7031 89_4-5151 X211C OPERATING STATUS North Anna Unit 1 Notes
            . . _ _ _ _ . . _
: 1. Unit Name:
OPERATING DATA REPORT DOCKET NO. _50-338 DATE 12-9-80 COMPLETED BY       M. E. Fel1ows TELEPHONE T7031 89_4-5151 X211C OPERATING STATUS
November 1980 Line 16 yr-to-date and
: 1. Unit Name: North Anna Unit 1 Notes November 1980                                 Line 16 yr-to-date and
: 2. Reporting Period:
: 2. Reporting Period:                                                   cumulative have been adjustek
cumulative have been adjustek
: 3. Licensed Thermal Power (MWr): 2775                                     r Burnup over estimation
: 3. Licensed Thermal Power (MWr): 2775 r Burnup over estimation
: 4. Nameplate Rating (Gross MWep:       947                                   ,
: 4. Nameplate Rating (Gross MWep:
i                                                                                during October.
947 during October.
: 5. Design Electrical Rating (Net MWe):     907 J
i J
: 6. Maximum Dependable Capacity (Grass MWe):       880
: 5. Design Electrical Rating (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):         850
907 880
: 6. Maximum Dependable Capacity (Grass MWe):
850
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
N/A
: 9. Power Level To which Restricted,1f Any (Net MWe):                             N/A
: 9. Power Level To which Restricted,1f Any (Net MWe):
: 10. Reasons For Restrictions,if Any:                                               N/A This Month           Yr.-to-Date         Cumulatise
N/A
!
: 10. Reasons For Restrictions,if Any:
l      II. Hours In Reporting Period                               72n               A ndn               91_917
N/A This Month Yr.-to-Date Cumulatise l
: 12. Number Of Hours Reactor Was Critical                     720               7.155.6             17.'320.8
II. Hours In Reporting Period 72n A ndn 91_917
,
: 12. Number Of Hours Reactor Was Critical 720 7.155.6 17.'320.8
: 13. Reactor Reserve Shutdown Hours                             0                   64.3               213.1 l       14. Hours Generator On.Line                                 720               6,943.2             16,996.4
: 13. Reactor Reserve Shutdown Hours 0
: 15. Unit Reserve Shutdown Hours                                 0                   0                     0
64.3 213.1 l
: 16. Gross Thermal Energy Generated (MWH)                 1.793.316           17.346.043         43.625.056
: 14. Hours Generator On.Line 720 6,943.2 16,996.4
: 17. Gross Electrical Energy Generated (MWH)                 ER4 : 3%._.       E:6A7;01A         11 417,7A7
: 15. Unit Reserve Shutdown Hours 0
: 18. Net Electrical Energy Generated (MWH)                   549.449           5.256.749         13.110.195
0 0
: 19. Unit Service Factor                                     100                   A6.4               77 0
: 16. Gross Thermal Energy Generated (MWH) 1.793.316 17.346.043 43.625.056
: 20. Unit Availability Factor                               100                   86.4               77.9
: 17. Gross Electrical Energy Generated (MWH)
: 21. Unit Capacity Factor (Using MDC Net)                      89.8                 76.9               70.7
ER4 : 3%._.
: 22. Unit Capacity Factor (Using DER Net)                     84.I                 72.1               66.3
E:6A7;01A 11 417,7A7
: 23. Unit Forced Outage Rate                                    0                     7.5               6.1
: 18. Net Electrical Energy Generated (MWH) 549.449 5.256.749 13.110.195
: 19. Unit Service Factor 100 A6.4 77 0
: 20. Unit Availability Factor 100 86.4 77.9 89.8 76.9 70.7
: 21. Unit Capacity Factor (Using MDC Net) 84.I 72.1 66.3
: 22. Unit Capacity Factor (Using DER Net) 0 7.5 6.1
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:
Reftipling TMT and Firo Prntortinn Mn di fi ca t i nn e . nocomhor 11 1090 A wegte             ,
Reftipling TMT and Firo Prntortinn Mn di fi ca t i nn e. nocomhor 11 1090 A wegte Maintonanen. May 1 1001 In A2ye
Maintonanen. May 1 1001 In A2ye
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:                         N/A
N/A
: 26. Units In Test Status tPrior to Commercial Operation):                       Forecast           Achiesed j                             INITIAL CRITICALITY l                             INITIA L ELECTRICITY COMMERCIAL OPERATION l
: 26. Units In Test Status tPrior to Commercial Operation):
l l,                                                                                                                 (4/771 l
Forecast Achiesed j
INITIAL CRITICALITY l
INITIA L ELECTRICITY COMMERCIAL OPERATION l
l l,
(4/771 l
l e
l e


_ _ _ _ _ _ _ _
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
    .
50- 3'4 A UNIT -NA-1 DATE 12-9-80 COMPLETED BY M. E. Fellows TELEPHONE (703) 894-5151 X2110 November MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.       50- 3'4 A UNIT -NA-1 DATE 12-9-80 COMPLETED BY         M. E. Fellows TELEPHONE       (703) 894-5151 X2110 MONTH       November DAY       AVERAGE DAILY POWER LEVEL                           DAY       AVERAGE DAILY POWER LEVEL (MWe-Net)                                                   (Mwe. Net) 1 845                                                          742 37 2                       841                                 ig                       741 3                       838                                 19                       732 4                       845                                 20                       724 5                       844                                 21                       720 6                       842                                 22                       718 7                       838                   --
(Mwe. Net) 845 1
23                       707 8                       818                                 24                       71 3 9                       819                                 25                       695 to                       812                                 26                       690 11                         798                                 27                       679 12                         797                                   g                     673 13                         781                                                         675 29 14                         771                                 30                       668 15                         771                                 3                       N/A 16                         757 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to
37 742 2
,
841 741 ig 3
the nearest whole megawatt.
838 19 732 4
845 20 724 5
844 720 21 6
842 718 22 7
838 23 707 8
818 24 71 3 695 9
819 25 to 812 26 690 11 798 27 679 12 797 673 g
13 781 29 675 14 771 30 668 15 771 3
N/A 16 757 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
'r (9/77)
'r (9/77)
I
I
  \                   -              A                         " W- -                                                         . 1
\\
* _,
A
                                                                                                                                                  -                                                                             -
" W- -
                                          . . .
1
                                      .
 
!
50-338 UNITSHUIDOWNS AND POWER RElitfCTIONS DOCKET NO.
                                      '
UNIINAME Nor h Anna Unit 1 DAsE 80 WMEIE" "Y 0-3CNE I
UNITSHUIDOWNS AND POWER RElitfCTIONS                   DOCKET NO.         50-338 UNIINAME Nor h Anna Unit 1
RrrORT MONTil _ November 1Fl.FPflONE (703) 894-5151 i
                                        ,                                                                                                                                                    DAsE     80 RrrORT MONTil _ November WMEIE" "Y                 0-3CNE           I
I 8g titensee g*,
'
k Y
1Fl.FPflONE (703) 894-5151
cause a coeretiive ky N.e.
                                        '
Ibse Q
                                        .
;; g s
i
}gy Event u3 Atikm en jI E
                                                                                                                              .
jgc Repme
I                                                         -,            8g   "!;    Y            titensee     g*,       k                 cause a coeretiive
* AU
                                    -
[u F
N.e.             Ibse         Q           ;; g   s   }gy             Event       u3         ky                      Atikm en F          jI                                     AU i
p,,,,n, g,,,,,,,,,
E    jgc d
i d
Repme *
i 80-26 801101 N/A N/A H*
[u                 p,,,,n, g ,,,,,,,,,
N/A N/A N/A N/A Began scheduled unit coastdown due i
:
to end of life on Cycle 2 Core.
i
i i:
                                                                                                                                                                                                                      -
- i t'
                                        .
i
                                        '
80-26                     801101       N/A           N/A   H*     N/A           N/A       N/A       N/A       Began scheduled unit coastdown due
;
i to end of life on Cycle 2 Core.
:
,
                                    .
i:
-
                                  !!
                                    -
i t
                                        '
I.
I.
                                      !
T L3 80-26 Powe r Rec uction conti nues through December.
                                      .
W t
T
I
                                                                                                                                                                                '
~'
L3
3 4
                                  ,,                                            80-26 Powe r Rec uction conti nues through December.
i F: Forced Reason:
W t             I                                       ~'                                                   3                             4
                                                                                                                                                                                                                        @
i
                                  -
F: Forced S: Scheduled Reason:
A lepeipmens Fallme(Emplain),
Meilumi:
Meilumi:
I-Manuel Enhible G . Insieutchms             M for riepasathm of Data Il Maintenance of Test C-Refueling FManual Scram.
Enhible G. Insieutchms M
3-Automatic Sceam.
S: Scheduled A lepeipmens Fallme(Emplain),
Entsy Sheets for IAensee Frent Repost (11 R)l'ile (NilH1 G.
I-Manuel for riepasathm of Data Il Maintenance of Test FManual Scram.
bw c3 D Regniatory Restsitelem
Entsy Sheets for IAensee b c3 C-Refueling 3-Automatic Sceam.
                                                                                                                  -
Frent Repost (11 R)l'ile (NilH1 G.
4 Othee (0uplalo)               0161) i                                                     li Operator Training A Ikense l'.naminallim 7g i
w D Regniatory Restsitelem 4 Othee (0uplalo) 0161) 7g i
F.Ailndnist stive n Opcesthmal I e ro. Ir nelain) 5 I ihibii I - Sa.nc Soon c h
li Operator Training A Ikense l'.naminallim h
l8/F7)                                       11 Ott,ce (Explain)                                                                                                         b
i F.Ailndnist stive 5
                                                  *See attached sheet i
n Opcesthmal I e ro. Ir nelain)
                                  !
I ihibii I - Sa.nc Soon c l8/F7) 11 Ott,ce (Explain) b
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _            _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                    _ _ __
*See attached sheet i


  .  -
Page I
Page I   of   I UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET         DOCKET NO. 50-338 REPORT MONTH November   UNIT NAME North Anna 1 YEAR 1980           DATE 12-10-80 COMPLETED BY A. G. Neufer X2511 80-26   (H)   Unit entering end of life on Cycle 2 Core began a scheduled power coastdown through the end of the month, i
of I
UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-338 REPORT MONTH November UNIT NAME North Anna 1 YEAR 1980 DATE 12-10-80 COMPLETED BY A. G. Neufer X2511 80-26 (H)
Unit entering end of life on Cycle 2 Core began a scheduled power coastdown through the end of the month, i
i I
i I
l l
l l
<
n y9
    - n y9
* w y
* w y -d*-- ,aep.- -a y #.    ,  ,,ww -w- -*                             -   '-
-d*--
: ee9s,
,aep.-
-a y
,,ww
-w-
*-M
* w tr+*
1r-t N
t
=v T'
-rwe'---


F
F OPERATING DATA REPORT DOCKET NO. 50-339 DATE 12-9-80 COMPLETED BY M F Follows TELEPHONE ( 703) 894-5151 X211(
  *  '
        . . _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ . .    ... .
OPERATING DATA REPORT DOCKET NO. 50-339 DATE 12-9-80 COMPLETED BY M F Follows TELEPHONE ( 703) 894-5151 X211(
OPERATING STATUS
OPERATING STATUS
: 1. Unit Name:             North Anna Unit 2                           Notes
: 1. Unit Name:
;              2. Reporting Period:             November 1980
North Anna Unit 2 Notes
: 3. Licensed Thermal Power (MWt):           2775
: 2. Reporting Period:
: 4. Nameplate Rating (Gross MWe):           947
November 1980
: 5. Design Electrical Rating (Net MWe):         907
: 3. Licensed Thermal Power (MWt):
: 6. Maximum Dependable Capacity (Gross MWe):           928
2775
: 7. Maximum Dependable Capacity (Net MWe):             898
: 4. Nameplate Rating (Gross MWe):
947 907
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
928
: 7. Maximum Dependable Capacity (Net MWe):
898
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since I sst Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since I sst Report. Give Reasons:
N/A
N/A
: 9. Power Level To which Restricted. lf Any (Net MWe):                           N/A
: 9. Power Level To which Restricted. lf Any (Net MWe):
: 10. Reasons For Restrictions.If Any:                                             N/A l
N/A
This Month           Yr.-to-Date         Cumulative
: 10. Reasons For Restrictions.If Any:
: 11. Hours in Reporting Period                                 720             4.141             _ d 147
N/A l
: 12. Number Of Hours Reactor Was Critical                       64.5           2.000.2               2.600.2
This Month Yr.-to-Date Cumulative
: 13. Reactor Reserve Shutdown Hours                               0                   0                   0
: 11. Hours in Reporting Period 720 4.141
: 14. Hours Generator On-Line                                     60.7           1_2RQ d               1 ppo_a
_ d 147
: 15. Unit Reserve Shutdown Hours                                 0                   0                   0
: 12. Number Of Hours Reactor Was Critical 64.5 2.000.2 2.600.2
,
: 13. Reactor Reserve Shutdown Hours 0
: 16. Gross Thennal Energy Generated (MWH)                     89,805           2.434.855           2.434.855
0 0
!            17. Gross Electrical Energy Generated (MWH)                 28,718 ,_.           782.050             782.050
: 14. Hours Generator On-Line 60.7 1_2RQ d 1 ppo_a
: 18. Net Electrical Energy Generated (MWH)                   26,376               732.929             732.929 l           19. Unit Service Factor                                         N/A                 N/A               N/A
: 15. Unit Reserve Shutdown Hours 0
: 20. Unit Availability Factor                                   N/A                   N/A               N/A
0 0
: 21. Unit Capacity Factor (Using MDC Net)                       N/A                   N/A               N/A     __
: 16. Gross Thennal Energy Generated (MWH) 89,805 2.434.855 2.434.855
: 22. Unit Capacity Factor (Using DER Net)                       N/A                   N/A               N/A
: 17. Gross Electrical Energy Generated (MWH) 28,718,_.
,
782.050 782.050
: 23. Unit Forced Outage Rate                                     N/A                   N/A               N/A i
: 18. Net Electrical Energy Generated (MWH) 26,376 732.929 732.929 l
: 19. Unit Service Factor N/A N/A N/A
: 20. Unit Availability Factor N/A N/A N/A
: 21. Unit Capacity Factor (Using MDC Net)
N/A N/A N/A
: 22. Unit Capacity Factor (Using DER Net)
N/A N/A N/A
: 23. Unit Forced Outage Rate N/A N/A N/A i
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each p:
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each p:
Maintenanen- Anril 1. 14R1- In a m
Maintenanen-Anril 1.
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:       December 12, 1980
14R1-In a m
: 26. Units In Test Status (Prior to Commercial Operation):                       Forecast             Achiesed
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
    .
December 12, 1980
INITIAL CRITICALITY                                                   6/19/ An INITIAL ELECTRICITY                                                   8/25/80 COMMERCIAL OPERATION                   week Of 12/14/R0 10/77) l
: 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY 6/19/ An INITIAL ELECTRICITY 8/25/80 COMMERCIAL OPERATION week Of 12/14/R0 10/77) l


              .                                                                _ .    - -. .      .--.                . - -                    --      ..                . _ , -
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
  .        .
50-339 6
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.           50-339                             6 UNIT NA-2 3
UNIT NA-2 3
DATE         12-9-80 COMPLETED BY                 M. E. Fellows TELEPHONE             (703) 894-5151 X2110 MONTH                                     Noverrber DAY                         AVERAGE DAILY POWER LEVEL                                         DAY         AVERAGE DAILY POWER LEVEL
DATE 12-9-80 COMPLETED BY M. E. Fellows TELEPHONE (703) 894-5151 X2110 MONTH Noverrber DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) 1 (p.Neg) 3 17 0
,                                                                              (MWe Net)                                                 (p .Neg) 1 3
0 0
17                               0
18 3
                        -
0 19 0
                        ,                                                          0                                                               0 18                           _
4 0
3                                                          0                             19                               0 4                                                           0                             ;g                               n 5                                                           0
;g n
,
5 0
21                               0 6                                                           0                             ;;                                o
21 0
                      ;                                                            O                            ,a                               0 8                                                           0                             ,4                                0
6 0
,.
o O
9                                                            0                             25                               0 10                                                             0                             26                               0 II                                                             O                                                             111 27 12                                                             0                                                             326 28 13                                                             0                             29                             660 14                                                             0                                                               0 30 15                                                             0                                                             N/A 31 16                                                             0 INSTRUCTIONS On this format list the average daily unit power levt.1in MWe Net for each day in the reporting month. Compure to the nearest whole megawatt.
0
,a 8
0 0
,4 9
0 25 0
10 0
26 0
II O
111 27 12 0
28 326 13 0
29 660 14 0
0 30 15 0
31 N/A 16 0
INSTRUCTIONS On this format list the average daily unit power levt.1in MWe Net for each day in the reporting month. Compure to the nearest whole megawatt.
(9/77)
(9/77)
    . . - - - . , - . _ . _ . , _ . . . _ . . _ _ _ _ . _ . _ . _ _ . _ . _ ,                          . . , .      .            . . _ . . _.            . . - . , , _ ,                . . _ _ . _


                                                                                                                                                                                .  .
i llNit SilUIIK)WNS ANI) POWER REIMPC110NS IM)cKF T NO. 50-339 tlNil iWAME North Anna Unj t 2 IPA f r TZ 10-gu l-RFFOR T Il40 Nill November COMPl FIFli ny A. G Neufpr 1FI FPflONE f703) 894-Slh] X2511 l'.
,
p t
                                                                                                '
~
          ..                                                                                                                                                                    .
3p "h
                                                                                                                                                                                    .
j E}
      .
I itensee Eg
llNit SilUIIK)WNS ANI) POWER REIMPC110NS                       IM)cKF T NO. 50-339 i                                                                                                                                    tlNil iWAME North Anna Unj t 2
~1, Cause A Conscielve N.n.
        '
liate g
IPA f r TZ 10-gu COMPl FIFli ny A. G Neufpr l-                                                                         RFFOR T Il40 Nill November
;; g
                                                                                            .                                         1FI FPflONE f703) 894-Slh] X2511 l' .
(
      !
,yu I:vens ug n%
                                                                          **.
Aul.m t..
p                                                                     t                                 ~
dE cE j ;f, e Repent sr du o
      ,
H p,,,,,,g,,,,,,,,
                                            ,      3p       "h     j,yu E}         I itensee     Eg           ~1,               Cause A Conscielve N.n.         liate H
g      ;; g       (                     I:vens       ug         n%
o Aul.m t..
dE         cE   j ;f, e         Repent sr     du                               p,,,,,,g,,,,,,,,
i 8
i 8
i
i 80-10 this shutc own uas conc ludec on No < ember 1 at 0109 wh ?n the turbine generator was placed in servict Duration this nonth.1 hrs.
                                                                                                                                                                            .
l 80-11 801101 S
        .
633.8 B
80-10     this shutc own uas conc ludec on No < ember 1 at 0109 wh ?n the turbine generator was placed in servict                                         .
4 N/A N/A N/A A scheduled trip was conducted fron i l'
<
10% power in accordance with 2-SU-i i
    >
38 Islackout Test. Commenced scheduled I
Duration this nonth .1 hrs.
maintenance outage.
l         80-11   801101         S         633.8       B       4           N/A         N/A           N/A     A scheduled trip was conducted fron l'
b.;
i i
80-12 801129 F
10% power in accordance with 2-SU-i I
25.4 A*
        ,'
3 N/A N/A N/A Reactor / Turbine trip on generator u
38 Islackout Test. Commenced scheduled maintenance outage.
b.;         80-12   801129         F         25.4       A*     3           N/A         N/A           N/A     Reactor / Turbine trip on generator u
leads differential.
leads differential.
l.
l.
I                     Shutdow n                     80-12           Continued into     Decem >e r
I Shutdow n 80-12 Continued into Decem >e r
        ,
/
        .
b l
                                                                                                                                  /
w-4 I
:.
2 3
b l                                                                                                                                                                         w-4
4 M
  '
F: Foeced Reasim:
  .
7.fethinl:
I F: Foeced 2
Fahible G. Instniteliwis 5: seheduled A 1.quipment Failure (l.mplain),
Reasim:
4 Manual fue Psepasail.m of Itata p
3 7.fethinl:
D Maintenance of Test 2 Manual Scram.
4 Fahible G . Instniteliwis M
I nity Shecis fin Iicemec C-Refueling 1 Automatic Scram.
5: seheduled           A 1.quipment Failure (l.mplain),                         4 Manual
I vent Repnet (I I R)Iile (NilHI G-M I) Regulatosy Ressek elim 4 Other (1.= plain) of f.I l l' Operstm Tealning A license I: aminallem g
,
F. Aelminististive 5
D Maintenance of Test                                     2 Manual Scram.
G Opceational I en.: 11 a plain)
fue Psepasail.m of Itata I nity Shecis fin Iicemec p
I sh61.is I. 5.mic S.um e m
C-Refueling I) Regulatosy Ressek elim 1 Automatic Scram.
t'in) ll oil'ee (F =rlain t MN i
4 Other (1.= plain)
*See attached sheet b
I vent Repnet (I I R)Iile (NilHI G-of f.I l M
l' Operstm Tealning A license I: aminallem
  '
      ,                                  .
F. Aelminististive                                                                     5 g
G Opceational I en.: 11 a plain)                                                             I sh61.is I . 5.mic S.um e               m t'in)                     ll oil'ee (F =rlain t                                                                                                                 M i           *See attached sheet                                                                                                                                           N b


r- -
r- -
            ,
Page 1
Page   1   of   1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET           DOCKET NO. 50-339 s
of 1
REPORT MONTH November     UNIT NAME North Anna 2 YEAR 1980               DATE 12-10-80 COMPLETED BY A. G. Neufer 12511
UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-339 REPORT MONTH November UNIT NAME North Anna 2 s
'
YEAR 1980 DATE 12-10-80 COMPLETED BY A. G. Neufer 12511 80-11 (4)
80-11               (4) Simulated loss of off site power to the emergency 4160V Duses.
Simulated loss of off site power to the emergency 4160V Duses.
80-12               (A) An internal fault of the             "A" phase main transformer caused a failure of the main bus potential transformers, ground detection protection and damaged the isolated phase bus.
80-12 (A)
An internal fault of the "A" phase main transformer caused a failure of the main bus potential transformers, ground detection protection and damaged the isolated phase bus.
This was sensed by the generator leads protection safety equipment causing an automatic generator, turbine and reactor trip. At this time it has not been determined why the main transformer failed.
This was sensed by the generator leads protection safety equipment causing an automatic generator, turbine and reactor trip. At this time it has not been determined why the main transformer failed.
;
I I
I I
      -
,n}}
        . , - . --      . , , , - - ,      , - . - .  . - - ,      - , , - ,n}}

Latest revision as of 17:53, 23 December 2024

Monthly Operating Repts for Nov 1980
ML19351E902
Person / Time
Site: North Anna  
Issue date: 12/09/1980
From: Fellows M
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19351E898 List:
References
NUDOCS 8012190513
Download: ML19351E902 (9)


Text

.

O VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH November YEAR 193p)_

l l

l l

l l

APPROVED:

f' I"

STATION MANAGER V

80121906/S iu u

I M

OPERATING DATA REPORT DOCKET NO. _50-338 DATE 12-9-80 COMPLETED BY M. E. Fel1ows TELEPHONE T7031 89_4-5151 X211C OPERATING STATUS North Anna Unit 1 Notes

1. Unit Name:

November 1980 Line 16 yr-to-date and

2. Reporting Period:

cumulative have been adjustek

3. Licensed Thermal Power (MWr): 2775 r Burnup over estimation
4. Nameplate Rating (Gross MWep:

947 during October.

i J

5. Design Electrical Rating (Net MWe):

907 880

6. Maximum Dependable Capacity (Grass MWe):

850

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To which Restricted,1f Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

N/A This Month Yr.-to-Date Cumulatise l

II. Hours In Reporting Period 72n A ndn 91_917

12. Number Of Hours Reactor Was Critical 720 7.155.6 17.'320.8
13. Reactor Reserve Shutdown Hours 0

64.3 213.1 l

14. Hours Generator On.Line 720 6,943.2 16,996.4
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1.793.316 17.346.043 43.625.056
17. Gross Electrical Energy Generated (MWH)

ER4 : 3%._.

E:6A7;01A 11 417,7A7

18. Net Electrical Energy Generated (MWH) 549.449 5.256.749 13.110.195
19. Unit Service Factor 100 A6.4 77 0
20. Unit Availability Factor 100 86.4 77.9 89.8 76.9 70.7
21. Unit Capacity Factor (Using MDC Net) 84.I 72.1 66.3
22. Unit Capacity Factor (Using DER Net) 0 7.5 6.1
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:

Reftipling TMT and Firo Prntortinn Mn di fi ca t i nn e. nocomhor 11 1090 A wegte Maintonanen. May 1 1001 In A2ye

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status tPrior to Commercial Operation):

Forecast Achiesed j

INITIAL CRITICALITY l

INITIA L ELECTRICITY COMMERCIAL OPERATION l

l l,

(4/771 l

l e

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50- 3'4 A UNIT -NA-1 DATE 12-9-80 COMPLETED BY M. E. Fellows TELEPHONE (703) 894-5151 X2110 November MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(Mwe. Net) 845 1

37 742 2

841 741 ig 3

838 19 732 4

845 20 724 5

844 720 21 6

842 718 22 7

838 23 707 8

818 24 71 3 695 9

819 25 to 812 26 690 11 798 27 679 12 797 673 g

13 781 29 675 14 771 30 668 15 771 3

N/A 16 757 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

'r (9/77)

I

\\

A

" W- -

1

50-338 UNITSHUIDOWNS AND POWER RElitfCTIONS DOCKET NO.

UNIINAME Nor h Anna Unit 1 DAsE 80 WMEIE" "Y 0-3CNE I

RrrORT MONTil _ November 1Fl.FPflONE (703) 894-5151 i

I 8g titensee g*,

k Y

cause a coeretiive ky N.e.

Ibse Q

g s

}gy Event u3 Atikm en jI E

jgc Repme

[u F

p,,,,n, g,,,,,,,,,

i d

i 80-26 801101 N/A N/A H*

N/A N/A N/A N/A Began scheduled unit coastdown due i

to end of life on Cycle 2 Core.

i i:

- i t'

I.

T L3 80-26 Powe r Rec uction conti nues through December.

W t

I

~'

3 4

i F: Forced Reason:

Meilumi:

Enhible G. Insieutchms M

S: Scheduled A lepeipmens Fallme(Emplain),

I-Manuel for riepasathm of Data Il Maintenance of Test FManual Scram.

Entsy Sheets for IAensee b c3 C-Refueling 3-Automatic Sceam.

Frent Repost (11 R)l'ile (NilH1 G.

w D Regniatory Restsitelem 4 Othee (0uplalo) 0161) 7g i

li Operator Training A Ikense l'.naminallim h

i F.Ailndnist stive 5

n Opcesthmal I e ro. Ir nelain)

I ihibii I - Sa.nc Soon c l8/F7) 11 Ott,ce (Explain) b

  • See attached sheet i

Page I

of I

UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-338 REPORT MONTH November UNIT NAME North Anna 1 YEAR 1980 DATE 12-10-80 COMPLETED BY A. G. Neufer X2511 80-26 (H)

Unit entering end of life on Cycle 2 Core began a scheduled power coastdown through the end of the month, i

i I

l l

n y9

  • w y

-d*--

ee9s,

,aep.-

-a y

,,ww

-w-

  • -M
  • w tr+*

1r-t N

t

=v T'

-rwe'---

F OPERATING DATA REPORT DOCKET NO. 50-339 DATE 12-9-80 COMPLETED BY M F Follows TELEPHONE ( 703) 894-5151 X211(

OPERATING STATUS

1. Unit Name:

North Anna Unit 2 Notes

2. Reporting Period:

November 1980

3. Licensed Thermal Power (MWt):

2775

4. Nameplate Rating (Gross MWe):

947 907

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

928

7. Maximum Dependable Capacity (Net MWe):

898

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since I sst Report. Give Reasons:

N/A

9. Power Level To which Restricted. lf Any (Net MWe):

N/A

10. Reasons For Restrictions.If Any:

N/A l

This Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 720 4.141

_ d 147

12. Number Of Hours Reactor Was Critical 64.5 2.000.2 2.600.2
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 60.7 1_2RQ d 1 ppo_a
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thennal Energy Generated (MWH) 89,805 2.434.855 2.434.855
17. Gross Electrical Energy Generated (MWH) 28,718,_.

782.050 782.050

18. Net Electrical Energy Generated (MWH) 26,376 732.929 732.929 l
19. Unit Service Factor N/A N/A N/A
20. Unit Availability Factor N/A N/A N/A
21. Unit Capacity Factor (Using MDC Net)

N/A N/A N/A

22. Unit Capacity Factor (Using DER Net)

N/A N/A N/A

23. Unit Forced Outage Rate N/A N/A N/A i
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each p:

Maintenanen-Anril 1.

14R1-In a m

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

December 12, 1980

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY 6/19/ An INITIAL ELECTRICITY 8/25/80 COMMERCIAL OPERATION week Of 12/14/R0 10/77) l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-339 6

UNIT NA-2 3

DATE 12-9-80 COMPLETED BY M. E. Fellows TELEPHONE (703) 894-5151 X2110 MONTH Noverrber DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) 1 (p.Neg) 3 17 0

0 0

18 3

0 19 0

4 0

g n

5 0

21 0

6 0

o O

0

,a 8

0 0

,4 9

0 25 0

10 0

26 0

II O

111 27 12 0

28 326 13 0

29 660 14 0

0 30 15 0

31 N/A 16 0

INSTRUCTIONS On this format list the average daily unit power levt.1in MWe Net for each day in the reporting month. Compure to the nearest whole megawatt.

(9/77)

i llNit SilUIIK)WNS ANI) POWER REIMPC110NS IM)cKF T NO. 50-339 tlNil iWAME North Anna Unj t 2 IPA f r TZ 10-gu l-RFFOR T Il40 Nill November COMPl FIFli ny A. G Neufpr 1FI FPflONE f703) 894-Slh] X2511 l'.

p t

~

3p "h

j E}

I itensee Eg

~1, Cause A Conscielve N.n.

liate g

g

(

,yu I:vens ug n%

Aul.m t..

dE cE j ;f, e Repent sr du o

H p,,,,,,g,,,,,,,,

i 8

i 80-10 this shutc own uas conc ludec on No < ember 1 at 0109 wh ?n the turbine generator was placed in servict Duration this nonth.1 hrs.

l 80-11 801101 S

633.8 B

4 N/A N/A N/A A scheduled trip was conducted fron i l'

10% power in accordance with 2-SU-i i

38 Islackout Test. Commenced scheduled I

maintenance outage.

b.;

80-12 801129 F

25.4 A*

3 N/A N/A N/A Reactor / Turbine trip on generator u

leads differential.

l.

I Shutdow n 80-12 Continued into Decem >e r

/

b l

w-4 I

2 3

4 M

F: Foeced Reasim:

7.fethinl:

Fahible G. Instniteliwis 5: seheduled A 1.quipment Failure (l.mplain),

4 Manual fue Psepasail.m of Itata p

D Maintenance of Test 2 Manual Scram.

I nity Shecis fin Iicemec C-Refueling 1 Automatic Scram.

I vent Repnet (I I R)Iile (NilHI G-M I) Regulatosy Ressek elim 4 Other (1.= plain) of f.I l l' Operstm Tealning A license I: aminallem g

F. Aelminististive 5

G Opceational I en.: 11 a plain)

I sh61.is I. 5.mic S.um e m

t'in) ll oil'ee (F =rlain t MN i

  • See attached sheet b

r- -

Page 1

of 1

UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-339 REPORT MONTH November UNIT NAME North Anna 2 s

YEAR 1980 DATE 12-10-80 COMPLETED BY A. G. Neufer 12511 80-11 (4)

Simulated loss of off site power to the emergency 4160V Duses.

80-12 (A)

An internal fault of the "A" phase main transformer caused a failure of the main bus potential transformers, ground detection protection and damaged the isolated phase bus.

This was sensed by the generator leads protection safety equipment causing an automatic generator, turbine and reactor trip. At this time it has not been determined why the main transformer failed.

I I

,n